Columbia Gas Transmission, LLC; Notice of Schedule for Environmental Review of the B-System Project, 95131 [2016-31094]

Download as PDF Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD17–4–000) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: December 20, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–31092 Filed 12–23–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. Cp16–498–000; Pf16–4–000] asabaliauskas on DSK3SPTVN1PROD with NOTICES Columbia Gas Transmission, LLC; Notice of Schedule for Environmental Review of the B-System Project On September 9, 2016, Columbia Gas Transmission, LLC (Columbia) filed an application in Docket No. CP16–498– 000 requesting a Certificate of Public Convenience and Necessity pursuant to Sections 7(b) and 7(c) of the Natural Gas Act to abandon, construct, and operate certain natural gas pipeline facilities. The proposed project is known as the BSystem Project (Project), and would modernize and upgrade Columbia’s BSystem pipelines by replacing and abandoning old pipeline as well as constructing new pipeline and appurtenant facilities in Fairfield and Franklin Counties, Ohio. On September 21, 2016, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental VerDate Sep<11>2014 20:45 Dec 23, 2016 Jkt 241001 Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA—March 13, 2017 90-day Federal Authorization Decision Deadline—June 11, 2017 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description Columbia would abandon in place approximately 17.5 miles of its Line B– 105; replace 14.0 miles of its Line B– 111; replace 0.1 mile of its Line B–121; replace 0.5 mile of its Line B–130; construct 7.6 miles of new pipeline Line K–270 and appurtenant facilities; and modify various point of delivery and point of receipt customer interconnects in Fairfield and Franklin Counties, Ohio. Background On May 6, 2016, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed B-System Project and Request for Comments on Environmental Issues (NOI). The NOI was issued during the pre-filing review of the Project in Docket No. PF16–4–000 and was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments from one U.S. representative, three Ohio state representatives, the U.S. Fish and Wildlife Service, the Miami Tribe of Oklahoma, the Ohio Department of Natural Resources, Columbia Gas of Ohio, Inc., and four landowners. The primary issues raised by the commentors are pipeline route alternatives, pollinator habitat, endangered species, migratory birds, and methods of pipe abandonment. The Ohio Department of Natural Resources is a cooperating agency in the preparation of the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 95131 summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP16–498), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: December 20, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–31094 Filed 12–23–16; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2016–0122; FRL–9957–37– OEI] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; Notice of Arrival of Pesticides and Devices Under Section 17(c) of the Federal Insecticide, Fungicide, and Rodenticide Act Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency has submitted an information collection request (ICR), ‘‘Notice of Arrival of Pesticides and Devices under section 17(c) of the Federal Insecticide, Fungicide, and Rodenticide Act’’ (EPA ICR No. 0152.12, OMB Control No. 2070–0020) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through December 31, 2016. Public comments were previously requested via the Federal Register (81 FR 22261) on April 15, 2016 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. SUMMARY: E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 81, Number 248 (Tuesday, December 27, 2016)]
[Notices]
[Page 95131]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31094]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. Cp16-498-000; Pf16-4-000]


Columbia Gas Transmission, LLC; Notice of Schedule for 
Environmental Review of the B-System Project

    On September 9, 2016, Columbia Gas Transmission, LLC (Columbia) 
filed an application in Docket No. CP16-498-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Sections 
7(b) and 7(c) of the Natural Gas Act to abandon, construct, and operate 
certain natural gas pipeline facilities. The proposed project is known 
as the B-System Project (Project), and would modernize and upgrade 
Columbia's B-System pipelines by replacing and abandoning old pipeline 
as well as constructing new pipeline and appurtenant facilities in 
Fairfield and Franklin Counties, Ohio.
    On September 21, 2016, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA--March 13, 2017
90-day Federal Authorization Decision Deadline--June 11, 2017

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    Columbia would abandon in place approximately 17.5 miles of its 
Line B-105; replace 14.0 miles of its Line B-111; replace 0.1 mile of 
its Line B-121; replace 0.5 mile of its Line B-130; construct 7.6 miles 
of new pipeline Line K-270 and appurtenant facilities; and modify 
various point of delivery and point of receipt customer interconnects 
in Fairfield and Franklin Counties, Ohio.

Background

    On May 6, 2016, the Commission issued a Notice of Intent to Prepare 
an Environmental Assessment for the Proposed B-System Project and 
Request for Comments on Environmental Issues (NOI). The NOI was issued 
during the pre-filing review of the Project in Docket No. PF16-4-000 
and was sent to affected landowners; federal, state, and local 
government agencies; elected officials; environmental and public 
interest groups; Native American tribes; other interested parties; and 
local libraries and newspapers. In response to the NOI, the Commission 
received comments from one U.S. representative, three Ohio state 
representatives, the U.S. Fish and Wildlife Service, the Miami Tribe of 
Oklahoma, the Ohio Department of Natural Resources, Columbia Gas of 
Ohio, Inc., and four landowners. The primary issues raised by the 
commentors are pipeline route alternatives, pollinator habitat, 
endangered species, migratory birds, and methods of pipe abandonment.
    The Ohio Department of Natural Resources is a cooperating agency in 
the preparation of the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP16-498), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

    Dated: December 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-31094 Filed 12-23-16; 8:45 am]
 BILLING CODE 6717-01-P