Town of Alma, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 95129-95130 [2016-31093]
Download as PDF
Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices
Docket Numbers: ER17–589–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3283
NextEra Energy and Sunflower Electric
Meter Agent Agreement to be effective
12/1/2016.
Filed Date: 12/20/16.
Accession Number: 20161220–5110.
Comments Due: 5 p.m. ET 1/10/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–31147 Filed 12–23–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD17–5–000]
Town of Alma, Colorado; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On December 15, 2016, the Town of
Alma, Colorado filed a notice of intent
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Alma
WTP Hydro Project would have an
installed capacity of 25 kilowatts (kW)
95129
and would be located at the end of the
Town of Alma’s existing raw water
pipeline. The project would be located
near the Town of Alma in Park County,
Colorado.
Applicant Contact: Nancy Comer,
Town Administrator, Town of Alma,
Colorado, P.O. Box 1050, Alma, CO
80420, Phone No. (719) 836–2712.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
8-foot long, 6-inch-diameter intake pipe
teeing off of the existing 8-inch raw
water pipeline; (2) a proposed
powerhouse containing one generating
unit with an installed capacity of 25kW; (3) a proposed 8-foot long, 6-inchdiameter discharge pipe connected to
the existing 8-inch raw water pipeline;
and (4) appurtenant facilities. The
proposed project would have an
estimated annual generating capacity of
200 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
Comments and Motions to Intervene:
The deadline for filing comments
contesting whether the facility meets the
qualifying criteria is 45 days from the
issuance date of this notice.
The deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
VerDate Sep<11>2014
20:45 Dec 23, 2016
Jkt 241001
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Y
Y
Y
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
1 18
E:\FR\FM\27DEN1.SGM
CFR 385.2001–2005 (2015).
27DEN1
95130
Federal Register / Vol. 81, No. 248 / Tuesday, December 27, 2016 / Notices
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD17–5–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: December 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–31093 Filed 12–23–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD17–4–000]
City of Louisville, Colorado; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On December 15, 2016, the City of
Louisville, Colorado filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed SCWTP
Hydro Project would have an installed
capacity of 34 kilowatts (kW) and would
be located at the end of the City of
Louisville’s existing raw water pipeline.
The project would be located near the
City of Louisville in Boulder County,
Colorado.
Applicant Contact: Cory Peterson,
Water Resources Engineer, City of
Louisville, Colorado, 749 Main Street,
Louisville, CO 80027, Phone No. (303)
335–4610.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
12-foot long, 24-inch-diameter intake
pipe teeing off of the existing 14-inch
raw water pipeline; (2) a proposed
powerhouse containing one generating
unit with an installed capacity of 34kW; (3) a proposed 12-foot long, 24inch-diameter discharge pipe connected
to the existing 14-inch raw water
pipeline; and (4) appurtenant facilities.
The proposed project would have an
estimated annual generating capacity of
196 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...............
The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for
the generation of electricity.
The facility is constructed, operated, or maintained for the generation of
electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....
On or before August 9, 2013, the facility is not licensed, or exempted from
the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA ............
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA ...........
FPA 30(a)(3)(C)(iii), as amended by HREA ..........
Preliminary Determination: Based
upon the above criteria, Commission
staff has preliminarily determined that
the proposal satisfies the requirements
for a qualifying conduit hydropower
facility under 16 U.S.C. 823a, and is
exempted from the licensing
requirements of the FPA.
Comments and Motions to Intervene:
The deadline for filing comments
contesting whether the facility meets the
qualifying criteria is 45 days from the
issuance date of this notice.
The deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
VerDate Sep<11>2014
20:45 Dec 23, 2016
Jkt 241001
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
1 18
PO 00000
CFR 385.2001–2005 (2015).
Frm 00033
Fmt 4703
Sfmt 4703
Y
Y
Y
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 81, Number 248 (Tuesday, December 27, 2016)]
[Notices]
[Pages 95129-95130]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-31093]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD17-5-000]
Town of Alma, Colorado; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On December 15, 2016, the Town of Alma, Colorado filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA), as amended by section 4
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The
proposed Alma WTP Hydro Project would have an installed capacity of 25
kilowatts (kW) and would be located at the end of the Town of Alma's
existing raw water pipeline. The project would be located near the Town
of Alma in Park County, Colorado.
Applicant Contact: Nancy Comer, Town Administrator, Town of Alma,
Colorado, P.O. Box 1050, Alma, CO 80420, Phone No. (719) 836-2712.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed 8-foot long, 6-inch-diameter
intake pipe teeing off of the existing 8-inch raw water pipeline; (2) a
proposed powerhouse containing one generating unit with an installed
capacity of 25-kW; (3) a proposed 8-foot long, 6-inch-diameter
discharge pipe connected to the existing 8-inch raw water pipeline; and
(4) appurtenant facilities. The proposed project would have an
estimated annual generating capacity of 200 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA...... The conduit is a tunnel, canal, pipeline, aqueduct, Y
flume, ditch, or similar manmade water conveyance
that is operated for the distribution of water for
agricultural, municipal, or industrial consumption
and not primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA... The facility is constructed, operated, or maintained Y
for the generation of electric power and uses for
such generation only the hydroelectric potential of
a non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA.. The facility has an installed capacity that does not Y
exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA. On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff has preliminarily determined that the proposal
satisfies the requirements for a qualifying conduit hydropower facility
under 16 U.S.C. 823a, and is exempted from the licensing requirements
of the FPA.
Comments and Motions to Intervene: The deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
The deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at
[[Page 95130]]
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD17-5-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: December 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-31093 Filed 12-23-16; 8:45 am]