Combined Notice of Filings #1, 92808-92809 [2016-30542]
Download as PDF
92808
Federal Register / Vol. 81, No. 244 / Tuesday, December 20, 2016 / Notices
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
mstockstill on DSK3G9T082PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
19:36 Dec 19, 2016
Jkt 241001
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s Web site.
Motions to intervene are more fully
described at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP17–2). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: December 13, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–30549 Filed 12–19–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–46–000.
Applicants: Pio Pico Energy Center,
LLC.
Description: Application of Pio Pico
Energy Center, LLC for Approval Under
Section 203 of the Federal Power Act
with Privileged Confidential Exhibit I.
Filed Date: 12/12/16.
Accession Number: 20161212–5289.
Comments Due: 5 p.m. ET 1/3/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–569–013
ER10–1849–012; ER10–1887–012 ER10–
1920–014; ER10–1928–014; ER10–1952–
012 ER10–1961–012; ER10–1971–031;
ER10–2720–014 ER11–2037–012; ER11–
4428–014; ER11–4462–022 ER12–1228–
014; ER12–1880–013; ER12–2227–012
ER12–895–012; ER13–2474–008; ER13–
712–014 ER14–2707–009; ER14–2708–
010; ER14–2709–009 ER14–2710–009;
ER15–1925–006; ER15–2676–005 ER15–
30–007; ER15–58–007; ER16–1440–003;
ER16–1672–003; ER16–2191–002;
ER16–2240–002; ER16–2241–002;
ER16–2275–002; ER16–2276–002;
ER16–2297–002; ER16–2453–002.
Applicants: Blackwell Wind, LLC,
Brady Interconnection, LLC, Brady
Wind II, LLC, Breckinridge Wind
Project, LLC, Cedar Bluff Wind, LLC,
Chaves County Solar, LLC, Cimarron
Wind Energy, LLC, Elk City Wind, LLC,
Elk City II Wind, LLC, Ensign Wind,
LLC, FPL Energy Cowboy Wind, LLC,
FPL Energy Oklahoma Wind, LLC, FPL
Energy Sooner Wind, LLC, Gray County
Wind Energy, LLC, High Majestic Wind
Energy Center, LLC, High Majestic Wind
II, LLC, Kingman Wind Energy I, LLC,
Kingman Wind Energy II, LLC,
E:\FR\FM\20DEN1.SGM
20DEN1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 81, No. 244 / Tuesday, December 20, 2016 / Notices
Mammoth Plains Wind Project, LLC,
Minco Wind Interconnection Services,
LLC, Minco Wind, LLC, Minco Wind II,
LLC, Minco Wind III, LLC, Ninnescah
Wind Energy, LLC, Osborn Wind
Energy, LLC, Palo Duro Wind
Interconnection Services, LLC, Palo
Duro Wind Energy, LLC, Roswell Solar,
LLC, Rush Springs Wind Energy, LLC,
Seiling Wind Interconnection Services,
LLC, Seiling Wind, LLC, Seiling Wind
II, LLC, Steele Flats Wind Project, LLC,
NEPM II, LLC, NextEra Energy Power
Marketing, LLC.
Description: Notification of Nonmaterial Change in Status of the NextEra
Resources Entities.
Filed Date: 12/12/16.
Accession Number: 20161212–5283.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17–311–000.
Applicants: SR South Loving LLC.
Description: Second Supplement to
November 4, 2016 SR South Loving LLC
tariff filing.
Filed Date: 12/9/16.
Accession Number: 20161209–5254.
Comments Due: 5 p.m. ET 12/19/16.
Docket Numbers: ER17–526–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
NITSA (Idaho Falls Power) Rev 1 to be
effective 12/1/2016.
Filed Date: 12/12/16.
Accession Number: 20161212–5243.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17–527–000.
Applicants: InterGen Energy
Solutions, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 12/31/
2016.
Filed Date: 12/12/16.
Accession Number: 20161212–5244.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17–528–000.
Applicants: Baltimore Gas and
Electric Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: BGE
Revisions to Attachment H–2A
Concerning Various Tax Issues to be
effective 2/11/2017.
Filed Date: 12/13/16.
Accession Number: 20161213–5027.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17–529–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Dairyland Power Cooperative.
Description: § 205(d) Rate Filing:
2016–12–13_Dairyland Power
Cooperative RTO Adder Request to be
effective 3/1/2017.
Filed Date: 12/13/16.
Accession Number: 20161213–5062.
Comments Due: 5 p.m. ET 1/3/17.
VerDate Sep<11>2014
19:36 Dec 19, 2016
Jkt 241001
Docket Numbers: ER17–530–000.
Applicants: Wheelabrator Ridge
Energy Inc.
Description: § 205(d) Rate Filing: 2017
normal to be effective 2/12/2017.
Filed Date: 12/13/16.
Accession Number: 20161213–5082.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17–531–000.
Applicants: Wheelabrator South
Broward Inc.
Description: § 205(d) Rate Filing: 2017
South Normal to be effective 2/12/2017.
Filed Date: 12/13/16.
Accession Number: 20161213–5083.
Comments Due: 5 p.m. ET 1/3/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–30542 Filed 12–19–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Applications
Docket Nos.
Port Arthur LNG, LLC and
PALNG Common Facilities Company, LLC.
Port Arthur Pipeline, LLC ..
CP17–20–000
PF15–18–000
CP17–21–000
PF15–19–000
Take notice that on November 29,
2016, Port Arthur LNG, LLC (Port
Arthur LNG) and PALNG Common
Facilities Company, LLC, 2925
Briarpark, Suite 900, Houston, Texas
77042, filed an application, in Docket
No. CP17–20–000, pursuant to section
3(a) of the Natural Gas Act (NGA) and
Parts 153 and 380 of the Commission’s
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
92809
Regulations, requesting authorization to
site, construct, modify, and operate a
natural gas liquefaction facility and
liquefied natural gas export marine and
truck loading terminal facilities
(Liquefaction Project), located in
Jefferson County, Texas.
Also, take notice that on November
29, 2016, Port Arthur Pipeline, LLC
(Port Arthur Pipeline), 2925 Briarpark,
Suite 900, Houston, Texas 77042, filed
an application pursuant to section 7(c)
of the NGA, and Parts 157 and 284 of
the Commission’s regulations, an
application in Docket No. CP17–21–000
for (1) a certificate of public
convenience and necessity (i)
authorizing Port Arthur Pipeline to
construct, own, and operate a new
natural gas pipeline system, (ii)
approving a pro forma Tariff, and (iii)
approving the proposed initial rates for
service; (2) a Part 157, Subpart F blanket
certificate authorizing Port Arthur
Pipeline to engage in certain selfimplementing routine activities; and (3)
a Part 284, Subpart G blanket certificate
authorizing Port Arthur Pipeline to
transport natural gas, on an open-access
and self-implementing basis with pregranted abandonment authority.
Specifically, Port Arthur LNG’s
proposed Liquefaction Project consists
of two liquefaction trains with a total
capacity of 13.5 MTPA (1,865 MMcf/d),
three LNG tanks capable of storing
160,000 m3 each, for a total working
capacity of 480,000 m3, marine and
truck loading facilities, and all
necessary ancillary and support
facilities. Port Arthur LNG states that
the purpose of the Liquefaction Project
is liquefying supplies of domestic
natural gas for export to foreign markets.
Port Arthur Pipeline proposes to
construct 34.2 miles of new 42-inchdiameter pipeline, approximately 4.65
miles of variable diameter lateral
pipelines, two compressor stations
totaling 65,052 horsepower, and
associated facilities to deliver up to
2,000 MMcf/d of natural gas to the
Liquefaction Project. Port Arthur
Pipeline’s proposed facilities will be
located in Orange and Jefferson
Counties, Texas and Cameron Parish,
Louisiana. Port Arthur Pipeline
estimates the proposed pipeline
facilities cost to be approximately
$899,739,889, all as more fully set forth
in the applications which are on file
with the Commission and open to
public inspection. These filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
E:\FR\FM\20DEN1.SGM
20DEN1
Agencies
[Federal Register Volume 81, Number 244 (Tuesday, December 20, 2016)]
[Notices]
[Pages 92808-92809]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-30542]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-46-000.
Applicants: Pio Pico Energy Center, LLC.
Description: Application of Pio Pico Energy Center, LLC for
Approval Under Section 203 of the Federal Power Act with Privileged
Confidential Exhibit I.
Filed Date: 12/12/16.
Accession Number: 20161212-5289.
Comments Due: 5 p.m. ET 1/3/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-569-013 ER10-1849-012; ER10-1887-012 ER10-
1920-014; ER10-1928-014; ER10-1952-012 ER10-1961-012; ER10-1971-031;
ER10-2720-014 ER11-2037-012; ER11-4428-014; ER11-4462-022 ER12-1228-
014; ER12-1880-013; ER12-2227-012 ER12-895-012; ER13-2474-008; ER13-
712-014 ER14-2707-009; ER14-2708-010; ER14-2709-009 ER14-2710-009;
ER15-1925-006; ER15-2676-005 ER15-30-007; ER15-58-007; ER16-1440-003;
ER16-1672-003; ER16-2191-002; ER16-2240-002; ER16-2241-002; ER16-2275-
002; ER16-2276-002; ER16-2297-002; ER16-2453-002.
Applicants: Blackwell Wind, LLC, Brady Interconnection, LLC, Brady
Wind II, LLC, Breckinridge Wind Project, LLC, Cedar Bluff Wind, LLC,
Chaves County Solar, LLC, Cimarron Wind Energy, LLC, Elk City Wind,
LLC, Elk City II Wind, LLC, Ensign Wind, LLC, FPL Energy Cowboy Wind,
LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, Gray
County Wind Energy, LLC, High Majestic Wind Energy Center, LLC, High
Majestic Wind II, LLC, Kingman Wind Energy I, LLC, Kingman Wind Energy
II, LLC,
[[Page 92809]]
Mammoth Plains Wind Project, LLC, Minco Wind Interconnection Services,
LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC,
Ninnescah Wind Energy, LLC, Osborn Wind Energy, LLC, Palo Duro Wind
Interconnection Services, LLC, Palo Duro Wind Energy, LLC, Roswell
Solar, LLC, Rush Springs Wind Energy, LLC, Seiling Wind Interconnection
Services, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Steele Flats
Wind Project, LLC, NEPM II, LLC, NextEra Energy Power Marketing, LLC.
Description: Notification of Non-material Change in Status of the
NextEra Resources Entities.
Filed Date: 12/12/16.
Accession Number: 20161212-5283.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17-311-000.
Applicants: SR South Loving LLC.
Description: Second Supplement to November 4, 2016 SR South Loving
LLC tariff filing.
Filed Date: 12/9/16.
Accession Number: 20161209-5254.
Comments Due: 5 p.m. ET 12/19/16.
Docket Numbers: ER17-526-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: BPA NITSA (Idaho Falls
Power) Rev 1 to be effective 12/1/2016.
Filed Date: 12/12/16.
Accession Number: 20161212-5243.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17-527-000.
Applicants: InterGen Energy Solutions, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 12/31/2016.
Filed Date: 12/12/16.
Accession Number: 20161212-5244.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17-528-000.
Applicants: Baltimore Gas and Electric Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: BGE Revisions to Attachment
H-2A Concerning Various Tax Issues to be effective 2/11/2017.
Filed Date: 12/13/16.
Accession Number: 20161213-5027.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17-529-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Dairyland Power Cooperative.
Description: Sec. 205(d) Rate Filing: 2016-12-13_Dairyland Power
Cooperative RTO Adder Request to be effective 3/1/2017.
Filed Date: 12/13/16.
Accession Number: 20161213-5062.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17-530-000.
Applicants: Wheelabrator Ridge Energy Inc.
Description: Sec. 205(d) Rate Filing: 2017 normal to be effective
2/12/2017.
Filed Date: 12/13/16.
Accession Number: 20161213-5082.
Comments Due: 5 p.m. ET 1/3/17.
Docket Numbers: ER17-531-000.
Applicants: Wheelabrator South Broward Inc.
Description: Sec. 205(d) Rate Filing: 2017 South Normal to be
effective 2/12/2017.
Filed Date: 12/13/16.
Accession Number: 20161213-5083.
Comments Due: 5 p.m. ET 1/3/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-30542 Filed 12-19-16; 8:45 am]
BILLING CODE 6717-01-P