Notice of Effectiveness of Exempt Wholesale Generator Status, 95580-95581 [2016-31343]
Download as PDF
95580
Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31344 Filed 12–27–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–22–000]
sradovich on DSK3GMQ082PROD with NOTICES
Kinder Morgan Louisiana Pipeline,
LLC; Notice of Application
Take notice that on December 13,
2016, Kinder Morgan Louisiana
Pipeline, LLC (KMLP), 3250 Lacey
Road, Suite 700, Downers Grove, IL
60515, filed an application under
sections 7(b) and 7(c) of the Natural Gas
Act (NGA), and Part 157 of the
Commission’s regulations, requesting
authorization to (1) construct and
operate the system modifications
necessary to enable KMLP to offer
600,000 dekatherms per day (Dth/d) of
firm transportation service utilizing a
north-to-south path on KMLP’s system;
and (2) for permission and approval to
abandon and remove facilities at an
existing meter station and the
replacement thereof with a larger meter
station on the same site.
The proposed facilities will provide
for gas flow on a north-to-south path on
KMLP’s system to deliver natural gas
from existing pipeline interconnects to
the natural gas liquefaction and LNG
export facility currently being expanded
and operated by Sabine Pass
Liquefaction, LLC (SPL) at Sabine Pass
in Cameron Parish Louisiana, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
The filing may also be viewed on the
Web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC at FERCOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or TTY,
(202) 502–8659.
Any questions regarding the proposed
project should be directed to Bruce H.
Newsome, Vice President, Kinder
Morgan Louisiana Pipeline Company,
LLC, 3250 Lacey Road, Suite 700,
Downers Grove, IL 60515, or by calling
VerDate Sep<11>2014
20:11 Dec 27, 2016
Jkt 241001
(630) 725–3070 (telephone) or email at
bruce_newsome@kindermorgan.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on January 11, 2017.
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31342 Filed 12–27–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Pioneer Wind Park I, LLC ...........
Cimarron Bend Wind Project II,
LLC.
Indeck Niles, LLC ........................
Grant Plains Wind, LLC ...............
Sunflower Wind Project, LLC ......
North Lancaster Ranch LLC ........
Pavant Solar II LLC .....................
Dermott Wind, LLC ......................
Innovative Solar 46, LLC .............
Summit Farms Solar, LLC ...........
Cimarron Bend Assets, LLC ........
FL Solar 1, LLC ...........................
AL Solar A, LLC ..........................
Deerfield Wind Energy, LLC ........
EG16–144–000
EG16–145–000
EG16–146–000
EG16–147–000
EG16–148–000
EG16–149–000
EG16–150–000
EG16–151–000
EG16–152–000
EG16–153–000
EG16–154–000
EG16–155–000
EG16–156–000
EG16–157–000
Take notice that during the month of
November 2016, the status of the above-
E:\FR\FM\28DEN1.SGM
28DEN1
Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices
captioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31343 Filed 12–27–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD17–6–000]
Salt Lake City Corporation; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On December 20, 2016, Salt Lake City
Corporation filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed 10th East
500 South PRV Station Hydropower
Project would have an installed capacity
of 225 kilowatts (kW) and would be
located on Salt Lake City Corporation’s
existing 36-inch-diameter water
distribution pipe, in a new pressure
reducing valve (PRV) station. The
project would be located in Salt Lake
City, in Salt Lake County, Utah.
Applicant Contact: David Pearson,
Salt Lake City Corporation, Department
of Public Utilities, 1530 S. West Temple,
Salt Lake City, UT 84115, Phone No.
(801) 707–0777.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
95581
project would consist of: (1) A proposed
generating unit with an installed
capacity of 225-kW on the 36-inchdiameter water distribution pipe, in a
new 34-foot by 27-foot PRV station; and
(2) appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 810 megawatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
sradovich on DSK3GMQ082PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
Comments and Motions to Intervene:
The deadline for filing comments
contesting whether the facility meets the
qualifying criteria is 45 days from the
issuance date of this notice.
The deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
VerDate Sep<11>2014
18:54 Dec 27, 2016
Jkt 241001
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
1 18
PO 00000
CFR 385.2001–2005 (2015).
Frm 00027
Fmt 4703
Sfmt 4703
Y
Y
Y
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 81, Number 249 (Wednesday, December 28, 2016)]
[Notices]
[Pages 95580-95581]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31343]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Pioneer Wind Park I, LLC................ EG16-144-000
Cimarron Bend Wind Project II, LLC...... EG16-145-000
Indeck Niles, LLC....................... EG16-146-000
Grant Plains Wind, LLC.................. EG16-147-000
Sunflower Wind Project, LLC............. EG16-148-000
North Lancaster Ranch LLC............... EG16-149-000
Pavant Solar II LLC..................... EG16-150-000
Dermott Wind, LLC....................... EG16-151-000
Innovative Solar 46, LLC................ EG16-152-000
Summit Farms Solar, LLC................. EG16-153-000
Cimarron Bend Assets, LLC............... EG16-154-000
FL Solar 1, LLC......................... EG16-155-000
AL Solar A, LLC......................... EG16-156-000
Deerfield Wind Energy, LLC.............. EG16-157-000
------------------------------------------------------------------------
Take notice that during the month of November 2016, the status of
the above-
[[Page 95581]]
captioned entities as Exempt Wholesale Generators became effective by
operation of the Commission's regulations. 18 CFR 366.7(a).
Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31343 Filed 12-27-16; 8:45 am]