FPL Energy MH50, L.P.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 95579-95580 [2016-31344]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices Docket Numbers: ER16–2578–002. Applicants: North Lancaster Ranch LLC. Description: Notice of Non-Material Change in Status of North Lancaster Ranch LLC. Filed Date: 12/20/16. Accession Number: 20161220–5385. Comments Due: 5 p.m. ET 1/10/17. Docket Numbers: ER16–2716–001. Applicants: NextEra Energy Transmission MidAtlantic. Description: Tariff Amendment: NextEra Energy MidAtlantic, LLC Response to Deficiency Letter to be effective 11/30/2016. Filed Date: 12/21/16. Accession Number: 20161221–5132. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER16–2717–001. Applicants: NextEra Energy Transmission Midwest, LLC. Description: Tariff Amendment: NextEra Energy Transmission Midwest, LLC Response to Deficiency Letter to be effective 11/30/2016. Filed Date: 12/21/16. Accession Number: 20161221–5130. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER16–2719–002. Applicants: NextEra Energy Transmission New York, Inc. Description: Tariff Amendment: NextEra Energy Transmission New York, Inc. Response to Deficiency Letter to be effective 11/30/2016. Filed Date: 12/21/16. Accession Number: 20161221–5134. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER16–2720–001. Applicants: NextEra Energy Transmission Southwest, LLC. Description: Tariff Amendment: NextEra Energy Transmission Southwest, LLC Response to Deficiency Letter to be effective 11/30/2016. Filed Date: 12/21/16. Accession Number: 20161221–5136. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER17–67–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2016– 12–21_Compliance filing for the reorginization of section 40.3.3 to be effective 11/12/2016. Filed Date: 12/21/16. Accession Number: 20161221–5088. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER17–306–001. Applicants: Beacon Solar 3, LLC. Description: Compliance filing: Beacon Solar 3, LLC MBR Tariff to be effective 12/21/2016. Filed Date: 12/20/16. Accession Number: 20161220–5137. Comments Due: 5 p.m. ET 1/10/17. VerDate Sep<11>2014 18:54 Dec 27, 2016 Jkt 241001 Docket Numbers: ER17–591–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2234R3 Osage Wind/PSO Facilities Construction Agreement to be effective 11/29/2016. Filed Date: 12/20/16. Accession Number: 20161220–5124. Comments Due: 5 p.m. ET 1/10/17. Docket Numbers: ER17–592–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: GIA & DSA 2MW Powin Bess, Irvine CA Project SA Nos. 925 & 926 to be effective 12/21/2016. Filed Date: 12/20/16. Accession Number: 20161220–5126. Comments Due: 5 p.m. ET 1/10/17. Docket Numbers: ER17–593–000. Applicants: Michigan Electric Transmission Company, LLC. Description: Notice of Cancellation of Facilities Agreement of Michigan Electric Transmission Company, LLC. Filed Date: 12/19/16. Accession Number: 20161219–5427. Comments Due: 5 p.m. ET 1/9/17. Docket Numbers: ER17–594–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2016–12–20_SA 2904 Cooperative Energy-MS Solar 3 1st Rev. (J473) to be effective 12/21/2016. Filed Date: 12/20/16. Accession Number: 20161220–5183. Comments Due: 5 p.m. ET 1/10/17. Docket Numbers: ER17–596–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 31 16th Rev—NITSA with Phillips 66 to be effective 3/1/2017. Filed Date: 12/21/16. Accession Number: 20161221–5082. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER17–597–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 32 7th Rev—NITSA with The Colstrip Steam Electric Station to be effective 3/ 1/2017. Filed Date: 12/21/16. Accession Number: 20161221–5084. Comments Due: 5 p.m. ET 1/11/17. Docket Numbers: ER17–598–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 35 4th Rev—NITSA with The Town of Philipsburg to be effective 3/1/2017. Filed Date: 12/21/16. Accession Number: 20161221–5085. Comments Due: 5 p.m. ET 1/11/17. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 95579 Docket Numbers: ER17–599–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 245 7th Rev—NITSA with Ash Grove Cement to be effective 3/1/2017. Filed Date: 12/21/16. Accession Number: 20161221–5113. Comments Due: 5 p.m. ET 1/11/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 21, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–31338 Filed 12–27–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL17–19–000] FPL Energy MH50, L.P.; Notice of Institution of Section 206 Proceeding and Refund Effective Date On December 21, 2016, the Commission issued an order in Docket No. EL17–19–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether the rates for Reactive Supply and Voltage Control Service (Reactive Service) of FPL Energy MH50, L.P. may be unjust and unreasonable. FPL Energy MH50, L.P., 157 FERC ¶ 61,225 (2016). The refund effective date in Docket No. EL17–19–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL17–19–000 must file a notice of intervention or motion to intervene, as appropriate, with the E:\FR\FM\28DEN1.SGM 28DEN1 95580 Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214, within 21 days of the date of issuance of the order. Dated: December 21, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–31344 Filed 12–27–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–22–000] sradovich on DSK3GMQ082PROD with NOTICES Kinder Morgan Louisiana Pipeline, LLC; Notice of Application Take notice that on December 13, 2016, Kinder Morgan Louisiana Pipeline, LLC (KMLP), 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, filed an application under sections 7(b) and 7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations, requesting authorization to (1) construct and operate the system modifications necessary to enable KMLP to offer 600,000 dekatherms per day (Dth/d) of firm transportation service utilizing a north-to-south path on KMLP’s system; and (2) for permission and approval to abandon and remove facilities at an existing meter station and the replacement thereof with a larger meter station on the same site. The proposed facilities will provide for gas flow on a north-to-south path on KMLP’s system to deliver natural gas from existing pipeline interconnects to the natural gas liquefaction and LNG export facility currently being expanded and operated by Sabine Pass Liquefaction, LLC (SPL) at Sabine Pass in Cameron Parish Louisiana, all as more fully set forth in the application which is on file with the Commission and open for public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, (202) 502–8659. Any questions regarding the proposed project should be directed to Bruce H. Newsome, Vice President, Kinder Morgan Louisiana Pipeline Company, LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, or by calling VerDate Sep<11>2014 20:11 Dec 27, 2016 Jkt 241001 (630) 725–3070 (telephone) or email at bruce_newsome@kindermorgan.com. Pursuant to Section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on January 11, 2017. Dated: December 21, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–31342 Filed 12–27–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Pioneer Wind Park I, LLC ........... Cimarron Bend Wind Project II, LLC. Indeck Niles, LLC ........................ Grant Plains Wind, LLC ............... Sunflower Wind Project, LLC ...... North Lancaster Ranch LLC ........ Pavant Solar II LLC ..................... Dermott Wind, LLC ...................... Innovative Solar 46, LLC ............. Summit Farms Solar, LLC ........... Cimarron Bend Assets, LLC ........ FL Solar 1, LLC ........................... AL Solar A, LLC .......................... Deerfield Wind Energy, LLC ........ EG16–144–000 EG16–145–000 EG16–146–000 EG16–147–000 EG16–148–000 EG16–149–000 EG16–150–000 EG16–151–000 EG16–152–000 EG16–153–000 EG16–154–000 EG16–155–000 EG16–156–000 EG16–157–000 Take notice that during the month of November 2016, the status of the above- E:\FR\FM\28DEN1.SGM 28DEN1

Agencies

[Federal Register Volume 81, Number 249 (Wednesday, December 28, 2016)]
[Notices]
[Pages 95579-95580]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31344]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No. EL17-19-000]


FPL Energy MH50, L.P.; Notice of Institution of Section 206 
Proceeding and Refund Effective Date

    On December 21, 2016, the Commission issued an order in Docket No. 
EL17-19-000, pursuant to section 206 of the Federal Power Act (FPA), 16 
U.S.C. 824e (2012), instituting an investigation into whether the rates 
for Reactive Supply and Voltage Control Service (Reactive Service) of 
FPL Energy MH50, L.P. may be unjust and unreasonable. FPL Energy MH50, 
L.P., 157 FERC ] 61,225 (2016).
    The refund effective date in Docket No. EL17-19-000, established 
pursuant to section 206(b) of the FPA, will be the date of publication 
of this notice in the Federal Register.
    Any interested person desiring to be heard in Docket No. EL17-19-
000 must file a notice of intervention or motion to intervene, as 
appropriate, with the

[[Page 95580]]

Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.214, within 21 days of the date of 
issuance of the order.

    Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31344 Filed 12-27-16; 8:45 am]
 BILLING CODE 6717-01-P