Drawbridge Operation Regulation; Annisquam River and Blynman Canal, Gloucester, MA, 89007 [2016-29554-2]
Download as PDF
Federal Register / Vol. 81, No. 237 / Friday, December 9, 2016 / Rules and Regulations
(xxviii) Type of REIT.
(xxix) From Form 1125–A—
purchases.
(xxx) From Form 1040, Schedule C—
(A) Purchases less cost of items
withdrawn for personal use; and
(B) Materials and supplies.
(xxxi) Electronic filing system
indicator.
(xxxii) Posting cycle date relative to
filing.
(xxxiii) Dividends, including ordinary
or qualified.
(xxxiv) From Form 1120S, Schedule
K–1—ordinary business income (loss).
(xxxv) From Form 1065, Schedule K–
1—
(A) Publicly-traded partnership
indicator;
(B) Partner’s share of nonrecourse,
qualified nonrecourse, and recourse
liabilities; and
(C) Ordinary business income (loss).
(b)(4) through (b)(6)(i)(B) [Reserved].
For further guidance see
§ 301.6103(j)(1)–1(b)(4) through
(b)(6)(i)(B).
(C) From Form 1120–REIT—
(1) Type of REIT; and
(2) Gross rents from real property;
(D) From Form 1120F—corporation’s
method of accounting.
(E) From Form 1096—total amount
reported.
(b)(6)(ii) through (d)(3)(ii) [Reserved].
For further guidance see
§ 301.6103(j)(1)–1(b)(6)(ii) through
(d)(3)(ii).
(e) Applicability date. This section
applies to disclosures to the Bureau of
the Census made on or after December
9, 2016.
(f) Expiration date. The applicability
of this section expires on or before
December 9, 2019.
John Dalrymple,
Deputy Commissioner for Services and
Enforcement.
Approved: November 23, 2016.
Mark J. Mazur,
Assistant Secretary of the Treasury (Tax
Policy).
[FR Doc. 2016–29488 Filed 12–8–16; 8:45 am]
BILLING CODE P
DEPARTMENT OF HOMELAND
SECURITY
mstockstill on DSK3G9T082PROD with RULES
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–1023]
Drawbridge Operation Regulation;
Annisquam River and Blynman Canal,
Gloucester, MA
AGENCY:
Coast Guard, DHS.
VerDate Sep<11>2014
16:13 Dec 08, 2016
Jkt 241001
Notice of deviation from
drawbridge regulation.
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Blynman
(SR127) Bridge across the Annisquam
River and Blynman Canal at mile 0.0 at
Gloucester, MA. The deviation is
necessary due to the construction of a
new operator’s house. This deviation
allows the bridge to be opened with a
two hour advanced notice during the
hours of 8 p.m. through 4 a.m. from
December 6, 2016 through April 30,
2017.
DATES: This deviation is effective
without actual notice from December 9,
2016 through 4 a.m. on April 30, 2017.
For the purposes of enforcement, actual
notice will be used from December 6,
2016, until December 9, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–1023] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jeffrey Stieb,
First Coast Guard District Bridge
Branch, Coast Guard; telephone 617–
223–8364, email Jeffrey.D.Stieb@
uscg.mil.
SUPPLEMENTARY INFORMATION: The
Blynman (SR 127) Bridge across the
Annisquam River and Blynman Canal,
mile 0.0, at Gloucester, Massachusetts,
has a vertical clearance in the closed
position of 8.2 feet at mean high water
and 16 feet at mean low water. The
existing bridge operating regulations are
found at 33 CFR 117.586. The owner of
the bridge, the Massachusetts
Department of Transportation, requested
a temporary deviation from the normal
operating schedule to open on signal
after at least a two-hour advance notice
is provided between the hours of 8 p.m.
to 4 a.m. for the period of December 6,
2016 through April 30, 2017.
The settling of the operator’s house
has rendered the structure unsafe for
occupancy. As a result, a temporary
control system in a temporary booth has
been installed. Electricians from a
private contractor are required to
operate the temporary control system at
an extraordinary high cost to the bridge
owner. The deviation will have
negligible effect on vessel navigation.
The waterways are transited primarily
by seasonal recreation vessels of various
sizes. Bridge records indicate an average
of less than three requests for openings
per month occurred during the hours
SUMMARY:
PO 00000
Frm 00033
Fmt 4700
Sfmt 4700
89007
covered by this deviation. The Coast
Guard contacted local waterway users
regarding the Commonwealth’s request
for a temporary deviation and received
no objections.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will not be able
to open immediately for emergencies.
However, the northern entrance to the
Annisquam River can be used as an
alternate route for vessels unable to pass
through the bridge in closed position.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 6, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–29554 Filed 12–8–16; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R03–OAR–2016–0308; FRL–9956–26–
Region 3]
Approval and Promulgation of Air
Quality Implementation Plans; Virginia;
Removal of Stage II Gasoline Vapor
Recovery Requirements for Gasoline
Dispensing Facilities; Withdrawal of
Direct Final Rule
Environmental Protection
Agency (EPA).
ACTION: Withdrawal of direct final rule.
AGENCY:
Due to the receipt of adverse
public comments, the Environmental
Protection Agency (EPA) is withdrawing
the direct final rule published on
October 21, 2016, to approve revisions
to the Virginia state implementation
plan (SIP). The revision serves to
remove requirements for installation
and operation of vapor recovery
equipment (also referred to as Stage II
vapor recovery) from subject gasoline
stations in areas of Virginia that were
formally subject to a Stage II vapor
recovery program under the Clean Air
Act.
SUMMARY:
E:\FR\FM\09DER1.SGM
09DER1
Agencies
[Federal Register Volume 81, Number 237 (Friday, December 9, 2016)]
[Rules and Regulations]
[Page 89007]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-29554]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-1023]
Drawbridge Operation Regulation; Annisquam River and Blynman
Canal, Gloucester, MA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Blynman (SR127) Bridge across the
Annisquam River and Blynman Canal at mile 0.0 at Gloucester, MA. The
deviation is necessary due to the construction of a new operator's
house. This deviation allows the bridge to be opened with a two hour
advanced notice during the hours of 8 p.m. through 4 a.m. from December
6, 2016 through April 30, 2017.
DATES: This deviation is effective without actual notice from December
9, 2016 through 4 a.m. on April 30, 2017. For the purposes of
enforcement, actual notice will be used from December 6, 2016, until
December 9, 2016.
ADDRESSES: The docket for this deviation, [USCG-2016-1023] is available
at https:// www.regulations.gov. Type the docket number in the
``SEARCH'' box and click ``SEARCH''. Click on Open Docket Folder on the
line associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jeffrey Stieb, First Coast Guard
District Bridge Branch, Coast Guard; telephone 617-223-8364, email
Jeffrey.D.Stieb@ uscg.mil.
SUPPLEMENTARY INFORMATION: The Blynman (SR 127) Bridge across the
Annisquam River and Blynman Canal, mile 0.0, at Gloucester,
Massachusetts, has a vertical clearance in the closed position of 8.2
feet at mean high water and 16 feet at mean low water. The existing
bridge operating regulations are found at 33 CFR 117.586. The owner of
the bridge, the Massachusetts Department of Transportation, requested a
temporary deviation from the normal operating schedule to open on
signal after at least a two-hour advance notice is provided between the
hours of 8 p.m. to 4 a.m. for the period of December 6, 2016 through
April 30, 2017.
The settling of the operator's house has rendered the structure
unsafe for occupancy. As a result, a temporary control system in a
temporary booth has been installed. Electricians from a private
contractor are required to operate the temporary control system at an
extraordinary high cost to the bridge owner. The deviation will have
negligible effect on vessel navigation. The waterways are transited
primarily by seasonal recreation vessels of various sizes. Bridge
records indicate an average of less than three requests for openings
per month occurred during the hours covered by this deviation. The
Coast Guard contacted local waterway users regarding the Commonwealth's
request for a temporary deviation and received no objections.
Vessels able to pass through the bridge in the closed position may
do so at any time. The bridge will not be able to open immediately for
emergencies. However, the northern entrance to the Annisquam River can
be used as an alternate route for vessels unable to pass through the
bridge in closed position. The Coast Guard will inform the users of the
waterways through our Local and Broadcast Notices to Mariners of the
change in operating schedule for the bridge so that vessel operators
can arrange their transits to minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: December 6, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-29554 Filed 12-8-16; 8:45 am]
BILLING CODE 9110-04-P