Federal Register / Vol. 81, No. 246 / Thursday, December 22, 2016 / Notices
Grizzly forebay, forming the Grizzly
forebay reservoir that extends
approximately 0.8 mile. Total storage in
the 38-acre reservoir is approximately
1,112 acre-feet at the normal maximum
water surface elevation of
approximately 4,316 feet.
Grizzly Forebay Tunnel (Bucks Creek
Development)
From Grizzly forebay, the project’s
water flow is conveyed through the
horseshoe-shaped Grizzly forebay
tunnel. The tunnel is 9,575-foot-long
with two 4,786-foot-long penstocks
leading to Bucks Creek powerhouse.
The maximum flow capacity is 400 cfs.
Bucks Creek Powerhouse (Bucks Creek
Development)
The project’s water flow is conveyed
through the Grizzly forebay tunnel to
Bucks Creek powerhouse. The Bucks
Creek powerhouse is a 47-foot-long by
132-foot-wide, steel frame and concrete
building constructed from reinforced
concrete. The powerhouse has a total
maximum capacity of 65 MW with an
average annual generation of 234.8
GWh. The powerhouse connects
directly to the non-project switchyard
adjacent to the powerhouse part of the
interconnected transmission system.
Bucks Creek powerhouse discharges
the project’s water flow in the North
Fork Feather River, one mile upstream
of Rock Creek powerhouse, part of
PG&E’s Rock Creek-Cresta Hydroelectric
Project (FERC Project No. 1962).
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ..................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ...............................
Commission issues Draft Environmental Impact Statement (EIS) ....................................................................
Comments on Draft EIS .....................................................................................................................................
Modified Terms and Conditions .........................................................................................................................
Commission Issues Final EIS ............................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the Notice of Ready
for Environmental Analysis.
Dated: December 16, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–30851 Filed 12–21–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1967–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance filing per 4/21/2016 orderDocket No. EL13–88 re: Generator
Deactivat to be effective 2/14/2017.
Filed Date: 12/15/16.
Accession Number: 20161215–5249.
Comments Due: 5 p.m. ET 1/5/17.
Docket Numbers: ER16–2656–001.
Applicants: Arizona Public Service
Company.
VerDate Sep<11>2014
17:40 Dec 21, 2016
Jkt 241001
Description: Tariff Amendment: APS
Response to Request for Additional
Information to be effective 11/23/2016.
Filed Date: 12/16/16.
Accession Number: 20161216–5125.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–468–001.
Applicants: Ohio Valley Electric
Corporation.
Description: Compliance filing: Errata
to Amendment J, K and P to be effective
10/14/2016.
Filed Date: 12/16/16.
Accession Number: 20161216–5182.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–563–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Administrative Filing for Collation
Correction to be effective 12/16/2016.
Filed Date: 12/16/16.
Accession Number: 20161216–5082.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–565–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT Definitions and Att
Q RE: Refinements to PJM’s Credit
Policy to be effective 2/14/2017.
Filed Date: 12/16/16.
Accession Number: 20161216–5098.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–566–000.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
February 2017.
April 2017.
October 2017.
December 2017.
February 2018.
May 2018.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: Cost
Reimbursement Agreement 2324Niagara Mohawk and Erie Boulevard
Hydropower to be effective 11/18/2016.
Filed Date: 12/16/16.
Accession Number: 20161216–5114.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–567–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing:
Southampton Solar Affected System
Operating Agreement to be effective 1/
19/2017.
Filed Date: 12/16/16.
Accession Number: 20161216–5145.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–568–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–12–16_Attachment X-Quarterly
Operating Limits to be effective 2/15/
2017.
Filed Date: 12/16/16.
Accession Number: 20161216–5155.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17–569–000.
Applicants: National Choice Energy
LLC.
Description: Baseline eTariff Filing:
Baseline New to be effective 12/30/
2016.
E:\FR\FM\22DEN1.SGM
22DEN1
93912
Federal Register / Vol. 81, No. 246 / Thursday, December 22, 2016 / Notices
Filed Date: 12/16/16.
Accession Number: 20161216–5158.
Comments Due: 5 p.m. ET 1/6/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 16, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–30835 Filed 12–21–16; 8:45 am]
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 5, 2017.
Dated: December 16, 2016.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2016–30850 Filed 12–21–16; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. EL16–14–000]
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Midcontinent Independent System
Operator, Inc.; Notice of Filing
Take notice that on December 15,
2016, Midcontinent Independent
System Operator, Inc. submitted tariff
filing per: Compliance Refund Report to
be effective N/A, pursuant to the
Federal Energy Regulatory
Commission’s (Commission) Letter
Order issued to Indiana Municipal
Power Agency on June 28, 2016.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
1 Indiana Municipal Power Agency, 155 FERC ¶
61,317 (2016).
VerDate Sep<11>2014
17:40 Dec 21, 2016
Jkt 241001
[Docket No. ER17–554–000]
Wolf Run Energy LLC: Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Wolf
Run Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 5,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: December 16, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–30840 Filed 12–21–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–540–000]
Wildwood Solar II, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Wildwood Solar II, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
E:\FR\FM\22DEN1.SGM
22DEN1
Agencies
[Federal Register Volume 81, Number 246 (Thursday, December 22, 2016)]
[Notices]
[Pages 93911-93912]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-30835]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-1967-001.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance filing per 4/21/2016
order-Docket No. EL13-88 re: Generator Deactivat to be effective 2/14/
2017.
Filed Date: 12/15/16.
Accession Number: 20161215-5249.
Comments Due: 5 p.m. ET 1/5/17.
Docket Numbers: ER16-2656-001.
Applicants: Arizona Public Service Company.
Description: Tariff Amendment: APS Response to Request for
Additional Information to be effective 11/23/2016.
Filed Date: 12/16/16.
Accession Number: 20161216-5125.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-468-001.
Applicants: Ohio Valley Electric Corporation.
Description: Compliance filing: Errata to Amendment J, K and P to
be effective 10/14/2016.
Filed Date: 12/16/16.
Accession Number: 20161216-5182.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-563-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Administrative Filing for
Collation Correction to be effective 12/16/2016.
Filed Date: 12/16/16.
Accession Number: 20161216-5082.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-565-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OATT
Definitions and Att Q RE: Refinements to PJM's Credit Policy to be
effective 2/14/2017.
Filed Date: 12/16/16.
Accession Number: 20161216-5098.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-566-000.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Cost Reimbursement Agreement
2324-Niagara Mohawk and Erie Boulevard Hydropower to be effective 11/
18/2016.
Filed Date: 12/16/16.
Accession Number: 20161216-5114.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-567-000.
Applicants: Duke Energy Progress, LLC.
Description: Sec. 205(d) Rate Filing: Southampton Solar Affected
System Operating Agreement to be effective 1/19/2017.
Filed Date: 12/16/16.
Accession Number: 20161216-5145.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-568-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2016-12-16_Attachment X-
Quarterly Operating Limits to be effective 2/15/2017.
Filed Date: 12/16/16.
Accession Number: 20161216-5155.
Comments Due: 5 p.m. ET 1/6/17.
Docket Numbers: ER17-569-000.
Applicants: National Choice Energy LLC.
Description: Baseline eTariff Filing: Baseline New to be effective
12/30/2016.
[[Page 93912]]
Filed Date: 12/16/16.
Accession Number: 20161216-5158.
Comments Due: 5 p.m. ET 1/6/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 16, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-30835 Filed 12-21-16; 8:45 am]
BILLING CODE 6717-01-P