Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization, 96448 [2016-31659]
Download as PDF
96448
Federal Register / Vol. 81, No. 251 / Friday, December 30, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–23–000]
srobinson on DSK5SPTVN1PROD with NOTICES
Florida Gas Transmission Company,
LLC; Notice of Request Under Blanket
Authorization
Take notice that on December 13,
2016, Florida Gas Transmission
Company, LLC (FGT), 1300 Main Street,
Houston, Texas 77002, filed in Docket
No. CP17–23–000 a prior notice request
pursuant to sections 157.205, 157.208,
and 157.210 of the Commission’s
regulations under the Natural Gas Act
(NGA), as amended, requesting
authorization to construct, install, own,
maintain, and operate its Western
Division Project. Specifically, FGT
proposes to construct approximately
one mile of 36-inch-diameter pipeline
loop, relocate an existing receiver, and
install one new mainline valve
downstream of Compressor Station 11
in Santa Rosa County, Florida.
Additionally, FGT proposes to install
approximately 100 feet of 8-inchdiameter connection piping, a custody
transfer flange, and other auxiliary and
appurtenant facilities at a new
interconnection to be constructed with
Florida Public Utilities Company (FPU)
in Escambia County, Alabama, near the
Alabama/Florida border. FGT states that
the Western Division Project will
provide 68,500 million British thermal
units per day of natural gas to FPU and
Ascend Performance Materials, Inc. FGT
estimates the cost of the Western
Division Project to be approximately
$10,655,060, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Stephen
T. Veatch, Senior Director of
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main Street,
Houston, Texas 77002, by telephone at
(713) 989–2024, by fax at (713) 989–
1205, or by email at stephen.veatch@
energytransfer.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
VerDate Sep<11>2014
19:18 Dec 29, 2016
Jkt 241001
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: December 23, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31659 Filed 12–29–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–37–000.
Applicants: Westar Energy, Inc.
Description: Supplement to November
18, 2016 Application of Westar Energy,
Inc. for Authorization for Consolidation
of Jurisdictional Facilities, et al.
Filed Date: 12/21/16.
Accession Number: 20161221–5461.
Comments Due: 5 p.m. ET 12/28/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3376–003;
ER11–3377–003; ER11–3378–003.
Applicants: North Hurlburt Wind,
LLC, Horseshoe Bend Wind, LLC, South
Hurlburt Wind, LLC.
Description: Triennial Report for
Northwest Region of North Hurlburt
Wind, LLC, et. al.
Filed Date: 12/22/16.
Accession Number: 20161222–5571.
Comments Due: 5 p.m. ET 2/21/17.
Docket Numbers: ER14–225–004.
Applicants: New Brunswick Energy
Marketing Corporation.
Description: Triennial Market Power
Update for the Northeast Region of New
Brunswick Energy Marketing
Corporation.
Filed Date: 12/22/16.
Accession Number: 20161222–5577.
Comments Due: 5 p.m. ET 2/21/17.
Docket Numbers: ER17–238–001.
Applicants: Southwestern Public
Service Company.
Description: Tariff Amendment: SAP
Ministerial_Amend to be effective 4/16/
2016.
Filed Date: 12/23/16.
Accession Number: 20161223–5102.
Comments Due: 5 p.m. ET 1/13/17.
Docket Numbers: ER17–267–001.
Applicants: Southwestern Public
Service Company.
Description: Tariff Amendment: Tri
County Formula Rate_Amend to be
effective 1/1/2017.
E:\FR\FM\30DEN1.SGM
30DEN1
Agencies
[Federal Register Volume 81, Number 251 (Friday, December 30, 2016)]
[Notices]
[Page 96448]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31659]
[[Page 96448]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-23-000]
Florida Gas Transmission Company, LLC; Notice of Request Under
Blanket Authorization
Take notice that on December 13, 2016, Florida Gas Transmission
Company, LLC (FGT), 1300 Main Street, Houston, Texas 77002, filed in
Docket No. CP17-23-000 a prior notice request pursuant to sections
157.205, 157.208, and 157.210 of the Commission's regulations under the
Natural Gas Act (NGA), as amended, requesting authorization to
construct, install, own, maintain, and operate its Western Division
Project. Specifically, FGT proposes to construct approximately one mile
of 36-inch-diameter pipeline loop, relocate an existing receiver, and
install one new mainline valve downstream of Compressor Station 11 in
Santa Rosa County, Florida. Additionally, FGT proposes to install
approximately 100 feet of 8-inch-diameter connection piping, a custody
transfer flange, and other auxiliary and appurtenant facilities at a
new interconnection to be constructed with Florida Public Utilities
Company (FPU) in Escambia County, Alabama, near the Alabama/Florida
border. FGT states that the Western Division Project will provide
68,500 million British thermal units per day of natural gas to FPU and
Ascend Performance Materials, Inc. FGT estimates the cost of the
Western Division Project to be approximately $10,655,060, all as more
fully set forth in the application which is on file with the Commission
and open to public inspection. The filing may also be viewed on the web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Stephen T. Veatch, Senior Director of Certificates, Florida Gas
Transmission Company, LLC, 1300 Main Street, Houston, Texas 77002, by
telephone at (713) 989-2024, by fax at (713) 989-1205, or by email at
stephen.veatch@energytransfer.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 7 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: December 23, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31659 Filed 12-29-16; 8:45 am]
BILLING CODE 6717-01-P