95128
Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices
FERC–551: REPORTING OF FLOW VOLUME AND CAPACITY BY INTERSTATE NATURAL GAS PIPELINES
Number of
respondents
Total number
of responses
Average burden & cost
per response 4
Total annual burden hours & total
annual cost
Cost per respondent
($)
(1)
FERC–551 ...................
Annual
number of responses per
respondent
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
169
365
61,685
0.5 hrs.; $30.22 ...........
30,842.50 hrs.; $1,864,120.70 .......
182.5 hrs.; $11,030.30.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: December 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–31096 Filed 12–23–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–50–000.
Applicants: ITC Midwest LLC.
Description: Application Pursuant to
Section 203 of the Federal Power Act to
Acquire New Assets of ITC Midwest
LLC.
Filed Date: 12/19/16.
Accession Number: 20161219–5425.
Comments Due: 5 p.m. ET 1/9/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1817–015;
ER10–1818–014; ER10–1819–016;
ER10–1820–019.
Applicants: Northern States Power
Company, a Minnesota corporation,
4 The estimates for cost per response are derived
using the following formula: Average Burden Hours
per Response × $60.44 per hour = Average Cost per
Response. This figure includes wages plus benefits
and comes from the Bureau of Labor Statistics
(https://bls.gov/oes/current/naics2_22.htm data from
May 2015) using Management Analyst category
code (13–1111).
VerDate Sep<11>2014
20:45 Dec 23, 2016
Jkt 241001
Northern States Power Company, a
Wisconsin corporation, Public Service
Company of Colorado, Southwestern
Public Service Company.
Description: Supplement to November
7, 2016 Notice of Change in Status of
Northern States Power Company, a
Minnesota corporation, et al.
Filed Date: 12/19/16.
Accession Number: 20161219–5375.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER10–3177–001;
ER10–3181–001; ER10–3285–001.
Applicants: UGI Utilities, Inc., UGI
Development Company, UGI Energy
Services, LLC.
Description: Updated Triennial
Market Power Analysis for Northeast
region of the UGI MBR Companies.
Filed Date: 12/19/16.
Accession Number: 20161219–5294.
Comments Due: 5 p.m. ET 2/17/17.
Docket Numbers: ER15–1775–003.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: Basin
Electric Power Cooperative Formula
Rate Compliance Filing to be effective
10/1/2015.
Filed Date: 12/20/16.
Accession Number: 20161220–5114.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER15–1943–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Missouri River Energy Services Formula
Rate Compliance Filing to be effective
10/1/2015.
Filed Date: 12/20/16.
Accession Number: 20161220–5105.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17–581–000.
Applicants: ISO New England Inc.
Description: § 205(d) Rate Filing:
Original Service Agreement No. SGIA–
ISONE/CMP–16–01 under Schedule 23
to be effective 11/30/2016.
Filed Date: 12/19/16.
Accession Number: 20161219–5339.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–582–000.
Applicants: Westside Solar, LLC.
Description: Baseline eTariff Filing:
Westside Solar, LLC Application for
MBR Authority to be effective 2/17/
2017.
Filed Date: 12/19/16.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Accession Number: 20161219–5352.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–583–000.
Applicants: Whitney Point Solar, LLC.
Description: Baseline eTariff Filing:
Whitney Point Solar, LLC Application
for MBR Authority to be effective 2/17/
2017.
Filed Date: 12/19/16.
Accession Number: 20161219–5353.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–584–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Queue Position AB2–027, Original
Service Agreement No. 4588 to be
effective 11/18/2016.
Filed Date: 12/19/16.
Accession Number: 20161219–5354.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–585–000.
Applicants: Michigan Electric
Transmission Company.
Description: § 205(d) Rate Filing:
Notice of Cancellation of METC RS No.
7 to be effective 11/19/2016.
Filed Date: 12/19/16.
Accession Number: 20161219–5357.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–586–000.
Applicants: International
Transmission Company.
Description: § 205(d) Rate Filing:
Notice of Termination of ITCT RS No.
10 to be effective 11/19/2016.
Filed Date: 12/19/16.
Accession Number: 20161219–5360.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17–587–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3290
Sholes Wind Energy, LLC GIA to be
effective 12/5/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5033.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17–588–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1135R1 Public Service Co of OK and
GRDA Interconnection Agr to be
effective 12/1/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5034.
Comments Due: 5 p.m. ET 1/10/17.
E:\FR\FM\27DEN1.SGM
27DEN1
Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices
Docket Numbers: ER17–589–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3283
NextEra Energy and Sunflower Electric
Meter Agent Agreement to be effective
12/1/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5110.
Comments Due: 5 p.m. ET 1/10/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31147 Filed 12–23–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD17–5–000]
Town of Alma, Colorado; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On December 15, 2016, the Town of
Alma, Colorado filed a notice of intent
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Alma
WTP Hydro Project would have an
installed capacity of 25 kilowatts (kW)
95129
and would be located at the end of the
Town of Alma’s existing raw water
pipeline. The project would be located
near the Town of Alma in Park County,
Colorado.
Applicant Contact: Nancy Comer,
Town Administrator, Town of Alma,
Colorado, P.O. Box 1050, Alma, CO
80420, Phone No. (719) 836–2712.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
8-foot long, 6-inch-diameter intake pipe
teeing off of the existing 8-inch raw
water pipeline; (2) a proposed
powerhouse containing one generating
unit with an installed capacity of 25kW; (3) a proposed 8-foot long, 6-inchdiameter discharge pipe connected to
the existing 8-inch raw water pipeline;
and (4) appurtenant facilities. The
proposed project would have an
estimated annual generating capacity of
200 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
Comments and Motions to Intervene:
The deadline for filing comments
contesting whether the facility meets the
qualifying criteria is 45 days from the
issuance date of this notice.
The deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
VerDate Sep<11>2014
20:45 Dec 23, 2016
Jkt 241001
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Y
Y
Y
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
1 18
E:\FR\FM\27DEN1.SGM
CFR 385.2001–2005 (2015).
27DEN1
Agencies
[Federal Register Volume 81, Number 248 (Tuesday, December 27, 2016)]
[Notices]
[Pages 95128-95129]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31147]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-50-000.
Applicants: ITC Midwest LLC.
Description: Application Pursuant to Section 203 of the Federal
Power Act to Acquire New Assets of ITC Midwest LLC.
Filed Date: 12/19/16.
Accession Number: 20161219-5425.
Comments Due: 5 p.m. ET 1/9/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1817-015; ER10-1818-014; ER10-1819-016; ER10-
1820-019.
Applicants: Northern States Power Company, a Minnesota corporation,
Northern States Power Company, a Wisconsin corporation, Public Service
Company of Colorado, Southwestern Public Service Company.
Description: Supplement to November 7, 2016 Notice of Change in
Status of Northern States Power Company, a Minnesota corporation, et
al.
Filed Date: 12/19/16.
Accession Number: 20161219-5375.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER10-3177-001; ER10-3181-001; ER10-3285-001.
Applicants: UGI Utilities, Inc., UGI Development Company, UGI
Energy Services, LLC.
Description: Updated Triennial Market Power Analysis for Northeast
region of the UGI MBR Companies.
Filed Date: 12/19/16.
Accession Number: 20161219-5294.
Comments Due: 5 p.m. ET 2/17/17.
Docket Numbers: ER15-1775-003.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Basin Electric Power Cooperative
Formula Rate Compliance Filing to be effective 10/1/2015.
Filed Date: 12/20/16.
Accession Number: 20161220-5114.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER15-1943-002.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Missouri River Energy Services
Formula Rate Compliance Filing to be effective 10/1/2015.
Filed Date: 12/20/16.
Accession Number: 20161220-5105.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17-581-000.
Applicants: ISO New England Inc.
Description: Sec. 205(d) Rate Filing: Original Service Agreement
No. SGIA-ISONE/CMP-16-01 under Schedule 23 to be effective 11/30/2016.
Filed Date: 12/19/16.
Accession Number: 20161219-5339.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17-582-000.
Applicants: Westside Solar, LLC.
Description: Baseline eTariff Filing: Westside Solar, LLC
Application for MBR Authority to be effective 2/17/2017.
Filed Date: 12/19/16.
Accession Number: 20161219-5352.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17-583-000.
Applicants: Whitney Point Solar, LLC.
Description: Baseline eTariff Filing: Whitney Point Solar, LLC
Application for MBR Authority to be effective 2/17/2017.
Filed Date: 12/19/16.
Accession Number: 20161219-5353.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17-584-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Queue Position AB2-027,
Original Service Agreement No. 4588 to be effective 11/18/2016.
Filed Date: 12/19/16.
Accession Number: 20161219-5354.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17-585-000.
Applicants: Michigan Electric Transmission Company.
Description: Sec. 205(d) Rate Filing: Notice of Cancellation of
METC RS No. 7 to be effective 11/19/2016.
Filed Date: 12/19/16.
Accession Number: 20161219-5357.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17-586-000.
Applicants: International Transmission Company.
Description: Sec. 205(d) Rate Filing: Notice of Termination of
ITCT RS No. 10 to be effective 11/19/2016.
Filed Date: 12/19/16.
Accession Number: 20161219-5360.
Comments Due: 5 p.m. ET 1/9/17.
Docket Numbers: ER17-587-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3290 Sholes Wind Energy, LLC
GIA to be effective 12/5/2016.
Filed Date: 12/20/16.
Accession Number: 20161220-5033.
Comments Due: 5 p.m. ET 1/10/17.
Docket Numbers: ER17-588-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1135R1 Public Service Co of
OK and GRDA Interconnection Agr to be effective 12/1/2016.
Filed Date: 12/20/16.
Accession Number: 20161220-5034.
Comments Due: 5 p.m. ET 1/10/17.
[[Page 95129]]
Docket Numbers: ER17-589-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3283 NextEra Energy and
Sunflower Electric Meter Agent Agreement to be effective 12/1/2016.
Filed Date: 12/20/16.
Accession Number: 20161220-5110.
Comments Due: 5 p.m. ET 1/10/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31147 Filed 12-23-16; 8:45 am]
BILLING CODE 6717-01-P