Columbia Gas Transmission, LLC, Columbia Gulf Transmission, LLC; Notice of Revised Schedule for Environmental Review of the Mountaineer Xpress Project and the Gulf Xpress Project, 87926 [2016-29217]
Download as PDF
87926
Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
request. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–29225 Filed 12–5–16; 8:45 am]
90-day Federal Authorization
Decision Deadline: October 26, 2017.
If another schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the projects’
progress.
Additional Information
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–357–000; Docket No.
CP16–361–000]
Columbia Gas Transmission, LLC,
Columbia Gulf Transmission, LLC;
Notice of Revised Schedule for
Environmental Review of the
Mountaineer Xpress Project and the
Gulf Xpress Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental impact statement
(EIS) for Columbia Gas Transmission,
LLC’s Mountaineer XPress Project and
Columbia Gulf Transmission, LLC’s Gulf
XPress Project. The first notice of
schedule, issued on September 14, 2016,
identified April 28, 2017 as the final EIS
issuance date. However, due to recently
filed re-routes and additional
environmental information that required
re-opening a scoping period, it was
necessary for us to revise the published
EIS schedule. Staff has now received all
the information necessary to complete
our review. As a result, staff has revised
the schedule for issuance of the final
EIS, based on a revised issuance of the
draft EIS in February 2017.
Schedule for Environmental Review
Issuance of Notice of Availability of
the final EIS: July 28, 2017.
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription
(https://www.ferc.gov/docs-filing/
esubscription.asp).
Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–29217 Filed 12–5–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–496–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Public Scoping
Session for the Proposed Lone Star
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will hold a public scoping
session as part of their preparation of an
environmental assessment (EA) in Edna,
Texas to receive comments on the Lone
Star Project involving construction and
operation of facilities by Tennessee Gas
Pipeline Company, L.L.C. (Tennessee)
in San Patricio and Jackson Counties,
Texas. The date, time, and location of
the meeting is detailed in the table
below.
FERC PUBLIC SCOPING SESSION, LONE STAR PROJECT
Date and time
Location
Tuesday, December 13, 2016, 5:00 p.m. to 10:00 p.m. a ........................
mstockstill on DSK3G9T082PROD with NOTICES
a FERC
Edna Elementary School, 400 Apollo Drive, Edna, TX 77957.
staff may conclude the session at 8:00 p.m. if all comments have been received. See session format below.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
More information about the
Commission’s EA and Tennessee’s
project is available in the Notice of
Intent to Prepare an Environmental
VerDate Sep<11>2014
17:39 Dec 05, 2016
Jkt 241001
Assessment for the Proposed Lone Star
Project and Request for Comments on
Environmental Issues (NOI) issued on
October 12, 2016. The NOI describes the
scoping process that is under way
seeking public participation in the
environmental review of this project.
Based on public concerns, this notice
announces the continuation of the
scoping process, initiated by the NOI,
the Commission will use to gather input
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
from the public and interested agencies
on the project. The scoping period has
been extended until December 21, 2016.
The Commission invites you to attend
the public scoping session.
The primary goal of the scoping
session is to identify the specific
environmental issues and concerns that
should be considered and addressed in
the EA. Commission staff will accept
verbal comments between 5:00 p.m. and
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 81, Number 234 (Tuesday, December 6, 2016)]
[Notices]
[Page 87926]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-29217]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-357-000; Docket No. CP16-361-000]
Columbia Gas Transmission, LLC, Columbia Gulf Transmission, LLC;
Notice of Revised Schedule for Environmental Review of the Mountaineer
Xpress Project and the Gulf Xpress Project
This notice identifies the Federal Energy Regulatory Commission
staff's revised schedule for the completion of the environmental impact
statement (EIS) for Columbia Gas Transmission, LLC's Mountaineer XPress
Project and Columbia Gulf Transmission, LLC's Gulf XPress Project. The
first notice of schedule, issued on September 14, 2016, identified
April 28, 2017 as the final EIS issuance date. However, due to recently
filed re-routes and additional environmental information that required
re-opening a scoping period, it was necessary for us to revise the
published EIS schedule. Staff has now received all the information
necessary to complete our review. As a result, staff has revised the
schedule for issuance of the final EIS, based on a revised issuance of
the draft EIS in February 2017.
Schedule for Environmental Review
Issuance of Notice of Availability of the final EIS: July 28, 2017.
90-day Federal Authorization Decision Deadline: October 26, 2017.
If another schedule change becomes necessary, an additional notice
will be provided so that the relevant agencies are kept informed of the
projects' progress.
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription (https://www.ferc.gov/docs-filing/esubscription.asp).
Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-29217 Filed 12-5-16; 8:45 am]
BILLING CODE 6717-01-P