Drawbridge Operation Regulation; Sloop Channel, Nassau, NY, 93819 [2016-30866]
Download as PDF
Federal Register / Vol. 81, No. 246 / Thursday, December 22, 2016 / Rules and Regulations
the limitation on the extent to which this
exemption may be asserted. The existence
and general character of the information
exempted will be made known to the
individual to whom it pertains.
(6) Partner Vetting System. This
system is exempt under 5 U.S.C.
552a(k)(1), (k)(2), and (k)(5) from the
provision of 5 U.S.C. 552a(c)(3); (d);
(e)(1); (e)(4)(G), (H), (I); and (f). These
exemptions are claimed to protect the
materials required by executive order to
be kept secret in the interest of national
defense or foreign policy, to prevent
subjects of investigation from frustrating
the investigatory process, to insure the
proper functioning and integrity of law
enforcement activities, to prevent
disclosure of investigative techniques,
to maintain the ability to obtain candid
and necessary information, to fulfill
commitments made to sources to protect
the confidentiality of information, to
avoid endangering these sources, and to
facilitate proper selection or
continuance of the best applicants or
persons for a given position or contract.
Dated: December 12, 2016.
Alecia Sillah,
Chief, Information and Records Division
(acting), FOIA Public Liaison/Agency Records
Officer, U.S. Agency for International
Development.
[FR Doc. 2016–30413 Filed 12–21–16; 8:45 am]
BILLING CODE P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–1039]
Drawbridge Operation Regulation;
Sloop Channel, Nassau, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Wantagh
Parkway Bridge, mile 15.4 and the
Meadowbrook State Parkway Bridge,
mile 12.8, both across Sloop Channel, at
Nassau, New York. This temporary
deviation is necessary to facilitate
public safety during a public event, the
Jones Beach State Park U.S. Air Force
Thunderbirds Air Show. This deviation
allows the bridges to remain in the
closed position during the public event.
DATES: This deviation is effective from
4 p.m. on May 27, 2017 to 7 p.m. on
May 28, 2017.
Lhorne on DSK30JT082PROD with RULES
SUMMARY:
VerDate Sep<11>2014
15:15 Dec 21, 2016
Jkt 241001
The docket for this
deviation, [USCG–2016–1039] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy K.
Leung-Yee, Project Officer, First Coast
Guard District, telephone (212) 514–
4330, email judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: New York
State Office of Parks, Recreation and
Historic Preservation requested and the
bridge owner for both bridges, the State
of New York Department of
Transportation, concurred with this
temporary deviation from the normal
operating schedule to facilitate public
safety at the Jones Beach State Park U.S.
Air Force Thunderbirds Air Show.
The Wantagh Parkway Bridge, mile
15.4, across Sloop Channel has a
vertical clearance in the closed position
of 16 feet at mean high water and 19.5
feet at mean low water. The existing
bridge operating regulations are found at
33 CFR 117.5.
The Meadowbrook State Parkway
Bridge, mile 12.8, across Sloop Channel
has a vertical clearance in the closed
position of 22 feet at mean high water
and 25 feet at mean low water. The
existing bridge operating regulations are
found at 33 CFR 117.799(h).
Sloop Channel is transited by
commercial fishing and recreational
vessel traffic.
Under this temporary deviation, the
Wantagh Parkway and the
Meadowbrook State Parkway Bridges
may remain in the closed position
between 4 p.m. and 7 p.m. on May 27,
2017 and between 4 p.m. and 7 p.m. on
May 28, 2017.
Vessels able to pass under the bridge
in the closed position may do so at any
time. The bridges will not be able to
open for emergencies and there are no
immediate alternate routes for vessels to
pass.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
ADDRESSES:
PO 00000
Frm 00029
Fmt 4700
Sfmt 4700
93819
Dated: December 19, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–30866 Filed 12–21–16; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–1063]
Drawbridge Operation Regulation;
Reynolds Channel, Nassau County, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Long Beach
Bridge, mile 4.7, across Reynolds
Channel, at Nassau County, New York.
This temporary deviation is necessary to
temporarily increase staffing flexibility.
This deviation allows the bridge to be
opened with a four-hour advanced
notice during the hours of 5 p.m. on
December 23, 2016, to 7 a.m. on
December 26, 2016 and from 5 p.m. on
December 30, 2016, to 7 a.m. on January
2, 2017.
DATES: This deviation is effective from
5 p.m. on December 23, 2016 to 7 a.m.
on January 2, 2017.
ADDRESSES: The docket for this
deviation, [USCG–2016–1063] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy K.
Leung-Yee, Project Officer, First Coast
Guard District, telephone (212) 514–
4330, email judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: The Long
Beach Bridge, mile 4.7, across Reynolds
Channel has a vertical clearance in the
closed position of 22 feet at mean high
water and 24 feet at mean low water.
The existing bridge operating
regulations are found at 33 CFR
117.799(g).
Reynolds Channel is transited by
commercial and recreational traffic.
The bridge owner, Nassau County
Department of Public Works, requested
a temporary deviation from the normal
operating schedule to increase staffing
flexibility during this period. Historical
SUMMARY:
E:\FR\FM\22DER1.SGM
22DER1
Agencies
[Federal Register Volume 81, Number 246 (Thursday, December 22, 2016)]
[Rules and Regulations]
[Page 93819]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-30866]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-1039]
Drawbridge Operation Regulation; Sloop Channel, Nassau, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Wantagh Parkway Bridge, mile 15.4
and the Meadowbrook State Parkway Bridge, mile 12.8, both across Sloop
Channel, at Nassau, New York. This temporary deviation is necessary to
facilitate public safety during a public event, the Jones Beach State
Park U.S. Air Force Thunderbirds Air Show. This deviation allows the
bridges to remain in the closed position during the public event.
DATES: This deviation is effective from 4 p.m. on May 27, 2017 to 7
p.m. on May 28, 2017.
ADDRESSES: The docket for this deviation, [USCG-2016-1039] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy K. Leung-Yee, Project
Officer, First Coast Guard District, telephone (212) 514-4330, email
judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: New York State Office of Parks, Recreation
and Historic Preservation requested and the bridge owner for both
bridges, the State of New York Department of Transportation, concurred
with this temporary deviation from the normal operating schedule to
facilitate public safety at the Jones Beach State Park U.S. Air Force
Thunderbirds Air Show.
The Wantagh Parkway Bridge, mile 15.4, across Sloop Channel has a
vertical clearance in the closed position of 16 feet at mean high water
and 19.5 feet at mean low water. The existing bridge operating
regulations are found at 33 CFR 117.5.
The Meadowbrook State Parkway Bridge, mile 12.8, across Sloop
Channel has a vertical clearance in the closed position of 22 feet at
mean high water and 25 feet at mean low water. The existing bridge
operating regulations are found at 33 CFR 117.799(h).
Sloop Channel is transited by commercial fishing and recreational
vessel traffic.
Under this temporary deviation, the Wantagh Parkway and the
Meadowbrook State Parkway Bridges may remain in the closed position
between 4 p.m. and 7 p.m. on May 27, 2017 and between 4 p.m. and 7 p.m.
on May 28, 2017.
Vessels able to pass under the bridge in the closed position may do
so at any time. The bridges will not be able to open for emergencies
and there are no immediate alternate routes for vessels to pass.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so that vessels can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: December 19, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-30866 Filed 12-21-16; 8:45 am]
BILLING CODE 9110-04-P