Valley Crossing Pipeline, LLC; Notice of Application, 88675-88676 [2016-29423]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 81, No. 236 / Thursday, December 8, 2016 / Notices Description: § 205(d) Rate Filing: 205 filing re: LGIA (SA 2310) among the NYISO, Con Edison, and Cricket Valley to be effective 11/16/2016. Filed Date: 12/1/16. Accession Number: 20161201–5365. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–468–000. Applicants: Ohio Valley Electric Corporation. Description: Compliance filing: Amendment to Attachments J, K and P Tariff Records to be effective 10/14/ 2016. Filed Date: 12/1/16. Accession Number: 20161201–5389. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–469–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Midwest Energy Formula Rate Revisions to be effective 1/1/2017. Filed Date: 12/1/16. Accession Number: 20161201–5402. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–470–000. Applicants: San Diego Gas & Electric Company. Description: Fourth Annual Informational Filing [Cycle 4] of Fourth Transmission Owner Rate Formula rate mechanism of San Diego Gas & Electric Company. Filed Date: 12/1/16. Accession Number: 20161201–5434. Comments Due: 5 p.m. ET 12/22/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 2, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–29421 Filed 12–7–16; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:28 Dec 07, 2016 Jkt 241001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–19–000] Valley Crossing Pipeline, LLC; Notice of Application Take notice that on November 21, 2016, Valley Crossing Pipeline, LLC (Valley Crossing), 5400 Westheimer Court, Houston, Texas 77056, filed an application in Docket No. CP17–19–000 under section 3 of the Natural Gas Act (NGA), and Part 153 of the Commission’s regulations requesting authorization to site, construct, and operate new natural gas facilities to import/export natural gas between the United States to the Republic of Mexico at a point on the International Boundary in Texas state waters (Border Crossing Project), all as more fully set forth in the application which is on file with the Commission and open to public inspection. The facilities will consist of a segment of 42-in-diameter pipe that extends 1,000 feet in the Gulf of Mexico in Texas state waters to the International Boundary between the United States and Mexico. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Lisa A. Connolly, General Manager, Rates and Certificates Department, Valley Crossing Pipeline, LLC, 5400 Westheimer Court, Houston, TX 77056; by calling (713) 627–4102; by faxing (304) 357–5947; or by emailing laconnolly@ spectraenergy.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 88675 Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents E:\FR\FM\08DEN1.SGM 08DEN1 88676 Federal Register / Vol. 81, No. 236 / Thursday, December 8, 2016 / Notices filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: December 23, 2016. Dated: December 2, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–29423 Filed 12–7–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sradovich on DSK3GMQ082PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–3697–000. Applicants: Southern California Edison Company. Description: Informational Filing of Notice of Revision to Formula Transmission Rate Annual Update of Southern California Edison Company. Filed Date: 11/30/16. Accession Number: 20161130–5418. Comments Due: 5 p.m. ET 12/21/16. Docket Numbers: ER12–1436–011; ER10–2329–008; ER10–2740–010; ER10–2742–009; ER10–3099–017; ER10–3143–018; ER10–3169–011; ER10–3300–014; ER12–1260–010; ER13–1488–008; ER13–1793–008; ER14–152–006; ER14–153–006; ER14– 154–006; ER16–517–001. Applicants: Eagle Point Power Generation LLC, Elgin Energy Center, LLC, Gibson City Energy Center, LLC, Grand Tower Energy Center, LLC, Hazle Spindle, LLC, La Paloma Generating Company, LLC, Michigan Power Limited Partnership, Quantum Pasco Power, LP, RC Cape May Holdings, LLC, Rocky Road Power, LLC, Sabine Cogen, LP, Shelby County Energy Center, LLC, Tilton Energy LLC, Vineland Energy, LLC, Stephentown Spindle, LLC. Description: Notice of Non-Material Change in Status of the Rockland Sellers. Filed Date: 11/30/16. VerDate Sep<11>2014 17:28 Dec 07, 2016 Jkt 241001 Accession Number: 20161130–5427. Comments Due: 5 p.m. ET 12/21/16. Docket Numbers: ER17–426–000. Applicants: Southwest Power Pool, Inc. Description: Offer of Settlement of Southwest Power Pool, Inc., on behalf of Missouri River Energy Services and member Denison Municipal Utilities. Filed Date: 11/30/16. Accession Number: 20161130–5420. Comments Due: 5 p.m. ET 12/21/16. Docket Numbers: ER17–460–000. Applicants: Elgin Energy Center, LLC. Description: Compliance filing: Revised MBR Tariff to be effective 1/30/2017. Filed Date: 12/1/16. Accession Number: 20161201–5188. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–461–000. Applicants: Michigan Power Limited Partnership. Description: Compliance filing: Revised MBR Tariff to be effective 1/30/2017. Filed Date: 12/1/16. Accession Number: 20161201–5189. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–462–000. Applicants: Tilton Energy LLC. Description: Compliance filing: Revised MBR Tariff to be effective 1/30/2017. Filed Date: 12/1/16. Accession Number: 20161201–5197. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–463–000. Applicants: Rocky Road Power, LLC. Description: Compliance filing: Revised MBR Tariff to be effective 1/30/2017. Filed Date: 12/1/16. Accession Number: 20161201–5208. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–464–000. Applicants: New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: Dec 2016 Membership Filing to be effective 11/1/2016. Filed Date: 12/1/16. Accession Number: 20161201–5212. Comments Due: 5 p.m. ET 12/22/16. Docket Numbers: ER17–465–000. Applicants: Appalachian Power Company. Description: § 205(d) Rate Filing: OATT—Revise Attachment K, TCC and TNC Rate Update to be effective 12/31/9998. Filed Date: 12/1/16. Accession Number: 20161201–5244. Comments Due: 5 p.m. ET 12/22/16. Take notice that the Commission received the following qualifying facility filings: PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Docket Numbers: QF17–244–000. Applicants: Allegheny Solar 1, LLC. Description: Refund Report of Allegheny Solar 1, LLC under QF17– 244. Filed Date: 12/1/16. Accession Number: 20161201–5245. Comments Due: 5 p.m. ET 12/22/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 1, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–29420 Filed 12–7–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–42–000. Applicants: 96WI 8ME, LLC. Description: Application for Authorization for Disposition of Jurisdictional Facilities and Request for Expedited Action of 96WI 8ME, LLC. Filed Date: 12/2/16. Accession Number: 20161202–5247. Comments Due: 5 p.m. ET 12/23/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2249–005. Applicants: Portland General Electric Company. Description: Third Supplement to June 30, 2016 Triennial Market Power Analysis in the Northwest Region for Portland General Electric Company. Filed Date: 12/2/16. Accession Number: 20161202–5250. E:\FR\FM\08DEN1.SGM 08DEN1

Agencies

[Federal Register Volume 81, Number 236 (Thursday, December 8, 2016)]
[Notices]
[Pages 88675-88676]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-29423]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-19-000]


Valley Crossing Pipeline, LLC; Notice of Application

    Take notice that on November 21, 2016, Valley Crossing Pipeline, 
LLC (Valley Crossing), 5400 Westheimer Court, Houston, Texas 77056, 
filed an application in Docket No. CP17-19-000 under section 3 of the 
Natural Gas Act (NGA), and Part 153 of the Commission's regulations 
requesting authorization to site, construct, and operate new natural 
gas facilities to import/export natural gas between the United States 
to the Republic of Mexico at a point on the International Boundary in 
Texas state waters (Border Crossing Project), all as more fully set 
forth in the application which is on file with the Commission and open 
to public inspection. The facilities will consist of a segment of 42-
in-diameter pipe that extends 1,000 feet in the Gulf of Mexico in Texas 
state waters to the International Boundary between the United States 
and Mexico. The filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site web 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to Lisa 
A. Connolly, General Manager, Rates and Certificates Department, Valley 
Crossing Pipeline, LLC, 5400 Westheimer Court, Houston, TX 77056; by 
calling (713) 627-4102; by faxing (304) 357-5947; or by emailing 
laconnolly@spectraenergy.com.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents

[[Page 88676]]

filed by other parties or issued by the Commission (except for the 
mailing of environmental documents issued by the Commission) and will 
not have the right to seek court review of the Commission's final 
order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

Comment Date: December 23, 2016.

    Dated: December 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-29423 Filed 12-7-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.