Transmission Tariff and the Reliability
Assurance Agreement among Load
Serving Entities in the PJM Region,
regarding Seasonal Capacity
Performance Resources in the RPM
auctions, are no longer just and
reasonable, all as more fully explained
in the complaint.
Complainants certifies that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email FERC
OnlineSupport@ferc.gov, or call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 18, 2017.
Dated: December 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–32023 Filed 1–4–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
21:06 Jan 04, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–31–000]
Northern Illinois Municipal Power
Agency v. PJM Interconnection, L.L.C.;
Notice of Complaint
Take notice that on December 21,
2016, pursuant to sections 206, 306, and
309 of the Federal Power Act, 16 U.S.C.
824e, 825e, and 825h, and Rules 206
and 212 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.206 and 385.212, Northern Illinois
Municipal Power Agency (Complainant)
filed a formal complaint against PJM
Interconnection, L.L.C. (Respondent)
alleging that Respondent is assessing
duplicative congestion charges for
pseudo-tied resources located in the
adjoining balancing area of the
Midcontinent Independent System
Operator, Inc., all as more fully
explained in the complaint.
Complainant certify that copies of the
complaint were served on the contacts
for Respondent, as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
1333
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 10, 2017.
Dated: December 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–32022 Filed 1–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–58–000.
Applicants: International
Transmission Company.
Description: Application Pursuant to
Section 203 of the Federal Power Act to
Acquire New Assets of International
Transmission Company.
Filed Date: 12/28/16.
Accession Number: 20161228–5204.
Comments Due: 5 p.m. ET 1/18/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–061;
ER10–2317–052; ER10–2319–052;
ER10–2330–059; ER13–1351–034.
Applicants: J.P. Morgan Ventures
Energy Corporation, BE CA LLC, BE
Alabama LLC, Florida Power
Development LLC, Utility Contract
Funding, L.L.C.
Description: Non-Material Change in
Status of the J.P. Morgan Sellers.
Filed Date: 12/28/16.
Accession Number: 20161228–5211.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER10–2633–029;
ER10–2570–029; ER10–2717–029;
ER10–3140–029; ER13–55–019.
Applicants: Birchwood Power
Partners, L.P., Shady Hills Power
Company, L.L.C., EFS Parlin Holdings,
LLC, Inland Empire Energy Center, LLC,
Homer City Generation, L.P.
Description: Notice of Non-Material
Change in Status of the GE Companies.
Filed Date: 12/28/16.
Accession Number: 20161228–5209.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER13–1504–003;
ER10–2861–002; ER10–2866–002.
Applicants: SWG Arapahoe, LLC,
SWG Colorado, LLC, Fountain Valley
Power, LLC.
E:\FR\FM\05JAN1.SGM
05JAN1
mstockstill on DSK3G9T082PROD with NOTICES
1334
Federal Register / Vol. 82, No. 3 / Thursday, January 5, 2017 / Notices
Description: Triennial Market Power
Analysis for the Northwest Region of the
Southwest Generation Operating
Company Sellers.
Filed Date: 12/28/16.
Accession Number: 20161228–5106.
Comments Due: 5 p.m. ET 2/27/17.
Docket Numbers: ER17–75–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Request to Hold Proceeding in
Abeyance to be effective 12/31/9998.
Filed Date: 12/28/16.
Accession Number: 20161228–5094.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17–692–000.
Applicants: Algonquin Power Sanger
LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate to be
effective 1/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228–5161.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17–693–000.
Applicants: Valley Electric
Association, Inc.
Description: § 205(d) Rate Filing:
Annual TRBA Filing to be effective 1/
1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228–5165.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17–694–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2016–12–28 Transmission Control
Agreement Amendment to be effective
3/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228–5166.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17–695–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2016–12–28 Third Amendment to
Valley Electric Transition Agreement to
be effective 3/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228–5167.
Comments Due: 5 p.m. ET 1/18/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Sep<11>2014
21:06 Jan 04, 2017
Jkt 241001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–32042 Filed 1–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–681–000]
Enel Trading North America, Inc.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Enel
Trading North America, Inc.’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 17,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: December 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–32024 Filed 1–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–30–000]
Nogales Transmission, L.L.C., Nogales
Frontier Operations, L.L.C.; Notice of
Petition for Declaratory Order
Take notice that on December 21,
2016, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure,1 Nogales
Transmission, L.L.C. (Nogales
Transmission) and Nogales Frontier
Operations, L.L.C. (Nogales Operations)
filed a petition for declaratory order: (1)
Finding that Nogales Transmission is a
passive entity and therefore not a
‘‘public utility’’ under the Federal
Power Act, or an ‘‘electric utility
company’’ under the Public Utility
Holding Company Act of 2005; (2)
granting Nogales Operations negotiated
rate authority; (3) approving Nogales
Operations’ capacity allocation
methodology; and (4) granting certain
waivers of Commission regulations, all
as more fully explained in the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
1 18
E:\FR\FM\05JAN1.SGM
CFR 385.207(a)(2) (2016).
05JAN1
Agencies
[Federal Register Volume 82, Number 3 (Thursday, January 5, 2017)]
[Notices]
[Pages 1333-1334]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-32042]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-58-000.
Applicants: International Transmission Company.
Description: Application Pursuant to Section 203 of the Federal
Power Act to Acquire New Assets of International Transmission Company.
Filed Date: 12/28/16.
Accession Number: 20161228-5204.
Comments Due: 5 p.m. ET 1/18/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2331-061; ER10-2317-052; ER10-2319-052; ER10-
2330-059; ER13-1351-034.
Applicants: J.P. Morgan Ventures Energy Corporation, BE CA LLC, BE
Alabama LLC, Florida Power Development LLC, Utility Contract Funding,
L.L.C.
Description: Non-Material Change in Status of the J.P. Morgan
Sellers.
Filed Date: 12/28/16.
Accession Number: 20161228-5211.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER10-2633-029; ER10-2570-029; ER10-2717-029; ER10-
3140-029; ER13-55-019.
Applicants: Birchwood Power Partners, L.P., Shady Hills Power
Company, L.L.C., EFS Parlin Holdings, LLC, Inland Empire Energy Center,
LLC, Homer City Generation, L.P.
Description: Notice of Non-Material Change in Status of the GE
Companies.
Filed Date: 12/28/16.
Accession Number: 20161228-5209.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER13-1504-003; ER10-2861-002; ER10-2866-002.
Applicants: SWG Arapahoe, LLC, SWG Colorado, LLC, Fountain Valley
Power, LLC.
[[Page 1334]]
Description: Triennial Market Power Analysis for the Northwest
Region of the Southwest Generation Operating Company Sellers.
Filed Date: 12/28/16.
Accession Number: 20161228-5106.
Comments Due: 5 p.m. ET 2/27/17.
Docket Numbers: ER17-75-002.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Request to Hold Proceeding in
Abeyance to be effective 12/31/9998.
Filed Date: 12/28/16.
Accession Number: 20161228-5094.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17-692-000.
Applicants: Algonquin Power Sanger LLC.
Description: Baseline eTariff Filing: Application for Market Based
Rate to be effective 1/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228-5161.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17-693-000.
Applicants: Valley Electric Association, Inc.
Description: Sec. 205(d) Rate Filing: Annual TRBA Filing to be
effective 1/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228-5165.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17-694-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2016-12-28 Transmission
Control Agreement Amendment to be effective 3/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228-5166.
Comments Due: 5 p.m. ET 1/18/17.
Docket Numbers: ER17-695-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2016-12-28 Third Amendment
to Valley Electric Transition Agreement to be effective 3/1/2017.
Filed Date: 12/28/16.
Accession Number: 20161228-5167.
Comments Due: 5 p.m. ET 1/18/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-32042 Filed 1-4-17; 8:45 am]
BILLING CODE 6717-01-P