Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 90835 [2016-30067]
Download as PDF
Federal Register / Vol. 81, No. 241 / Thursday, December 15, 2016 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–30128 Filed 12–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14757–000]
rmajette on DSK2TPTVN1PROD with NOTICES
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On February 19, 2016, Energy
Resources USA, Inc. (Energy Resources)
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the New
Savannah Bluff Lock and Dam
Hydroelectric Project (project) to be
located at the U.S. Army Corps of
Engineers’ New Savannah Bluff Lock
and Dam on the Savannah River in
Aiken County, South Carolina. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 300-foot-long, 90foot-wide intake area; (2) a 98-foot-long,
45-foot-wide powerhouse containing
two vertical Kaplan turbine-generator
units with a total capacity of 8
megawatts; (3) a 350-foot-long, 120-footwide tailrace; (4) a 60-foot-long, 50-footwide substation; and (5) a 6.54-milelong, 69 kV transmission line. The
estimated annual generation of the
project would be 68.5 gigawatt-hours,
VerDate Sep<11>2014
15:19 Dec 14, 2016
Jkt 241001
and would operate as directed by the
U.S. Army Corps of Engineers.
Applicant Contact: Mr. Ander
Gonzalez, Business Development
Manager, Energy Resources USA, Inc.,
350 Lincoln Road, 2nd floor, Miami,
Florida 22139; phone: (954) 248–8425.
FERC Contact: Navreet Deo; phone:
(202) 502–6304.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14757–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14757–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–30067 Filed 12–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–43–000.
Applicants: Boulder Solar II, LLC,
AEP Renewables, LLC.
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
90835
Description: Joint Application of
Boulder Solar II, LLC and AEP
Renewables, LLC for Authorization of
Transaction under Section 203 of the
Federal Power Act and Requests for
Waivers, Confidential Treatment, and
Expedited Action.
Filed Date: 12/6/16.
Accession Number: 20161206–5276.
Comments Due: 5 p.m. ET 12/27/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–492–000.
Applicants: Lark Energy
Developments, Inc.
Description: Petition for Limited
Waiver of Tariff Provisions and Request
for Expedited Action of Lark Energy
Developments, Inc.
Filed Date: 12/6/16.
Accession Number: 20161206–5168.
Comments Due: 5 p.m. ET 12/16/16.
Docket Numbers: ER17–495–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AE to Add
Term Instantaneous Load Capacity to be
effective 2/4/2017.
Filed Date: 12/6/16.
Accession Number: 20161206–5250.
Comments Due: 5 p.m. ET 12/27/16.
Docket Numbers: ER17–496–000.
Applicants: Peak View Wind Energy
LLC, Black Hills/Colorado Electric
Utility Company, LP.
Description: Black Hills/Colorado
Electric Utility Company, LP submits
Notice of Cancellation of Market-Based
Rate Tariff on behalf of Peak View Wind
Energy LLC.
Filed Date: 12/6/16.
Accession Number: 20161206–5278.
Comments Due: 5 p.m. ET 12/27/16.
Docket Numbers: ER17–497–000.
Applicants: International
Transmission Company.
Description: Request for Limited
Waiver of Tariff Provisions and
Expedited Action of International
Transmission Company.
Filed Date: 12/6/16.
Accession Number: 20161206–5280.
Comments Due: 5 p.m. ET 12/27/16.
Docket Numbers: ER17–498–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: § 205(d) Rate Filing:
Temporary Credit Extension to be
effective 1/1/2017.
Filed Date: 12/7/16.
Accession Number: 20161207–5047.
Comments Due: 5 p.m. ET 12/28/16.
Docket Numbers: ER17–499–000.
Applicants: Arizona Public Service
Company.
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 81, Number 241 (Thursday, December 15, 2016)]
[Notices]
[Page 90835]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-30067]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14757-000]
Energy Resources USA, Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments and Motions To
Intervene
On February 19, 2016, Energy Resources USA, Inc. (Energy Resources)
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the New Savannah Bluff Lock and Dam Hydroelectric Project (project) to
be located at the U.S. Army Corps of Engineers' New Savannah Bluff Lock
and Dam on the Savannah River in Aiken County, South Carolina. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A 300-
foot-long, 90-foot-wide intake area; (2) a 98-foot-long, 45-foot-wide
powerhouse containing two vertical Kaplan turbine-generator units with
a total capacity of 8 megawatts; (3) a 350-foot-long, 120-foot-wide
tailrace; (4) a 60-foot-long, 50-foot-wide substation; and (5) a 6.54-
mile-long, 69 kV transmission line. The estimated annual generation of
the project would be 68.5 gigawatt-hours, and would operate as directed
by the U.S. Army Corps of Engineers.
Applicant Contact: Mr. Ander Gonzalez, Business Development
Manager, Energy Resources USA, Inc., 350 Lincoln Road, 2nd floor,
Miami, Florida 22139; phone: (954) 248-8425.
FERC Contact: Navreet Deo; phone: (202) 502-6304.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14757-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14757-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: December 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-30067 Filed 12-14-16; 8:45 am]