Brookfield White Pine Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 87922 [2016-29226]
Download as PDF
87922
Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11834–065]
mstockstill on DSK3G9T082PROD with NOTICES
Brookfield White Pine Hydro, LLC;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of Minimum
Flow Requirements.
b. Project No.: 11834–065.
c. Date Filed: November 23, 2016.
d. Applicant: Brookfield White Pine
Hydro, LLC (licensee).
e. Name of Project: Upper and Middle
Dams Storage Hydroelectric Project.
f. Location: Rapid River in Oxford and
Franklin counties, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Kelly Maloney,
Manager, Licensing and Compliance,
Brookfield White Pine Hydro LLC, 150
Main Street, Lewiston, ME 04240,
Phone: (207) 755–5605.
i. FERC Contact: Robert Ballantine,
(202) 502–6289, or robert.ballantine@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice (by
December 29, 2016). The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
11834–065) on any comments, motions
to intervene, protests, or
recommendations filed.
k. Description of Request: The
licensee requests a temporary variance
of the minimum flow requirements in
the Rapid River below the Middle Dam
VerDate Sep<11>2014
17:39 Dec 05, 2016
Jkt 241001
development due to drought conditions.
License Article 402, in part, requires the
licensee to release from September 16
through the start of the spring refill of
Richardson Lake, a minimum flow of
472 cubic feet per second (cfs). The
licensee explains that due to drought
conditions, Richardson Lake is below its
long term average. Considering a dry
long term precipitation forecast and the
impending winter freeze up, the
licensee is concerned that the reservoir
may not refill by spring as intended,
which could cause additional water
level and minimum flow issues in the
spring of 2017. Therefore in order to
conserve as much fall runoff as possible,
the licensee is requesting to reduce the
minimum flow to 200 cfs until April 23,
2017, at which time a minimum flow of
382 cfs would be released in accordance
with the requirements of Article 402.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of proposed
action. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–29226 Filed 12–5–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–9–000]
ANR Pipeline Company; Notice of
Intent To Prepare an Environmental
Assessment for the Proposed
Wisconsin South Expansion Project,
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Wisconsin South Expansion Project
(Project) involving replacement and
expansion of existing aboveground
facilities by ANR Pipeline Company
(ANR) in the area west and southwest of
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 81, Number 234 (Tuesday, December 6, 2016)]
[Notices]
[Page 87922]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-29226]
[[Page 87922]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11834-065]
Brookfield White Pine Hydro, LLC; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application for Temporary Variance of
Minimum Flow Requirements.
b. Project No.: 11834-065.
c. Date Filed: November 23, 2016.
d. Applicant: Brookfield White Pine Hydro, LLC (licensee).
e. Name of Project: Upper and Middle Dams Storage Hydroelectric
Project.
f. Location: Rapid River in Oxford and Franklin counties, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Kelly Maloney, Manager, Licensing and
Compliance, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston,
ME 04240, Phone: (207) 755-5605.
i. FERC Contact: Robert Ballantine, (202) 502-6289, or
robert.ballantine@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 30 days from the issuance date of this notice
(by December 29, 2016). The Commission strongly encourages electronic
filing. Please file motions to intervene, protests, comments, or
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. Please include the project number (P-11834-065)
on any comments, motions to intervene, protests, or recommendations
filed.
k. Description of Request: The licensee requests a temporary
variance of the minimum flow requirements in the Rapid River below the
Middle Dam development due to drought conditions. License Article 402,
in part, requires the licensee to release from September 16 through the
start of the spring refill of Richardson Lake, a minimum flow of 472
cubic feet per second (cfs). The licensee explains that due to drought
conditions, Richardson Lake is below its long term average. Considering
a dry long term precipitation forecast and the impending winter freeze
up, the licensee is concerned that the reservoir may not refill by
spring as intended, which could cause additional water level and
minimum flow issues in the spring of 2017. Therefore in order to
conserve as much fall runoff as possible, the licensee is requesting to
reduce the minimum flow to 200 cfs until April 23, 2017, at which time
a minimum flow of 382 cfs would be released in accordance with the
requirements of Article 402.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of proposed action. Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-29226 Filed 12-5-16; 8:45 am]
BILLING CODE 6717-01-P