FPL Energy MH50, L.P.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 95579-95580 [2016-31344]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices
Docket Numbers: ER16–2578–002.
Applicants: North Lancaster Ranch
LLC.
Description: Notice of Non-Material
Change in Status of North Lancaster
Ranch LLC.
Filed Date: 12/20/16.
Accession Number: 20161220–5385.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER16–2716–001.
Applicants: NextEra Energy
Transmission MidAtlantic.
Description: Tariff Amendment:
NextEra Energy MidAtlantic, LLC
Response to Deficiency Letter to be
effective 11/30/2016.
Filed Date: 12/21/16.
Accession Number: 20161221–5132.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER16–2717–001.
Applicants: NextEra Energy
Transmission Midwest, LLC.
Description: Tariff Amendment:
NextEra Energy Transmission Midwest,
LLC Response to Deficiency Letter to be
effective 11/30/2016.
Filed Date: 12/21/16.
Accession Number: 20161221–5130.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER16–2719–002.
Applicants: NextEra Energy
Transmission New York, Inc.
Description: Tariff Amendment:
NextEra Energy Transmission New
York, Inc. Response to Deficiency Letter
to be effective 11/30/2016.
Filed Date: 12/21/16.
Accession Number: 20161221–5134.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER16–2720–001.
Applicants: NextEra Energy
Transmission Southwest, LLC.
Description: Tariff Amendment:
NextEra Energy Transmission
Southwest, LLC Response to Deficiency
Letter to be effective 11/30/2016.
Filed Date: 12/21/16.
Accession Number: 20161221–5136.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER17–67–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
12–21_Compliance filing for the
reorginization of section 40.3.3 to be
effective 11/12/2016.
Filed Date: 12/21/16.
Accession Number: 20161221–5088.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER17–306–001.
Applicants: Beacon Solar 3, LLC.
Description: Compliance filing:
Beacon Solar 3, LLC MBR Tariff to be
effective 12/21/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5137.
Comments Due: 5 p.m. ET 1/10/17.
VerDate Sep<11>2014
18:54 Dec 27, 2016
Jkt 241001
Docket Numbers: ER17–591–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2234R3 Osage Wind/PSO Facilities
Construction Agreement to be effective
11/29/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5124.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17–592–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA 2MW Powin Bess, Irvine CA
Project SA Nos. 925 & 926 to be effective
12/21/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5126.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17–593–000.
Applicants: Michigan Electric
Transmission Company, LLC.
Description: Notice of Cancellation of
Facilities Agreement of Michigan
Electric Transmission Company, LLC.
Filed Date: 12/19/16.
Accession Number: 20161219–5427.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–594–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–12–20_SA 2904 Cooperative
Energy-MS Solar 3 1st Rev. (J473) to be
effective 12/21/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5183.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17–596–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
31 16th Rev—NITSA with Phillips 66 to
be effective 3/1/2017.
Filed Date: 12/21/16.
Accession Number: 20161221–5082.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER17–597–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
32 7th Rev—NITSA with The Colstrip
Steam Electric Station to be effective 3/
1/2017.
Filed Date: 12/21/16.
Accession Number: 20161221–5084.
Comments Due: 5 p.m. ET 1/11/17.
Docket Numbers: ER17–598–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
35 4th Rev—NITSA with The Town of
Philipsburg to be effective 3/1/2017.
Filed Date: 12/21/16.
Accession Number: 20161221–5085.
Comments Due: 5 p.m. ET 1/11/17.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
95579
Docket Numbers: ER17–599–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
245 7th Rev—NITSA with Ash Grove
Cement to be effective 3/1/2017.
Filed Date: 12/21/16.
Accession Number: 20161221–5113.
Comments Due: 5 p.m. ET 1/11/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31338 Filed 12–27–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–19–000]
FPL Energy MH50, L.P.; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On December 21, 2016, the
Commission issued an order in Docket
No. EL17–19–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into whether the rates for
Reactive Supply and Voltage Control
Service (Reactive Service) of FPL Energy
MH50, L.P. may be unjust and
unreasonable. FPL Energy MH50, L.P.,
157 FERC ¶ 61,225 (2016).
The refund effective date in Docket
No. EL17–19–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–19–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
E:\FR\FM\28DEN1.SGM
28DEN1
95580
Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31344 Filed 12–27–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–22–000]
sradovich on DSK3GMQ082PROD with NOTICES
Kinder Morgan Louisiana Pipeline,
LLC; Notice of Application
Take notice that on December 13,
2016, Kinder Morgan Louisiana
Pipeline, LLC (KMLP), 3250 Lacey
Road, Suite 700, Downers Grove, IL
60515, filed an application under
sections 7(b) and 7(c) of the Natural Gas
Act (NGA), and Part 157 of the
Commission’s regulations, requesting
authorization to (1) construct and
operate the system modifications
necessary to enable KMLP to offer
600,000 dekatherms per day (Dth/d) of
firm transportation service utilizing a
north-to-south path on KMLP’s system;
and (2) for permission and approval to
abandon and remove facilities at an
existing meter station and the
replacement thereof with a larger meter
station on the same site.
The proposed facilities will provide
for gas flow on a north-to-south path on
KMLP’s system to deliver natural gas
from existing pipeline interconnects to
the natural gas liquefaction and LNG
export facility currently being expanded
and operated by Sabine Pass
Liquefaction, LLC (SPL) at Sabine Pass
in Cameron Parish Louisiana, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
The filing may also be viewed on the
Web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC at FERCOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or TTY,
(202) 502–8659.
Any questions regarding the proposed
project should be directed to Bruce H.
Newsome, Vice President, Kinder
Morgan Louisiana Pipeline Company,
LLC, 3250 Lacey Road, Suite 700,
Downers Grove, IL 60515, or by calling
VerDate Sep<11>2014
20:11 Dec 27, 2016
Jkt 241001
(630) 725–3070 (telephone) or email at
bruce_newsome@kindermorgan.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on January 11, 2017.
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31342 Filed 12–27–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Pioneer Wind Park I, LLC ...........
Cimarron Bend Wind Project II,
LLC.
Indeck Niles, LLC ........................
Grant Plains Wind, LLC ...............
Sunflower Wind Project, LLC ......
North Lancaster Ranch LLC ........
Pavant Solar II LLC .....................
Dermott Wind, LLC ......................
Innovative Solar 46, LLC .............
Summit Farms Solar, LLC ...........
Cimarron Bend Assets, LLC ........
FL Solar 1, LLC ...........................
AL Solar A, LLC ..........................
Deerfield Wind Energy, LLC ........
EG16–144–000
EG16–145–000
EG16–146–000
EG16–147–000
EG16–148–000
EG16–149–000
EG16–150–000
EG16–151–000
EG16–152–000
EG16–153–000
EG16–154–000
EG16–155–000
EG16–156–000
EG16–157–000
Take notice that during the month of
November 2016, the status of the above-
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 81, Number 249 (Wednesday, December 28, 2016)]
[Notices]
[Pages 95579-95580]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31344]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL17-19-000]
FPL Energy MH50, L.P.; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On December 21, 2016, the Commission issued an order in Docket No.
EL17-19-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into whether the rates
for Reactive Supply and Voltage Control Service (Reactive Service) of
FPL Energy MH50, L.P. may be unjust and unreasonable. FPL Energy MH50,
L.P., 157 FERC ] 61,225 (2016).
The refund effective date in Docket No. EL17-19-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL17-19-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the
[[Page 95580]]
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.214, within 21 days of the date of
issuance of the order.
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31344 Filed 12-27-16; 8:45 am]
BILLING CODE 6717-01-P