Greenhouse Gas Reporting Rule: Leak Detection Methodology Revisions and Confidentiality Determinations for Petroleum and Natural Gas Systems, 86490-86519 [2016-27981]
Download as PDF
86490
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 98
[EPA–HQ–OAR–2015–0764; FRL–9955–12–
OAR]
RIN 2060–AS73
Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
The Environmental Protection
Agency is finalizing revisions and
confidentiality determinations for the
petroleum and natural gas systems
source category of the Greenhouse Gas
Reporting Program. In particular, this
action adds new monitoring methods for
detecting leaks from oil and gas
equipment in the petroleum and natural
gas systems source category consistent
with the fugitive emissions monitoring
methods in the recently finalized new
source performance standards for the oil
and gas industry. This action also adds
emission factors for leaking equipment
to be used in conjunction with these
monitoring methods to calculate and
report greenhouse gas emissions
resulting from equipment leaks. Finally,
this action finalizes reporting
requirements and confidentiality
determinations for nine new or
SUMMARY:
substantially revised data elements
contained in these amendments.
DATES: This final rule is effective on
January 1, 2017.
ADDRESSES: The EPA has established a
docket for this action under Docket ID
No. EPA–HQ–OAR–2015–0764. All
documents in the docket are listed on
the https://www.regulations.gov Web
site. Although listed in the index, some
information is not publicly available,
e.g., confidential business information
(CBI) or other information whose
disclosure is restricted by statute.
Certain other material, such as
copyrighted material, is not placed on
the Internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available electronically through https://
www.regulations.gov.
FOR FURTHER INFORMATION CONTACT:
Carole Cook, Climate Change Division,
Office of Atmospheric Programs (MC–
6207A), Environmental Protection
Agency, 1200 Pennsylvania Ave. NW.,
Washington, DC 20460; telephone
number: (202) 343–9334; fax number:
(202) 343–2342; email address:
GHGReporting@epa.gov. For technical
information, please go to the
Greenhouse Gas Reporting Rule Web
site, https://www.epa.gov/ghgreporting/.
To submit a question, select Help
Center, followed by ‘‘Contact Us.’’
Worldwide Web (WWW). In addition
to being available in the docket, an
electronic copy of this final rule will
also be available through the WWW.
Following the Administrator’s signature,
a copy of this action will be posted on
the EPA’s Greenhouse Gas Reporting
Rule Web site at https://www.epa.gov/
ghgreporting/.
SUPPLEMENTARY INFORMATION:
Regulated Entities. These revisions
affect entities that must submit annual
greenhouse gas (GHG) reports under the
Greenhouse Gas Reporting Program
(GHGRP), codified in the Code of
Federal Regulations (CFR) at 40 CFR
part 98. This rule applies to all
petroleum and natural gas systems
facilities that are subject to 40 CFR part
98, regardless of the facility’s location,
and ensures that all these facilities
across the United States (U.S.) report
GHG data consistently, and therefore is
‘‘nationally applicable’’ within the
meaning of section 307(b)(1) of the
Clean Air Act (CAA). Further, the
Administrator has determined that rules
codified in 40 CFR part 98 are subject
to the provisions of CAA section 307(d).
(See CAA section 307(d)(1)(V) (the
provisions of section 307(d) apply to
‘‘such other actions as the Administrator
may determine’’).) These are
amendments to existing regulations.
These amended regulations affect
owners or operators of petroleum and
natural gas systems that directly emit
GHGs. Regulated categories and entities
include, but are not limited to, those
listed in Table 1 of this preamble:
TABLE 1—EXAMPLES OF AFFECTED ENTITIES BY CATEGORY
NAICS a
Category
Petroleum and Natural Gas Systems .........................................
sradovich on DSK3GMQ082PROD with RULES3
a North
486210
221210
211111
211112
Examples of affected facilities
Pipeline transportation of natural gas.
Natural gas distribution.
Crude petroleum and natural gas extraction.
Natural gas liquid extraction.
American Industry Classification System.
Table 1 of this preamble is not
intended to be exhaustive, but rather
provides a guide for readers regarding
facilities likely to be affected by this
action. Other types of facilities than
those listed in the table could also be
subject to reporting requirements. To
determine whether you are affected by
this action, you should carefully
examine the applicability criteria found
in 40 CFR part 98, subpart A and 40
CFR part 98, subpart W. If you have
questions regarding the applicability of
this action to a particular facility,
consult the person listed in the
preceding FOR FURTHER INFORMATION
CONTACT section.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
What is the effective date? The final
rule is effective on January 1, 2017.
Section 553(d) of the Administrative
Procedure Act (APA), 5 U.S.C. Chapter
5, generally provides that rules may not
take effect earlier than 30 days after they
are published in the Federal Register.
The EPA is issuing this final rule under
section 307(d)(1) of the Clean Air Act,
which states: ‘‘The provisions of section
553 through 557 * * * of Title 5 shall
not, except as expressly provided in this
section, apply to actions to which this
subsection applies.’’ Thus, section
553(d) of the APA does not apply to this
rule. The EPA is nevertheless acting
consistently with the purposes
underlying APA section 553(d) in
PO 00000
Frm 00002
Fmt 4701
Sfmt 4700
making the first set of amendments to
this rule effective on January 1, 2017.
Section 553(d) allows an effective date
less than 30 days after publication for a
rule that ‘‘grants or recognizes an
exemption or relieves a restriction’’ or
‘‘as otherwise provided by the agency
for good cause found and published
with the rule.’’ As explained below, the
EPA finds that there is good cause for
the first set of amendments to this rule
to become effective on January 1, 2017,
even though this may result in an
effective date fewer than 30 days from
date of publication in the Federal
Register.
While this action is being signed prior
to December 1, 2016, there is likely to
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
be a significant delay in the publication
of this rule as it contains complex
equations and tables and is relatively
long. As an example, the EPA
Administrator signed the Greenhouse
Gas Reporting Rule: 2015 Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems
final rule on October 1, 2015, but the
rule was not published in the Federal
Register until October 22, 2015 (80 FR
64262). The purpose of the 30-day
waiting period prescribed in 5 U.S.C.
553(d) is to give affected parties a
reasonable time to adjust their behavior
and prepare before the final rule takes
effect. To employ the APA section
553(d)(3) ‘‘good cause’’ exemption, an
agency must balance the necessity for
immediate implementation against
principles of fundamental fairness
which require that all affected persons
be afforded a reasonable amount of time
to prepare for the effective date of its
ruling.1 Where, as here, the final rule
will be signed and made available on
the EPA Web site more than 30 days
before the effective date, but where the
publication is likely to be delayed due
to the complexity and length of the rule,
the regulated entities are afforded this
reasonable amount of time. We balance
these circumstances with the need for
the amendments to be effective by
January 1, 2017; a delayed effective date
would result in regulatory uncertainty,
program disruption, and an inability to
have the amendments effective for the
2017 reporting year. Accordingly, we
find good cause exists to make this rule
effective on January 1, 2017, consistent
with the purposes of APA section
553(d)(3).
Judicial Review. Under CAA section
307(b)(1), judicial review of this final
rule is available only by filing a petition
for review in the U.S. Court of Appeals
for the District of Columbia Circuit (the
Court) by January 30, 2017 Under CAA
section 307(d)(7)(B), only an objection
to this final rule that was raised with
reasonable specificity during the period
for public comment can be raised during
judicial review. Section 307(d)(7)(B) of
the CAA also provides a mechanism for
the EPA to convene a proceeding for
reconsideration, ‘‘[i]f the person raising
an objection can demonstrate to the EPA
that it was impracticable to raise such
objection within [the period for public
comment] or if the grounds for such
objection arose after the period for
public comment (but within the time
specified for judicial review) and if such
objection is of central relevance to the
1 Omnipoint Corp. v. FCC, 78 F3d 620, 630 (D.C.
Cir. 1996), quoting U.S. v. Gavrilovic, 551 F.2d
1099, 1105 (8th Cir. 1977).
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
outcome of the rule.’’ Any person
seeking to make such a demonstration to
us should submit a Petition for
Reconsideration to the Office of the
Administrator, Environmental
Protection Agency, Room 3000, William
Jefferson Clinton Building, 1200
Pennsylvania Ave. NW., Washington,
DC 20460, with a copy to the person
listed in the preceding FOR FURTHER
INFORMATION CONTACT section, and the
Associate General Counsel for the Air
and Radiation Law Office, Office of
General Counsel (Mail Code 2344A),
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20004. Note that under CAA section
307(b)(2), the requirements established
by this final rule may not be challenged
separately in any civil or criminal
proceedings brought by the EPA to
enforce these requirements.
Acronyms and Abbreviations. The
following acronyms and abbreviations
are used in this document.
APA Administrative Procedure Act
CAA Clean Air Act
CBI Confidential Business Information
CFR Code of Federal Regulations
CH4 methane
CO2 carbon dioxide
CRA Congressional Review Act
DOT Department of Transportation
EPA U.S. Environmental Protection Agency
FR Federal Register
GHG greenhouse gas
GHGRP Greenhouse Gas Reporting Program
GRI Gas Research Institute
ICR Information Collection Request
LNG liquefied natural gas
NAICS North American Industry
Classification System
NSPS New Source Performance Standards
NTTAA National Technology Transfer and
Advancement Act
OGI optical gas imaging
OMB Office of Management and Budget
ppmv parts per million by volume
PRA Paperwork Reduction Act
RFA Regulatory Flexibility Act
U.S. United States
UMRA Unfunded Mandates Reform Act
VOC volatile organic compounds
WWW Worldwide Web
Organization of This Document. The
following outline is provided to aid in
locating information in this preamble.
I. Background
A. Organization of This Preamble
B. Background on This Action
C. Legal Authority
D. How do these amendments apply to
2016 and 2017 reports?
II. Summary of Final Revisions and Other
Amendments to Subpart W and
Responses to Public Comment
A. Summary of Final Amendments—
General
B. Summary of Final Amendments to the
Requirement To Use the Calculation
Methodology Based on Equipment Leak
Surveys
PO 00000
Frm 00003
Fmt 4701
Sfmt 4700
86491
C. Summary of Final Amendments to
Monitoring Methods
D. Summary of Final Amendments to
Components To Be Surveyed
E. Summary of Final Amendments to
Leaker Emission Factors and the
Calculation Methodology Based on
Equipment Leak Surveys
F. Summary of Final Amendments to
Reporting Requirements
III. Final Confidentiality Determinations
A. Summary of Final Confidentiality
Determinations for New or Substantially
Revised Subpart W Data Elements
B. Summary of Public Comments and
Responses on the Proposed
Confidentiality Determinations
IV. Impacts of the Final Amendments to
Subpart W
A. Impacts of the Final Amendments
B. Summary of Comments and Responses
on the Impacts of the Proposed Rule
V. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
B. Paperwork Reduction Act
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act
(UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution or Use
I. National Technology Transfer and
Advancement Act
J. Executive Order 12898: Federal Actions
to Address Environmental Justice in
Minority Populations and Low-Income
Populations
K. Congressional Review Act
I. Background
A. Organization of This Preamble
Section I of this preamble provides
background information regarding the
origin of the final amendments. This
section also discusses the EPA’s legal
authority under the CAA to promulgate
and amend 40 CFR part 98 of the
Greenhouse Gas Reporting Rule
(hereafter referred to as ‘‘part 98’’) as
well as the legal authority for making
confidentiality determinations for the
data to be reported. Section II of this
preamble contains information on the
final amendments to part 98, subpart W
(Petroleum and Natural Gas Systems)
(hereafter referred to as ‘‘subpart W’’),
including a summary of the major
comments that the EPA considered in
the development of this final rule.
Section III of this preamble discusses
the final confidentiality determinations
for new or substantially revised data
E:\FR\FM\30NOR3.SGM
30NOR3
86492
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
reporting elements. Section IV of this
preamble discusses the impacts of the
final amendments to subpart W. Finally,
section V of this preamble describes the
statutory and executive order
requirements applicable to this action.
sradovich on DSK3GMQ082PROD with RULES3
B. Background on This Action
The EPA’s GHGRP requires annual
reporting of GHG data and other
relevant information from large sources
and suppliers in the United States. On
October 30, 2009, the EPA published
part 98 in the Federal Register (FR) for
collecting information regarding GHG
emissions from a broad range of
industry sectors (74 FR 56260).
Although reporting requirements for
petroleum and natural gas systems were
originally proposed to be part of part 98
(74 FR 16448, April 10, 2009), the final
October 2009 rulemaking did not
include the petroleum and natural gas
systems source category as one of the 29
source categories for which reporting
requirements were finalized. The EPA
re-proposed subpart W in 2010 (75 FR
18608; April 12, 2010), and a
subsequent final rulemaking was
published on November 30, 2010, with
the requirements for the petroleum and
natural gas systems source category at
40 CFR part 98, subpart W (75 FR
74458). Following promulgation, the
EPA finalized several actions revising
subpart W (76 FR 22825, April 25, 2011;
76 FR 53057, August 25, 2011; 76 FR
59533, September 27, 2011; 76 FR
80554, December 23, 2011; 77 FR 51477,
August 24, 2012; 78 FR 25392, May 1,
2013; 78 FR 71904, November 29, 2013;
79 FR 70352, November 25, 2014; 80 FR
64262, October 22, 2015).2
The Strategy to Reduce Methane
Emissions in the President’s Climate
Action Plan summarizes the sources of
CH4 emissions, commits to new steps to
cut emissions of this potent GHG, and
outlines the Administration’s efforts to
improve the measurement of these
emissions. The strategy builds on
progress to date and takes steps to
further cut CH4 emissions from several
sectors, including the oil and natural gas
sector. In the strategy, the EPA was
specifically tasked with continuing to
review GHGRP regulatory requirements
to address potential gaps in coverage,
improve methods, and ensure high
quality data reporting.3 On January 14,
2 See Greenhouse Gas Reporting Program,
Historical Rulemakings. Available at https://
www.epa.gov/ghgreporting/rulemaking-notices-ghgreporting.
3 Climate Action Plan—Strategy to Reduce
Methane Emissions. The White House, Washington,
DC, March 2014. Available at https://
www.whitehouse.gov/sites/default/files/
strategy_to_reduce_methane_emissions_2014-0328_final.pdf.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
2015, the Obama administration
provided additional direction to the
EPA to ‘‘explore potential regulatory
opportunities for applying remote
sensing technologies and other
innovations in measurement and
monitoring technology to further
improve the identification and
quantification of emissions’’ in the oil
and natural gas sector, such as the
emissions submitted as part of GHGRP
annual reporting.4
Under subpart W, GHGs that must be
reported by each industry segment and
applicable source types are specified in
40 CFR 98.232, including equipment
leaks from listed component types. In
order to fulfill these equipment leak
emissions reporting requirements,
reporters must utilize one of two
calculation methodologies 5 to calculate
GHG emissions from equipment leaks as
specified in 40 CFR 98.233: (1)
Calculation methodology based on
equipment leak surveys (40 CFR
98.233(q)), or (2) calculation
methodology based on population
counts (40 CFR 98.233(r).6 For example,
facilities in the Onshore Natural Gas
Processing and Onshore Natural Gas
Transmission Compression industry
segments use the calculation
methodology based on equipment leak
surveys for most components at their
facilities. If 40 CFR 98.233(q) specifies
that an equipment leak survey is
required for the subsection of listed
component types in 40 CFR 98.232,
reporters must use one of the
monitoring methods specified in 40 CFR
98.234 when conducting those
equipment leak surveys to detect
leaking components at the facility. The
calculation methodology based on
equipment leak surveys requires that the
reporter then determine the total
4 FACT SHEET: Administration Takes Steps
Forward on Climate Action Plan by Announcing
Actions to Cut Methane Emissions. The White
House, Office of the Press Secretary, January 14,
2015. Available at https://www.whitehouse.gov/thepress-office/2015/01/14/fact-sheet-administrationtakes-steps-forward-climate-action-plan-anno-1.
5 Throughout this preamble, the term ‘‘calculation
methodology’’ refers to the procedures used to
calculate emissions (e.g., ‘‘calculation methodology
based on equipment leak surveys’’ refers to the
methodology described in 40 CFR 98.233(q)) and
‘‘monitoring method’’ refers to the technology, test
method, or other method of determining whether an
individual component is leaking (see 40 CFR
98.234(a)). The term ‘‘leak detection method’’ that
is used in the 40 CFR part 98 subpart W regulatory
text has the same meaning as ‘‘monitoring method’’
used in this preamble.
6 Reporters using the calculation methodology
based on population counts determine the total
number of all components in the facility and
multiply that count by the average estimated time
of operation, the concentration of the CH4 and CO2
in the gas, and the applicable emission factor
(referred to as a ‘‘population emission factor’’) to
calculate emissions.
PO 00000
Frm 00004
Fmt 4701
Sfmt 4700
amount of time each component was
assumed to be leaking and multiply that
by the concentration of the methane
(CH4) and carbon dioxide (CO2) in the
gas and the applicable emission factor
(referred to as a ‘‘leaker emission
factor’’), listed in Table W–1E and Table
W–2 through Table W–7, to calculate
emissions. Finally, 40 CFR 98.236
specifies the data elements that must be
reported to the EPA.
On January 29, 2016, the EPA
proposed ‘‘Leak Detection Methodology
Revisions and Confidentiality
Determinations for Petroleum and
Natural Gas Systems’’ (81 FR 4987) to
add new monitoring methods for
detecting leaks from oil and gas
equipment, to revise which industry
segments and sources use the
calculation methodology based on
equipment leak surveys or the
calculation methodology based on
population counts, to clarify how the
definition of fugitive emission
components in the new source
performance standards (NSPS) for the
oil and natural gas sector (40 CFR part
60, subpart OOOOa, at 81 FR 35824)
(hereafter referred to as the ‘‘NSPS
subpart OOOOa’’) aligns with the
equipment components subject to
subpart W, to add leaker emission
factors for multiple industry segments,
and to add reporting requirements and
confidentiality determinations for new
or substantially revised data elements.
Under those proposed amendments,
facilities with fugitive emissions
components at a well site or compressor
station subject to the NSPS subpart
OOOOa would use data derived from
the NSPS subpart OOOOa fugitive
emissions requirements (i.e., which
components were determined to have
fugitive emissions) along with the
subpart W leaker emission factors to
calculate and report GHG emissions to
the GHGRP. The proposed revisions
provided the opportunity for owners
and operators of sources not subject to
the NSPS subpart OOOOa well site or
compressor station fugitive emissions
standards (e.g., sources participating in
a voluntarily implemented program)
and not already required to conduct leak
surveys under subpart W to optionally
use the calculation methodology at 40
CFR 98.233(q) to calculate and report
their GHG emissions to the GHGRP. The
EPA also proposed that facilities that are
already required to conduct leak surveys
under subpart W would be able to use
the newly proposed monitoring
method(s) in 40 CFR 98.234. In
addition, the EPA proposed new
reporting requirements for all reporters
using the calculation methodology
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
based on equipment leak surveys and
proposed to require reporters using the
calculation methodology for the first
time to begin reporting the information
associated with that methodology.
Finally, the EPA proposed
confidentiality determinations for nine
new or substantially revised data
elements. The public comment period
for these proposed rule amendments
ended on March 15, 2016, following a
15-day extension of the original
comment period end date (81 FR 9797;
February 26, 2016). On June 3, 2016, the
EPA published the final NSPS subpart
OOOOa requirements (81 FR 35824).
In this action, the EPA is finalizing
revisions to subpart W largely as
proposed, with some changes made after
consideration of public comments.
Summaries of significant comments
submitted on the proposed amendments
and the EPA’s responses to those
comments can be found in sections II,
III, and IV of this preamble. All
comments submitted on the proposed
amendments and the EPA’s additional
responses to the comments can be found
in ‘‘Response to Public Comments on
Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764.
As further detailed in the preamble to
the proposed amendments, these
revisions advance the EPA’s goal of
maximizing rule effectiveness by
providing a mechanism for facilities to
use the NSPS subpart OOOOa
monitoring results for purposes of
GHGRP subpart W reporting. This
alignment reduces burden for entities
subject to the fugitive emissions/
equipment leak detection method
requirements in both programs, and,
when combined with the other
amendments being finalized in this
revision, provides clear monitoring
methods, equipment leak survey and
calculation methodologies and emission
factors, and reporting requirements in
subpart W, thus enabling government,
regulated entities, and the public to
easily identify and understand
regulatory requirements. These
amendments also further advance the
ability of the GHGRP to provide access
to high quality data on GHG emissions
by adding the ability for reporters to use
data collected during equipment leak
surveys and to perform site-specific
equipment leak calculations.
C. Legal Authority
The EPA is finalizing these rule
amendments under its existing CAA
authority provided in CAA section 114.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
As stated in the preamble to the 2009
final GHG reporting rule (74 FR 56260;
October 30, 2009), CAA section
114(a)(1) provides the EPA broad
authority to require the information to
be gathered by this rule because such
data will inform and are relevant to the
EPA’s carrying out a wide variety of
CAA provisions. See the preambles to
the proposed (74 FR 16448; April 10,
2009) and final GHG reporting rule (74
FR 56260; October 30, 2009) for further
information.
In addition, pursuant to sections 114,
301, and 307 of the CAA, the EPA is
publishing final confidentiality
determinations for the new or
substantially revised data elements
required by these amendments. Section
114(c) requires that the EPA make
information obtained under section 114
available to the public, except for
information (excluding emission data)
that qualifies for confidential treatment.
The Administrator has determined that
this action is subject to the provisions
of section 307(d) of the CAA. Section
307(d) contains a set of procedures
relating to the issuance and review of
certain CAA rules.
D. How do these amendments apply to
2016 and 2017 reports?
These amendments are effective on
January 1, 2017. Starting with the 2017
reporting year, facilities must follow the
revised methods to detect equipment
leaks (if applicable) and to calculate and
report their annual equipment leak
emissions. The first annual reports of
emissions calculated using the amended
requirements will be those submitted by
April 2, 2018, covering reporting year
2017. For reporting year 2016, reporters
will calculate emissions according to
the requirements in part 98 that are
applicable to reporting year 2016 (i.e.,
the requirements in place until the
effective date of this final rule).
II. Summary of Final Revisions and
Other Amendments to Subpart W and
Responses to Public Comment
Sections II.A through II.F of this
preamble describe the revisions that we
are finalizing in this rulemaking.
Section II.A provides a general summary
of the final amendments to subpart W.
Section II.B describes the final
amendments to the requirement to use
the calculation methodology based on
equipment leak surveys. Section II.C
describes the final amendments to the
subpart W monitoring methods. Section
II.D describes the final amendments for
component types to be surveyed.
Section II.E describes the final
amendments to the subpart W leaker
emission factors. Finally, section II.F
PO 00000
Frm 00005
Fmt 4701
Sfmt 4700
86493
provides a summary of the final
amendments to the subpart W reporting
requirements. The amendments
described in each section are followed
by a summary of the major comments on
those amendments and the EPA’s
responses. See ‘‘Response to Public
Comments on Greenhouse Gas
Reporting Rule: Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764 for a complete listing of all
comments and the EPA’s responses.
A. Summary of Final Amendments—
General
1. Summary of Final Amendments
In this action, the EPA is amending
subpart W to add new monitoring
methods for detecting leaks from oil and
gas equipment in the petroleum and
natural gas systems source category
consistent with the NSPS subpart
OOOOa. The EPA is also specifying that
facilities with a collection of fugitive
emissions components at a well site or
compressor station subject to the NSPS
subpart OOOOa (40 CFR 60.5397a)
would be required to survey those
components, except as otherwise
specified in this subpart W final rule,
for the subpart W calculation
methodology based on equipment leak
surveys using one of the new
monitoring methods being added to
subpart W. In practice, this means that
facilities can use the results of the NSPS
subpart OOOOa-required fugitive
emissions monitoring survey to fulfill
these subpart W requirements. The EPA
is adding leaker emission factors to be
used in conjunction with the calculation
methodology based on equipment leak
surveys to calculate and report GHG
emissions. The revisions provide the
opportunity for owners and operators of
sources not subject to the NSPS subpart
OOOOa well site or compressor station
fugitive emissions standards (e.g.,
sources participating in a voluntarily
implemented program) and not already
required to conduct leak surveys under
subpart W to optionally use the
calculation methodology at 40 CFR
98.233(q) to calculate and report their
GHG emissions, and to use the new
monitoring methods in 40 CFR 98.234 to
do so.
Facilities in certain subpart W
industry segments 7 that are already
required to conduct leak surveys will be
able to use the new monitoring methods
7 These segments are Onshore Natural Gas
Transmission Compression, Underground Natural
Gas Storage, LNG Storage, and LNG Import and
Export Equipment.
E:\FR\FM\30NOR3.SGM
30NOR3
86494
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
sradovich on DSK3GMQ082PROD with RULES3
in 40 CFR 98.234. If they use either of
the two new monitoring methods in 40
CFR 98.234(a)(6) or (7) that are
consistent with the NSPS subpart
OOOOa, then in addition to surveying
the components currently subject to the
survey requirements in subpart W, they
must also survey all other components
that are fugitive emissions components
in the NSPS subpart OOOOa, with
limited exceptions, as specified in 40
CFR 98.232 (see sections II.C and II.D of
this preamble). If they use any of the
monitoring methods currently in 40 CFR
98.234(a)(1) through (5), then in
addition to surveying the components
currently subject to the survey
requirements in subpart W, they may
elect to survey the other components
specified in 40 CFR 98.232.
The comments received on this rule
generally do not dispute the merit of
allowing the use of new monitoring
methods in subpart W, but they do
include issues related to the adequacy of
the notice and comment process, the
calculation methodology based on
equipment leak surveys, reporting, and
applicability.
2. Summary of Comments and
Responses
Comment: Numerous commenters
stated that the EPA’s reference to the
proposed NSPS subpart OOOOa
included in the subpart W proposal was
premature, and substantively and
procedurally flawed. According to these
commenters, by relying on a proposed
action, the EPA did not provide the
opportunity for notice or comment on
how the rule would ultimately affect
stakeholders. These commenters stated
that at the very least the EPA made it
difficult and increased burden for
stakeholders to evaluate scope and
impacts and to provide comment.
Commenters stated that they could only
comment on the effect of the
incorporation of the NSPS subpart
OOOOa proposed requirements, as they
could not review and comment on the
effect of the finalized NSPS subpart
OOOOa requirements on subpart W
prior to closure of the comment period
for the subpart W proposal. Specifically,
the commenters expressed concern that
because the EPA received so many
comments on the proposed NSPS
subpart OOOOa, the final NSPS subpart
OOOOa provisions would likely be
significantly different in certain aspects
and that those details were unknowable
at the time of comment. Noting that the
EPA expressed intent in the preamble to
the subpart W proposed amendments to
incorporate the final NSPS subpart
OOOOa provisions in the final subpart
W rule, the commenters stated they
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
inherently would have no formal
opportunity to meaningfully comment
on the effect those final NSPS subpart
OOOOa provisions would have on
subpart W reporters. Several
commenters stated that this created
substantive and procedural flaws in the
proposed rule, as the EPA provided
neither the ‘‘terms or substance’’ nor a
‘‘description of the subjects and issues
involved’’ of the proposed rule as
required for notice and comment
rulemaking under the Administrative
Procedure Act, 5 U.S.C. 553(b), nor did
the EPA meet the more stringent notice
and comment requirements of CAA
section 307. Several commenters stated
that EPA similarly did not consider
changes that might be made to the final
NSPS subpart OOOOa through the
judicial review process.
Several commenters requested that
the EPA either finalize, or re-propose or
re-open the public comment period for,
the proposed alignment of subpart W
with the NSPS subpart OOOOa only
after the NSPS subpart OOOOa is
finalized. Other commenters requested
that the EPA withdraw the proposal to
amend subpart W and reconsider
whether any revisions are necessary
once the NSPS subpart OOOOa is in
effect.
Response: The EPA disagrees that the
proposed rule for this subpart W
revision was premature, or substantively
and procedurally flawed. This action is
focused on aligning the subpart W
requirements, to the extent possible,
with the finalized NSPS subpart OOOOa
fugitive emission requirements so that
facilities may use the results of the
NSPS subpart OOOOa-required fugitive
emissions monitoring surveys to fulfill
subpart W requirements, and does so
through revisions that incorporate final
NSPS subpart OOOOa monitoring
methods into subpart W and make their
use mandatory in subpart W surveys for
most components subject to NSPS
subpart OOOOa. The proposed rule for
subpart W clearly specified that only a
monitoring method finalized in the
NSPS subpart OOOOa rule would be
finalized for subpart W, which ensured
that no requirement would reference
any monitoring method that was merely
at proposal stage. The proposed rule
provided adequate notice and
opportunity to comment on how the
rule will affect stakeholders, and thus
this final rule is in compliance with the
relevant requirements of CAA section
307(d). Multiple commenters cited the
Administrative Procedure Act (APA),
including 5 U.S.C. 553(b)(3), which
requires that a notice of proposed
rulemaking shall include ‘‘either the
terms or substance of the proposed rule
PO 00000
Frm 00006
Fmt 4701
Sfmt 4700
or a description of the subjects and
issues involved.’’ The EPA notes that
our process is also consistent with the
notice and comment requirements of the
APA, 5 U.S.C. 551–559. In the preamble
to the proposed and final rule, as well
as in ‘‘Response to Public Comments on
Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764, the EPA describes at length the
statement and purpose of the revisions,
provides explanations for any changes
in the rule, and responds to all
comments submitted.
Specifically, in regards to the
proposed rule referencing the then
proposed NSPS subpart OOOOa
monitoring method(s) and fugitive
emissions component definition,8 the
EPA disagrees that the proposed rule
did not give adequate notice and
therefore the EPA did not re-propose or
re-open the comment period for this
action. The proposed rule clearly laid
out the EPA’s proposal and requested
comment regarding alternatives, as well
as the detailed reasoning behind and
goals of the proposal. The EPA provided
this detailed explanation to ensure that
commenters had ample notice of the
revisions under consideration, and
provided 45 days for the public
comment period. This process accords
with proper notice and comment
procedure. Commenters posit that
referencing the then proposed NSPS
subpart OOOOa standard in the
proposed rule renders this notice
premature and inadequate, and the EPA
respectfully disagrees. First, in
proposing to add the NSPS subpart
OOOOa equipment leak detection
methods as approved monitoring
methods for subpart W surveys, the EPA
was not proposing to require any new
collection of data under subpart W, as
the data on fugitive emissions
components would already be collected
to meet the requirements of NSPS
subpart OOOOa. Instead, the EPA
proposed to add these new monitoring
methods under subpart W so that
reporters would be able to use, for the
purpose of compliance with the
proposed mandatory subpart W
equipment leak survey, calculation, and
reporting requirements, whatever data
would already be collected as a result of
complying with the monitoring
method(s) that would be finalized in the
NSPS subpart OOOOa. Similarly, while
the EPA proposed to include all fugitive
emissions components subject to the
8 The NSPS subpart OOOOa rule has since been
finalized. 81 FR 35824 (June 3, 2016).
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
final NSPS subpart OOOOa monitoring
methods within subpart W emissions
reporting requirements, with some
exceptions, which would mean that
additional components would fall
within the scope of subpart W
applicability, these data would already
be collected under the NSPS subpart
OOOOa, meaning that no new data
would need to be collected for subpart
W that was not already required by
another CAA program. As such, the
substance of the monitoring method(s)
and fugitive emission component
definition was not at issue for purposes
of subpart W within these revisions, as
that process took place within the NSPS
subpart OOOOa rulemaking. Rather, the
EPA ensured that reporters were
provided notice of the proposal to add
the monitoring methods and scope of
components that would be finalized
under the NSPS OOOOa as additional
monitoring methods and applicable
components for subpart W, provided
notice of the proposed additional
subpart W equipment leak survey,
calculation, and reporting requirements
for equipment components subject to
the NSPS subpart OOOOa, and made
clear that the intent of these revisions
was to align the programs so that
reporters would use the data gathered in
complying with the finalized NSPS
subpart OOOOa to comply with their
subpart W requirements. The proposed
rule further explained the purpose
behind this proposed revision, as
detailed in the proposed rule (81 FR
4987; January 29, 2016), including
reducing burden on reporters by
minimizing the potential equipment
leak surveys required at a given facility
across CAA programs. As noted earlier,
the proposed rule for subpart W clearly
specified that only a monitoring method
finalized in the NSPS subpart OOOOa
rule would be finalized for subpart W,
which ensured that no requirement
would reference any monitoring method
that was merely at proposal stage. In
fact, the proposed rule for subpart W
clearly detailed the NSPS subpart
OOOOa proposed monitoring method,
and identified that the NSPS subpart
OOOOa proposal included a potential
alternative monitoring method, and
furthermore explained that any
method(s) added in this final subpart W
action would be the method(s) that were
finalized in the NSPS subpart OOOOa.
Furthermore, Subpart W currently
includes an optical gas imaging (OGI)
method (see 40 CFR 98.234(a)(1)) and
Method 21 (40 CFR 98.234(a)(2)) in the
subpart W list of monitoring methods.
While there are differences in the
application of the methods between the
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
current subpart W and the final NSPS
subpart OOOOa,9 necessitating this
revision, current use of OGI and Method
21 for purposes of subpart W provides
support that the methods at issue
provide reliable data for use in subpart
W emissions reporting.
This final rule incorporates the
monitoring methods finalized in the
NSPS subpart OOOOa with some
changes from proposal. To the extent
the specifics of how this final subpart W
rule is adding method(s) in accordance
with the NSPS subpart OOOOa differ
from the specifics in the subpart W
proposal, as explained further in section
II.C of this preamble, these changes are
consistent with the purpose detailed in
the proposed rule and were made to
ensure only those portions of the final
NSPS subpart OOOOa that are essential
to the integrity of the methods are
referenced within the requirements of
subpart W. This final rule revises
applicable components subject to
subpart W to include all components
subject to the final NSPS subpart
OOOOa, except for the finalized as
proposed exclusion of certain
components, as further detailed in
section II.D of this preamble. The EPA
notes that while we finalized the
reference to the NSPS subpart OOOOa
with certain exceptions regarding
applicable components as proposed, the
final NSPS subpart OOOOa definition of
fugitive emission components was
narrower in scope than that rule’s
proposal. This final rule also includes
revisions, with some changes from
proposal as detailed in Sections II.B,
II.D, II.E, and II.F of this preamble, to
how reporters must use the data
obtained in accordance with the
methods finalized in the NSPS subpart
OOOOa for subpart W reporting.
Although the EPA’s own reasoned
consideration and its assessment of
public comment have resulted in some
modifications to the final rule, as
explained further in sections II.B
through II.F of this preamble, such
changes reflect the goals and
alternatives in the EPA’s original
proposal, and the proposed rule ensured
that interested parties were ‘‘fairly
apprised’’ of the elements ultimately
included in this final rulemaking. See,
e.g., United Steelworkers of America v.
Schuylkill Metals, 828 F.2d 314 (5th Cir.
1987).
While some changes occurred to the
NSPS subpart OOOOa requirements
from proposal to final in that
rulemaking, including changes to the
substance of the monitoring methods
and the fugitive emission component
9 See
PO 00000
section II.C of this preamble.
Frm 00007
Fmt 4701
Sfmt 4700
86495
definition, those substantive changes are
out of scope of this subpart W
rulemaking that is intended to align
with the final NSPS subpart OOOOa
requirements; however, commenters
were provided full notice and
opportunity to comment within that
NSPS subpart OOOOa rulemaking, as
fully explained within those proposed
and final preambles, the EPA’s response
to comments, and the docket of that
action.10
The commenter is correct that the
EPA did not consider changes that may
be made to the final NSPS subpart
OOOOa through the judicial review
process. Any such potential, future
changes are premature to consider at
this time.
B. Summary of Final Amendments to
the Requirement To Use the Calculation
Methodology Based on Equipment Leak
Surveys
1. Summary of Final Amendments
As noted in section I.B of this
preamble, subpart W presently requires
reporters with sources in certain
industry segments to use the calculation
methodology based on population
counts according to 40 CFR 98.233(r).
For example, reporters in the Onshore
Petroleum and Natural Gas Production
and the Onshore Petroleum and Natural
Gas Gathering and Boosting industry
segments are required either to count
the number of equipment components
of each type (e.g., valve, connector,
open-ended line, or pressure relief
valve) or to count the number of major
equipment at the facility and then
calculate the number of equipment
components of each type using default
average component counts for each
piece of major equipment in Tables W–
1B and W–1C to subpart W (40 CFR
98.233(r)(2)). The resulting equipment
component counts are then multiplied
by default ‘‘population emission
factors’’ in Table W–1A to subpart W to
calculate emissions from equipment
leaks.
Other reporters are required to use the
calculation methodology based on
equipment leak surveys according to 40
CFR 98.233(q) using one of the
monitoring methods in 40 CFR
98.234(a). For example, reporters in the
Onshore Natural Gas Transmission
Compression industry segment must
conduct at least one equipment leak
survey in a calendar year for the
compressor and non-compressor
components in gas service listed in
Table W–3A to subpart W. These
reporters then use the number of leaking
10 Docket
E:\FR\FM\30NOR3.SGM
ID No. EPA–HQ–OAR–2010–0505.
30NOR3
86496
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
components in the calendar year, the
average amount of time each component
was leaking, and the default ‘‘leaker
emission factors’’ in Table W–3A to
subpart W to calculate emissions
according to Equation W–30.
The EPA is finalizing the proposal to
apply the calculation methodology
based on equipment leak surveys in 40
CFR 98.233(q) to additional reporters in
subpart W. Specifically, reporters in any
subpart W industry segment with a well
site(s) and/or compressor station(s)
required to conduct fugitive emissions
monitoring to comply with the NSPS
subpart OOOOa will be required to use
the calculation methodology based on
equipment leak surveys for those
components 11 under subpart W using
the new monitoring methods consistent
with the NSPS subpart OOOOa (see
section II.C of this preamble). While
these are new calculation methodology
and equipment leak survey
requirements for the subpart W
reporting of these components, reporters
may meet the survey requirements by
counting the actual number of
components with fugitive emissions
identified through implementation of
the NSPS subpart OOOOa as leaks for
purposes of subpart W and use those
counts with the calculation
methodologies specified in 40 CFR
98.233(q) to determine equipment leak
emissions for those components.
We received extensive comment
regarding the proposed revisions to
require facilities in the Onshore Natural
Gas Processing industry segment to use
the results of the leak surveys
conducted to comply with the NSPS
subpart OOOOa equipment leak
requirements for reporting under
subpart W. We are still reviewing those
comments and are not taking final
action on those revisions at this time.
For other sources of equipment leaks
(i.e., those not subject to the NSPS
subpart OOOOa well site or compressor
station fugitive emissions standards),12
the amended subpart W requirements
depend on whether the component
types are currently required to be
reported using the calculation
methodology based on equipment leak
surveys (40 CFR 98.233(q)) or the
calculation methodology based on
population counts (40 CFR 98.233(r)).
For components at facilities in industry
segments that are currently required to
use the calculation methodology based
on equipment leak surveys to comply
with subpart W, the EPA is finalizing as
proposed that reporters must continue
to conduct equipment leak surveys as
required by subpart W but may use any
monitoring method in 40 CFR 98.234(a).
If they use either of the two new
monitoring methods in 40 CFR
98.234(a)(6) or (7) that are consistent
with the NSPS subpart OOOOa, then in
addition to surveying the components
currently subject to the survey
requirements in subpart W, they must
also survey all other components that
are fugitive emissions components in
the NSPS subpart OOOOa, with limited
exceptions, as specified in 40 CFR
98.232 (see sections II.C and II.D of this
preamble). If they use any of the
monitoring methods currently in 40 CFR
98.234(a)(1) through (5), then in
addition to surveying the components
currently subject to the survey
requirements in subpart W, they may
elect to survey the other components
specified in 40 CFR 98.232.
For components at facilities in
industry segments that are currently
required to use the calculation
methodology based on population
counts, the reporter may continue to use
that methodology. Alternatively, the
EPA is finalizing as proposed the option
that the reporter may elect to use the
calculation methodology based on
equipment leak surveys (40 CFR
98.233(q)(1)(iv)) in lieu of the
calculation methodology based on
population counts (40 CFR 98.233(r)). If
this option is selected, then the reporter
must use any of the monitoring methods
in 40 CFR 98.234(a). If they use a
monitoring method in 40 CFR
98.234(a)(6) or (7), then they must
survey all components that would
otherwise be subject to the calculation
methodology based on population
counts, and they must also survey all
other components that are fugitive
emissions components in the NSPS
subpart OOOOa, with limited
exceptions, as specified in 40 CFR
98.232. If they use any of the monitoring
methods currently in 40 CFR
98.234(a)(1) through (5), then in
addition to surveying the components
that would otherwise be subject to the
calculation methodology based on
population counts, they may elect to
survey the other specified in 40 CFR
98.232. The intent of the new provision
in 40 CFR 98.233(q)(1)(iv) is to allow
flexibility for reporters currently
required to use the calculation
methodology based on population
counts for components that are not
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions standards.
The burden of using the calculation
methodology based on equipment leak
surveys will be similar to using the
existing subpart W calculation
methodology based on population
counts, and the results will be more
representative of the number of leaks at
the facility than the calculation
methodology based on population
counts. Table 2 of this preamble
provides a summary of the equipment
leak calculation methodologies and
monitoring methods that will be
available to each industry segment
covered by subpart W under these
amendments.
TABLE 2—FINAL EQUIPMENT LEAK REQUIREMENTS FOR SUBPART W
Subpart W industry
segments a
sradovich on DSK3GMQ082PROD with RULES3
Onshore Petroleum and
Natural Gas Production.
Components subject to 40 CFR 60.5397a of the NSPS
subpart OOOOa
Subpart W calculation
methodology b
Subpart W monitoring
method for leak detection c
Leak survey (40 CFR
98.233(q)).
OGI or Method 21 as
specified in the NSPS
subpart OOOOa.
Onshore Natural Gas
Leak survey (40 CFR
Transmission Compres98.233(q)).
sion; Underground Natural Gas Storage: Storage stations, gas service.
OGI or Method 21 as
specified in the NSPS
subpart OOOOa.
11 See
section II.D of this preamble.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
Components not subject to 40 CFR 60.5397a of the
NSPS subpart OOOOa
Subpart W calculation
methodology
Leak survey (40 CFR
98.233(q)); OR
Population count (40 CFR
98.233(r)).
Leak survey (40 CFR
98.233(q)) e.
12 Except for onshore natural gas processing and
natural gas distribution.
PO 00000
Frm 00008
Fmt 4701
Sfmt 4700
E:\FR\FM\30NOR3.SGM
30NOR3
Subpart W monitoring
method for leak detection d
Any method in 40 CFR
98.234(a).
N/A.
Any method in 40 CFR
98.234(a).
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
86497
TABLE 2—FINAL EQUIPMENT LEAK REQUIREMENTS FOR SUBPART W—Continued
Subpart W industry
segments a
Components subject to 40 CFR 60.5397a of the NSPS
subpart OOOOa
Subpart W calculation
methodology b
Subpart W monitoring
method for leak detection c
Underground Natural Gas
Storage: Storage
wellheads, gas service.
Leak survey (40 CFR
98.233(q)).
OGI or Method 21 as
specified in the NSPS
subpart OOOOa.
LNG f Storage: LNG Service; LNG Import and Export Equipment: LNG
Service.
LNG Storage: Gas Service;
LNG Import and Export
Equipment: Gas Service.
Leak survey (40 CFR
98.233(q)).
OGI or Method 21 as
specified in the NSPS
subpart OOOOa.
Leak survey (40 CFR
98.233(q)).
OGI or Method 21 as
specified in the NSPS
subpart OOOOa.
Components not subject to 40 CFR 60.5397a of the
NSPS subpart OOOOa
Subpart W calculation
methodology
Leak survey (40 CFR
98.233(q)); OR
Population count (40 CFR
98.233(r)).
Leak survey (40 CFR
98.233(q)).
Leak survey (40 CFR
98.233(q)); OR
Population count (40 CFR
98.233(r)) g.
Subpart W monitoring
method for leak detection d
Any method in 40 CFR
98.234(a).
N/A.
Any method in 40 CFR
98.234(a).
Any method in 40 CFR
98.234(a).
N/A.
a Onshore Natural Gas Processing and Natural Gas Distribution are not included in this table because we are not revising the calculation methodology and monitoring method for leak detection for these industry segments in this action. The current requirements are still applicable to components in these industry segments.
b The term ‘‘calculation methodology’’ refers to the procedures used to calculate emissions (e.g., ‘‘calculation methodology based on equipment
leak surveys’’ refers to the methodology described in 40 CFR 98.233(q)) and ‘‘monitoring method’’ refers to the technology, test method, or other
method of determining whether an individual component is leaking (see 40 CFR 98.234(a)).
c OGI as specified in the NSPS subpart OOOOa is codified in subpart W at 40 CFR 98.234(a)(6) and Method 21 as specified in the NSPS
subpart OOOOa is codified in subpart W at 40 CFR 98.234(a)(7).
d ‘‘Any method in 40 CFR 98.234(a)’’ means any of the following methods: OGI as specified in 40 CFR 60.18 (40 CFR 98.234(a)(1)), Method
21 with a leak definition of 10,000 parts per million by volume (ppmv)(40 CFR 98.234(a)(2)), Infrared laser beam illuminated instrument (40 CFR
98.234(a)(3)), Acoustic leak detection device (40 CFR 98.234(a)(5)), OGI as specified in the NSPS subpart OOOOa (40 CFR 98.234(a)(6)) or
Method 21 with a leak definition of 500 ppmv (40 CFR 98.234(a)(7)).
e Reporting is required for emissions from valves, connectors, open-ended lines, pressure relief valves, and meters but is optional for instruments and other components unless the reporter elects to use either OGI or Method 21 as specified in the NSPS subpart OOOOa (40 CFR
98.234(a)(6) or (7)), in which case reporting is also required for instruments and other fugitive emissions components.13
f LNG = liquefied natural gas.
g Reporting is only required for emissions from vapor recovery compressors if this option is chosen.
2. Summary of Comments and
Responses
sradovich on DSK3GMQ082PROD with RULES3
Comment: Several commenters stated
that facilities in the Onshore Petroleum
and Natural Gas Production and
Onshore Petroleum and Natural Gas
Gathering and Boosting industry
segments should not be required to use
the NSPS subpart OOOOa results to
calculate GHG emissions to comply
with subpart W. They stated that the
proposed NSPS subpart OOOOa leak
detection program was limited to one
monitoring method, which is
inconsistent with the current flexibility
for reporters conducting equipment leak
surveys for subpart W to choose any
monitoring method within 40 CFR
98.234(a). The commenters asserted that
this requirement will result in some
subpart W reporters having to manage
multiple equipment leak survey
programs within one facility, especially
if the facility is located within a state
with a different leak detection program,
and this result is overly burdensome. In
13 See section II.D.1 of this preamble for the EPA’s
decision on the final subpart W requirements for
components not subject to 40 CFR 60.5397a of the
NSPS Subpart OOOOa from affected facilities in the
Onshore Natural Gas Transmission Compression
industry segment, and storage stations in gas service
within the Underground Natural Gas Storage
industry segment.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
addition, the commenters stated that the
equipment leak survey results will be
internally inconsistent if they use
different methods, and a facility’s
emissions could appear to increase one
year simply because the number of sites
subject to the NSPS subpart OOOOa
increases, requiring the reporter to use
the OGI method in the NSPS subpart
OOOOa for an increased number of
components. Instead, the reporters
suggested, use of the calculation
methodology based on equipment leak
surveys, including the selection of
monitoring method within 40 CFR
98.234(a), should be voluntary for all
facilities not currently required to
conduct leak surveys under subpart W.
In contrast, another commenter
requested that the EPA require all
subpart W reporters to detect leaks
using direct equipment leak detection
technologies such as OGI. The
commenter stated that leak detection
using OGI can produce more accurate
data than current subpart W methods
and that the EPA’s approach is
consistent with the EPA’s stated goals to
enhance the rigor and transparency of
subpart W data. In addition, the
commenter stated that applying OGI
detection uniformly across subpart W
sources will produce data that is readily
comparable across facilities and will
PO 00000
Frm 00009
Fmt 4701
Sfmt 4700
allow the EPA to assess the performance
of facilities over time.
Response: For facilities that have
affected sources required to conduct
fugitive emissions monitoring to comply
with the NSPS subpart OOOOa well site
or compressor station fugitive emissions
standards, the EPA is finalizing as
proposed that these components must
meet the subpart W calculation
methodology based on equipment leak
survey requirements. In practice, this
means reporters can meet these
requirements by counting the actual
number of components with fugitive
emissions identified through
implementation of the NSPS subpart
OOOOa as leaks for purposes of subpart
W. This requirement will achieve the
EPA’s stated goal of alignment with the
NSPS subpart OOOOa and will assist in
providing the EPA with a greater
understanding of emission reductions.
At this time, we are not requiring all
subpart W facilities to perform a leak
detection survey using direct equipment
leak detection technologies such as OGI.
Rather this action is focused on aligning
the subpart W requirements, to the
extent possible, with the NSPS subpart
OOOOa fugitive emission requirements
so that facilities may use the results of
the NSPS subpart OOOOa-required
E:\FR\FM\30NOR3.SGM
30NOR3
86498
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
fugitive emissions monitoring surveys to
fulfill subpart W requirements.
The EPA does not agree that a subpart
W requirement to use the results of a
previously completed leak survey
within the subpart W calculation
methodology based on equipment leak
surveys will result in an undue burden
to these reporters. For components
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions standards, there is little to no
burden associated with using the
number of components found to have
fugitive emissions as the number of
leaking components in the subpart W
calculation methodology based on
equipment leak surveys. The only
additional piece of information these
reporters need to calculate emissions is
the amount of time each component was
leaking, and this is a straightforward
determination based on the dates of the
equipment leak surveys. See section
IV.B of this preamble for information
and responses to comments related to
the EPA’s burden estimates for these
amendments.
sradovich on DSK3GMQ082PROD with RULES3
C. Summary of Final Amendments to
Monitoring Methods
1. Summary of Final Amendments
The EPA is finalizing the proposal to
add OGI, as specified in the NSPS
subpart OOOOa, to the list of
monitoring methods in 40 CFR
98.234(a). The addition of this specific
OGI method to subpart W at 40 CFR
98.234(a)(6) aligns the methods in the
two rulemakings and allows subpart W
facilities to directly use information
derived from the implementation of the
fugitive emissions monitoring
conducted under the NSPS subpart
OOOOa to calculate and report
equipment leak emissions to the
GHGRP.
The EPA has made changes to the
proposed subpart W amendments after
consideration of public comment and/or
to be consistent with the final revisions
made to the corresponding proposed
NSPS subpart OOOOa specifications.
The proposed subpart W amendments
cross-referenced the proposed 40 CFR
60.5397a(b) through (e) and (g) through
(i), which included the requirements to:
(1) Develop a corporate-wide fugitive
emissions monitoring plan; (2) develop
a site-specific monitoring plan; (3)
observe each fugitive emissions
component for fugitive emissions; (4)
conduct monitoring surveys
semiannually; and (5) adjust the
frequency of monitoring surveys based
on the percent of the fugitive emissions
components detected to have fugitive
emissions. For the reasons described
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
below, the final amendments to subpart
W for the OGI method cross-reference a
portion of the NSPS subpart OOOOa
requirements to develop the fugitive
emissions monitoring plan and the
NSPS subpart OOOOa requirements to
observe each fugitive emissions
component for fugitive emissions.
The final NSPS subpart OOOOa
requires an emissions monitoring plan
that covers the affected sources within
each company-defined area. This
monitoring plan includes information
about the survey frequency, monitoring
method and instrument selected, repair
procedures and timeframes,
recordkeeping, and procedures for
calibrating the monitoring instrument
and verifying that it can detect fugitive
emissions at the required levels.
For the final subpart W amendments,
the EPA evaluated the NSPS subpart
OOOOa requirements for the monitoring
plan along with the level of detail in the
existing monitoring methods in 40 CFR
98.234(a). The EPA determined that
information about the monitoring
instrument selected and procedures for
calibrating the monitoring instrument
and verifying that it can detect fugitive
emissions at the required levels is
necessary to ensure the OGI monitoring
is performed correctly. Therefore, the
new OGI detection method in subpart W
does include the NSPS subpart OOOOa
requirement to develop a monitoring
plan that describes the OGI instrument
(40 CFR 60.5397a(c)(3)) and how the
OGI survey will be conducted to ensure
that fugitive emissions can be imaged
effectively (40 CFR 60.5397a(c)(7)). The
EPA determined that the NSPS subpart
OOOOa survey frequency should not be
cross-referenced in subpart W because
cross-referencing these frequencies
would override the current annual
survey requirement in subpart W
regardless of whether the use of the new
monitoring methods is voluntary or
mandatory. The EPA determined that
the repair procedures and timeframes
should not be cross-referenced because
subpart W is part of a reporting program
and does not require repair of detected
leaks. The EPA also determined that the
NSPS subpart OOOOa recordkeeping
requirements should not be crossreferenced because they include
provisions that are not applicable to
greenhouse gas reporting, such as
records related to repairs. Applicable
recordkeeping requirements for all leak
detection methods in subpart W are
specified at 40 CFR 98.237.
The final site-specific monitoring plan
in the NSPS subpart OOOOa includes
three items specific to the OGI method:
(1) A sitemap; (2) a defined observation
path for the operator that ensures that
PO 00000
Frm 00010
Fmt 4701
Sfmt 4700
all fugitive emissions components are
within sight of the path; and (3) a
monitoring plan for difficult-to-monitor
and unsafe-to-monitor fugitive
emissions components. The EPA has
reviewed these elements as well and
determined not to cross-reference these
three elements in subpart W. The
observation path and the sitemap ensure
that the OGI operator visualizes all of
the components that must be surveyed,
analogous to requirements in some rules
to identify all of the equipment that
must be monitored using Method 21
(e.g., 40 CFR 60.486a(e)(1) and 40 CFR
63.162(c)). Subpart W does not include
these identification requirements as part
of the Method 21 requirements in 40
CFR 98.234(a)(2), so it would be
inconsistent to require the observation
path as part of the new OGI method.
However, while we are not finalizing
the explicit requirement to define the
observation path the operator will
follow during their survey, we do note
that 40 CFR part 98, subpart A requires
a written GHG monitoring plan for all
facilities subject to the GHGRP (see 40
CFR 98.4(g)(5)). Defining an observation
path is one item that could be included
in the GHG monitoring plan to meet the
requirement to describe ‘‘procedures
and methods that are used for quality
assurance . . . of all . . . other
instrumentation’’ used to collect data to
comply with the GHGRP (40 CFR
98.3(g)(5)(i)(C)).
The EPA is finalizing the proposed
requirement to observe each fugitive
emissions component for fugitive
emissions (40 CFR 60.5397a(e)).14 The
EPA considers surveying all fugitive
emissions components (instead of just
the current list of equipment in subpart
W for a particular industry segment) to
be an inherent part of the NSPS subpart
OOOOa OGI method.
The EPA is not cross-referencing the
semi-annual (well sites) and quarterly
(compressor stations) monitoring
frequencies of the final NSPS subpart
OOOOa. As noted above, crossreferencing these monitoring
frequencies would override the current
annual survey requirement in subpart W
regardless of whether the use of the new
monitoring methods is voluntary or
mandatory. The EPA is instead
clarifying that for reporters with
components subject to the NSPS subpart
OOOOa well site or compressor station
fugitive emissions requirements and for
which surveys are required or elected,
the results from each equipment leak
14 See section II.D.1 of this preamble for details
regarding the specific NSPS subpart OOOOadefined fugitive emissions components that are not
considered sources of ‘‘equipment leaks’’ in subpart
W.
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
survey must be used to calculate GHG
emissions for subpart W. The EPA is
further clarifying that it is not our intent
to require reporters that are not subject
to the NSPS subpart OOOOa well site or
compressor station fugitive emissions
requirements to conduct more than one
equipment leak survey in a calendar
year for purposes of GHGRP reporting,
solely because they choose to use the
OGI method. The EPA also notes that
the proposed NSPS subpart OOOOa
provisions for adjusting the frequency of
equipment leak surveys based on the
percent of the fugitive emissions
components detected to have fugitive
emissions were not included in the final
NSPS subpart OOOOa and therefore are
not cross-referenced in the final subpart
W revisions.
Finally, consistent with the final
NSPS subpart OOOOa, the EPA is
finalizing the use of Method 21 as an
alternative monitoring method to OGI
(as specified in the NSPS subpart
OOOOa) at 40 CFR 98.234(a)(7). As the
EPA noted in the preamble for this
proposed revision to subpart W (81 FR
4989; Jan. 29, 2016), the NSPS subpart
OOOOa proposal identified EPA
Method 21 as a monitoring method that
may also be used to conduct resurveys
of repaired components when fugitive
emissions are detected (80 FR 56612
(well sites) and 80 FR 56612
(compressor stations)), and the EPA
requested comment on including in the
final rule the use of Method 21 for
fugitive emissions monitoring as well
(80 FR 56638 (well sites) and 80 FR
56643 (compressor stations)). The EPA
also made clear in the preamble to these
proposed revisions to subpart W that,
consistent with the goal of aligning the
methods in the two rulemakings
(subpart W and the NSPS subpart
OOOOa), the EPA expected that the
final amendments to subpart W for
monitoring methods would reference
the final version of the method(s) in the
NSPS subpart OOOOa, including any
changes made to the NSPS subpart
OOOOa in response to comments on the
proposed monitoring method(s) (81 FR
4991). Accordingly, the EPA is
finalizing the use of Method 21 as an
alternative monitoring method to OGI
(as specified in the NSPS subpart
OOOOa) at 40 CFR 98.234(a)(7).
For reporters that elect to use Method
21 as specified in 40 CFR 98.234(a)(7),
either for components that are subject to
the NSPS subpart OOOOa well site or
compressor station fugitive emissions
requirements or voluntarily, a leak is
detected if an instrument reading of 500
ppmv or greater is measured. As
explained in this section regarding the
NSPS subpart OOOOa OGI monitoring
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
method, we determined that the
requirements in 40 CFR 60.5397a(b) are
consistent with the requirements of
subpart W regarding the development of
an emissions monitoring plan; this
monitoring plan is required to include
verification that the procedures of
Method 21 are followed consistent with
the requirements in 40 CFR
60.5397a(c)(8). Also, as with the NSPS
subpart OOOOa OGI method, the EPA is
requiring in subpart W observation of
each fugitive emissions component for
fugitive emissions consistent with the
requirements in 40 CFR 60.5397a(e); the
EPA considers surveying all fugitive
emissions components to be an inherent
part of the NSPS subpart OOOOa
Method 21 alternative to the OGI
method and is consistent with
requirements in subpart W to conduct a
complete equipment leak survey.
At this time, the EPA is not adding
any other monitoring methods to
subpart W. We will continue to evaluate
equipment leak detection methods and
technologies 15 and may amend subpart
W to allow the use of additional
methods in the future.
2. Summary of Comments and
Responses
Comment: Many commenters
disagreed with the EPA’s proposal to
add only the OGI method as specified in
the NSPS subpart OOOOa to 40 CFR
98.234(a) of subpart W. They asserted
that while OGI is an effective method
for finding the majority of emissions
more quickly than EPA Method 21, it is
also a costly technology that cannot
quantify emissions. The commenters
stated that OGI has other limitations,
especially in non-ideal weather
conditions; one commenter also stated
that use of the OGI camera requires a
hot work permit in many instances.
Response: Due to similar comments
on the proposed NSPS subpart OOOOa,
the final NSPS subpart OOOOa provides
owners and operators of new, modified,
or reconstructed well sites or
compressor stations with the option of
using EPA Method 21 with a repair
threshold of 500 ppmv if they elect not
to use the OGI method (40 CFR
60.5397a). As discussed in section II.C.1
of this preamble, the final amendments
to subpart W provide for the use of EPA
Method 21 where a leak is detected for
purposes of subpart W if an instrument
reading of 500 ppmv or greater is
measured. This amendment to subpart
W maintains the alignment with the
15 For example, the EPA has issued a voluntary
request for information inviting all parties to
provide information on innovative technologies to
detect, measure, and mitigate emissions from the oil
and gas industry. See 81 FR 46670 (July 18, 2016).
PO 00000
Frm 00011
Fmt 4701
Sfmt 4700
86499
NSPS subpart OOOOa well site and
compressor station fugitive emissions
monitoring requirements, so that
reporters can directly use the NSPS
subpart OOOOa monitoring results to
count the number of leaks under subpart
W.
Comment: Many commenters stated
that leak detection technology is a
rapidly growing field and there are
many alternative technologies and new
technologies in development that may
be more accurate and less costly than
OGI. Some commenters noted that
recent emphasis on CH4 emissions has
caused vendors to focus on CH4 leak
detection. Therefore, according to the
commenters, some of those technologies
may be better options for the purpose of
reporting emissions under subpart W
than other leak detection programs. The
commenters stated that the EPA’s
proposal to limit leak surveys to a
prescriptive list of methods could limit
development of these new technologies.
Commenters provided a variety of
suggestions for incorporation of new
and emerging technologies into subpart
W. Three commenters recommended
that the EPA establish a clear process for
industry, vendors, and/or the EPA to
evaluate the efficacy and accuracy of
alternative CH4 monitoring technologies
and approve the use of those
technologies. One of these commenters
noted that any technology evaluation
process should be straightforward and
more streamlined than the years-long
process needed to approve emissions
control devices or continuous emissions
monitoring systems. Another of these
commenters suggested that the EPA
model a technology evaluation process
after the vendor testing program for
flares and combustors, in which the
EPA sets testing protocols and vendors
demonstrate that they can meet specific
criteria. A fourth commenter suggested
that the EPA develop a pilot program to
incentivize the accelerated development
and deployment of advanced
monitoring and detection technologies
and to compare the effectiveness of
these approaches to periodic, OGI-based
surveys.
Response: The EPA agrees with the
commenters that emissions monitoring
in the oil and gas sector is a field of
emerging technology, and major
advances are expected in the near
future. We are seeing a rapidly growing
push to develop and produce low-cost
monitoring technologies to find fugitive
CH4 emissions sooner and at lower
levels than current technology allows,
thus enhancing the ability of operators
to detect fugitive emissions. The EPA
agrees that continued development of
these cost-effective technologies is
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
86500
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
important. However, the EPA does not
have enough information at this time to
evaluate specific technologies to
determine if they are equivalent to or
better than the monitoring methods
provided in and being added to 40 CFR
98.234(a). The EPA may evaluate new
options as they become available and
determine if they are equivalent to
existing methods. For example, the final
NSPS subpart OOOOa provides a
process for the EPA to determine that a
technology can be used as an
‘‘alternative means of emission
limitation.’’ 16 As technologies are
approved through this process, the EPA
anticipates that it would
contemporaneously incorporate these
monitoring methods in subpart W to
ensure continued alignment between
the NSPS subpart OOOOa and subpart
W through future notice and comment
rulemaking.
Comment: Multiple commenters
addressed the proposed requirement to
consider any fugitive emissions
observed using OGI during the NSPS
subpart OOOOa fugitive emissions
monitoring as a leak for purposes of
subpart W. Most of these commenters
objected to the proposal and stated that
the definition of a leak for subpart W
should be 10,000 ppmv, regardless of
the monitoring method used. These
commenters asserted that setting the
leak definition consistent with the
current methods in subpart W would
ensure that the new methods result in
new information being collected and
reported consistently within a facility
and consistent with the equipment leak
data already in the GHGRP. One
commenter noted that defining a leak as
emissions at a set concentration is much
less subjective than defining a leak as
any emissions observed with OGI, and
setting the leak definition at 10,000
ppmv rather than a lower concentration
would allow operators to focus on
finding (and fixing) large leaks instead
of spending resources to identify many
small leaks that do not contribute much
to overall emissions. Another
commenter noted that a leak definition
of 10,000 ppmv is consistent with the
leaker emission factors currently
provided in subpart W as well as the
proposed new leaker emission factors.
One commenter agreed with a subpart
W leak being defined as any fugitive
emissions observed using OGI during
the NSPS subpart OOOOa fugitive
16 See
40 CFR 60.5398a titled ‘‘What are the
alternative means of emission limitations for GHG
and volatile organic compounds from well
completions, reciprocating compressors, the
collection of fugitive emissions components at a
well site and the collection of fugitive emissions
components at a compressor station?’’
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
emissions monitoring or emissions
above 500 ppmv detected via EPA
Method 21, but the commenter asserted
that the leak definition for any new or
emerging technologies used in a
voluntary leak survey should be 5,000
ppmv. The commenter noted that these
new technologies are likely to be more
sensitive and detect emissions at lower
concentrations than OGI, and
companies that are employing more
accurate instruments should not be
‘‘penalized’’ by having to report more
leaks than if they used OGI.
Response: Subpart W already includes
OGI and EPA Method 21 with a leak
definition of 10,000 ppmv for use by
reporters currently required to conduct
leak surveys for subpart W. The final
amendments also provide for use of
these methods by reporters electing to
conduct an equipment leak survey
voluntarily (i.e., for sources currently
required to use the calculation
methodology based on population
counts that are not subject to the NSPS
subpart OOOOa well site or compressor
station fugitive emissions requirements).
The EPA is adding the methods used for
fugitive emissions monitoring in the
NSPS subpart OOOOa to 40 CFR
98.234(a), as approved monitoring
methods for subpart W leak surveys.
This addition facilitates alignment with
the NSPS subpart OOOOa and will
allow reporters to directly use the NSPS
subpart OOOOa monitoring results to
count the number of leaks under subpart
W. Finally, as noted in section II.C.1 of
this preamble, the EPA is not adding
any other monitoring methods to
subpart W at this time, so it is not
necessary to consider a different leak
definition for new or emerging
technologies.
The EPA disagrees that using a leak
definition other than 10,000 ppmv
would undermine the quality of the data
reported to the GHGRP. First, subpart W
currently includes an OGI monitoring
method in 40 CFR 98.234(a)(1). While
this monitoring method allows facilities
to screen the observed leaks using
Method 21, it does not require it, and
we do not expect that many reporters
actively use dual monitoring methods in
their leak surveys to screen all OGIdetected leaks using Method 21.
Second, we are also finalizing,
consistent with the final NSPS subpart
OOOOa rule, the ability to use Method
21 with a leak definition of 500 ppmv
as an alternative to the OGI method. We
agree with commenters that the average
emissions rate of leaks identified using
Method 21 with a leak definition of 500
ppmv would be less than the average
emissions rate of leaks identified using
Method 21 with a leak definition of
PO 00000
Frm 00012
Fmt 4701
Sfmt 4700
10,000 ppmv. To address this issue, we
are also finalizing separate leaker factors
that are appropriate for reporters using
this alternative method (Method 21 with
a leak definition of 500 ppmv). As
described in further detail in section
II.E.1 of this preamble and in the
document ‘‘Greenhouse Gas Reporting
Rule: Technical Support for Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems
Final Rule’’ in Docket ID No. EPA–HQ–
OAR–2015–0764, these additional
emission factors were developed from
the same data set that was used to
develop the original population
emission factors and the proposed
leaker factors.17 Therefore, this
additional Method 21 monitoring
method, which includes a different leak
definition than the other Method 21based method already available in
subpart W at 40 CFR 98.234(a)(2), has
been specifically considered and new
emission factors are provided in the
final rule to ensure that this new
monitoring method’s leak definition
will not undermine the quality of the
emissions reported under subpart W.
If the EPA did not provide the ability
for reporters to use the monitoring
methods required by the NSPS subpart
OOOOa within subpart W, reporters
would not be able to use the NSPS
subpart OOOOa monitoring results
directly; instead, they would have to
measure each occurrence of fugitive
emissions individually to determine if it
is a leak for purposes of subpart W,
which would increase the burden for
those reporters.
D. Summary of Final Amendments for
Components To Be Surveyed
1. Summary of Final Amendments
The EPA proposed to align the
subpart W equipment components with
the NSPS subpart OOOOa definition of
‘‘fugitive emissions component,’’ with
certain exceptions.18 After careful
consideration of comments, the EPA is
finalizing that provision consistent with
the final NSPS subpart OOOOa
definition of ‘‘fugitive emissions
component’’ with certain exceptions
consistent with the proposal, as
described in further detail in this
section below. A ‘‘fugitive emissions
component’’ is defined in 40 CFR
60.5430a of the final NSPS subpart
17 This data set was developed from monitoring
conducted using Method 21 with a leak definition
of 10,000 ppmv.
18 See 81 FR 4994 for a discussion of the
differences between the proposed definition of
‘‘fugitive emissions component’’ and the proposed
components subject to equipment leak reporting in
subpart W.
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
OOOOa to include any component that
has the potential to emit fugitive
emissions of CH4 or volatile organic
compounds at a well site or compressor
station, including but not limited to
valves, connectors, pressure relief
devices, open-ended lines, flanges,
covers and closed vent systems not
subject to 40 CFR 60.5411a, thief
hatches or other openings on a
controlled storage vessel not subject to
40 CFR 60.5395a, compressors,
instruments, and meters. Devices that
vent as part of normal operations, such
as natural gas-driven pneumatic
controllers or natural gas-driven pumps,
are not fugitive emissions components,
as the natural gas discharged from the
device’s vent is not considered a
fugitive emission. Emissions originating
from a location other than the vent are
considered fugitive emissions.
As noted in the preamble to the
proposed subpart W amendments, some
of the components listed in the NSPS
subpart OOOOa definition of fugitive
emissions component are already
included as part of the subpart W
equipment leaks calculation
methodologies (either based on
equipment leak surveys or on
population counts), while other fugitive
emissions components are specifically
addressed in other calculation
methodologies in subpart W. As part of
developing the proposed amendments
for subpart W, we compared the list of
components in the NSPS subpart
OOOOa proposed definition of fugitive
emissions component with the current
86501
methodologies in subpart W to identify
which fugitive emissions components
were already covered by an existing
requirement in subpart W and which
fugitive emissions components would
be specifically covered in subpart W
when using the OGI method as specified
in the proposed NSPS subpart OOOOa.
Table 3 of this preamble provides a
summary of the applicable subpart W
calculation methodologies for
components subject to the fugitive
emissions standards in the final NSPS
subpart OOOOa. The basis for excluding
certain components that are subject to
the fugitive emissions standards in the
final NSPS subpart OOOOa from the
final equipment leak survey
requirements in 40 CFR 98.233(q) is
discussed below.
TABLE 3—FINAL SUBPART W CALCULATION METHODOLOGY REQUIREMENTS FOR COMPONENTS SUBJECT TO THE FUGITIVE
EMISSIONS STANDARDS IN NSPS SUBPART OOOOa
Type of component in definition of
fugitive emissions component and
subject to the fugitive emissions
standards in NSPS subpart
OOOOa
Applicable GHG emissions calculation methodology in subpart W by industry segment for components that
are also subject to the fugitive emissions standards for well sites or compressor stations in the NSPS
subpart OOOOaa
Onshore petroleum and natural
gas production, onshore
petroleum and natural gas
gathering and boosting
Underground natural gas storage,
LNG storage, LNG import and
export equipment
Onshore natural gas transmission
compression
Thief hatches or other openings on
controlled storage vessels not
subject to 40 CFR 60.5395a.
• 40 CFR 98.233(j) ......................
• 40 CFR 98.233(k).
Compressors, excluding emissions
from vents that are part of normal operations (i.e., wet seal oil
degassing vents).
• 40 CFR 98.233(q) for blowdown
valve leakage and isolation
valve leakage (use factor for
‘‘open-ended line’’ in Table W–
1E to subpart W) b.
• 40 CFR 98.233(q) for all other
leaks from the housing (use
factor for ‘‘other’’ components in
Table W–1E to subpart W) b.
• 40 CFR 98.233(p)(10) for rod
packing venting from reciprocating compressors.
All other components .....................
• 40 CFR 98.233(q) (use factors
for applicable component types
in Table W–1E to subpart W) b.
• 40 CFR 98.233(q) (use factor
for ‘‘other’’ components in Tables W–4A, W–5A, and W–6A
to subpart W) b.
• 40 CFR 98.233(o) for blowdown
valve leakage and isolation
valve leakage from centrifugal
compressors.
• 40 CFR 98.233(p) for blowdown
valve leakage, isolation valve
leakage, and rod packing venting from reciprocating compressors.
• 40 CFR 98.233(q) for all other
leaks from the housing (use
factor for ‘‘other’’ components in
Table W–4A, W–5A, and W–6A
to subpart W) b.
• 40 CFR 98.233(q) (use factors
for applicable component types
in Tables W–4A, W–5A, and
W–6A to subpart W) c.
• 40 CFR 98.233(o) for blowdown
valve leakage and isolation
valve leakage from centrifugal
compressors
• 40 CFR 98.233(p) for blowdown
valve leakage, isolation valve
leakage, and rod packing venting from reciprocating compressors
• 40 CFR 98.233(q) for all other
leaks from the housing (use
factor for ‘‘other’’ components in
Tables W–3A, to subpart W) b
• 40 CFR 98.233(q) (use factors
for applicable component types
in Table W–3A to subpart W) c.
sradovich on DSK3GMQ082PROD with RULES3
a Onshore Natural Gas Processing and Natural Gas Distribution are not included in this table because we are not revising the calculation methodology and monitoring method for leak detection for these industry segments in this action. The current requirements are still applicable to components in these industry segments.
b The leaker emission factors for ‘‘other’’ components are being finalized in this revision.
c The leaker emission factors include both factors in the current rule and factors that are being finalized in this action, depending on the specific component and the monitoring method used to conduct the survey, as discussed in section II.E.1 of this preamble.
At proposal, we determined that the
subpart W calculation methodology for
storage tanks in 40 CFR 98.233(j)
already includes emissions from thief
hatches or other openings on storage
vessels in the Onshore Petroleum and
Natural Gas Production and Onshore
Petroleum and Natural Gas Gathering
and Boosting industry segments.
However, we requested comment on
VerDate Sep<11>2014
19:20 Nov 29, 2016
Jkt 241001
whether the agency should consider
separate approaches for controlled
storage tanks and uncontrolled storage
tanks. The final definition of ‘‘fugitive
emissions component’’ in the NSPS
subpart OOOOa (40 CFR 60.5430a)
includes only thief hatches or other
openings on a controlled storage vessel;
it does not specifically list openings on
uncontrolled storage vessels. We
PO 00000
Frm 00013
Fmt 4701
Sfmt 4700
reviewed the subpart W calculation
methodology specifically for storage
tanks with a vapor recovery system (40
CFR 98.233(j)(4)) and storage tanks with
a flare (40 CFR 98.233(j)(5)). The
procedure for determining emissions
from a tank with a vapor recovery
system instructs reporters to adjust the
storage tank emissions downward by the
magnitude of emissions recovered using
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
86502
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
a vapor recovery system as determined
by engineering estimate based on best
available data (40 CFR 98.233(j)(4)(i)).
The procedure for determining
emissions from a tank with a flare
references 40 CFR 98.233(n), which
instructs reporters to use engineering
calculations based on process
knowledge, company records, and best
available data to determine the flow to
the flare if the flare does not have a
continuous flow measurement device. If
a reporter sees fugitive emissions from
a thief hatch or other opening on a
controlled storage vessel during an
equipment leak survey conducted using
OGI, the reporter should consider that
information as part of the ‘‘best
available data’’ used to calculate
emissions from that storage tank.
Therefore, we have concluded that
emissions from thief hatches or other
openings on storage vessels in the
Onshore Petroleum and Natural Gas
Production and Onshore Petroleum and
Natural Gas Gathering and Boosting
industry segments are already included
in the subpart W storage tank emission
calculations in 40 CFR 98.233(j) and are
finalizing, consistent with the proposal,
that they are not to be considered when
determining emissions from equipment
leaks for purposes of subpart W.
We are also finalizing as proposed the
exclusion of thief hatches and other
openings on transmission storage tanks
from the equipment leak reporting
requirements.19 We note that, for
purposes of subpart W reporting, a
leaking thief hatch or other opening is
functionally a secondary vent, and thus
subject to annual screening on an
uncontrolled tank according to 40 CFR
98.233(k)(1). If screening shows vapors
from the thief hatch or opening are
continuous for 5 minutes, then a
method in 40 CFR 98.233(k)(2) must be
used to quantify the leak rate, and this
amount must be combined with any
other vent leak rates for reporting.
We are also finalizing the proposed
distinction between equipment leak
emissions and compressor emissions.
Specifically, for centrifugal
compressors, emission sources include
wet seal oil degassing vents (for
centrifugal compressors with wet seals),
blowdown valve leakage, and isolation
valve leakage. For reciprocating
compressors, emission sources include
reciprocating compressor rod packing
vents, blowdown valve leakage, and
isolation valve leakage.
19 The
exceptions to equipment leak reporting
requirements were included in Tables W–1E and
W–3 through W–6 of the proposal. The final rule
moves these exceptions to 40 CFR 98.232, to
increase clarity and reduce confusion while
achieving the same purpose and effect.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
For compressors in the Onshore
Petroleum and Natural Gas Production
and the Onshore Petroleum and Natural
Gas Gathering and Boosting industry
segments under subpart W, the
compressor methodologies only cover
emissions from centrifugal compressor
wet seal oil degassing vents and from
reciprocating compressor rod packing
vents. Thus, the EPA is finalizing as
proposed, for these industry segments,
that blowdown valve leakage and
isolation valve leakage are considered
equipment leaks (i.e., open-ended lines),
and finalizing as proposed that
emissions from centrifugal compressor
wet seal oil degassing vents and from
reciprocating compressor rod packing
vents are not considered equipment
leaks when using the calculation
methodology based on equipment leak
surveys in 40 CFR 98.233(q).20
For the Onshore Natural Gas
Transmission Compression,
Underground Natural Gas Storage, LNG
Storage, and LNG Import and Export
Equipment segments, subpart W
requires reporters to make ‘‘as found’’ or
continuous measurements for
compressor emission sources, so the
reporters will have either direct
measurement data or site-specific
emission factors by which to calculate
emissions from all of the compressor
sources listed above (i.e., wet seal oil
degassing vents for centrifugal
compressors with wet seals, rod packing
vents for reciprocating compressors, and
blowdown valve leakage and isolation
valve leakage for both centrifugal and
reciprocating compressors). Therefore,
we are finalizing as proposed to exclude
these compressor emission sources from
the requirements in the calculation
methodology based on equipment leak
surveys so that reporters do not doublecount emissions from these sources in
their GHGRP reports.
Finally, as noted in section II.C.1 of
this preamble, we are finalizing the
proposed determination that for
purposes of subpart W, all other fugitive
emissions components as defined in the
NSPS subpart OOOOa not specifically
identified above (e.g., thief hatches or
other openings on a controlled storage
vessel, compressor sources with explicit
calculation methodologies in subpart W)
will be considered equipment
components when conducting an
equipment leak survey using the OGI
method as specified in the NSPS
20 40 CFR 98.233(q) specifies which subsections
in 40 CFR 98.232 (i.e., which components) must
follow the calculation methodology based on
equipment leak surveys in 40 CFR 98.233(q), and
40 CFR 98.232 subsections identify exceptions from
the list of components for which equipment leak
reporting is required.
PO 00000
Frm 00014
Fmt 4701
Sfmt 4700
subpart OOOOa or EPA Method 21 with
a leak definition of 500 ppmv. In other
words, we consider the provision
requiring monitoring of fugitive
emissions components as defined in the
NSPS subpart OOOOa in 40 CFR
60.5397a(e) to be an inherent part of the
NSPS subpart OOOOa OGI method and
EPA Method 21 with a leak definition
of 500 ppmv. Therefore, if a reporter
with components not subject to the
NSPS subpart OOOOa well site or
compressor station fugitive emission
requirements elects to use the NSPS
subpart OOOOa OGI method or EPA
Method 21 with a leak definition of 500
ppmv for purposes of subpart W, they
are also electing to survey these
additional components.
2. Summary of Comments and
Responses
Comment: Several commenters stated
that the NSPS subpart OOOOa proposed
definition of ‘‘fugitive emissions
component’’ is too expansive. Because it
includes many more emission sources
than a more traditional definition of
equipment, the commenters asserted
that it is inconsistent with current
subpart W requirements. The
commenters stated that aligning subpart
W with the NSPS subpart OOOOa in
this respect will complicate the question
of which components must be
monitored at subpart W facilities and
will result in facilities having higher
numbers of leaks than they would have
if they used any other equipment leak
detection method in subpart W. Some
commenters stated that even for well
sites and compressor station sites
subject to the NSPS subpart OOOOa,
component types considered to be
equipment under subpart W should be
consistent with a more traditional
definition of equipment. Other
commenters requested that equipment
under subpart W only include
component types for which the EPA can
provide specific population factors and
leaker emission factors.
Response: As noted in section II.D.1
of this preamble, the final definition of
‘‘fugitive emissions component’’ in the
NSPS subpart OOOOa (40 CFR
60.5430a) does not list as many explicit
individual component types, as
originally proposed. The EPA is
finalizing, with the exceptions
discussed in section II.D.1 of this
preamble and consistent with the extent
proposed, this alignment with the NSPS
subpart OOOOa, so that reporters may
directly use the NSPS subpart OOOOa
monitoring results to count the number
of leaks under subpart W. Reporters
using the calculation methodology
based on equipment leak surveys for
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
components not subject to the NSPS
subpart OOOOa may choose which
monitoring method to use. If a reporter
chooses to use one of the monitoring
methods listed in 40 CFR 98.234(a)(1)
through (5), that reporter would use the
current list of equipment components
for the appropriate industry segment in
40 CFR 98.232 (e.g., the list of
equipment at 40 CFR 98.232(e)(7) for the
Onshore Natural Gas Transmission
Compression industry segment). If a
reporter chooses to use the OGI method
as specified in the NSPS subpart
OOOOa or EPA Method 21 with a leak
definition of 500 ppmv, the reporter
would use both the current list and the
newly added list of equipment
components for the appropriate industry
segment in 40 CFR 98.232, which in
conjunction include the NSPS subpart
OOOOa definition of ‘‘fugitive
emissions component’’ in 40 CFR
60.5430a with the exceptions discussed
in section II.D.1 of this preamble (e.g.,
the list of equipment at 40 CFR
98.232(e)(7) and (8) for the Onshore
Natural Gas Transmission Compression
industry segment).
sradovich on DSK3GMQ082PROD with RULES3
E. Summary of Final Amendments to
Leaker Emission Factors and the
Calculation Methodology Based on
Equipment Leak Surveys
1. Summary of Final Amendments
To quantify emissions from leaking
equipment components, subpart W
includes leaker emission factors for each
component type in each industry
segment currently required to use the
calculation methodology based on
equipment leak surveys. In contrast to
the population emission factors, which
are multiplied by the total facility
component counts, leaker emission
factors are multiplied by the actual
number of leaks for each component
type, as identified by the equipment
leak survey. These amendments
increase the component types that are
required or may elect to use the
calculation methodology based on
equipment leak surveys, including most
of the component types currently using
the subpart W calculation methodology
based on population counts.21
Therefore, new leaker emission factors
are being added so that reporters can
calculate their GHG emissions for these
new component types.
Specifically, the EPA proposed to add
new sets of leaker emission factors to
subpart W for: (1) The Onshore
Petroleum and Natural Gas Production
21 The NSPS subpart OOOOa fugitive emission
requirements do not apply to fugitive emissions
components in the Natural Gas Distribution
industry segment.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
industry segment; (2) the Onshore
Petroleum and Natural Gas Gathering
and Boosting industry segment; (3)
storage wellheads in gas service in the
Underground Natural Gas Storage
industry segment; (4) LNG storage
components in gas service in the LNG
Storage industry segment; and (5) LNG
terminals components in gas service for
the LNG Import and Export Equipment
industry segment. For industry
segments that already include a set of
leaker emission factors, the EPA also
proposed to expand that set of leaker
emission factors to include certain
additional components to better align
with the definition of fugitive emissions
components in the NSPS subpart
OOOOa. See the document ‘‘Greenhouse
Gas Reporting Rule: Technical Support
for Leak Detection Methodology
Revisions and Confidentiality
Determinations for Petroleum and
Natural Gas Systems’’ in Docket Item
No. EPA–HQ–OAR–2015–0764–0028,
for more information on the
development of the proposed leaker
emission factors.
We are finalizing the leaker emission
factors for the Onshore Petroleum and
Natural Gas Production and the Onshore
Petroleum and Natural Gas Gathering
and Boosting industry segments as
proposed, with clarifications for flanges
and connectors noted below. We are
also finalizing the following leaker
emission factors as proposed: (1) The
leaker emission factors for ‘‘other’’
components in Tables W–3A, W–4A,
W–5A, and W–6A to subpart W; (2) the
leaker emission factors for storage
wellhead equipment in gas service
within Table W–4A to subpart W; and
(3) the leaker emission factors for
equipment in gas service for LNG
storage components within Table W–5A
to subpart W and for LNG terminal
components within Table W–6A to
subpart W. We are also finalizing the
proposal to expand the existing leaker
emission factor for meters to also
include instruments in Tables W–3A
and W–4A to subpart W for the Onshore
Natural Gas Transmission Compression
and Underground Natural Gas Storage
industry segments, respectively. All but
one of the proposed leaker factors for
flanges in Tables W–3 through W–6 to
subpart W (Tables W–3A, W–4A, W–5A,
and W–6A to subpart W in these final
amendments) were the same as the
leaker factors for connectors; the
exception was for flanges in gas service
associated with storage wellheads at
Underground Natural Gas Storage
facilities, which had a proposed leaker
factor that differed from the proposed
leaker factor for connectors in the same
PO 00000
Frm 00015
Fmt 4701
Sfmt 4700
86503
service. Flanges are a type of connector,
which means the proposed flange
factors that were identical to the
existing connector factors were
redundant. Therefore, we have not
finalized the proposed separate factors
for flanges where the factor was the
same as the factor for connectors and are
finalizing that flanges must use the final
connector factor, meaning the effect of
the final amendments is the same as the
proposal. The separate factors for
connectors and flanges for storage
wellheads in gas service at Underground
Natural Gas Storage facilities are
finalized as proposed, but to clarify that
the factor for connectors applies only to
all types of connectors other than
flanges, the component name has been
changed from ‘‘connector’’ in the
proposal to ‘‘connector (other)’’ in Table
W–4A of the final amendments. This
change also makes the terminology in
Table W–4A consistent with the
terminology in Tables W–1A and W–1E,
which also specify factors for flanges
that differ from the factors for other
types of connectors.
We are not finalizing the proposed
addition of pumps to the leaker factors
in Table W–2 for the Onshore Natural
Gas Processing industry segment. As
described in section II.B.1 of this
preamble, we are not taking final action
on the Onshore Natural Gas Processing
revisions at this time.
In addition to finalizing nearly all of
the proposed leaker factors, we are also
finalizing an additional set of emission
factors corresponding to the average
emissions rates of components
identified using Method 21 with a leak
definition of 500 ppmv. The proposed
leaker factors were developed based on
Method 21 monitoring using a leak
definition of 10,000 ppmv and were to
be applied by all reporters regardless of
the leak survey monitoring method
used. As noted in section II.C of this
preamble, the final NSPS subpart
OOOOa includes an additional
alternative that allows reporters to use
Method 21 with a leak definition of 500
ppmv. On average, the emissions from
a leak identified with a Method 21
reading above 500 ppmv are less than
the emissions from a leak identified
with a Method 21 reading of 10,000
ppmv or higher. Consequently, the
leaker factor (which is the average
emissions rate) for leaks identified when
using a leak definition of 500 ppmv is
smaller than the leaker factor for leaks
identified when using a leak definition
of 10,000 ppmv. Therefore, in order to
use the NSPS subpart OOOOa survey
results directly to calculate equipment
leak emissions for subpart W when
Method 21 with a leak definition of 500
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
86504
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
ppmv is used, leaker factors were
developed consistent with the average
emissions rate of a ‘‘leak’’ defined as a
measurement reading of 500 ppmv or
more using Method 21. We developed
these new leaker factors using data from
EPA’s Protocol for Equipment Leak
Emissions Estimates 22 consistent with
the data used to develop the proposed
leaker factors for Onshore Petroleum
and Natural Gas Production and the
Onshore Petroleum and Natural Gas
Gathering and Boosting industry
segments. See the document
‘‘Greenhouse Gas Reporting Rule:
Technical Support for Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems
Final Rule’’ in Docket ID No. EPA–HQ–
OAR–2015–0764, which provides more
information on the development of the
final leaker emission factors. The
inclusion of leaker factors specific to
Method 21 with a leak definition of 500
ppmv is consistent with our proposal to
align subpart W calculation
methodologies with the monitoring
requirements in the NSPS subpart
OOOOa.
We are also finalizing the proposed
amendments to the time variable Tp,z in
Equation W–30 to clarify the total time
a surveyed component found leaking is
assumed to be leaking and operational.
The previous language for the definition
of the time variable specifically
considers a first leak survey and a last
leak survey in the year but does not
provide specific language with respect
to the duration of any ‘‘intermediate’’
survey conducted between the first and
last survey. Therefore, the EPA
proposed to amend the definition of the
time variable to clarify how to
determine the duration of a leak if more
than two leak surveys are conducted in
a year and to instruct reporters to sum
the individual durations to determine
the total time the component was
leaking during the year.
The EPA is finalizing this amendment
as proposed. The amendments to the
time variable Tp,z define each equipment
leak survey as covering a unique, nonoverlapping time period and we are
clarifying our intent that a leak detected
in the first or any intermediate survey
is not considered to continue leaking
past the date of that specific equipment
leak survey. For the last survey
conducted in the calendar year, the leak
is assumed to continue until the end of
the year. For example, if a reporter
22 U.S. Environmental Protection Agency.
Protocol for Equipment Leak Emissions Estimates.
EPA–453/R–95–017. November 1995. Docket Item
No. EPA–HQ–OAR–2009–0927–0043.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
conducts three equipment leak surveys
in a calendar year and a particular
component is found to be leaking in the
first and second surveys but not the
third, the total leak duration is the sum
of the time from January 1 to the date
of the second survey. If a reporter
conducts three equipment leak surveys
in a calendar year and a particular
component is found to be leaking in the
first and last surveys but not the second,
then the total leak duration is the sum
of the time from January 1 to the date
of the first survey and the time from the
date of the second survey to December
31.
See ‘‘Response to Public Comments
on Greenhouse Gas Reporting Rule:
Leak Detection Methodology Revisions
and Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764 for all comments and the EPA’s
responses to comments on other aspects
of the time variable Tp,z in Equation W–
30.
Finally, 40 CFR 98.233(q) includes a
provision requiring reporters to conduct
one equipment leak survey in a calendar
year (which must include ‘‘all
component types’’ subject to 40 CFR
98.233(q)) or multiple ‘‘complete’’
equipment leak surveys in a calendar
year. In response to comments as part of
the 2010 subpart W final rule, the EPA
noted that subsequent equipment leak
surveys should be ‘‘conducted for an
entire facility.’’ 23
The EPA has reviewed how this
interpretation could interact with these
final amendments for components
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements and finds that
additional clarification is necessary. For
example, a facility in the Onshore
Petroleum and Natural Gas Production
industry segment or the Onshore
Petroleum and Natural Gas Gathering
and Boosting industry segment may
have some components that are subject
to the NSPS subpart OOOOa well site or
compressor station fugitive emissions
requirements and some components that
are not. In such a case, multiple
equipment leak surveys would be
conducted for the components subject to
the NSPS subpart OOOOa well site or
compressor station fugitive emissions
requirements, to fulfill the requirements
of the NSPS subpart OOOOa for those
components, that would be consistent
23 U.S. Environmental Protection Agency.
Mandatory Greenhouse Gas Reporting Rule Subpart
W—Petroleum and Natural Gas: EPA’s Response to
Public Comments. November 2010. Docket Item No.
EPA–HQ–OAR–2009–0923–3608. Response to
Comment Number EPA–HQ–OAR–2009–0923–
1014–9, pp. 1281–1282.
PO 00000
Frm 00016
Fmt 4701
Sfmt 4700
with subpart W monitoring methods
under these final revisions.
However, under the current
interpretation of a ‘‘complete’’ survey, it
would appear that these reporters would
either: (1) Be unable to use the NSPS
subpart OOOOa fugitive emissions
monitoring results as directed, because
they did not survey all components at
the facility; or (2) be forced to monitor
all components at the facility on the
same frequency as the components
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements to meet the
subpart W requirement to use all
additional leak surveys conducted in
accordance with NSPS OOOOa. The
first interpretation would render these
final amendments useless, and the
second interpretation would increase
the burden beyond the EPA’s intentions,
and could also have unintended
consequences for the components
subject to the NSPS subpart OOOOa
(e.g., a subpart W facility with some
components subject to the NSPS subpart
OOOOa well site fugitive emissions
requirements and others subject to the
NSPS subpart OOOOa compressor
station fugitive emissions requirements
could end up being required to monitor
the fugitive emissions components at a
well site four times a year instead of
twice). Therefore, the EPA is clarifying
in 40 CFR 98.233(q)(2)(i) that any
monitoring conducted pursuant to and
in compliance with the NSPS subpart
OOOOa well site or compressor station
fugitive emissions requirements
constitutes a ‘‘complete’’ survey for
purposes of subpart W and must be used
for subpart W reporting. The EPA is
further clarifying that, to meet the
requirements of 40 CFR 98.233(q), at
least one equipment leak survey must be
conducted in a calendar year.
2. Summary of Comments and
Responses
Comment: Several commenters
addressed the EPA’s proposed leaker
emission factors. Some of the
commenters indicated that the EPA/Gas
Research Institute (GRI) data set upon
which the proposed factors are based is
an older data set and asserted that it
may not be representative of operating
practices and procedures that have
changed significantly over the past 20
years. In addition, the commenters
stated that the EPA/GRI data set
includes a limited population of
measurements, so the proposed leaker
emission factors may not account for
operational variability on a regional or
national level. Some commenters
requested that the EPA consider newer
studies, including those cited in
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
‘‘Greenhouse Gas Reporting Rule:
Technical Support for Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’
(Docket Item No. EPA–HQ–OAR–2015–
0764–0028) either instead of or in
combination with the EPA/GRI data set.
Several commenters urged the EPA to
work with the regulated community to
improve the default leaker emission
factors in subpart W. One commenter
noted that the proposed leaker emission
factors may be a viable interim solution
but recommended that the EPA analyze
more robust data sets consisting of the
combined results of all studies for each
industry segment and evaluate whether
the subpart W leaker emission factors
should be revised.
Response: As described in the
preamble to the proposed rule and the
document ‘‘Greenhouse Gas Reporting
Rule: Technical Support for Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems
Final Rule’’ (Docket ID No. EPA–HQ–
OAR–2015–0764), the EPA has
determined that the EPA/GRI data set is
appropriate to base leaker emission
factors in these subpart W amendments.
We note that the EPA/GRI data set
provides sufficient data to develop
leaker emission factors and that using
this data set for the leaker emission
factors provides consistency with the
population emission factors used by
reporters that do not conduct equipment
leak surveys.
The EPA agrees that there are
numerous recent studies that could be
used to either replace or supplement the
EPA/GRI study data, and many of these
are described in the technical support
document. The EPA evaluated these
other studies and found that the leaker
emission factors determined from these
data sets agreed reasonably well with
the leaker emission factors developed
from the EPA/GRI data set, suggesting
that the EPA/GRI leaker emission factors
are still valid. Commenters that
supported a different basis for the leaker
emission factors than the EPA/GRI data
set did not provide specific information
explaining why another study would be
a better basis or address any of the
specific considerations listed above,
although the comments received suggest
that stakeholders are interested in
further involvement in the assessment
of the available data. Therefore, for the
reasons stated in the preamble to the
proposed rule and the document
‘‘Greenhouse Gas Reporting Rule:
Technical Support for Leak Detection
Methodology Revisions and
Confidentiality Determinations for
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
Petroleum and Natural Gas Systems
Final Rule’’ in Docket ID No. EPA–HQ–
OAR–2015–0764, the EPA is finalizing
the leaker emission factors as proposed.
The EPA appreciates the commenters’
interest in providing a thorough review
of the available study data to develop an
accurate set of leaker emission factors.
The EPA is committed to working with
stakeholders to ensure that GHGRP
requirements and calculation methods
are based upon the most robust data
available. If the EPA determines that
revisions to the subpart W leaker
emission factors are appropriate in the
future based on additional information,
we anticipate that we will propose to
amend the rule accordingly.
Comment: Numerous commenters
stated that reporters should be allowed
to use site-specific leak quantification
data if available, either directly for each
individual leak (i.e., direct measurement
data) or to develop their own leaker
emission factors on a facility-specific,
company-specific, or product-specific
basis. Most of these commenters
supported the EPA’s proposal to include
default leaker emission factors, but
stated that reporters should not be
limited to using them if the facility has
more accurate, site-specific information.
Some commenters further noted that the
site-specific data reported to the GHGRP
could be used to improve the default
leaker emission factors in the future.
One commenter also requested that the
EPA require quantification of any leak
that a reporter elects not to repair.
Response: The EPA did not propose
and, after review and consideration of
comments, is not finalizing provisions
allowing reporters to use site-specific
information to calculate equipment leak
emissions for subpart W. While we
agree that direct measurement has the
potential to provide more accurate
emissions data than using emission
factors, we would need to develop
criteria and guidelines for using direct
measurement data consistently across
subpart W reporters for calculating
equipment leak emissions. Similarly, we
agree that using site-specific emission
factors can provide more accurate
emissions data than using default
emission factors, but a robust set of
requirements would be needed for
reporters to use when developing their
own emission factors to ensure that
those factors are as unbiased and
representative as possible. In addition, if
reporters are using direct measurement
or their own emission factors, we would
most likely need to amend the reporting
requirements (e.g., to require reporters
to provide site-specific emission
factors), and we would need to consider
whether any other amendments would
PO 00000
Frm 00017
Fmt 4701
Sfmt 4700
86505
be needed to enable us to review and
verify reported data. In either of these
cases, we would provide the
opportunity for the public to comment
on those amended requirements before
finalizing them within subpart W.
F. Summary of Final Amendments to
Reporting Requirements
1. Summary of Final Amendments
The EPA is finalizing largely as
proposed the new reporting
requirements for facilities conducting
equipment leak surveys under subpart
W. Reporters in the Onshore Petroleum
and Natural Gas Production and the
Onshore Petroleum and Natural Gas
Gathering and Boosting industry
segments, reporters with storage
wellheads in the Underground Natural
Gas Storage industry segment, and
reporters with components in gas
service in the LNG Storage and LNG
Import and Export Equipment industry
segments that begin using the
calculation methodology based on
equipment leak surveys must report the
information currently listed in 40 CFR
98.236(q)(1) and (2), which includes the
number of equipment leak surveys,
component types, number of leaking
components, average time the
components were assumed to be
leaking, and annual CO2 and CH4
emissions. Facilities that conduct
surveys using the new monitoring
methods in 40 CFR 98.234(a)(6) or (7)
must also report the data elements in 40
CFR 98.236(q)(2) for additional
component types specified in 40 CFR
98.232. Reporters may elect to report the
data elements in 40 CFR 98.236(q)(2) for
the additional component types if they
conduct surveys using a monitoring
method in 40 CFR 98.234(a)(1) through
(5).
The data elements in 40 CFR
98.236(q)(1) and (2) are already required
to be reported by facilities conducting
equipment leak surveys in the Onshore
Natural Gas Transmission Compression,
Underground Natural Gas Storage
(storage stations), and LNG Storage and
LNG Import and Export Equipment
(components in LNG service) industry
segments. However, facilities in those
segments conducting equipment leak
surveys using the new OGI method or
Method 21, as specified in the NSPS
subpart OOOOa (finalized in subpart W
as 40 CFR 98.234(a)(6) or (7)), must
begin reporting the data elements in 40
CFR 98.236(q)(2) for component types
with the new leaker emission factors,
including component types that are not
currently subject to reporting. Facilities
conducting equipment leak surveys
using a monitoring method in 40 CFR
E:\FR\FM\30NOR3.SGM
30NOR3
86506
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
sradovich on DSK3GMQ082PROD with RULES3
98.234(a)(1) through (5) may elect to
begin reporting the data elements in 40
CFR 98.236(q)(2) for other components
that are not currently subject to
reporting.
In addition, the EPA is finalizing as
proposed three new reporting
requirements for facilities conducting
equipment leak surveys in all of the
above segments as well as the Onshore
Natural Gas Processing and Natural Gas
Distribution segments. First, facilities in
those segments will be required to
report the monitoring method(s) in 40
CFR 98.234(a) used to conduct the
survey(s). Second, facilities in the above
segments except for Onshore Natural
Gas Processing and Natural Gas
Distribution will be required to indicate
whether any of their component types
are subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements. Finally,
facilities with components for which the
calculation methodology based on
equipment leak surveys is optional (e.g.,
facilities in the Onshore Petroleum and
Natural Gas Production segment) will be
required to indicate whether they
elected to use the calculation
methodology based on equipment leak
surveys for any of their component
types at the facility.
Additionally, in reviewing specific
reporting requirements while
responding to public comments, we
recognized that the reporting
requirements at 40 CFR 98.236(r)(3)(ii)
were unclear, and could be
misinterpreted with respect to how this
reporting element relates to the
calculated emissions. Therefore, we are
revising 40 CFR 98.236(r)(3)(ii) by
adding the phrase ‘‘. . . for which
equipment leak emissions are calculated
using the methodology in § 98.233(r)’’ to
clarify our original intent that the major
equipment counts reported under this
requirement are specific to equipment
for which emissions are calculated
using the population count
methodology.
2. Summary of Comments and
Responses
Comment: Two commenters
addressed the proposed requirement in
40 CFR 98.236(q)(1)(iii) to indicate
whether any component types at a
facility are subject to the NSPS subpart
OOOOa. One commenter opposed the
addition, stating that it is overly
burdensome to require reporters to
delineate reporting of emission sources
subject to the NSPS subpart OOOOa,
especially if this is intended to be a
numeric response regarding the number
of individual components subject to the
NSPS subpart OOOOa. Another
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
commenter asserted that it is not clear
if the response to proposed 40 CFR
98.236(q)(1)(iii) is a single yes or no for
each facility or if the EPA will be
expecting a yes or no response for each
component type.
Response: In the final rule, the EPA
has revised the proposed requirement in
40 CFR 98.236(q)(1)(iii) (indicate
whether any component types are
subject to the NSPS subpart OOOOa) to
be clear that the EPA expects only one
yes or no response for an entire facility.
While the EPA understands that the
number of leaking components and
equipment leak emissions may increase
as the number of components subject to
the NSPS subpart OOOOa increases,
this response will allow the EPA to
provide transparent data related to
changes in emissions for facilities with
components subject to the NSPS subpart
OOOOa well site or compressor station
fugitive emissions requirements over
time. This data element will also
support verification that the appropriate
GHGRP monitoring method was used by
the facility.
III. Confidentiality Determinations
A. Summary of Final Confidentiality
Determinations for New Subpart W Data
Elements
As noted in the proposed rule, we are
applying the same approach as
previously used for making
confidentiality determinations for data
elements reported under the GHGRP. In
the ‘‘Confidentiality Determinations for
Data Required Under the Mandatory
Greenhouse Gas Reporting Rule and
Amendments to Special Rules
Governing Certain Information Obtained
Under the Clean Air Act’’ (hereafter
referred to as ‘‘2011 Final CBI
Rulemaking’’) (76 FR 30782, May 26,
2011), the EPA grouped part 98 data
elements for which EPA was
determining confidentiality status
through that rulemaking into 22 data
categories (11 direct emitter data
categories and 11 supplier data
categories) with each of the 22 data
categories containing data elements that
are similar in type or characteristics.
The EPA then made categorical
confidentiality determinations for eight
direct emitter data categories and eight
supplier data categories and applied the
categorical confidentiality
determination to all data elements
assigned to the category. Of these data
categories with categorical
determinations, the EPA determined
that four direct emitter data categories
are comprised of those data elements
that meet the definition of ‘‘emission
data,’’ as defined at 40 CFR 2.301(a),
PO 00000
Frm 00018
Fmt 4701
Sfmt 4700
and are, therefore, not entitled to
confidential treatment under section
114(c) of the CAA.24 The EPA
determined that the other four direct
emitter data categories and the eight
supplier data categories do not meet the
definition of ‘‘emission data.’’ For these
data categories that are determined not
to be emission data, the EPA determined
categorically that data in three direct
emitter data categories and five supplier
data categories are eligible for
confidential treatment as CBI, and that
the data in one direct emitter data
category and three supplier data
categories are ineligible for confidential
treatment as CBI. For two direct emitter
data categories, ‘‘Unit/Process ‘Static’
Characteristics that Are Not Inputs to
Emission Equations’’ and ‘‘Unit/Process
Operating Characteristics that Are Not
Inputs to Emission Equations,’’ and
three supplier data categories, ‘‘GHGs
Reported,’’ ‘‘Production/Throughput
Quantities and Composition,’’ and
‘‘Unit/Process Operating
Characteristics,’’ the EPA determined in
the 2011 Final CBI Rulemaking that the
data elements assigned to those
categories are not emission data, but the
EPA did not make categorical CBI
determinations for them. Rather, the
EPA made CBI determinations for each
individual data element included in
those categories on a case-by-case basis
taking into consideration the criteria in
40 CFR 2.208. The EPA did not make a
final confidentiality determination for
data elements assigned to the inputs to
emission equation data category (a
direct emitter data category) in the 2011
Final CBI Rulemaking. However, the
EPA has since proposed and finalized
an approach for addressing disclosure
concerns associated with inputs to
emissions equations.25
In the proposed rule, we assigned the
nine proposed new or substantially
revised data elements to the appropriate
direct emitter data categories created in
the 2011 Final CBI Rulemaking based on
the type and characteristics of each data
element. For the seven data elements
the EPA assigned to a direct emitter
category with a categorical
determination, the EPA proposed that
the categorical determination for the
category be applied to the proposed new
or substantially revised data elements,
24 Direct emitter data categories that meet the
definition of ‘‘emission data’’ in 40 CFR 2.301(a) are
‘‘Facility and Unit Identifier Information,’’
‘‘Emissions,’’ ‘‘Calculation Methodology and
Methodological Tier,’’ and ‘‘Data Elements Reported
for Periods of Missing Data that are not Inputs to
Emission Equations.’’
25 Revisions to Reporting and Recordkeeping
Requirements, and Confidentiality Determinations
Under the Greenhouse Gas Reporting Program;
Final Rule. (79 FR 63750, October 24, 2014).
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
used for data elements previously
assigned to these two data categories, as
shown in Table 5 of this preamble. Refer
to the preamble to the proposed rule (81
FR 4987; January 29, 2016) for
additional information regarding the
proposed confidentiality
determinations.
as shown in Table 4 of this preamble.
For the two data elements assigned to
the ‘‘Unit/Process Operating
Characteristics that Are Not Inputs to
Emission Equations,’’ we proposed
confidentiality determinations on a
case-by-case basis taking into
consideration the criteria in 40 CFR
2.208, consistent with the approach
86507
With consideration of the information
provided by commenters, the EPA is
finalizing the confidentiality
determinations as proposed.
Specifically, the EPA is finalizing the
proposed determination for each of the
nine new or substantially revised data
elements to be designated as ‘‘emission
data’’ or ‘‘not CBI.’’
TABLE 4—FINAL DATA CATEGORY ASSIGNMENTS AND CONFIDENTIALITY DETERMINATIONS FOR NEW DATA ELEMENTS
ASSIGNED TO CATEGORIES WITH CATEGORICAL DETERMINATIONS
Citation
Data element
Final category assignment
Categorical determination
(as established in 2011) 26
§ 98.236(q)(1)(i) ...................
The number of complete equipment leak surveys performed during the calendar year.
Whether any component types were subject to 40
CFR part 60, subpart OOOOa.
Whether you elected to comply with § 98.233(q) per
§ 98.233(q)(1)(iii).
Each type of method described in § 98.234(a) that was
used to conduct leak surveys.
For each component type that is located at your facility, component type.
For each component type that is located at your facility, annual CO2 emissions, in metric tons CO2.
For each component type that is located at your facility, annual CH4 emissions, in metric tons CH4.
Test and Calibration Methods.
Facility and Unit Identifier
Information.
Facility and Unit Identifier
Information.
Test and Calibration Methods.
Facility and Unit Identifier
Information.
Emissions ..........................
Not Emission Data and Not
CBI.
Emission Data.
Emissions ..........................
Emission Data.
§ 98.236(q)(1)(iii) ..................
§ 98.236(q)(1)(iv) .................
§ 98.236(q)(1)(v) ..................
§ 98.236(q)(2)(i) ...................
§ 98.236(q)(2)(iv) .................
§ 98.236(q)(2)(v) ..................
Emission Data.
Not Emission Data and Not
CBI.
Emission Data.
Emission Data.
TABLE 5—FINAL CONFIDENTIALITY FOR DATA ELEMENTS ASSIGNED TO THE ‘‘UNIT/PROCESS OPERATING
CHARACTERISTICS THAT ARE NOT INPUTS TO EMISSION EQUATIONS’’ DATA CATEGORY
Data element
Final confidentiality determination and rationale
§ 98.236(q)(2)(ii) ...................
For each component type
that is located at your facility, total number of the
surveyed component type
that were identified as
leaking in the calendar
year (‘‘xp’’ in Equation
W–30).
§ 98.236(q)(2)(iii) ..................
sradovich on DSK3GMQ082PROD with RULES3
Citation
For each component type
that is located at your facility, average time the
surveyed components
are assumed to be leaking and operational, in
hours (average of ‘‘Tp,z’’
from Equation W–30).
Not Emission Data (Categorical Determination as Established in 2011).
Not CBI. The term ‘‘equipment leaks’’ refers to those emissions which could not
reasonably pass through a stack, chimney, vent, or other functionally-equivalent
opening. Leaking components at a facility may have a correlation to the level of
maintenance at a facility. However, there is no direct correlation between the
level of maintenance and process efficiency, i.e., a higher number of leaks in one
facility do not indicate that the processes have been running longer or more frequently than those processes at another facility that has a lower number of leaks.
Furthermore, Department of Transportation (DOT) regulations require natural gas
distribution companies and transmission pipeline companies to conduct periodic
leak detection and fix any leaking equipment. The number of leaks detected and
fixed is reported to the DOT and is publicly available. Finally, 40 CFR part 60,
subpart OOOOa requires reporting for each component with visible emissions at
affected well sites and compressor station sites. The EPA is finalizing that this
data element is not confidential; and that it will be considered ‘‘not CBI.’’
Not Emission Data (Categorical Determination as Established in 2011).
Not CBI. This data element will provide information on the amount of time operational components were found to be leaking. This information provides little insight into maintenance practices at a facility because it does not identify the
cause of the leaks or the nature and cost of repairs. Therefore, this information
would not be likely to cause substantial competitive harm to reporters. For this
reason, we are finalizing the average time operational components were found
leaking be designated as ‘‘not CBI.’’
B. Summary of Comments and
Responses
This section summarizes the major
comments and responses related to the
proposed categorical assignments and
confidentiality determinations. See
‘‘Response to Public Comments on
Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
26 The categorical confidentiality determinations
for the data categories listed in this table were
finalized on May 26, 2011 (see 76 FR 30782).
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
PO 00000
Frm 00019
Fmt 4701
Sfmt 4700
E:\FR\FM\30NOR3.SGM
30NOR3
86508
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
0764 for a complete listing of all
comments and responses. See the
memorandum ‘‘Final Data Category
Assignments and Confidentiality
Determinations for Data Elements in the
‘Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems;
Final Rule’ ’’ in Docket ID No. EPA–HQ–
OAR–2015–0764 for a complete listing
of final data category assignments and
confidentiality determinations.
Comment: One commenter stated that
the EPA should reconsider the proposed
determination of ‘‘not CBI’’ for the
number of components identified as
leaking in a calendar year and the
average time the surveyed components
are assumed to be leaking. The
commenter asserted that designating
this information as CBI would
encourage more reporters to voluntarily
conduct leak surveys. The commenter
also noted that this information is
publically available for some sources
and suggested that the rule provide an
exception from classification as CBI for
components subject to State programs or
NSPS that already require public
disclosure. Another commenter
requested that the EPA protect the
community’s right to know and not
allow companies to keep the public
from finding out about leaks from
hydrocarbon facilities.
Response: While it is possible that the
requirement to report the number of
leaking components and the average
time those components were leaking
could discourage some reporters from
conducting voluntary equipment leak
surveys, this is not a valid reason to
allow reporters to claim these data
elements as confidential. As noted in
section III.C of the preamble to the
proposed rule, the EPA proposed that
disclosure of these data elements is
unlikely to cause substantial harm to a
business’s competitive position, and the
commenter did not indicate that the
EPA’s determination was incorrect.
Therefore, the EPA is finalizing the
confidentiality determinations for these
data elements as ‘‘not CBI.’’
sradovich on DSK3GMQ082PROD with RULES3
IV. Impacts of the Final Amendments to
Subpart W
A. Impacts of the Final Amendments
The final amendments to subpart W
revise costs associated with the use of
the monitoring methods and the
calculation methodology based on
equipment leak surveys for reporters in
the following industry segments:
Onshore Petroleum and Natural Gas
Production, Onshore Petroleum and
Natural Gas Gathering and Boosting,
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
Onshore Natural Gas Transmission
Compression, Underground Natural Gas
Storage, LNG Storage, and LNG Import
and Export Equipment. Reporters in
these industry segments are required to
use the results of fugitive emissions
component monitoring required for well
sites and compressor stations under the
NSPS subpart OOOOa. Reporters in
these segments with components not
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements and for which
they are currently required to use the
calculation methodology based on
population counts under subpart W may
voluntarily use the calculation
methodology based on equipment leak
surveys for those components if the
equipment leak survey is conducted
following a monitoring method listed in
subpart W.
The EPA received comments from one
commenter regarding the specific
impacts of the proposed amendments.
After evaluating these comments and
reviewing other changes from proposal,
the EPA revised the impacts assessment
from proposal. The EPA estimates that
the costs of the final amendments to
subpart W are slightly more burdensome
than we estimated at proposal, but they
do not significantly change the overall
burden to subpart W reporters. The EPA
estimated that the additional costs to
subpart W reporters in the Onshore
Petroleum and Natural Gas Production
and the Onshore Petroleum and Natural
Gas Gathering and Boosting industry
segments to transition their existing
equipment leak recordkeeping,
calculating, and reporting systems to
use the calculation methodology based
on equipment leak surveys and to
determine which components are
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements and which are
not, will be approximately $110,000 per
year, or about $410 per reporter. The
EPA estimated that the additional costs
for subpart W reporters in the other
industry segments (i.e., Onshore Natural
Gas Transmission Compression,
Underground Natural Gas Storage,
Liquefied Natural Gas (LNG) Storage,
and LNG Import and Export Equipment)
to add a few new emission factors to
their existing systems (rather than
transitioning their recordkeeping,
calculating, and reporting systems) and
to determine which components are
covered by the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements and which are
not, will be approximately $20,000 per
year or about $110 per reporter. The
total costs are approximately $128,400
PO 00000
Frm 00020
Fmt 4701
Sfmt 4700
per year for all reporters, or about $286
per reporter. See the memorandum,
‘‘Assessment of Impacts of the Final
Leak Detection Methodology Revisions
and Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764 for additional information.
B. Summary of Comments and
Responses
This section summarizes the major
comments and responses related to the
impacts of the proposed amendments to
subpart W of part 98. We note that while
several commenters asserted that the
proposed rule would be burdensome for
many operators and suggested revisions
to the rule requirements that would
reduce the burden, only one commenter
provided comments on the EPA’s
impacts estimate and supporting
statement, and that commenter’s major
comments are summarized in this
section. See ‘‘Response to Public
Comments on Greenhouse Gas
Reporting Rule: Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764 for a complete listing of all
comments and responses.
Comment: One commenter stated that
the EPA’s estimate of two hours of labor
and $198 per reporter significantly
underestimates and misrepresents the
amount of time and effort that goes into
implementing a new rule. The
commenter provided a cost estimate that
assumes more labor hours than in the
EPA’s memorandum ‘‘Assessment of
Impacts of the Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’
(Docket Item No. EPA–HQ–OAR–2015–
0764–0025). The commenter noted that
as more sites become subject to the
NSPS subpart OOOOa at a facility, the
costs of managing the data and
processing it into a usable format for the
GHGRP will increase each year for that
reporter. The commenter also noted that
the EPA was incorrect in assuming that
there would be no costs for facilities in
the Onshore Natural Gas Processing
segment.
Response: The EPA has evaluated the
comments and has made changes to the
estimate of burden in the supporting
statement. The following paragraphs
address each of the points in the
commenter’s detailed cost estimate
included with the comment letter and
explain how the points are being
addressed in the final burden and cost
estimate.
E:\FR\FM\30NOR3.SGM
30NOR3
sradovich on DSK3GMQ082PROD with RULES3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
The commenter suggested adding
burden of two hours in the first year
related to the initial monitoring plan
development and burden of 0.5 hours in
subsequent years related to yearly
monitoring plan revisions. The EPA did
not include costs at proposal related to
the monitoring plan because the subpart
W amendments do not require the
development of a separate monitoring
plan. Instead, the subpart W
amendments cross reference the
monitoring plan that is already being
developed according to the NSPS
subpart OOOOa. The EPA recognizes
that reporters that are not subject to the
NSPS subpart OOOOa would not
already be required to develop a
monitoring plan under the NSPS
subpart OOOOa; however, reporters that
elect to use one of the new leak
detection methods are also electing to
incur the burden of developing a
monitoring plan. Therefore, there is no
monitoring plan burden associated with
the subpart W amendments and the
final burden and cost estimate has not
changed from proposal as a result of this
comment.
The commenter suggested changing
the number of hours to revise the
reporting system to five hours and to
allow one hour for maintenance in each
subsequent year. At proposal, the EPA
estimated that revising the reporting
system to use the calculation
methodology based on equipment leak
surveys would require two hours. The
commenter did not provide the basis for
their estimate of five hours to update the
data management system. The overall
reporting costs for compliance already
include a burden of ten hours per year
and the EPA disagrees that updating the
data management system would
encompass half of that allotment
because EPA anticipates that reporters
would only need to add a few emission
factors for leaking components to their
existing system, rather than something
more time-intensive such as creating a
new data management system. We
reviewed the revisions expected to be
needed in the data management system.
While we maintain that two hours are
sufficient to implement the calculation
methodology based on equipment leak
surveys into a reporter’s existing system,
we recognize that this process will also
require quality assurance reviews and
testing to ensure the data are stored
properly and the calculations are
performed correctly. Therefore, we
increased the number of hours
estimated to revise the reporting system
from two hours to 3.5 hours to account
for these additional quality reviews of
the data management system. However,
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
the EPA has made no changes to burden
associated with maintenance of the
revised reporting system because the
EPA asserts that any reporting system
maintenance related to subpart W is
already reflected in the twenty hours
per year allotted to each subpart W
reporter for recordkeeping and reporting
activities.
The commenter suggested that the
EPA adjust the proposed burden and
cost estimate by adding the following
activities and burden estimates: (1)
Time for staff to process the survey data
resulting from the calculation
methodology based on equipment leak
surveys and to enter it into the GHGRP
system at a burden of three hours per
year; (2) time for staff training at a
burden of two hours for initial training
and one hour per year in subsequent
years; and (3) time for staff to review the
data for quality assurance, follow
missing data requirements, report data
to the EPA, and retain all records at a
burden of four total hours per year.
At proposal, the EPA did not include
burden related to these activities
because they are covered by the twenty
hours per year already accounted for in
the overall subpart W reporter burden
for recordkeeping and reporting
activities. Therefore, the final burden
and cost estimate has not changed from
proposal as a result of these comments.
However, at proposal, the EPA did not
account for the time associated with
determining which components in the
reporting system are covered by the
NSPS subpart OOOOa well site or
compressor station fugitive emissions
requirements and which are not. As a
result, the EPA has added 0.5 hours per
reporter in the first year that the reporter
has an affected collection of fugitive
emissions components subject to the
NSPS subpart OOOOa well site or
compressor station fugitive emissions
requirements and 0.1 hours per reporter
in subsequent years.
Finally, for the reasons described in
section II.B.2 of this preamble, the final
rule language specifies that the
requirement to use the NSPS subpart
OOOOa results as part of the calculation
methodology based on equipment leak
surveys only applies to components
subject to the NSPS subpart OOOOa
well site or compressor station fugitive
emissions requirements. The subpart W
equipment leak survey requirements for
facilities in the Onshore Natural Gas
Processing segment do not change as a
result of these amendments. Therefore,
the EPA is not including any burden
estimate for Onshore Natural Gas
Processing reporters (i.e., the revisions
to the burden estimate described in this
PO 00000
Frm 00021
Fmt 4701
Sfmt 4700
86509
response do not apply to the Onshore
Natural Gas Processing segment).
Overall, the burden and cost estimate
has been revised as discussed above
from 502 hours and $50,000 per year at
proposal to approximately 1,295 hours
and $128,400 per year for all reporters.
V. Statutory and Executive Order
Reviews
Additional information about these
statutes and Executive Orders can be
found at https://www2.epa.gov/laws-andexecutive orders.
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
This action is not a significant
regulatory action and was therefore not
submitted to the Office of Management
and Budget (OMB) for review.
B. Paperwork Reduction Act (PRA)
The information collection activities
in this rule have been submitted for
approval to the OMB under the PRA.
The Information Collection Request
(ICR) document that the EPA prepared
has been assigned EPA ICR number
2300.19. You can find a copy of the ICR
in the docket for this rule, and it is
briefly summarized here. The
information collection requirements are
not enforceable until OMB approves
them.
This action increases burden for
industry segments that conduct
equipment leak surveys. These revisions
are expected to increase respondent
burden for subpart W reporters that
become subject to the NSPS subpart
OOOOa well site or compressor station
fugitive requirements. To accommodate
the new methods and emission factors
added by these final amendments, the
EPA expects that each affected subpart
W reporter will either revise their
reporter-specific calculation mechanism
(i.e., calculation spreadsheet,
recordkeeping database, etc.) or add a
few new emission factors to the
reporter-specific calculation
mechanism, when and if the reporter
becomes subject to the NSPS subpart
OOOOa well site or compressor station
fugitive requirements. The
recordkeeping and reporting
requirements are being finalized as
proposed. Impacts associated with the
final revisions to the recordkeeping and
reporting requirements are detailed in
the memorandum ‘‘Assessment of
Impacts of the Final Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’
E:\FR\FM\30NOR3.SGM
30NOR3
86510
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
sradovich on DSK3GMQ082PROD with RULES3
(see Docket ID No. EPA–HQ–OAR–
2015–0764).
Data collection provides a critical tool
for communities to identify nearby
sources of GHGs and provides
information to state and local
governments. The data can be used to
complement atmospheric GHG studies
and inform updates to emission
inventories such as the Inventory of U.S.
Greenhouse Gas Emissions and Sinks
(Inventory). Various activity data are
collected that can be used to improve
understanding of the occurrence of
emissions from a variety of sources.
Data collected must be made available
to the public unless the data qualify for
CBI treatment under the CAA and EPA
regulations. All data determined by the
EPA to be CBI are safeguarded in
accordance with regulations in 40 CFR
chapter 1, part 2, subpart B.
Respondents/affected entities: The
respondents in this information
collection include owners and operators
of petroleum and natural gas systems
facilities that report their GHG
emissions from equipment leaks to the
EPA to comply with subpart W.
Respondent’s obligation to respond:
The respondent’s obligation to respond
is mandatory under the authority
provided in CAA section 114.
Estimated number of respondents:
Approximately 899 respondents per
year.
Frequency of response: Annual.
Total estimated burden: 1,295 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $128,400 (per
year), includes $0 annualized capital or
operation and maintenance costs.
An agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number. The OMB control
numbers for the EPA’s regulations in 40
CFR are listed in 40 CFR part 9. When
OMB approves this ICR, the EPA will
announce that approval in the Federal
Register and publish a technical
amendment to 40 CFR part 9 to display
the OMB control number for the
approved information collection
activities contained in this final rule.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have
a significant economic impact on a
substantial number of small entities
under the RFA. The small entities
directly regulated by this final rule
include small businesses in the
petroleum and natural gas industry. The
EPA has determined that some small
businesses will be affected because their
production processes emit GHGs
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
exceeding the reporting threshold. This
action includes amendments that may
result in a small burden increase on
some subpart W reporters, but the EPA
has determined that the increased cost
of less than $286 per reporter is not a
significant impact. Details of this
analysis are presented in ‘‘Assessment
of Impacts of the Final Leak Detection
Methodology Revisions and
Confidentiality Determinations for
Petroleum and Natural Gas Systems’’ in
Docket ID No. EPA–HQ–OAR–2015–
0764.
D. Unfunded Mandates Reform Act
(UMRA)
This action does not contain an
unfunded mandate of $100 million or
more as described in UMRA, 2 U.S.C.
1531–1538, and does not significantly or
uniquely affect small governments. As
shown in sections IV.A and V.B of this
preamble, the annual cost of this action
is $128,400, which is well under $100
million per year.
E. Executive Order 13132: Federalism
This action does not have federalism
implications. It will not have substantial
direct effects on the states, on the
relationship between the national
government and the states, or on the
distribution of power and
responsibilities among the various
levels of government.
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
This action has tribal implications.
However, it will neither impose
substantial direct compliance costs on
federally recognized tribal governments,
nor preempt tribal law. This regulation
will apply directly to petroleum and
natural gas facilities that emit GHGs.
Although few facilities that will be
subject to the rule are likely to be owned
by tribal governments, the EPA sought
opportunities to provide information to
tribal governments and representatives
during the development of the proposed
and final subpart W that was
promulgated on November 30, 2010 (75
FR 74458).
The EPA consulted with tribal
officials under the EPA Policy on
Consultation and Coordination with
Indian Tribes early in the process of
developing this regulation to permit
them to have meaningful and timely
input into its development. A summary
of that consultation is provided in
section IV.F of the preamble to the reproposal of subpart W published on
April 12, 2010 (75 FR 18608), and
section IV.F of the preamble to the
PO 00000
Frm 00022
Fmt 4701
Sfmt 4700
subpart W 2010 final rule published on
November 30, 2010 (75 FR 74458).
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
The EPA interprets Executive Order
13045 as applying only to those
regulatory actions that concern
environmental health or safety risks that
the EPA has reason to believe may
disproportionately affect children, per
the definition of ‘‘covered regulatory
action’’ in section 2–202 of the
Executive Order. This action is not
subject to Executive Order 13045
because it does not concern an
environmental health risk or safety risk.
H. Executive Order 13211: Actions That
Significantly Affect Energy Supply,
Distribution, or Use
This action is not subject to Executive
Order 13211, because it is not a
significant regulatory action under
Executive Order 12866.
I. National Technology Transfer and
Advancement Act (NTTAA)
This rulemaking does not involve
technical standards.
J. Executive Order 12898: Federal
Actions To Address Environmental
Justice in Minority Populations and
Low-Income Populations
The EPA believes that this action is
not subject to Executive Order 12898 (59
FR 7629, February 16, 1994) because it
does not establish an environmental
health or safety standard. Instead, this
rule addresses information collection
and reporting and verification
procedures.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and
the EPA will submit a rule report to
each House of the Congress and to the
Comptroller General of the United
States. This action is not a ‘‘major rule’’
as defined by 5 U.S.C. 804(2).
List of Subjects in 40 CFR Part 98
Environmental protection,
Administrative practice and procedure,
Greenhouse gases, Reporting and
recordkeeping requirements.
Dated: November 10, 2016.
Gina McCarthy,
Administrator.
For the reasons stated in the
preamble, title 40, chapter I, of the Code
of Federal Regulations is amended as
follows:
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
PART 98—MANDATORY
GREENHOUSE GAS REPORTING
1. The authority citation for part 98
continues to read as follows:
■
Authority: 42 U.S.C. 7401–7671q.
Subpart W—Petroleum and Natural
Gas Systems
2. Section 98.232 is amended by:
a. Revising paragraph (c)(21);
b. Adding paragraph (e)(8);
c. Revising paragraph (f)(5);
d. Adding paragraphs (f)(6) through
(8);
■ e. Revising paragraphs (g)(3) and (4);
■ f. Adding paragraphs (g)(5) through
(7);
■ g. Revising paragraphs (h)(4) and (5);
■ h. Adding paragraphs (h)(6) through
(8); and
■ i. Revising paragraph (j)(10).
The revisions and additions read as
follows:
■
■
■
■
■
§ 98.232
GHGs to report.
sradovich on DSK3GMQ082PROD with RULES3
*
*
*
*
*
(c) * * *
(21) Equipment leaks from valves,
connectors, open ended lines, pressure
relief valves, pumps, flanges, and other
components (such as instruments,
loading arms, stuffing boxes,
compressor seals, dump lever arms, and
breather caps, but does not include
components listed in paragraph (c)(11)
or (19) of this section, and it does not
include thief hatches or other openings
on a storage vessel).
*
*
*
*
*
(e) * * *
(8) Equipment leaks from all other
components that are not listed in
paragraph (e)(1), (2), or (7) of this
section and are either subject to the well
site or compressor station fugitive
emissions standards in § 60.5397a of
this chapter or you elect to survey using
a leak detection method described in
§ 98.234(a)(6) or (7). The other
components subject to this paragraph
(e)(8) also do not include thief hatches
or other openings on a storage vessel. If
these other components are not subject
to the well site or compressor station
fugitive emissions standards in
§ 60.5397a of this chapter, you may also
elect to report emissions from these
other components if you elect to survey
them using a leak detection method
described in § 98.234(a)(1) through (5).
(f) * * *
(5) Equipment leaks from valves,
connectors, open ended lines, pressure
relief valves, and meters associated with
storage stations.
(6) Equipment leaks from all other
components that are associated with
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
storage stations, are not listed in
paragraph (f)(1), (2), or (5) of this
section, and are either subject to the
well site or compressor station fugitive
emissions standards in § 60.5397a of
this chapter or you elect to survey using
a leak detection method described in
§ 98.234(a)(6) or (7). If these other
components are not subject to the well
site or compressor station fugitive
emissions standards in § 60.5397a of
this chapter, you may also elect to
report emissions from these other
components if you elect to survey them
using a leak detection method described
in § 98.234(a)(1) through (5).
(7) Equipment leaks from valves,
connectors, open-ended lines, and
pressure relief valves associated with
storage wellheads.
(8) Equipment leaks from all other
components that are associated with
storage wellheads, are not listed in
paragraph (f)(1), (2), or (7) of this
section, and are either subject to the
well site or compressor station fugitive
emissions standards in § 60.5397a, of
this chapter or you elect to survey using
a leak detection method described in
§ 98.234(a)(6) or (7). If these other
components are not subject to the well
site or compressor station fugitive
emissions standards in § 60.5397a of
this chapter, you may also elect to
report emissions from these other
components if you elect to survey them
using a leak detection method described
in § 98.234(a)(1) through (5).
(g) * * *
(3) Flare stack emissions.
(4) Equipment leaks from valves,
pump seals, connectors, and other
equipment leak sources in LNG service.
(5) Equipment leaks from vapor
recovery compressors, if you do not
survey components associated with
vapor recovery compressors in
accordance with paragraph (g)(6) of this
section.
(6) Equipment leaks from all
components in gas service that are
associated with a vapor recovery
compressor, are not listed in paragraph
(g)(1) or (2) of this section, and that are
either subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter
or you elect to survey using a leak
detection method described in
§ 98.234(a).
(7) Equipment leaks from all
components in gas service that are not
associated with a vapor recovery
compressor, are not listed in paragraph
(g)(1) or (2) of this section, and are
either subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter
or you elect to survey using a leak
PO 00000
Frm 00023
Fmt 4701
Sfmt 4700
86511
detection method described in
§ 98.234(a)(6) or (7). If these components
are not subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter,
you may also elect to report emissions
from these components if you elect to
survey them using a leak detection
method described in § 98.234(a)(1)
through (5).
(h) * * *
(4) Flare stack emissions.
(5) Equipment leaks from valves,
pump seals, connectors, and other
equipment leak sources in LNG service.
(6) Equipment leaks from vapor
recovery compressors, if you do not
survey components associated with
vapor recovery compressors in
accordance with paragraph (h)(7) of this
section.
(7) Equipment leaks from all
components in gas service that are
associated with a vapor recovery
compressor, are not listed in paragraph
(h)(1) or (2) of this section, and that are
either subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter
or you elect to survey using a leak
detection method described in
§ 98.234(a).
(8) Equipment leaks from all
components in gas service that are not
associated with a vapor recovery
compressor, are not listed in paragraph
(h)(1) or (2) of this section, and that are
either subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter
or you elect to survey using a leak
detection method described in
§ 98.234(a)(6) or (7). If these components
are not subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter,
you may also elect to report emissions
from these components if you elect to
survey them using a leak detection
method described in § 98.234(a)(1)
through (5).
*
*
*
*
*
(j) * * *
(10) Equipment leaks from valves,
connectors, open ended lines, pressure
relief valves, pumps, flanges, and other
components (such as instruments,
loading arms, stuffing boxes,
compressor seals, dump lever arms, and
breather caps, but does not include
components in paragraph (j)(8) or (9) of
this section, and it does not include
thief hatches or other openings on a
storage vessel).
*
*
*
*
*
■ 3. Section 98.233 is amended by:
■ a. Revising the parameter EFt of
Equation W–1 in paragraph (a)
introductory text, and paragraph (q);
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
*
*
*
*
(q) Equipment leak surveys. For the
components identified in paragraphs
(q)(1)(i) through (iii) of this section, you
must conduct equipment leak surveys
using the leak detection methods
specified in paragraphs (q)(1)(i) through
(iii) of this section. For the components
identified in paragraph (q)(1)(iv) of this
section, you may elect to conduct
equipment leak surveys, and if you elect
to conduct surveys, you must use a leak
detection method specified in paragraph
(q)(1)(iv) of this section. This paragraph
(q) applies to components in streams
with gas content greater than 10 percent
CH4 plus CO2 by weight. Components in
streams with gas content less than or
equal to 10 percent CH4 plus CO2 by
weight are exempt from the
requirements of this paragraph (q) and
do not need to be reported. Tubing
systems equal to or less than one half
inch diameter are exempt from the
requirements of this paragraph (q) and
do not need to be reported.
(1) Survey requirements. (i) For the
components listed in § 98.232(e)(7),
(f)(5), (g)(4), and (h)(5), that are not
subject to the well site or compressor
station fugitive emissions standards in
§ 60.5397a of this chapter, you must
conduct surveys using any of the leak
detection methods listed in § 98.234(a)
and calculate equipment leak emissions
using the procedures specified in
paragraph (q)(2) of this section.
(ii) For the components listed in
§ 98.232(d)(7) and (i)(1), you must
conduct surveys using any of the leak
detection methods listed in
§ 98.234(a)(1) through (5) and calculate
equipment leak emissions using the
procedures specified in paragraph (q)(2)
of this section.
(iii) For the components listed in
§ 98.232(c)(21), (e)(7), (e)(8), (f)(5), (f)(6),
(f)(7), (f)(8), (g)(4), (g)(6), (g)(7), (h)(5),
(h)(7), (h)(8), and (j)(10) that are subject
to the well site or compressor station
fugitive emissions standards in
§ 60.5397a of this chapter, you must
conduct surveys using any of the leak
detection methods in § 98.234(a)(6) or
(7) and calculate equipment leak
emissions using the procedures
specified in paragraph (q)(2) of this
section.
(iv) For the components listed in
§ 98.232(c)(21), (e)(8), (f)(6), (f)(7), (f)(8),
(g)(6), (g)(7), (h)(7), (h)(8), or (j)(10), that
are not subject to fugitive emissions
standards in § 60.5397a of this chapter,
you may elect to conduct surveys
according to this paragraph (q), and, if
you elect to do so, then you must use
one of the leak detection methods in
§ 98.234(a).
(A) If you elect to use a leak detection
method in § 98.234(a)(1) through (5) for
the surveyed component types in
§ 98.232(c)(21), (f)(7), (g)(6), (h)(7), or
(j)(10) in lieu of the population count
methodology specified in paragraph (r)
of this section, then you must calculate
emissions for the surveyed component
types in § 98.232(c)(21), (f)(7), (g)(6),
Where:
Es,p,i = Annual total volumetric emissions of
GHGi from specific component type ‘‘p’’
(in accordance with paragraphs (q)(1)(i)
through (iv) of this section) in standard
(‘‘s’’) cubic feet, as specified in
paragraphs (q)(2)(ii) through (x) of this
section.
xp = Total number of specific component
type ‘‘p’’ detected as leaking in any leak
survey during the year. A component
found leaking in two or more surveys
during the year is counted as one leaking
component.
EFs,p = Leaker emission factor for specific
component types listed in Tables W–1E,
W–2, W–3A, W–4A, W–5A, W–6A, and
W–7 to this subpart.
GHGi = For onshore petroleum and natural
gas production facilities and onshore
b. Removing the first two sentences of
paragraph (r) introductory text and
adding four sentences in their place;
and
■ c. Revising the parameters Counte and
EFs,e of Equation W–32A in paragraph
(r) introductory text, and paragraphs
(r)(3) through (5).
The revisions read as follows:
■
§ 98.233
Calculating GHG emissions.
*
*
*
(a) * * *
*
*
*
*
*
*
*
EFt = Population emission factors for natural
gas pneumatic device vents (in standard
cubic feet per hour per device) of each
type ‘‘t’’ listed in Tables W–1A, W–3B,
and W–4B to this subpart for onshore
petroleum and natural gas production,
onshore natural gas transmission
compression, and underground natural
gas storage facilities, respectively.
Onshore petroleum and natural gas
gathering and boosting facilities must
use the population emission factors
listed in Table W–1A to this subpart.
sradovich on DSK3GMQ082PROD with RULES3
*
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
PO 00000
Frm 00024
Fmt 4701
Sfmt 4700
(h)(7), or (j)(10) using the procedures in
paragraph (q)(2) of this section.
(B) If you elect to use a leak detection
method in § 98.234(a)(1) through (5) for
the surveyed component types in
§ 98.232(e)(8), (f)(6), (f)(8), (g)(7), and
(h)(8), then you must use the procedures
in paragraph (q)(2) of this section to
calculate those emissions.
(C) If you elect to use a leak detection
method in § 98.234(a)(6) or (7) for any
elective survey under this subparagraph
(q)(1)(iv), then you must survey the
component types in § 98.232(c)(21),
(e)(8), (f)(6), (f)(7), (f)(8), (g)(6), (g)(7),
(h)(7), (h)(8), and (j)(10) that are not
subject to fugitive emissions standards
in § 60.5397a of this chapter, and you
must calculate emissions from the
surveyed component types in
§ 98.232(c)(21), (e)(8), (f)(6), (f)(7), (f)(8),
(g)(6), (g)(7), (h)(7), (h)(8), and (j)(10)
using the emission calculation
requirements in paragraph (q)(2) of this
section.
(2) Emission calculation methodology.
For industry segments listed in
§ 98.230(a)(2) through (9), if equipment
leaks are detected during surveys
required or elected for components
listed in paragraphs (q)(1)(i) through (iv)
of this section, then you must calculate
equipment leak emissions per
component type per reporting facility
using Equation W–30 of this section and
the requirements specified in
paragraphs (q)(2)(i) through (xi) of this
section. For the industry segment listed
in § 98.230(a)(8), the results from
Equation W–30 are used to calculate
population emission factors on a meter/
regulator run basis using Equation W–31
of this section. If you chose to conduct
equipment leak surveys at all above
grade transmission-distribution transfer
stations over multiple years, ‘‘n,’’
according to paragraph (q)(2)(x)(A) of
this section, then you must calculate the
emissions from all above grade
transmission-distribution transfer
stations as specified in paragraph
(q)(2)(xi) of this section.
petroleum and natural gas gathering and
boosting facilities, concentration of
GHGi, CH4, or CO2, in produced natural
gas as defined in paragraph (u)(2) of this
section; for onshore natural gas
processing facilities, concentration of
GHGi, CH4 or CO2, in the total
hydrocarbon of the feed natural gas; for
onshore natural gas transmission
compression and underground natural
E:\FR\FM\30NOR3.SGM
30NOR3
ER30NO16.000
86512
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
sradovich on DSK3GMQ082PROD with RULES3
(i) You must conduct at least one leak
detection survey in a calendar year. The
leak detection surveys selected must be
conducted during the calendar year. If
you conduct multiple complete leak
detection surveys in a calendar year,
you must use the results from each
complete leak detection survey when
calculating emissions using Equation
W–30. For components subject to the
well site and compressor station fugitive
emissions standards in § 60.5397a of
this chapter, each survey conducted in
accordance with § 60.5397a of this
chapter will be considered a complete
leak detection survey for purposes of
this section.
Where:
EFs,MR,i = Meter/regulator run population
emission factor for GHGi based on all
surveyed above grade transmissiondistribution transfer stations over ‘‘n’’
years, in standard cubic feet of GHGi per
operational hour of all meter/regulator
runs.
Es,p,i,y = Annual total volumetric emissions at
standard conditions of GHGi from
component type ‘‘p’’ during year ‘‘y’’ in
standard (‘‘s’’) cubic feet, as calculated
using Equation W–30 of this section.
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
(ii) Calculate both CO2 and CH4 mass
emissions using calculations in
paragraph (v) of this section.
(iii) Onshore petroleum and natural
gas production facilities must use the
appropriate default whole gas leaker
emission factors for components in gas
service, light crude service, and heavy
crude service listed in Table W–1E to
this subpart.
(iv) Onshore petroleum and natural
gas gathering and boosting facilities
must use the appropriate default whole
gas leaker factors for components in gas
service listed in Table W–1E to this
subpart.
(v) Onshore natural gas processing
facilities must use the appropriate
default total hydrocarbon leaker
emission factors for compressor
components in gas service and noncompressor components in gas service
listed in Table W–2 to this subpart.
(vi) Onshore natural gas transmission
compression facilities must use the
appropriate default total hydrocarbon
leaker emission factors for compressor
components in gas service and noncompressor components in gas service
listed in Table W–3A to this subpart.
(vii) Underground natural gas storage
facilities must use the appropriate
default total hydrocarbon leaker
emission factors for storage stations or
storage wellheads in gas service listed in
Table W–4A to this subpart.
(viii) LNG storage facilities must use
the appropriate default methane leaker
emission factors for LNG storage
components in LNG service or gas
service listed in Table W–5A to this
subpart.
(ix) LNG import and export facilities
must use the appropriate default
methane leaker emission factors for LNG
terminals components in LNG service or
gas service listed in Table W–6A to this
subpart.
(x) Natural gas distribution facilities
must use Equation W–30 of this section
and the default methane leaker emission
factors for transmission-distribution
transfer station components in gas
service listed in Table W–7 to this
subpart to calculate component
emissions from annual equipment leak
surveys conducted at above grade
transmission-distribution transfer
stations. Natural gas distribution
facilities are required to perform
equipment leak surveys only at above
grade stations that qualify as
transmission-distribution transfer
stations. Below grade transmissiondistribution transfer stations and all
metering-regulating stations that do not
meet the definition of transmissiondistribution transfer stations are not
required to perform equipment leak
surveys under this section.
(A) Natural gas distribution facilities
may choose to conduct equipment leak
surveys at all above grade transmissiondistribution transfer stations over
multiple years ‘‘n,’’ not exceeding a five
year period to cover all above grade
transmission-distribution transfer
stations. If the facility chooses to use the
multiple year option, then the number
of transmission-distribution transfer
stations that are monitored in each year
should be approximately equal across
all years in the cycle.
(B) Use Equation W–31 of this section
to determine the meter/regulator run
population emission factors for each
GHGi. As additional survey data become
available, you must recalculate the
meter/regulator run population
emission factors for each GHGi annually
according to paragraph (q)(2)(x)(C) of
this section.
p = Seven component types listed in Table
W–7 to this subpart for transmissiondistribution transfer stations.
Tw,y = The total time the surveyed meter/
regulator run ‘‘w’’ was operational, in
hours during survey year ‘‘y’’ using an
engineering estimate based on best
available data.
CountMR,y = Count of meter/regulator runs
surveyed at above grade transmissiondistribution transfer stations in year ‘‘y’’.
y = Year of data included in emission factor
‘‘EFs,MR,i’’ according to paragraph
(q)(2)(x)(C) of this section.
n = Number of years of data, according to
paragraph (q)(2)(x)(A) of this section,
whose results are used to calculate
emission factor ‘‘EFs,MR,i’’ according to
paragraph (q)(2)(x)(C) of this section.
PO 00000
Frm 00025
Fmt 4701
Sfmt 4700
(C) The emission factor ‘‘EFs,MR,i,’’
based on annual equipment leak surveys
at above grade transmission-distribution
transfer stations, must be calculated
E:\FR\FM\30NOR3.SGM
30NOR3
ER30NO16.001
gas storage, GHGi equals 0.975 for CH4
and 1.1 × 10¥2 for CO2; for LNG storage
and LNG import and export equipment,
GHGi equals 1 for CH4 and 0 for CO2; and
for natural gas distribution, GHGi equals
1 for CH4 and 1.1 × 10¥2 CO2.
Tp,z = The total time the surveyed component
‘‘z,’’ component type ‘‘p,’’ was assumed
to be leaking and operational, in hours.
If one leak detection survey is conducted
in the calendar year, assume the
component was leaking for the entire
calendar year. If multiple leak detection
surveys are conducted in the calendar
year, assume a component found leaking
in the first survey was leaking since the
beginning of the year until the date of the
survey; assume a component found
leaking in the last survey of the year was
leaking from the preceding survey
through the end of the year; assume a
component found leaking in a survey
between the first and last surveys of the
year was leaking since the preceding
survey until the date of the survey; and
sum times for all leaking periods. For
each leaking component, account for
time the component was not operational
(i.e., not operating under pressure) using
an engineering estimate based on best
available data.
86513
sradovich on DSK3GMQ082PROD with RULES3
86514
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
annually. If you chose to conduct
equipment leak surveys at all above
grade transmission-distribution transfer
stations over multiple years, ‘‘n,’’
according to paragraph (q)(2)(x)(A) of
this section and you have submitted a
smaller number of annual reports than
the duration of the selected cycle period
of 5 years or less, then all available data
from the current year and previous years
must be used in the calculation of the
emission factor ‘‘EFs,MR,i’’ from Equation
W–31 of this section. After the first
survey cycle of ‘‘n’’ years is completed
and beginning in calendar year (n+1),
the survey will continue on a rolling
basis by including the survey results
from the current calendar year ‘‘y’’ and
survey results from all previous (n¥1)
calendar years, such that each annual
calculation of the emission factor
‘‘EFs,MR,i’’ from Equation W–31 is based
on survey results from ‘‘n’’ years. Upon
completion of a cycle, you may elect to
change the number of years in the next
cycle period (to be 5 years or less). If the
number of years in the new cycle is
greater than the number of years in the
previous cycle, calculate ‘‘EFs,MR,i’’ from
Equation W–31 in each year of the new
cycle using the survey results from the
current calendar year and the survey
results from the preceding number years
that is equal to the number of years in
the previous cycle period. If the number
of years, ‘‘nnew,’’ in the new cycle is
smaller than the number of years in the
previous cycle, ‘‘n,’’ calculate ‘‘EFs,MR,i’’
from Equation W–31 in each year of the
new cycle using the survey results from
the current calendar year and survey
results from all previous (nnew¥1)
calendar years.
(xi) If you chose to conduct
equipment leak surveys at all above
grade transmission-distribution transfer
stations over multiple years, ‘‘n,’’
according to paragraph (q)(2)(x)(A) of
this section, you must use the meter/
regulator run population emission
factors calculated using Equation W–31
of this section and the total count of all
meter/regulator runs at above grade
transmission-distribution transfer
stations to calculate emissions from all
above grade transmission-distribution
transfer stations using Equation W–32B
in paragraph (r) of this section.
(r) * * * This paragraph (r) applies to
emissions sources listed in
§ 98.232(c)(21), (f)(7), (g)(5), (h)(6), and
(j)(10) if you are not required to comply
with paragraph (q) of this section and if
you do not elect to comply with
paragraph (q) of this section for these
components in lieu of this paragraph (r).
This paragraph (r) also applies to
emission sources listed in § 98.232(i)(2),
(i)(3), (i)(4), (i)(5), (i)(6), and (j)(11). To
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
be subject to the requirements of this
paragraph (r), the listed emissions
sources also must contact streams with
gas content greater than 10 percent CH
plus CO2 by weight. Emissions sources
that contact streams with gas content
less than or equal to 10 percent CH4
plus CO2 by weight are exempt from the
requirements of this paragraph (r) and
do not need to be reported. * * *
*
*
*
*
*
Counte = Total number of the emission
source type at the facility. For onshore
petroleum and natural gas production
facilities and onshore petroleum and
natural gas gathering and boosting
facilities, average component counts are
provided by major equipment piece in
Tables W–1B and Table W–1C to this
subpart. Use average component counts
as appropriate for operations in Eastern
and Western U.S., according to Table W–
1D to this subpart. Onshore petroleum
and natural gas gathering and boosting
facilities must also count the miles of
gathering pipelines by material type
(protected steel, unprotected steel,
plastic, or cast iron). Underground
natural gas storage facilities must count
each component listed in Table W–4B to
this subpart. LNG storage facilities must
count the number of vapor recovery
compressors. LNG import and export
facilities must count the number of vapor
recovery compressors. Natural gas
distribution facilities must count: (1) The
number of distribution services by
material type; (2) miles of distribution
mains by material type; and (3) number
of below grade metering-regulating
stations, by pressure type; as listed in
Table W–7 to this subpart.
*
*
*
*
*
EFs,e = Population emission factor for the
specific emission source type, as listed
in Tables W–1A, W–4B, W–5B, W–6B,
and W–7 to this subpart. Use appropriate
population emission factor for operations
in Eastern and Western U.S., according
to Table W–1D to this subpart.
*
*
*
*
*
(3) Underground natural gas storage
facilities must use the appropriate
default total hydrocarbon population
emission factors for storage wellheads in
gas service listed in Table W–4B to this
subpart.
(4) LNG storage facilities must use the
appropriate default methane population
emission factor for LNG storage
compressors in gas service listed in
Table W–5B to this subpart.
(5) LNG import and export facilities
must use the appropriate default
methane population emission factor for
LNG terminal compressors in gas
service listed in Table W–6B to this
subpart.
*
*
*
*
*
■ 4. Section 98.234 is amended by:
PO 00000
Frm 00026
Fmt 4701
Sfmt 4700
a. Revising paragraph (a) introductory
text, the paragraph (a)(1) heading, and
the fourth sentence in paragraph (a)(2);
and
■ b. Adding paragraphs (a)(6) and (7).
The revisions and additions read as
follows:
*
*
*
*
*
■
§ 98.234 Monitoring and QA/QC
requirements.
(a) You must use any of the methods
described in paragraphs (a)(1) through
(5) of this section to conduct leak
detection(s) of through-valve leakage
from all source types listed in
§ 98.233(k), (o), and (p) that occur
during a calendar year. You must use
any of the methods described in
paragraphs (a)(1) through (7) of this
section to conduct leak detection(s) of
equipment leaks from components as
specified in § 98.233(q)(1)(i) that occur
during a calendar year. You must use
any of the methods described in
paragraphs (a)(1) through (5) of this
section to conduct leak detection(s) of
equipment leaks from components as
specified in § 98.233(q)(1)(ii) that occur
during a calendar year. You must use
one of the methods described in
paragraph (a)(6) or (7) of this section to
conduct leak detection(s) of equipment
leaks from components as specified in
§ 98.233(q)(1)(iii). If electing to comply
with § 98.233(q) as specified in
§ 98.233(q)(1)(iv), you must use any of
the methods described in paragraphs
(a)(1) through (7) of this section to
conduct leak detection(s) of equipment
leaks from component types as specified
in § 98.233(q)(1)(iv) that occur during a
calendar year.
(1) Optical gas imaging instrument as
specified in § 60.18 of this
chapter. * * *
*
*
*
*
*
(2) * * * If the equipment leak
detection methods in this paragraph
cannot be used, you must use
alternative leak detection devices as
described in paragraph (a)(1) of this
section to monitor inaccessible
equipment leaks or vented emissions.
*
*
*
*
*
(6) Optical gas imaging instrument as
specified in § 60.5397a of this chapter.
Use an optical gas imaging instrument
for equipment leak detection in
accordance with § 60.5397a(b), (c)(3),
(c)(7), and (e) of this chapter and
paragraphs (a)(6)(i) through (iii) of this
section. Unless using methods in
paragraph (a)(7) of this section, an
optical gas imaging instrument must be
used for all source types that are
inaccessible and cannot be monitored
without elevating the monitoring
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
sradovich on DSK3GMQ082PROD with RULES3
personnel more than 2 meters above a
support surface.
(i) For the purposes of this subpart,
any visible emissions from a component
listed in § 98.232 observed by the
optical gas imaging instrument is a leak.
(ii) For the purposes of this subpart,
the term ‘‘fugitive emissions
component’’ in § 60.5397a of this
chapter means ‘‘component.’’
(iii) For the purpose of complying
with § 98.233(q)(1)(iv), the phrase ‘‘the
collection of fugitive emissions
components at well sites and
compressor stations’’ in § 60.5397a(b) of
this chapter means ‘‘the collection of
components for which you elect to
comply with § 98.233(q)(1)(iv).’’
(7) Method 21 as specified in
§ 60.5397a of this chapter. Use the
equipment leak detection methods in
appendix A–7 to part 60 of this chapter,
Method 21, in accordance with
§ 60.5397a(b), (c)(8), and (e) of this
chapter and paragraphs (a)(7)(i) through
(iii) of this section. Inaccessible
emissions sources, as defined in part 60
of this chapter, are not exempt from this
subpart. If the equipment leak detection
methods in this paragraph cannot be
used, you must use alternative leak
detection devices as described in
paragraph (a)(6) of this section to
monitor inaccessible equipment leaks.
(i) For the purposes of this subpart,
any instrument reading from a
component listed in § 98.232 of this
chapter of 500 ppm or greater using
Method 21 is a leak.
(ii) For the purposes of this subpart,
the term ‘‘fugitive emissions
component’’ in § 60.5397a of this
chapter means ‘‘component.’’
(iii) For the purpose of complying
with § 98.233(q)(1)(iv), the phrase ‘‘the
collection of fugitive emissions
components at well sites and
compressor stations’’ in § 60.5397a(b) of
this chapter means ‘‘the collection of
components for which you elect to
comply with § 98.233(q)(1)(iv).’’
*
*
*
*
*
■ 5. Section 98.236 is amended by:
■ a. Redesignating paragraphs (a)(1)(xiv)
through (xvii) as paragraphs (a)(1)(xv)
through (xviii), respectively;
■ b. Adding new paragraph (a)(1)(xiv);
■ c. Redesignating paragraphs (a)(9)(x)
and (xi) as paragraphs (a)(9)(xi) and
(xii), respectively;
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
d. Adding new paragraph (a)(9)(x);
e. Revising paragraph (q) introductory
text, paragraph (q)(1), paragraph (q)(2)
introductory text, paragraph (r)(3)(ii)
introductory text, and the second
sentence of paragraph (z) introductory
text.
The revisions and additions read as
follows:
■
■
§ 98.236
Data reporting requirements.
*
*
*
*
*
(a) * * *
(1) * * *
(xiv) Equipment leak surveys. Report
the information specified in paragraph
(q) of this section.
*
*
*
*
*
(9) * * *
(x) Equipment leak surveys. Report
the information specified in paragraph
(q) of this section.
*
*
*
*
*
(q) Equipment leak surveys. For any
components subject to or complying
with the requirements of § 98.233(q),
you must report the information
specified in paragraphs (q)(1) and (2) of
this section. Natural gas distribution
facilities with emission sources listed in
§ 98.232(i)(1) must also report the
information specified in paragraph
(q)(3) of this section.
(1) You must report the information
specified in paragraphs (q)(1)(i) through
(v) of this section.
(i) Except as specified in paragraph
(q)(1)(ii) of this section, the number of
complete equipment leak surveys
performed during the calendar year.
(ii) Natural gas distribution facilities
performing equipment leak surveys
across a multiple year leak survey cycle
must report the number of years in the
leak survey cycle.
(iii) Except for onshore natural gas
processing facilities and natural gas
distribution facilities, indicate whether
any equipment components at your
facility are subject to the well site or
compressor station fugitive emissions
standards in § 60.5397a of this chapter.
Report the indication per facility, not
per component type.
(iv) For facilities in onshore
petroleum and natural gas production,
onshore petroleum and natural gas
gathering and boosting, onshore natural
gas transmission compression,
underground natural gas storage, LNG
PO 00000
Frm 00027
Fmt 4701
Sfmt 4700
86515
storage, and LNG import and export
equipment, indicate whether you
elected to comply with § 98.233(q)
according to § 98.233(q)(1)(iv) for any
equipment components at your facility.
(v) Report each type of method
described in § 98.234(a) that was used to
conduct leak surveys.
(2) You must indicate whether your
facility contains any of the component
types subject to or complying with
§ 98.233(q) that are listed in
§ 98.232(c)(21), (d)(7), (e)(7), (e)(8),
(f)(5), (f)(6), (f)(7), (f)(8), (g)(4), (g)(6),
(g)(7), (h)(5), (h)(7), (h)(8), (i)(1), or
(j)(10) for your facility’s industry
segment. For each component type that
is located at your facility, you must
report the information specified in
paragraphs (q)(2)(i) through (v) of this
section. If a component type is located
at your facility and no leaks were
identified from that component, then
you must report the information in
paragraphs (q)(2)(i) through (v) of this
section but report a zero (‘‘0’’) for the
information required according to
paragraphs (q)(2)(ii) through (v) of this
section.
*
*
*
*
*
(r) * * *
(3) * * *
(ii) Onshore petroleum and natural
gas production facilities and onshore
petroleum and natural gas gathering and
boosting facilities must report the
information specified in paragraphs
(r)(3)(ii)(A) and (B) of this section, for
each major equipment type, production
type (i.e., natural gas or crude oil), and
geographic location combination in
Tables W–1B and W–1C to this subpart
for which equipment leak emissions are
calculated using the methodology in
§ 98.233(r).
*
*
*
*
*
(z) * * * If your facility contains any
combustion units subject to reporting
according to paragraph (a)(1)(xviii),
(a)(8)(i), or (a)(9)(xii) of this section,
then you must report the information
specified in paragraphs (z)(1) and (2) of
this section, as applicable.
*
*
*
*
*
6. Add Table W–1E to subpart W of
part 98 in numerical order to read as
follows:
■
E:\FR\FM\30NOR3.SGM
30NOR3
86516
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
TABLE W–1E TO SUBPART W OF PART 98—DEFAULT WHOLE GAS LEAKER EMISSION FACTORS FOR ONSHORE
PETROLEUM AND NATURAL GAS PRODUCTION AND ONSHORE PETROLEUM AND NATURAL GAS GATHERING AND BOOSTING
Emission factor
(scf/hour/component)
Equipment components
If you survey using
any of the methods in
§ 98.234(a)(1)
through (6)
If you survey using
Method 21
as specified in
§ 98.234(a)(7)
Leaker Emission Factors—All Components, Gas Service 1
Valve ................................................................................................................................................
Flange ..............................................................................................................................................
Connector (other) .............................................................................................................................
Open-Ended Line 2 ..........................................................................................................................
Pressure Relief Valve ......................................................................................................................
Pump Seal .......................................................................................................................................
Other 3 ..............................................................................................................................................
4.9
4.1
1.3
2.8
4.5
3.7
4.5
3.5
2.2
0.8
1.9
2.8
1.4
2.8
3.2
2.7
1.0
1.6
3.7
3.7
3.1
2.2
1.4
0.6
1.1
2.6
2.6
2.0
3.2
2.7
1.0
1.6
3.7
3.7
3.1
2.2
1.4
0.6
1.1
2.6
2.6
2.0
Leaker Emission Factors—All Components, Light Crude Service 4
Valve ................................................................................................................................................
Flange ..............................................................................................................................................
Connector (other) .............................................................................................................................
Open-Ended Line .............................................................................................................................
Pump ................................................................................................................................................
Agitator Seal ....................................................................................................................................
Other 3 ..............................................................................................................................................
Leaker Emission Factors—All Components, Heavy Crude Service 5
Valve ................................................................................................................................................
Flange ..............................................................................................................................................
Connector (other) .............................................................................................................................
Open-Ended Line .............................................................................................................................
Pump ................................................................................................................................................
Agitator Seal ....................................................................................................................................
Other 3 ..............................................................................................................................................
1 For
multi-phase flow that includes gas, use the gas service emission factors.
open-ended lines component type includes blowdown valve and isolation valve leaks emitted through the blowdown vent stack for centrifugal and reciprocating compressors.
3 ‘‘Others’’ category includes any equipment leak emission point not specifically listed in this table, as specified in § 98.232(c)(21) and (j)(10).
4 Hydrocarbon liquids greater than or equal to 20°API are considered ‘‘light crude.’’
5 Hydrocarbon liquids less than 20°API are considered ‘‘heavy crude.’’
2 The
7. Remove Table W–3 to subpart W of
part 98 and add Table W–3A and Table
■
W–3B to subpart W of part 98 in
numerical order to read as follows:
TABLE W–3A TO SUBPART W OF PART 98—DEFAULT TOTAL HYDROCARBON LEAKER EMISSION FACTORS FOR ONSHORE
NATURAL GAS TRANSMISSION COMPRESSION
Emission factor
(scf/hour/component)
Onshore natural gas transmission compression
If you survey using
any of the methods in
§ 98.234(a)(1)
through (6)
If you survey using
Method 21 as
specified in
§ 98.234(a)(7)
sradovich on DSK3GMQ082PROD with RULES3
Leaker Emission Factors—Compressor Components, Gas Service
Valve 1 ..............................................................................................................................................
Connector ........................................................................................................................................
Open-Ended Line .............................................................................................................................
Pressure Relief Valve ......................................................................................................................
Meter or Instrument .........................................................................................................................
Other 2 ..............................................................................................................................................
14.84
5.59
17.27
39.66
19.33
4.1
9.51
3.58
11.07
25.42
12.39
2.63
6.42
5.71
11.27
4.12
3.66
7.22
Leaker Emission Factors—Non-Compressor Components, Gas Service
Valve 1 ..............................................................................................................................................
Connector ........................................................................................................................................
Open-Ended Line .............................................................................................................................
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
PO 00000
Frm 00028
Fmt 4701
Sfmt 4700
E:\FR\FM\30NOR3.SGM
30NOR3
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
86517
TABLE W–3A TO SUBPART W OF PART 98—DEFAULT TOTAL HYDROCARBON LEAKER EMISSION FACTORS FOR ONSHORE
NATURAL GAS TRANSMISSION COMPRESSION—Continued
Emission factor
(scf/hour/component)
Onshore natural gas transmission compression
If you survey using
any of the methods in
§ 98.234(a)(1)
through (6)
Pressure Relief Valve ......................................................................................................................
Meter or Instrument .........................................................................................................................
Other 2 ..............................................................................................................................................
If you survey using
Method 21 as
specified in
§ 98.234(a)(7)
2.01
2.93
4.1
1.29
1.88
2.63
1 Valves
include control valves, block valves and regulator valves.
includes any potential equipment leak emission point in gas service that is not specifically listed in this table, as specified in
§ 98.232(e)(8).
2 Other
TABLE W–3B TO SUBPART W OF PART 98—DEFAULT TOTAL HYDROCARBON POPULATION EMISSION FACTORS FOR
ONSHORE NATURAL GAS TRANSMISSION COMPRESSION
Emission factor
(scf/hour/component)
Population emission factors—gas service onshore natural gas transmission compression
Low Continuous Bleed Pneumatic Device Vents 1 ..................................................................................................................
High Continuous Bleed Pneumatic Device Vents 1 .................................................................................................................
Intermittent Bleed Pneumatic Device Vents 1 ..........................................................................................................................
1 Emission
1.37
18.20
2.35
Factor is in units of ‘‘scf/hour/device.’’
8. Remove Table W–4 to subpart W of
part 98 and add Table W–4A and Table
■
W–4B to subpart W of part 98 in
numerical order to read as follows:
TABLE W–4A TO SUBPART W OF PART 98—DEFAULT TOTAL HYDROCARBON LEAKER EMISSION FACTORS FOR
UNDERGROUND NATURAL GAS STORAGE
Emission factor
(scf/hour/component)
Underground natural gas storage
If you survey using
any of the methods in
§ 98.234(a)(1)
through (6)
If you survey using
Method 21 as
specified in
§ 98.234(a)(7)
Leaker Emission Factors—Storage Station, Gas Service
Valve 1 ..............................................................................................................................................
Connector (other) .............................................................................................................................
Open-Ended Line .............................................................................................................................
Pressure Relief Valve ......................................................................................................................
Meter and Instrument ......................................................................................................................
Other 2 ..............................................................................................................................................
14.84
5.59
17.27
39.66
19.33
4.1
9.51
3.58
11.07
25.42
12.39
2.63
4.5
1.2
3.8
2.5
4.1
4.1
3.2
0.7
2.0
1.7
2.5
2.5
Leaker Emission Factors—Storage Wellheads, Gas Service
Valve 1 ..............................................................................................................................................
Connector (other than flanges) ........................................................................................................
Flange ..............................................................................................................................................
Open-Ended Line .............................................................................................................................
Pressure Relief Valve ......................................................................................................................
Other 2 ..............................................................................................................................................
1 Valves
include control valves, block valves and regulator valves.
includes any potential equipment leak emission point in gas service that is not specifically listed in this table, as specified in
§ 98.232(f)(6) and (8).
sradovich on DSK3GMQ082PROD with RULES3
2 Other
TABLE W–4B TO SUBPART W OF PART 98—DEFAULT TOTAL HYDROCARBON POPULATION EMISSION FACTORS FOR
UNDERGROUND NATURAL GAS STORAGE
Emission factor
(scf/hour/component)
Underground natural gas storage
Population Emission Factors—Storage Wellheads, Gas Service
Connector ................................................................................................................................................................................
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
PO 00000
Frm 00029
Fmt 4701
Sfmt 4700
E:\FR\FM\30NOR3.SGM
30NOR3
0.01
86518
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
TABLE W–4B TO SUBPART W OF PART 98—DEFAULT TOTAL HYDROCARBON POPULATION EMISSION FACTORS FOR
UNDERGROUND NATURAL GAS STORAGE—Continued
Emission factor
(scf/hour/component)
Underground natural gas storage
Valve ........................................................................................................................................................................................
Pressure Relief Valve ..............................................................................................................................................................
Open-Ended Line .....................................................................................................................................................................
0.1
0.17
0.03
Population Emission Factors—Other Components, Gas Service
Low Continuous Bleed Pneumatic Device Vents 1 ..................................................................................................................
High Continuous Bleed Pneumatic Device Vents 1 .................................................................................................................
Intermittent Bleed Pneumatic Device Vents 1 ..........................................................................................................................
1 Emission
1.37
18.20
2.35
Factor is in units of ‘‘scf/hour/device.’’
9. Remove Table W–5 to subpart W of
part 98 and add Table W–5A and Table
■
W–5B to subpart W of part 98 in
numerical order to read as follows:
TABLE W–5A TO SUBPART W OF PART 98—DEFAULT METHANE LEAKER EMISSION FACTORS FOR LIQUEFIED NATURAL
GAS (LNG) STORAGE
Emission factor
(scf/hour/component)
LNG storage
If you survey using
any of the methods in
§ 98.234(a)(1)
through (6)
If you survey using
Method 21 as
specified in
§ 98.234(a)(7)
Leaker Emission Factors—LNG Storage Components, LNG Service
Valve ................................................................................................................................................
Pump Seal .......................................................................................................................................
Connector ........................................................................................................................................
Other 1 ..............................................................................................................................................
1.19
4.00
0.34
1.77
0.23
0.73
0.11
0.99
14.84
5.59
17.27
39.66
19.33
4.1
9.51
3.58
11.07
25.42
12.39
2.63
Leaker Emission Factors—LNG Storage Components, Gas Service
Valve 2 ..............................................................................................................................................
Connector ........................................................................................................................................
Open-Ended Line .............................................................................................................................
Pressure Relief Valve ......................................................................................................................
Meter and Instrument ......................................................................................................................
Other 3 ..............................................................................................................................................
1 ‘‘Other’’
equipment type for components in LNG service should be applied for any equipment type other than connectors, pumps, or valves.
include control valves, block valves and regulator valves.
3 ‘‘Other’’ equipment type for components in gas service should be applied for any equipment type other than valves, connectors, flanges,
open-ended lines, pressure relief valves, and meters and instruments, as specified in § 98.232(g)(6) and (7).
2 Valves
TABLE W–5B TO SUBPART W OF PART 98—DEFAULT METHANE POPULATION EMISSION FACTORS FOR LIQUEFIED
NATURAL GAS (LNG) STORAGE
Emission factor
(scf/hour/component)
LNG storage
Population Emission Factors—LNG Storage Compressor, Gas Service
Vapor Recovery Compressor 1 ................................................................................................................................................
1 Emission
Factor is in units of ‘‘scf/hour/device.’’
10. Remove Table W–6 to subpart W
of part 98 and add Table W–6A and
sradovich on DSK3GMQ082PROD with RULES3
■
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
Table W–6B to subpart W of part 98 in
numerical order to read as follows:
PO 00000
Frm 00030
Fmt 4701
Sfmt 4700
E:\FR\FM\30NOR3.SGM
30NOR3
4.17
Federal Register / Vol. 81, No. 230 / Wednesday, November 30, 2016 / Rules and Regulations
86519
TABLE W–6A TO SUBPART W OF PART 98—DEFAULT METHANE LEAKER EMISSION FACTORS FOR LNG IMPORT AND
EXPORT EQUIPMENT
Emission factor
(scf/hour/component)
LNG import and export equipment
If you survey using
any of the methods in
§ 98.234(a)(1)
through (6)
If you survey using
Method 21 as
specified in
sect; 98.234(a)(7)
Leaker Emission Factors—LNG Terminals Components, LNG Service
Valve ................................................................................................................................................
Pump Seal .......................................................................................................................................
Connector ........................................................................................................................................
Other 1 ..............................................................................................................................................
1.19
4.00
0.34
1.77
0.23
0.73
0.11
0.99
14.84
5.59
17.27
39.66
19.33
4.1
9.51
3.58
11.07
25.42
12.39
2.63
Leaker Emission Factors—LNG Terminals Components, Gas Service
Valve 2 ..............................................................................................................................................
Connector ........................................................................................................................................
Open-Ended Line .............................................................................................................................
Pressure Relief Valve ......................................................................................................................
Meter and Instrument ......................................................................................................................
Other 3 ..............................................................................................................................................
1 ‘‘Other’’
equipment type for components in LNG service should be applied for any equipment type other than connectors, pumps, or valves.
include control valves, block valves and regulator valves.
3 ‘‘Other’’ equipment type for components in gas service should be applied for any equipment type other than valves, connectors, flanges,
open-ended lines, pressure relief valves, and meters and instruments, as specified in § 98.232(h)(7) and (8).
2 Valves
TABLE W–6B TO SUBPART W OF PART 98—DEFAULT METHANE POPULATION EMISSION FACTORS FOR LNG IMPORT AND
EXPORT EQUIPMENT
Emission factor
(scf/hour/component)
LNG import and export equipment
Population Emission Factors—LNG Terminals Compressor, Gas Service
Vapor Recovery Compressor 1 ................................................................................................................................................
1 Emission
Factor is in units of ‘‘scf/hour/compressor.’’
[FR Doc. 2016–27981 Filed 11–29–16; 8:45 am]
sradovich on DSK3GMQ082PROD with RULES3
BILLING CODE 6560–50–P
VerDate Sep<11>2014
18:04 Nov 29, 2016
Jkt 241001
PO 00000
Frm 00031
Fmt 4701
Sfmt 9990
E:\FR\FM\30NOR3.SGM
30NOR3
4.17
Agencies
[Federal Register Volume 81, Number 230 (Wednesday, November 30, 2016)]
[Rules and Regulations]
[Pages 86490-86519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-27981]
[[Page 86489]]
Vol. 81
Wednesday,
No. 230
November 30, 2016
Part III
Environmental Protection Agency
-----------------------------------------------------------------------
40 CFR Part 98
Greenhouse Gas Reporting Rule: Leak Detection Methodology Revisions and
Confidentiality Determinations for Petroleum and Natural Gas Systems;
Final Rule
Federal Register / Vol. 81 , No. 230 / Wednesday, November 30, 2016 /
Rules and Regulations
[[Page 86490]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 98
[EPA-HQ-OAR-2015-0764; FRL-9955-12-OAR]
RIN 2060-AS73
Greenhouse Gas Reporting Rule: Leak Detection Methodology
Revisions and Confidentiality Determinations for Petroleum and Natural
Gas Systems
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency is finalizing revisions
and confidentiality determinations for the petroleum and natural gas
systems source category of the Greenhouse Gas Reporting Program. In
particular, this action adds new monitoring methods for detecting leaks
from oil and gas equipment in the petroleum and natural gas systems
source category consistent with the fugitive emissions monitoring
methods in the recently finalized new source performance standards for
the oil and gas industry. This action also adds emission factors for
leaking equipment to be used in conjunction with these monitoring
methods to calculate and report greenhouse gas emissions resulting from
equipment leaks. Finally, this action finalizes reporting requirements
and confidentiality determinations for nine new or substantially
revised data elements contained in these amendments.
DATES: This final rule is effective on January 1, 2017.
ADDRESSES: The EPA has established a docket for this action under
Docket ID No. EPA-HQ-OAR-2015-0764. All documents in the docket are
listed on the https://www.regulations.gov Web site. Although listed in
the index, some information is not publicly available, e.g.,
confidential business information (CBI) or other information whose
disclosure is restricted by statute. Certain other material, such as
copyrighted material, is not placed on the Internet and will be
publicly available only in hard copy form. Publicly available docket
materials are available electronically through https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: Carole Cook, Climate Change Division,
Office of Atmospheric Programs (MC-6207A), Environmental Protection
Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone
number: (202) 343-9334; fax number: (202) 343-2342; email address:
GHGReporting@epa.gov. For technical information, please go to the
Greenhouse Gas Reporting Rule Web site, https://www.epa.gov/ghgreporting/. To submit a question, select Help Center, followed by
``Contact Us.''
Worldwide Web (WWW). In addition to being available in the docket,
an electronic copy of this final rule will also be available through
the WWW. Following the Administrator's signature, a copy of this action
will be posted on the EPA's Greenhouse Gas Reporting Rule Web site at
https://www.epa.gov/ghgreporting/.
SUPPLEMENTARY INFORMATION:
Regulated Entities. These revisions affect entities that must
submit annual greenhouse gas (GHG) reports under the Greenhouse Gas
Reporting Program (GHGRP), codified in the Code of Federal Regulations
(CFR) at 40 CFR part 98. This rule applies to all petroleum and natural
gas systems facilities that are subject to 40 CFR part 98, regardless
of the facility's location, and ensures that all these facilities
across the United States (U.S.) report GHG data consistently, and
therefore is ``nationally applicable'' within the meaning of section
307(b)(1) of the Clean Air Act (CAA). Further, the Administrator has
determined that rules codified in 40 CFR part 98 are subject to the
provisions of CAA section 307(d). (See CAA section 307(d)(1)(V) (the
provisions of section 307(d) apply to ``such other actions as the
Administrator may determine'').) These are amendments to existing
regulations. These amended regulations affect owners or operators of
petroleum and natural gas systems that directly emit GHGs. Regulated
categories and entities include, but are not limited to, those listed
in Table 1 of this preamble:
Table 1--Examples of Affected Entities by Category
------------------------------------------------------------------------
Examples of affected
Category NAICS \a\ facilities
------------------------------------------------------------------------
Petroleum and Natural Gas 486210 Pipeline transportation
Systems. of natural gas.
221210 Natural gas
distribution.
211111 Crude petroleum and
natural gas
extraction.
211112 Natural gas liquid
extraction.
------------------------------------------------------------------------
\a\ North American Industry Classification System.
Table 1 of this preamble is not intended to be exhaustive, but
rather provides a guide for readers regarding facilities likely to be
affected by this action. Other types of facilities than those listed in
the table could also be subject to reporting requirements. To determine
whether you are affected by this action, you should carefully examine
the applicability criteria found in 40 CFR part 98, subpart A and 40
CFR part 98, subpart W. If you have questions regarding the
applicability of this action to a particular facility, consult the
person listed in the preceding FOR FURTHER INFORMATION CONTACT section.
What is the effective date? The final rule is effective on January
1, 2017. Section 553(d) of the Administrative Procedure Act (APA), 5
U.S.C. Chapter 5, generally provides that rules may not take effect
earlier than 30 days after they are published in the Federal Register.
The EPA is issuing this final rule under section 307(d)(1) of the Clean
Air Act, which states: ``The provisions of section 553 through 557 * *
* of Title 5 shall not, except as expressly provided in this section,
apply to actions to which this subsection applies.'' Thus, section
553(d) of the APA does not apply to this rule. The EPA is nevertheless
acting consistently with the purposes underlying APA section 553(d) in
making the first set of amendments to this rule effective on January 1,
2017. Section 553(d) allows an effective date less than 30 days after
publication for a rule that ``grants or recognizes an exemption or
relieves a restriction'' or ``as otherwise provided by the agency for
good cause found and published with the rule.'' As explained below, the
EPA finds that there is good cause for the first set of amendments to
this rule to become effective on January 1, 2017, even though this may
result in an effective date fewer than 30 days from date of publication
in the Federal Register.
While this action is being signed prior to December 1, 2016, there
is likely to
[[Page 86491]]
be a significant delay in the publication of this rule as it contains
complex equations and tables and is relatively long. As an example, the
EPA Administrator signed the Greenhouse Gas Reporting Rule: 2015
Revisions and Confidentiality Determinations for Petroleum and Natural
Gas Systems final rule on October 1, 2015, but the rule was not
published in the Federal Register until October 22, 2015 (80 FR 64262).
The purpose of the 30-day waiting period prescribed in 5 U.S.C. 553(d)
is to give affected parties a reasonable time to adjust their behavior
and prepare before the final rule takes effect. To employ the APA
section 553(d)(3) ``good cause'' exemption, an agency must balance the
necessity for immediate implementation against principles of
fundamental fairness which require that all affected persons be
afforded a reasonable amount of time to prepare for the effective date
of its ruling.\1\ Where, as here, the final rule will be signed and
made available on the EPA Web site more than 30 days before the
effective date, but where the publication is likely to be delayed due
to the complexity and length of the rule, the regulated entities are
afforded this reasonable amount of time. We balance these circumstances
with the need for the amendments to be effective by January 1, 2017; a
delayed effective date would result in regulatory uncertainty, program
disruption, and an inability to have the amendments effective for the
2017 reporting year. Accordingly, we find good cause exists to make
this rule effective on January 1, 2017, consistent with the purposes of
APA section 553(d)(3).
---------------------------------------------------------------------------
\1\ Omnipoint Corp. v. FCC, 78 F3d 620, 630 (D.C. Cir. 1996),
quoting U.S. v. Gavrilovic, 551 F.2d 1099, 1105 (8th Cir. 1977).
---------------------------------------------------------------------------
Judicial Review. Under CAA section 307(b)(1), judicial review of
this final rule is available only by filing a petition for review in
the U.S. Court of Appeals for the District of Columbia Circuit (the
Court) by January 30, 2017 Under CAA section 307(d)(7)(B), only an
objection to this final rule that was raised with reasonable
specificity during the period for public comment can be raised during
judicial review. Section 307(d)(7)(B) of the CAA also provides a
mechanism for the EPA to convene a proceeding for reconsideration,
``[i]f the person raising an objection can demonstrate to the EPA that
it was impracticable to raise such objection within [the period for
public comment] or if the grounds for such objection arose after the
period for public comment (but within the time specified for judicial
review) and if such objection is of central relevance to the outcome of
the rule.'' Any person seeking to make such a demonstration to us
should submit a Petition for Reconsideration to the Office of the
Administrator, Environmental Protection Agency, Room 3000, William
Jefferson Clinton Building, 1200 Pennsylvania Ave. NW., Washington, DC
20460, with a copy to the person listed in the preceding FOR FURTHER
INFORMATION CONTACT section, and the Associate General Counsel for the
Air and Radiation Law Office, Office of General Counsel (Mail Code
2344A), Environmental Protection Agency, 1200 Pennsylvania Ave. NW.,
Washington, DC 20004. Note that under CAA section 307(b)(2), the
requirements established by this final rule may not be challenged
separately in any civil or criminal proceedings brought by the EPA to
enforce these requirements.
Acronyms and Abbreviations. The following acronyms and
abbreviations are used in this document.
APA Administrative Procedure Act
CAA Clean Air Act
CBI Confidential Business Information
CFR Code of Federal Regulations
CH4 methane
CO2 carbon dioxide
CRA Congressional Review Act
DOT Department of Transportation
EPA U.S. Environmental Protection Agency
FR Federal Register
GHG greenhouse gas
GHGRP Greenhouse Gas Reporting Program
GRI Gas Research Institute
ICR Information Collection Request
LNG liquefied natural gas
NAICS North American Industry Classification System
NSPS New Source Performance Standards
NTTAA National Technology Transfer and Advancement Act
OGI optical gas imaging
OMB Office of Management and Budget
ppmv parts per million by volume
PRA Paperwork Reduction Act
RFA Regulatory Flexibility Act
U.S. United States
UMRA Unfunded Mandates Reform Act
VOC volatile organic compounds
WWW Worldwide Web
Organization of This Document. The following outline is provided to
aid in locating information in this preamble.
I. Background
A. Organization of This Preamble
B. Background on This Action
C. Legal Authority
D. How do these amendments apply to 2016 and 2017 reports?
II. Summary of Final Revisions and Other Amendments to Subpart W and
Responses to Public Comment
A. Summary of Final Amendments--General
B. Summary of Final Amendments to the Requirement To Use the
Calculation Methodology Based on Equipment Leak Surveys
C. Summary of Final Amendments to Monitoring Methods
D. Summary of Final Amendments to Components To Be Surveyed
E. Summary of Final Amendments to Leaker Emission Factors and
the Calculation Methodology Based on Equipment Leak Surveys
F. Summary of Final Amendments to Reporting Requirements
III. Final Confidentiality Determinations
A. Summary of Final Confidentiality Determinations for New or
Substantially Revised Subpart W Data Elements
B. Summary of Public Comments and Responses on the Proposed
Confidentiality Determinations
IV. Impacts of the Final Amendments to Subpart W
A. Impacts of the Final Amendments
B. Summary of Comments and Responses on the Impacts of the
Proposed Rule
V. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory Planning and Review and
Executive Order 13563: Improving Regulation and Regulatory Review
B. Paperwork Reduction Act
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act (UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation and Coordination With
Indian Tribal Governments
G. Executive Order 13045: Protection of Children From
Environmental Health Risks and Safety Risks
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution or Use
I. National Technology Transfer and Advancement Act
J. Executive Order 12898: Federal Actions to Address
Environmental Justice in Minority Populations and Low-Income
Populations
K. Congressional Review Act
I. Background
A. Organization of This Preamble
Section I of this preamble provides background information
regarding the origin of the final amendments. This section also
discusses the EPA's legal authority under the CAA to promulgate and
amend 40 CFR part 98 of the Greenhouse Gas Reporting Rule (hereafter
referred to as ``part 98'') as well as the legal authority for making
confidentiality determinations for the data to be reported. Section II
of this preamble contains information on the final amendments to part
98, subpart W (Petroleum and Natural Gas Systems) (hereafter referred
to as ``subpart W''), including a summary of the major comments that
the EPA considered in the development of this final rule. Section III
of this preamble discusses the final confidentiality determinations for
new or substantially revised data
[[Page 86492]]
reporting elements. Section IV of this preamble discusses the impacts
of the final amendments to subpart W. Finally, section V of this
preamble describes the statutory and executive order requirements
applicable to this action.
B. Background on This Action
The EPA's GHGRP requires annual reporting of GHG data and other
relevant information from large sources and suppliers in the United
States. On October 30, 2009, the EPA published part 98 in the Federal
Register (FR) for collecting information regarding GHG emissions from a
broad range of industry sectors (74 FR 56260). Although reporting
requirements for petroleum and natural gas systems were originally
proposed to be part of part 98 (74 FR 16448, April 10, 2009), the final
October 2009 rulemaking did not include the petroleum and natural gas
systems source category as one of the 29 source categories for which
reporting requirements were finalized. The EPA re-proposed subpart W in
2010 (75 FR 18608; April 12, 2010), and a subsequent final rulemaking
was published on November 30, 2010, with the requirements for the
petroleum and natural gas systems source category at 40 CFR part 98,
subpart W (75 FR 74458). Following promulgation, the EPA finalized
several actions revising subpart W (76 FR 22825, April 25, 2011; 76 FR
53057, August 25, 2011; 76 FR 59533, September 27, 2011; 76 FR 80554,
December 23, 2011; 77 FR 51477, August 24, 2012; 78 FR 25392, May 1,
2013; 78 FR 71904, November 29, 2013; 79 FR 70352, November 25, 2014;
80 FR 64262, October 22, 2015).\2\
---------------------------------------------------------------------------
\2\ See Greenhouse Gas Reporting Program, Historical
Rulemakings. Available at https://www.epa.gov/ghgreporting/rulemaking-notices-ghg-reporting.
---------------------------------------------------------------------------
The Strategy to Reduce Methane Emissions in the President's Climate
Action Plan summarizes the sources of CH4 emissions, commits
to new steps to cut emissions of this potent GHG, and outlines the
Administration's efforts to improve the measurement of these emissions.
The strategy builds on progress to date and takes steps to further cut
CH4 emissions from several sectors, including the oil and
natural gas sector. In the strategy, the EPA was specifically tasked
with continuing to review GHGRP regulatory requirements to address
potential gaps in coverage, improve methods, and ensure high quality
data reporting.\3\ On January 14, 2015, the Obama administration
provided additional direction to the EPA to ``explore potential
regulatory opportunities for applying remote sensing technologies and
other innovations in measurement and monitoring technology to further
improve the identification and quantification of emissions'' in the oil
and natural gas sector, such as the emissions submitted as part of
GHGRP annual reporting.\4\
---------------------------------------------------------------------------
\3\ Climate Action Plan--Strategy to Reduce Methane Emissions.
The White House, Washington, DC, March 2014. Available at https://www.whitehouse.gov/sites/default/files/strategy_to_reduce_methane_emissions_2014-03-28_final.pdf.
\4\ FACT SHEET: Administration Takes Steps Forward on Climate
Action Plan by Announcing Actions to Cut Methane Emissions. The
White House, Office of the Press Secretary, January 14, 2015.
Available at https://www.whitehouse.gov/the-press-office/2015/01/14/fact-sheet-administration-takes-steps-forward-climate-action-plan-anno-1.
---------------------------------------------------------------------------
Under subpart W, GHGs that must be reported by each industry
segment and applicable source types are specified in 40 CFR 98.232,
including equipment leaks from listed component types. In order to
fulfill these equipment leak emissions reporting requirements,
reporters must utilize one of two calculation methodologies \5\ to
calculate GHG emissions from equipment leaks as specified in 40 CFR
98.233: (1) Calculation methodology based on equipment leak surveys (40
CFR 98.233(q)), or (2) calculation methodology based on population
counts (40 CFR 98.233(r).\6\ For example, facilities in the Onshore
Natural Gas Processing and Onshore Natural Gas Transmission Compression
industry segments use the calculation methodology based on equipment
leak surveys for most components at their facilities. If 40 CFR
98.233(q) specifies that an equipment leak survey is required for the
subsection of listed component types in 40 CFR 98.232, reporters must
use one of the monitoring methods specified in 40 CFR 98.234 when
conducting those equipment leak surveys to detect leaking components at
the facility. The calculation methodology based on equipment leak
surveys requires that the reporter then determine the total amount of
time each component was assumed to be leaking and multiply that by the
concentration of the methane (CH4) and carbon dioxide
(CO2) in the gas and the applicable emission factor
(referred to as a ``leaker emission factor''), listed in Table W-1E and
Table W-2 through Table W-7, to calculate emissions. Finally, 40 CFR
98.236 specifies the data elements that must be reported to the EPA.
---------------------------------------------------------------------------
\5\ Throughout this preamble, the term ``calculation
methodology'' refers to the procedures used to calculate emissions
(e.g., ``calculation methodology based on equipment leak surveys''
refers to the methodology described in 40 CFR 98.233(q)) and
``monitoring method'' refers to the technology, test method, or
other method of determining whether an individual component is
leaking (see 40 CFR 98.234(a)). The term ``leak detection method''
that is used in the 40 CFR part 98 subpart W regulatory text has the
same meaning as ``monitoring method'' used in this preamble.
\6\ Reporters using the calculation methodology based on
population counts determine the total number of all components in
the facility and multiply that count by the average estimated time
of operation, the concentration of the CH4 and
CO2 in the gas, and the applicable emission factor
(referred to as a ``population emission factor'') to calculate
emissions.
---------------------------------------------------------------------------
On January 29, 2016, the EPA proposed ``Leak Detection Methodology
Revisions and Confidentiality Determinations for Petroleum and Natural
Gas Systems'' (81 FR 4987) to add new monitoring methods for detecting
leaks from oil and gas equipment, to revise which industry segments and
sources use the calculation methodology based on equipment leak surveys
or the calculation methodology based on population counts, to clarify
how the definition of fugitive emission components in the new source
performance standards (NSPS) for the oil and natural gas sector (40 CFR
part 60, subpart OOOOa, at 81 FR 35824) (hereafter referred to as the
``NSPS subpart OOOOa'') aligns with the equipment components subject to
subpart W, to add leaker emission factors for multiple industry
segments, and to add reporting requirements and confidentiality
determinations for new or substantially revised data elements. Under
those proposed amendments, facilities with fugitive emissions
components at a well site or compressor station subject to the NSPS
subpart OOOOa would use data derived from the NSPS subpart OOOOa
fugitive emissions requirements (i.e., which components were determined
to have fugitive emissions) along with the subpart W leaker emission
factors to calculate and report GHG emissions to the GHGRP. The
proposed revisions provided the opportunity for owners and operators of
sources not subject to the NSPS subpart OOOOa well site or compressor
station fugitive emissions standards (e.g., sources participating in a
voluntarily implemented program) and not already required to conduct
leak surveys under subpart W to optionally use the calculation
methodology at 40 CFR 98.233(q) to calculate and report their GHG
emissions to the GHGRP. The EPA also proposed that facilities that are
already required to conduct leak surveys under subpart W would be able
to use the newly proposed monitoring method(s) in 40 CFR 98.234. In
addition, the EPA proposed new reporting requirements for all reporters
using the calculation methodology
[[Page 86493]]
based on equipment leak surveys and proposed to require reporters using
the calculation methodology for the first time to begin reporting the
information associated with that methodology. Finally, the EPA proposed
confidentiality determinations for nine new or substantially revised
data elements. The public comment period for these proposed rule
amendments ended on March 15, 2016, following a 15-day extension of the
original comment period end date (81 FR 9797; February 26, 2016). On
June 3, 2016, the EPA published the final NSPS subpart OOOOa
requirements (81 FR 35824).
In this action, the EPA is finalizing revisions to subpart W
largely as proposed, with some changes made after consideration of
public comments. Summaries of significant comments submitted on the
proposed amendments and the EPA's responses to those comments can be
found in sections II, III, and IV of this preamble. All comments
submitted on the proposed amendments and the EPA's additional responses
to the comments can be found in ``Response to Public Comments on
Greenhouse Gas Reporting Rule: Leak Detection Methodology Revisions and
Confidentiality Determinations for Petroleum and Natural Gas Systems''
in Docket ID No. EPA-HQ-OAR-2015-0764.
As further detailed in the preamble to the proposed amendments,
these revisions advance the EPA's goal of maximizing rule effectiveness
by providing a mechanism for facilities to use the NSPS subpart OOOOa
monitoring results for purposes of GHGRP subpart W reporting. This
alignment reduces burden for entities subject to the fugitive
emissions/equipment leak detection method requirements in both
programs, and, when combined with the other amendments being finalized
in this revision, provides clear monitoring methods, equipment leak
survey and calculation methodologies and emission factors, and
reporting requirements in subpart W, thus enabling government,
regulated entities, and the public to easily identify and understand
regulatory requirements. These amendments also further advance the
ability of the GHGRP to provide access to high quality data on GHG
emissions by adding the ability for reporters to use data collected
during equipment leak surveys and to perform site-specific equipment
leak calculations.
C. Legal Authority
The EPA is finalizing these rule amendments under its existing CAA
authority provided in CAA section 114. As stated in the preamble to the
2009 final GHG reporting rule (74 FR 56260; October 30, 2009), CAA
section 114(a)(1) provides the EPA broad authority to require the
information to be gathered by this rule because such data will inform
and are relevant to the EPA's carrying out a wide variety of CAA
provisions. See the preambles to the proposed (74 FR 16448; April 10,
2009) and final GHG reporting rule (74 FR 56260; October 30, 2009) for
further information.
In addition, pursuant to sections 114, 301, and 307 of the CAA, the
EPA is publishing final confidentiality determinations for the new or
substantially revised data elements required by these amendments.
Section 114(c) requires that the EPA make information obtained under
section 114 available to the public, except for information (excluding
emission data) that qualifies for confidential treatment. The
Administrator has determined that this action is subject to the
provisions of section 307(d) of the CAA. Section 307(d) contains a set
of procedures relating to the issuance and review of certain CAA rules.
D. How do these amendments apply to 2016 and 2017 reports?
These amendments are effective on January 1, 2017. Starting with
the 2017 reporting year, facilities must follow the revised methods to
detect equipment leaks (if applicable) and to calculate and report
their annual equipment leak emissions. The first annual reports of
emissions calculated using the amended requirements will be those
submitted by April 2, 2018, covering reporting year 2017. For reporting
year 2016, reporters will calculate emissions according to the
requirements in part 98 that are applicable to reporting year 2016
(i.e., the requirements in place until the effective date of this final
rule).
II. Summary of Final Revisions and Other Amendments to Subpart W and
Responses to Public Comment
Sections II.A through II.F of this preamble describe the revisions
that we are finalizing in this rulemaking. Section II.A provides a
general summary of the final amendments to subpart W. Section II.B
describes the final amendments to the requirement to use the
calculation methodology based on equipment leak surveys. Section II.C
describes the final amendments to the subpart W monitoring methods.
Section II.D describes the final amendments for component types to be
surveyed. Section II.E describes the final amendments to the subpart W
leaker emission factors. Finally, section II.F provides a summary of
the final amendments to the subpart W reporting requirements. The
amendments described in each section are followed by a summary of the
major comments on those amendments and the EPA's responses. See
``Response to Public Comments on Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and Confidentiality Determinations for
Petroleum and Natural Gas Systems'' in Docket ID No. EPA-HQ-OAR-2015-
0764 for a complete listing of all comments and the EPA's responses.
A. Summary of Final Amendments--General
1. Summary of Final Amendments
In this action, the EPA is amending subpart W to add new monitoring
methods for detecting leaks from oil and gas equipment in the petroleum
and natural gas systems source category consistent with the NSPS
subpart OOOOa. The EPA is also specifying that facilities with a
collection of fugitive emissions components at a well site or
compressor station subject to the NSPS subpart OOOOa (40 CFR 60.5397a)
would be required to survey those components, except as otherwise
specified in this subpart W final rule, for the subpart W calculation
methodology based on equipment leak surveys using one of the new
monitoring methods being added to subpart W. In practice, this means
that facilities can use the results of the NSPS subpart OOOOa-required
fugitive emissions monitoring survey to fulfill these subpart W
requirements. The EPA is adding leaker emission factors to be used in
conjunction with the calculation methodology based on equipment leak
surveys to calculate and report GHG emissions. The revisions provide
the opportunity for owners and operators of sources not subject to the
NSPS subpart OOOOa well site or compressor station fugitive emissions
standards (e.g., sources participating in a voluntarily implemented
program) and not already required to conduct leak surveys under subpart
W to optionally use the calculation methodology at 40 CFR 98.233(q) to
calculate and report their GHG emissions, and to use the new monitoring
methods in 40 CFR 98.234 to do so.
Facilities in certain subpart W industry segments \7\ that are
already required to conduct leak surveys will be able to use the new
monitoring methods
[[Page 86494]]
in 40 CFR 98.234. If they use either of the two new monitoring methods
in 40 CFR 98.234(a)(6) or (7) that are consistent with the NSPS subpart
OOOOa, then in addition to surveying the components currently subject
to the survey requirements in subpart W, they must also survey all
other components that are fugitive emissions components in the NSPS
subpart OOOOa, with limited exceptions, as specified in 40 CFR 98.232
(see sections II.C and II.D of this preamble). If they use any of the
monitoring methods currently in 40 CFR 98.234(a)(1) through (5), then
in addition to surveying the components currently subject to the survey
requirements in subpart W, they may elect to survey the other
components specified in 40 CFR 98.232.
---------------------------------------------------------------------------
\7\ These segments are Onshore Natural Gas Transmission
Compression, Underground Natural Gas Storage, LNG Storage, and LNG
Import and Export Equipment.
---------------------------------------------------------------------------
The comments received on this rule generally do not dispute the
merit of allowing the use of new monitoring methods in subpart W, but
they do include issues related to the adequacy of the notice and
comment process, the calculation methodology based on equipment leak
surveys, reporting, and applicability.
2. Summary of Comments and Responses
Comment: Numerous commenters stated that the EPA's reference to the
proposed NSPS subpart OOOOa included in the subpart W proposal was
premature, and substantively and procedurally flawed. According to
these commenters, by relying on a proposed action, the EPA did not
provide the opportunity for notice or comment on how the rule would
ultimately affect stakeholders. These commenters stated that at the
very least the EPA made it difficult and increased burden for
stakeholders to evaluate scope and impacts and to provide comment.
Commenters stated that they could only comment on the effect of the
incorporation of the NSPS subpart OOOOa proposed requirements, as they
could not review and comment on the effect of the finalized NSPS
subpart OOOOa requirements on subpart W prior to closure of the comment
period for the subpart W proposal. Specifically, the commenters
expressed concern that because the EPA received so many comments on the
proposed NSPS subpart OOOOa, the final NSPS subpart OOOOa provisions
would likely be significantly different in certain aspects and that
those details were unknowable at the time of comment. Noting that the
EPA expressed intent in the preamble to the subpart W proposed
amendments to incorporate the final NSPS subpart OOOOa provisions in
the final subpart W rule, the commenters stated they inherently would
have no formal opportunity to meaningfully comment on the effect those
final NSPS subpart OOOOa provisions would have on subpart W reporters.
Several commenters stated that this created substantive and procedural
flaws in the proposed rule, as the EPA provided neither the ``terms or
substance'' nor a ``description of the subjects and issues involved''
of the proposed rule as required for notice and comment rulemaking
under the Administrative Procedure Act, 5 U.S.C. 553(b), nor did the
EPA meet the more stringent notice and comment requirements of CAA
section 307. Several commenters stated that EPA similarly did not
consider changes that might be made to the final NSPS subpart OOOOa
through the judicial review process.
Several commenters requested that the EPA either finalize, or re-
propose or re-open the public comment period for, the proposed
alignment of subpart W with the NSPS subpart OOOOa only after the NSPS
subpart OOOOa is finalized. Other commenters requested that the EPA
withdraw the proposal to amend subpart W and reconsider whether any
revisions are necessary once the NSPS subpart OOOOa is in effect.
Response: The EPA disagrees that the proposed rule for this subpart
W revision was premature, or substantively and procedurally flawed.
This action is focused on aligning the subpart W requirements, to the
extent possible, with the finalized NSPS subpart OOOOa fugitive
emission requirements so that facilities may use the results of the
NSPS subpart OOOOa-required fugitive emissions monitoring surveys to
fulfill subpart W requirements, and does so through revisions that
incorporate final NSPS subpart OOOOa monitoring methods into subpart W
and make their use mandatory in subpart W surveys for most components
subject to NSPS subpart OOOOa. The proposed rule for subpart W clearly
specified that only a monitoring method finalized in the NSPS subpart
OOOOa rule would be finalized for subpart W, which ensured that no
requirement would reference any monitoring method that was merely at
proposal stage. The proposed rule provided adequate notice and
opportunity to comment on how the rule will affect stakeholders, and
thus this final rule is in compliance with the relevant requirements of
CAA section 307(d). Multiple commenters cited the Administrative
Procedure Act (APA), including 5 U.S.C. 553(b)(3), which requires that
a notice of proposed rulemaking shall include ``either the terms or
substance of the proposed rule or a description of the subjects and
issues involved.'' The EPA notes that our process is also consistent
with the notice and comment requirements of the APA, 5 U.S.C. 551-559.
In the preamble to the proposed and final rule, as well as in
``Response to Public Comments on Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and Confidentiality Determinations for
Petroleum and Natural Gas Systems'' in Docket ID No. EPA-HQ-OAR-2015-
0764, the EPA describes at length the statement and purpose of the
revisions, provides explanations for any changes in the rule, and
responds to all comments submitted.
Specifically, in regards to the proposed rule referencing the then
proposed NSPS subpart OOOOa monitoring method(s) and fugitive emissions
component definition,\8\ the EPA disagrees that the proposed rule did
not give adequate notice and therefore the EPA did not re-propose or
re-open the comment period for this action. The proposed rule clearly
laid out the EPA's proposal and requested comment regarding
alternatives, as well as the detailed reasoning behind and goals of the
proposal. The EPA provided this detailed explanation to ensure that
commenters had ample notice of the revisions under consideration, and
provided 45 days for the public comment period. This process accords
with proper notice and comment procedure. Commenters posit that
referencing the then proposed NSPS subpart OOOOa standard in the
proposed rule renders this notice premature and inadequate, and the EPA
respectfully disagrees. First, in proposing to add the NSPS subpart
OOOOa equipment leak detection methods as approved monitoring methods
for subpart W surveys, the EPA was not proposing to require any new
collection of data under subpart W, as the data on fugitive emissions
components would already be collected to meet the requirements of NSPS
subpart OOOOa. Instead, the EPA proposed to add these new monitoring
methods under subpart W so that reporters would be able to use, for the
purpose of compliance with the proposed mandatory subpart W equipment
leak survey, calculation, and reporting requirements, whatever data
would already be collected as a result of complying with the monitoring
method(s) that would be finalized in the NSPS subpart OOOOa. Similarly,
while the EPA proposed to include all fugitive emissions components
subject to the
[[Page 86495]]
final NSPS subpart OOOOa monitoring methods within subpart W emissions
reporting requirements, with some exceptions, which would mean that
additional components would fall within the scope of subpart W
applicability, these data would already be collected under the NSPS
subpart OOOOa, meaning that no new data would need to be collected for
subpart W that was not already required by another CAA program. As
such, the substance of the monitoring method(s) and fugitive emission
component definition was not at issue for purposes of subpart W within
these revisions, as that process took place within the NSPS subpart
OOOOa rulemaking. Rather, the EPA ensured that reporters were provided
notice of the proposal to add the monitoring methods and scope of
components that would be finalized under the NSPS OOOOa as additional
monitoring methods and applicable components for subpart W, provided
notice of the proposed additional subpart W equipment leak survey,
calculation, and reporting requirements for equipment components
subject to the NSPS subpart OOOOa, and made clear that the intent of
these revisions was to align the programs so that reporters would use
the data gathered in complying with the finalized NSPS subpart OOOOa to
comply with their subpart W requirements. The proposed rule further
explained the purpose behind this proposed revision, as detailed in the
proposed rule (81 FR 4987; January 29, 2016), including reducing burden
on reporters by minimizing the potential equipment leak surveys
required at a given facility across CAA programs. As noted earlier, the
proposed rule for subpart W clearly specified that only a monitoring
method finalized in the NSPS subpart OOOOa rule would be finalized for
subpart W, which ensured that no requirement would reference any
monitoring method that was merely at proposal stage. In fact, the
proposed rule for subpart W clearly detailed the NSPS subpart OOOOa
proposed monitoring method, and identified that the NSPS subpart OOOOa
proposal included a potential alternative monitoring method, and
furthermore explained that any method(s) added in this final subpart W
action would be the method(s) that were finalized in the NSPS subpart
OOOOa.
---------------------------------------------------------------------------
\8\ The NSPS subpart OOOOa rule has since been finalized. 81 FR
35824 (June 3, 2016).
---------------------------------------------------------------------------
Furthermore, Subpart W currently includes an optical gas imaging
(OGI) method (see 40 CFR 98.234(a)(1)) and Method 21 (40 CFR
98.234(a)(2)) in the subpart W list of monitoring methods. While there
are differences in the application of the methods between the current
subpart W and the final NSPS subpart OOOOa,\9\ necessitating this
revision, current use of OGI and Method 21 for purposes of subpart W
provides support that the methods at issue provide reliable data for
use in subpart W emissions reporting.
---------------------------------------------------------------------------
\9\ See section II.C of this preamble.
---------------------------------------------------------------------------
This final rule incorporates the monitoring methods finalized in
the NSPS subpart OOOOa with some changes from proposal. To the extent
the specifics of how this final subpart W rule is adding method(s) in
accordance with the NSPS subpart OOOOa differ from the specifics in the
subpart W proposal, as explained further in section II.C of this
preamble, these changes are consistent with the purpose detailed in the
proposed rule and were made to ensure only those portions of the final
NSPS subpart OOOOa that are essential to the integrity of the methods
are referenced within the requirements of subpart W. This final rule
revises applicable components subject to subpart W to include all
components subject to the final NSPS subpart OOOOa, except for the
finalized as proposed exclusion of certain components, as further
detailed in section II.D of this preamble. The EPA notes that while we
finalized the reference to the NSPS subpart OOOOa with certain
exceptions regarding applicable components as proposed, the final NSPS
subpart OOOOa definition of fugitive emission components was narrower
in scope than that rule's proposal. This final rule also includes
revisions, with some changes from proposal as detailed in Sections
II.B, II.D, II.E, and II.F of this preamble, to how reporters must use
the data obtained in accordance with the methods finalized in the NSPS
subpart OOOOa for subpart W reporting.
Although the EPA's own reasoned consideration and its assessment of
public comment have resulted in some modifications to the final rule,
as explained further in sections II.B through II.F of this preamble,
such changes reflect the goals and alternatives in the EPA's original
proposal, and the proposed rule ensured that interested parties were
``fairly apprised'' of the elements ultimately included in this final
rulemaking. See, e.g., United Steelworkers of America v. Schuylkill
Metals, 828 F.2d 314 (5th Cir. 1987).
While some changes occurred to the NSPS subpart OOOOa requirements
from proposal to final in that rulemaking, including changes to the
substance of the monitoring methods and the fugitive emission component
definition, those substantive changes are out of scope of this subpart
W rulemaking that is intended to align with the final NSPS subpart
OOOOa requirements; however, commenters were provided full notice and
opportunity to comment within that NSPS subpart OOOOa rulemaking, as
fully explained within those proposed and final preambles, the EPA's
response to comments, and the docket of that action.\10\
---------------------------------------------------------------------------
\10\ Docket ID No. EPA-HQ-OAR-2010-0505.
---------------------------------------------------------------------------
The commenter is correct that the EPA did not consider changes that
may be made to the final NSPS subpart OOOOa through the judicial review
process. Any such potential, future changes are premature to consider
at this time.
B. Summary of Final Amendments to the Requirement To Use the
Calculation Methodology Based on Equipment Leak Surveys
1. Summary of Final Amendments
As noted in section I.B of this preamble, subpart W presently
requires reporters with sources in certain industry segments to use the
calculation methodology based on population counts according to 40 CFR
98.233(r). For example, reporters in the Onshore Petroleum and Natural
Gas Production and the Onshore Petroleum and Natural Gas Gathering and
Boosting industry segments are required either to count the number of
equipment components of each type (e.g., valve, connector, open-ended
line, or pressure relief valve) or to count the number of major
equipment at the facility and then calculate the number of equipment
components of each type using default average component counts for each
piece of major equipment in Tables W-1B and W-1C to subpart W (40 CFR
98.233(r)(2)). The resulting equipment component counts are then
multiplied by default ``population emission factors'' in Table W-1A to
subpart W to calculate emissions from equipment leaks.
Other reporters are required to use the calculation methodology
based on equipment leak surveys according to 40 CFR 98.233(q) using one
of the monitoring methods in 40 CFR 98.234(a). For example, reporters
in the Onshore Natural Gas Transmission Compression industry segment
must conduct at least one equipment leak survey in a calendar year for
the compressor and non-compressor components in gas service listed in
Table W-3A to subpart W. These reporters then use the number of leaking
[[Page 86496]]
components in the calendar year, the average amount of time each
component was leaking, and the default ``leaker emission factors'' in
Table W-3A to subpart W to calculate emissions according to Equation W-
30.
The EPA is finalizing the proposal to apply the calculation
methodology based on equipment leak surveys in 40 CFR 98.233(q) to
additional reporters in subpart W. Specifically, reporters in any
subpart W industry segment with a well site(s) and/or compressor
station(s) required to conduct fugitive emissions monitoring to comply
with the NSPS subpart OOOOa will be required to use the calculation
methodology based on equipment leak surveys for those components \11\
under subpart W using the new monitoring methods consistent with the
NSPS subpart OOOOa (see section II.C of this preamble). While these are
new calculation methodology and equipment leak survey requirements for
the subpart W reporting of these components, reporters may meet the
survey requirements by counting the actual number of components with
fugitive emissions identified through implementation of the NSPS
subpart OOOOa as leaks for purposes of subpart W and use those counts
with the calculation methodologies specified in 40 CFR 98.233(q) to
determine equipment leak emissions for those components.
---------------------------------------------------------------------------
\11\ See section II.D of this preamble.
---------------------------------------------------------------------------
We received extensive comment regarding the proposed revisions to
require facilities in the Onshore Natural Gas Processing industry
segment to use the results of the leak surveys conducted to comply with
the NSPS subpart OOOOa equipment leak requirements for reporting under
subpart W. We are still reviewing those comments and are not taking
final action on those revisions at this time.
For other sources of equipment leaks (i.e., those not subject to
the NSPS subpart OOOOa well site or compressor station fugitive
emissions standards),\12\ the amended subpart W requirements depend on
whether the component types are currently required to be reported using
the calculation methodology based on equipment leak surveys (40 CFR
98.233(q)) or the calculation methodology based on population counts
(40 CFR 98.233(r)). For components at facilities in industry segments
that are currently required to use the calculation methodology based on
equipment leak surveys to comply with subpart W, the EPA is finalizing
as proposed that reporters must continue to conduct equipment leak
surveys as required by subpart W but may use any monitoring method in
40 CFR 98.234(a). If they use either of the two new monitoring methods
in 40 CFR 98.234(a)(6) or (7) that are consistent with the NSPS subpart
OOOOa, then in addition to surveying the components currently subject
to the survey requirements in subpart W, they must also survey all
other components that are fugitive emissions components in the NSPS
subpart OOOOa, with limited exceptions, as specified in 40 CFR 98.232
(see sections II.C and II.D of this preamble). If they use any of the
monitoring methods currently in 40 CFR 98.234(a)(1) through (5), then
in addition to surveying the components currently subject to the survey
requirements in subpart W, they may elect to survey the other
components specified in 40 CFR 98.232.
---------------------------------------------------------------------------
\12\ Except for onshore natural gas processing and natural gas
distribution.
---------------------------------------------------------------------------
For components at facilities in industry segments that are
currently required to use the calculation methodology based on
population counts, the reporter may continue to use that methodology.
Alternatively, the EPA is finalizing as proposed the option that the
reporter may elect to use the calculation methodology based on
equipment leak surveys (40 CFR 98.233(q)(1)(iv)) in lieu of the
calculation methodology based on population counts (40 CFR 98.233(r)).
If this option is selected, then the reporter must use any of the
monitoring methods in 40 CFR 98.234(a). If they use a monitoring method
in 40 CFR 98.234(a)(6) or (7), then they must survey all components
that would otherwise be subject to the calculation methodology based on
population counts, and they must also survey all other components that
are fugitive emissions components in the NSPS subpart OOOOa, with
limited exceptions, as specified in 40 CFR 98.232. If they use any of
the monitoring methods currently in 40 CFR 98.234(a)(1) through (5),
then in addition to surveying the components that would otherwise be
subject to the calculation methodology based on population counts, they
may elect to survey the other specified in 40 CFR 98.232. The intent of
the new provision in 40 CFR 98.233(q)(1)(iv) is to allow flexibility
for reporters currently required to use the calculation methodology
based on population counts for components that are not subject to the
NSPS subpart OOOOa well site or compressor station fugitive emissions
standards.
The burden of using the calculation methodology based on equipment
leak surveys will be similar to using the existing subpart W
calculation methodology based on population counts, and the results
will be more representative of the number of leaks at the facility than
the calculation methodology based on population counts. Table 2 of this
preamble provides a summary of the equipment leak calculation
methodologies and monitoring methods that will be available to each
industry segment covered by subpart W under these amendments.
Table 2--Final Equipment Leak Requirements for Subpart W
----------------------------------------------------------------------------------------------------------------
Components subject to 40 CFR 60.5397a Components not subject to 40 CFR
of the NSPS subpart OOOOa 60.5397a of the NSPS subpart OOOOa
-------------------------------------------------------------------------------
Subpart W industry segments \a\ Subpart W Subpart W
Subpart W monitoring method Subpart W monitoring method
calculation for leak detection calculation for leak detection
methodology \b\ \c\ methodology \d\
----------------------------------------------------------------------------------------------------------------
Onshore Petroleum and Natural Leak survey (40 OGI or Method 21 Leak survey (40 Any method in 40
Gas Production. CFR 98.233(q)). as specified in CFR 98.233(q)); CFR 98.234(a).
the NSPS subpart OR N/A.
OOOOa. Population count
(40 CFR
98.233(r)).
Onshore Natural Gas Transmission Leak survey (40 OGI or Method 21 Leak survey (40 Any method in 40
Compression; Underground CFR 98.233(q)). as specified in CFR 98.233(q)) CFR 98.234(a).
Natural Gas Storage: Storage the NSPS subpart \e\.
stations, gas service. OOOOa.
[[Page 86497]]
Underground Natural Gas Storage: Leak survey (40 OGI or Method 21 Leak survey (40 Any method in 40
Storage wellheads, gas service. CFR 98.233(q)). as specified in CFR 98.233(q)); CFR 98.234(a).
the NSPS subpart OR N/A.
OOOOa. Population count
(40 CFR
98.233(r)).
LNG \f\ Storage: LNG Service; Leak survey (40 OGI or Method 21 Leak survey (40 Any method in 40
LNG Import and Export CFR 98.233(q)). as specified in CFR 98.233(q)). CFR 98.234(a).
Equipment: LNG Service. the NSPS subpart
OOOOa.
LNG Storage: Gas Service; LNG Leak survey (40 OGI or Method 21 Leak survey (40 Any method in 40
Import and Export Equipment: CFR 98.233(q)). as specified in CFR 98.233(q)); CFR 98.234(a).
Gas Service. the NSPS subpart OR N/A.
OOOOa. Population count
(40 CFR
98.233(r)) g.
----------------------------------------------------------------------------------------------------------------
a Onshore Natural Gas Processing and Natural Gas Distribution are not included in this table because we are not
revising the calculation methodology and monitoring method for leak detection for these industry segments in
this action. The current requirements are still applicable to components in these industry segments.
b The term ``calculation methodology'' refers to the procedures used to calculate emissions (e.g., ``calculation
methodology based on equipment leak surveys'' refers to the methodology described in 40 CFR 98.233(q)) and
``monitoring method'' refers to the technology, test method, or other method of determining whether an
individual component is leaking (see 40 CFR 98.234(a)).
c OGI as specified in the NSPS subpart OOOOa is codified in subpart W at 40 CFR 98.234(a)(6) and Method 21 as
specified in the NSPS subpart OOOOa is codified in subpart W at 40 CFR 98.234(a)(7).
d ``Any method in 40 CFR 98.234(a)'' means any of the following methods: OGI as specified in 40 CFR 60.18 (40
CFR 98.234(a)(1)), Method 21 with a leak definition of 10,000 parts per million by volume (ppmv)(40 CFR
98.234(a)(2)), Infrared laser beam illuminated instrument (40 CFR 98.234(a)(3)), Acoustic leak detection
device (40 CFR 98.234(a)(5)), OGI as specified in the NSPS subpart OOOOa (40 CFR 98.234(a)(6)) or Method 21
with a leak definition of 500 ppmv (40 CFR 98.234(a)(7)).
e Reporting is required for emissions from valves, connectors, open-ended lines, pressure relief valves, and
meters but is optional for instruments and other components unless the reporter elects to use either OGI or
Method 21 as specified in the NSPS subpart OOOOa (40 CFR 98.234(a)(6) or (7)), in which case reporting is also
required for instruments and other fugitive emissions components.13
f LNG = liquefied natural gas.
g Reporting is only required for emissions from vapor recovery compressors if this option is chosen.
2. Summary of Comments and Responses
Comment: Several commenters stated that facilities in the Onshore
Petroleum and Natural Gas Production and Onshore Petroleum and Natural
Gas Gathering and Boosting industry segments should not be required to
use the NSPS subpart OOOOa results to calculate GHG emissions to comply
with subpart W. They stated that the proposed NSPS subpart OOOOa leak
detection program was limited to one monitoring method, which is
inconsistent with the current flexibility for reporters conducting
equipment leak surveys for subpart W to choose any monitoring method
within 40 CFR 98.234(a). The commenters asserted that this requirement
will result in some subpart W reporters having to manage multiple
equipment leak survey programs within one facility, especially if the
facility is located within a state with a different leak detection
program, and this result is overly burdensome. In addition, the
commenters stated that the equipment leak survey results will be
internally inconsistent if they use different methods, and a facility's
emissions could appear to increase one year simply because the number
of sites subject to the NSPS subpart OOOOa increases, requiring the
reporter to use the OGI method in the NSPS subpart OOOOa for an
increased number of components. Instead, the reporters suggested, use
of the calculation methodology based on equipment leak surveys,
including the selection of monitoring method within 40 CFR 98.234(a),
should be voluntary for all facilities not currently required to
conduct leak surveys under subpart W.
---------------------------------------------------------------------------
\13\ See section II.D.1 of this preamble for the EPA's decision
on the final subpart W requirements for components not subject to 40
CFR 60.5397a of the NSPS Subpart OOOOa from affected facilities in
the Onshore Natural Gas Transmission Compression industry segment,
and storage stations in gas service within the Underground Natural
Gas Storage industry segment.
---------------------------------------------------------------------------
In contrast, another commenter requested that the EPA require all
subpart W reporters to detect leaks using direct equipment leak
detection technologies such as OGI. The commenter stated that leak
detection using OGI can produce more accurate data than current subpart
W methods and that the EPA's approach is consistent with the EPA's
stated goals to enhance the rigor and transparency of subpart W data.
In addition, the commenter stated that applying OGI detection uniformly
across subpart W sources will produce data that is readily comparable
across facilities and will allow the EPA to assess the performance of
facilities over time.
Response: For facilities that have affected sources required to
conduct fugitive emissions monitoring to comply with the NSPS subpart
OOOOa well site or compressor station fugitive emissions standards, the
EPA is finalizing as proposed that these components must meet the
subpart W calculation methodology based on equipment leak survey
requirements. In practice, this means reporters can meet these
requirements by counting the actual number of components with fugitive
emissions identified through implementation of the NSPS subpart OOOOa
as leaks for purposes of subpart W. This requirement will achieve the
EPA's stated goal of alignment with the NSPS subpart OOOOa and will
assist in providing the EPA with a greater understanding of emission
reductions.
At this time, we are not requiring all subpart W facilities to
perform a leak detection survey using direct equipment leak detection
technologies such as OGI. Rather this action is focused on aligning the
subpart W requirements, to the extent possible, with the NSPS subpart
OOOOa fugitive emission requirements so that facilities may use the
results of the NSPS subpart OOOOa-required
[[Page 86498]]
fugitive emissions monitoring surveys to fulfill subpart W
requirements.
The EPA does not agree that a subpart W requirement to use the
results of a previously completed leak survey within the subpart W
calculation methodology based on equipment leak surveys will result in
an undue burden to these reporters. For components subject to the NSPS
subpart OOOOa well site or compressor station fugitive emissions
standards, there is little to no burden associated with using the
number of components found to have fugitive emissions as the number of
leaking components in the subpart W calculation methodology based on
equipment leak surveys. The only additional piece of information these
reporters need to calculate emissions is the amount of time each
component was leaking, and this is a straightforward determination
based on the dates of the equipment leak surveys. See section IV.B of
this preamble for information and responses to comments related to the
EPA's burden estimates for these amendments.
C. Summary of Final Amendments to Monitoring Methods
1. Summary of Final Amendments
The EPA is finalizing the proposal to add OGI, as specified in the
NSPS subpart OOOOa, to the list of monitoring methods in 40 CFR
98.234(a). The addition of this specific OGI method to subpart W at 40
CFR 98.234(a)(6) aligns the methods in the two rulemakings and allows
subpart W facilities to directly use information derived from the
implementation of the fugitive emissions monitoring conducted under the
NSPS subpart OOOOa to calculate and report equipment leak emissions to
the GHGRP.
The EPA has made changes to the proposed subpart W amendments after
consideration of public comment and/or to be consistent with the final
revisions made to the corresponding proposed NSPS subpart OOOOa
specifications. The proposed subpart W amendments cross-referenced the
proposed 40 CFR 60.5397a(b) through (e) and (g) through (i), which
included the requirements to: (1) Develop a corporate-wide fugitive
emissions monitoring plan; (2) develop a site-specific monitoring plan;
(3) observe each fugitive emissions component for fugitive emissions;
(4) conduct monitoring surveys semiannually; and (5) adjust the
frequency of monitoring surveys based on the percent of the fugitive
emissions components detected to have fugitive emissions. For the
reasons described below, the final amendments to subpart W for the OGI
method cross-reference a portion of the NSPS subpart OOOOa requirements
to develop the fugitive emissions monitoring plan and the NSPS subpart
OOOOa requirements to observe each fugitive emissions component for
fugitive emissions.
The final NSPS subpart OOOOa requires an emissions monitoring plan
that covers the affected sources within each company-defined area. This
monitoring plan includes information about the survey frequency,
monitoring method and instrument selected, repair procedures and
timeframes, recordkeeping, and procedures for calibrating the
monitoring instrument and verifying that it can detect fugitive
emissions at the required levels.
For the final subpart W amendments, the EPA evaluated the NSPS
subpart OOOOa requirements for the monitoring plan along with the level
of detail in the existing monitoring methods in 40 CFR 98.234(a). The
EPA determined that information about the monitoring instrument
selected and procedures for calibrating the monitoring instrument and
verifying that it can detect fugitive emissions at the required levels
is necessary to ensure the OGI monitoring is performed correctly.
Therefore, the new OGI detection method in subpart W does include the
NSPS subpart OOOOa requirement to develop a monitoring plan that
describes the OGI instrument (40 CFR 60.5397a(c)(3)) and how the OGI
survey will be conducted to ensure that fugitive emissions can be
imaged effectively (40 CFR 60.5397a(c)(7)). The EPA determined that the
NSPS subpart OOOOa survey frequency should not be cross-referenced in
subpart W because cross-referencing these frequencies would override
the current annual survey requirement in subpart W regardless of
whether the use of the new monitoring methods is voluntary or
mandatory. The EPA determined that the repair procedures and timeframes
should not be cross-referenced because subpart W is part of a reporting
program and does not require repair of detected leaks. The EPA also
determined that the NSPS subpart OOOOa recordkeeping requirements
should not be cross-referenced because they include provisions that are
not applicable to greenhouse gas reporting, such as records related to
repairs. Applicable recordkeeping requirements for all leak detection
methods in subpart W are specified at 40 CFR 98.237.
The final site-specific monitoring plan in the NSPS subpart OOOOa
includes three items specific to the OGI method: (1) A sitemap; (2) a
defined observation path for the operator that ensures that all
fugitive emissions components are within sight of the path; and (3) a
monitoring plan for difficult-to-monitor and unsafe-to-monitor fugitive
emissions components. The EPA has reviewed these elements as well and
determined not to cross-reference these three elements in subpart W.
The observation path and the sitemap ensure that the OGI operator
visualizes all of the components that must be surveyed, analogous to
requirements in some rules to identify all of the equipment that must
be monitored using Method 21 (e.g., 40 CFR 60.486a(e)(1) and 40 CFR
63.162(c)). Subpart W does not include these identification
requirements as part of the Method 21 requirements in 40 CFR
98.234(a)(2), so it would be inconsistent to require the observation
path as part of the new OGI method. However, while we are not
finalizing the explicit requirement to define the observation path the
operator will follow during their survey, we do note that 40 CFR part
98, subpart A requires a written GHG monitoring plan for all facilities
subject to the GHGRP (see 40 CFR 98.4(g)(5)). Defining an observation
path is one item that could be included in the GHG monitoring plan to
meet the requirement to describe ``procedures and methods that are used
for quality assurance . . . of all . . . other instrumentation'' used
to collect data to comply with the GHGRP (40 CFR 98.3(g)(5)(i)(C)).
The EPA is finalizing the proposed requirement to observe each
fugitive emissions component for fugitive emissions (40 CFR
60.5397a(e)).\14\ The EPA considers surveying all fugitive emissions
components (instead of just the current list of equipment in subpart W
for a particular industry segment) to be an inherent part of the NSPS
subpart OOOOa OGI method.
---------------------------------------------------------------------------
\14\ See section II.D.1 of this preamble for details regarding
the specific NSPS subpart OOOOa-defined fugitive emissions
components that are not considered sources of ``equipment leaks'' in
subpart W.
---------------------------------------------------------------------------
The EPA is not cross-referencing the semi-annual (well sites) and
quarterly (compressor stations) monitoring frequencies of the final
NSPS subpart OOOOa. As noted above, cross-referencing these monitoring
frequencies would override the current annual survey requirement in
subpart W regardless of whether the use of the new monitoring methods
is voluntary or mandatory. The EPA is instead clarifying that for
reporters with components subject to the NSPS subpart OOOOa well site
or compressor station fugitive emissions requirements and for which
surveys are required or elected, the results from each equipment leak
[[Page 86499]]
survey must be used to calculate GHG emissions for subpart W. The EPA
is further clarifying that it is not our intent to require reporters
that are not subject to the NSPS subpart OOOOa well site or compressor
station fugitive emissions requirements to conduct more than one
equipment leak survey in a calendar year for purposes of GHGRP
reporting, solely because they choose to use the OGI method. The EPA
also notes that the proposed NSPS subpart OOOOa provisions for
adjusting the frequency of equipment leak surveys based on the percent
of the fugitive emissions components detected to have fugitive
emissions were not included in the final NSPS subpart OOOOa and
therefore are not cross-referenced in the final subpart W revisions.
Finally, consistent with the final NSPS subpart OOOOa, the EPA is
finalizing the use of Method 21 as an alternative monitoring method to
OGI (as specified in the NSPS subpart OOOOa) at 40 CFR 98.234(a)(7). As
the EPA noted in the preamble for this proposed revision to subpart W
(81 FR 4989; Jan. 29, 2016), the NSPS subpart OOOOa proposal identified
EPA Method 21 as a monitoring method that may also be used to conduct
resurveys of repaired components when fugitive emissions are detected
(80 FR 56612 (well sites) and 80 FR 56612 (compressor stations)), and
the EPA requested comment on including in the final rule the use of
Method 21 for fugitive emissions monitoring as well (80 FR 56638 (well
sites) and 80 FR 56643 (compressor stations)). The EPA also made clear
in the preamble to these proposed revisions to subpart W that,
consistent with the goal of aligning the methods in the two rulemakings
(subpart W and the NSPS subpart OOOOa), the EPA expected that the final
amendments to subpart W for monitoring methods would reference the
final version of the method(s) in the NSPS subpart OOOOa, including any
changes made to the NSPS subpart OOOOa in response to comments on the
proposed monitoring method(s) (81 FR 4991). Accordingly, the EPA is
finalizing the use of Method 21 as an alternative monitoring method to
OGI (as specified in the NSPS subpart OOOOa) at 40 CFR 98.234(a)(7).
For reporters that elect to use Method 21 as specified in 40 CFR
98.234(a)(7), either for components that are subject to the NSPS
subpart OOOOa well site or compressor station fugitive emissions
requirements or voluntarily, a leak is detected if an instrument
reading of 500 ppmv or greater is measured. As explained in this
section regarding the NSPS subpart OOOOa OGI monitoring method, we
determined that the requirements in 40 CFR 60.5397a(b) are consistent
with the requirements of subpart W regarding the development of an
emissions monitoring plan; this monitoring plan is required to include
verification that the procedures of Method 21 are followed consistent
with the requirements in 40 CFR 60.5397a(c)(8). Also, as with the NSPS
subpart OOOOa OGI method, the EPA is requiring in subpart W observation
of each fugitive emissions component for fugitive emissions consistent
with the requirements in 40 CFR 60.5397a(e); the EPA considers
surveying all fugitive emissions components to be an inherent part of
the NSPS subpart OOOOa Method 21 alternative to the OGI method and is
consistent with requirements in subpart W to conduct a complete
equipment leak survey.
At this time, the EPA is not adding any other monitoring methods to
subpart W. We will continue to evaluate equipment leak detection
methods and technologies \15\ and may amend subpart W to allow the use
of additional methods in the future.
---------------------------------------------------------------------------
\15\ For example, the EPA has issued a voluntary request for
information inviting all parties to provide information on
innovative technologies to detect, measure, and mitigate emissions
from the oil and gas industry. See 81 FR 46670 (July 18, 2016).
---------------------------------------------------------------------------
2. Summary of Comments and Responses
Comment: Many commenters disagreed with the EPA's proposal to add
only the OGI method as specified in the NSPS subpart OOOOa to 40 CFR
98.234(a) of subpart W. They asserted that while OGI is an effective
method for finding the majority of emissions more quickly than EPA
Method 21, it is also a costly technology that cannot quantify
emissions. The commenters stated that OGI has other limitations,
especially in non-ideal weather conditions; one commenter also stated
that use of the OGI camera requires a hot work permit in many
instances.
Response: Due to similar comments on the proposed NSPS subpart
OOOOa, the final NSPS subpart OOOOa provides owners and operators of
new, modified, or reconstructed well sites or compressor stations with
the option of using EPA Method 21 with a repair threshold of 500 ppmv
if they elect not to use the OGI method (40 CFR 60.5397a). As discussed
in section II.C.1 of this preamble, the final amendments to subpart W
provide for the use of EPA Method 21 where a leak is detected for
purposes of subpart W if an instrument reading of 500 ppmv or greater
is measured. This amendment to subpart W maintains the alignment with
the NSPS subpart OOOOa well site and compressor station fugitive
emissions monitoring requirements, so that reporters can directly use
the NSPS subpart OOOOa monitoring results to count the number of leaks
under subpart W.
Comment: Many commenters stated that leak detection technology is a
rapidly growing field and there are many alternative technologies and
new technologies in development that may be more accurate and less
costly than OGI. Some commenters noted that recent emphasis on
CH4 emissions has caused vendors to focus on CH4
leak detection. Therefore, according to the commenters, some of those
technologies may be better options for the purpose of reporting
emissions under subpart W than other leak detection programs. The
commenters stated that the EPA's proposal to limit leak surveys to a
prescriptive list of methods could limit development of these new
technologies.
Commenters provided a variety of suggestions for incorporation of
new and emerging technologies into subpart W. Three commenters
recommended that the EPA establish a clear process for industry,
vendors, and/or the EPA to evaluate the efficacy and accuracy of
alternative CH4 monitoring technologies and approve the use
of those technologies. One of these commenters noted that any
technology evaluation process should be straightforward and more
streamlined than the years-long process needed to approve emissions
control devices or continuous emissions monitoring systems. Another of
these commenters suggested that the EPA model a technology evaluation
process after the vendor testing program for flares and combustors, in
which the EPA sets testing protocols and vendors demonstrate that they
can meet specific criteria. A fourth commenter suggested that the EPA
develop a pilot program to incentivize the accelerated development and
deployment of advanced monitoring and detection technologies and to
compare the effectiveness of these approaches to periodic, OGI-based
surveys.
Response: The EPA agrees with the commenters that emissions
monitoring in the oil and gas sector is a field of emerging technology,
and major advances are expected in the near future. We are seeing a
rapidly growing push to develop and produce low-cost monitoring
technologies to find fugitive CH4 emissions sooner and at
lower levels than current technology allows, thus enhancing the ability
of operators to detect fugitive emissions. The EPA agrees that
continued development of these cost-effective technologies is
[[Page 86500]]
important. However, the EPA does not have enough information at this
time to evaluate specific technologies to determine if they are
equivalent to or better than the monitoring methods provided in and
being added to 40 CFR 98.234(a). The EPA may evaluate new options as
they become available and determine if they are equivalent to existing
methods. For example, the final NSPS subpart OOOOa provides a process
for the EPA to determine that a technology can be used as an
``alternative means of emission limitation.'' \16\ As technologies are
approved through this process, the EPA anticipates that it would
contemporaneously incorporate these monitoring methods in subpart W to
ensure continued alignment between the NSPS subpart OOOOa and subpart W
through future notice and comment rulemaking.
---------------------------------------------------------------------------
\16\ See 40 CFR 60.5398a titled ``What are the alternative means
of emission limitations for GHG and volatile organic compounds from
well completions, reciprocating compressors, the collection of
fugitive emissions components at a well site and the collection of
fugitive emissions components at a compressor station?''
---------------------------------------------------------------------------
Comment: Multiple commenters addressed the proposed requirement to
consider any fugitive emissions observed using OGI during the NSPS
subpart OOOOa fugitive emissions monitoring as a leak for purposes of
subpart W. Most of these commenters objected to the proposal and stated
that the definition of a leak for subpart W should be 10,000 ppmv,
regardless of the monitoring method used. These commenters asserted
that setting the leak definition consistent with the current methods in
subpart W would ensure that the new methods result in new information
being collected and reported consistently within a facility and
consistent with the equipment leak data already in the GHGRP. One
commenter noted that defining a leak as emissions at a set
concentration is much less subjective than defining a leak as any
emissions observed with OGI, and setting the leak definition at 10,000
ppmv rather than a lower concentration would allow operators to focus
on finding (and fixing) large leaks instead of spending resources to
identify many small leaks that do not contribute much to overall
emissions. Another commenter noted that a leak definition of 10,000
ppmv is consistent with the leaker emission factors currently provided
in subpart W as well as the proposed new leaker emission factors.
One commenter agreed with a subpart W leak being defined as any
fugitive emissions observed using OGI during the NSPS subpart OOOOa
fugitive emissions monitoring or emissions above 500 ppmv detected via
EPA Method 21, but the commenter asserted that the leak definition for
any new or emerging technologies used in a voluntary leak survey should
be 5,000 ppmv. The commenter noted that these new technologies are
likely to be more sensitive and detect emissions at lower
concentrations than OGI, and companies that are employing more accurate
instruments should not be ``penalized'' by having to report more leaks
than if they used OGI.
Response: Subpart W already includes OGI and EPA Method 21 with a
leak definition of 10,000 ppmv for use by reporters currently required
to conduct leak surveys for subpart W. The final amendments also
provide for use of these methods by reporters electing to conduct an
equipment leak survey voluntarily (i.e., for sources currently required
to use the calculation methodology based on population counts that are
not subject to the NSPS subpart OOOOa well site or compressor station
fugitive emissions requirements). The EPA is adding the methods used
for fugitive emissions monitoring in the NSPS subpart OOOOa to 40 CFR
98.234(a), as approved monitoring methods for subpart W leak surveys.
This addition facilitates alignment with the NSPS subpart OOOOa and
will allow reporters to directly use the NSPS subpart OOOOa monitoring
results to count the number of leaks under subpart W. Finally, as noted
in section II.C.1 of this preamble, the EPA is not adding any other
monitoring methods to subpart W at this time, so it is not necessary to
consider a different leak definition for new or emerging technologies.
The EPA disagrees that using a leak definition other than 10,000
ppmv would undermine the quality of the data reported to the GHGRP.
First, subpart W currently includes an OGI monitoring method in 40 CFR
98.234(a)(1). While this monitoring method allows facilities to screen
the observed leaks using Method 21, it does not require it, and we do
not expect that many reporters actively use dual monitoring methods in
their leak surveys to screen all OGI-detected leaks using Method 21.
Second, we are also finalizing, consistent with the final NSPS
subpart OOOOa rule, the ability to use Method 21 with a leak definition
of 500 ppmv as an alternative to the OGI method. We agree with
commenters that the average emissions rate of leaks identified using
Method 21 with a leak definition of 500 ppmv would be less than the
average emissions rate of leaks identified using Method 21 with a leak
definition of 10,000 ppmv. To address this issue, we are also
finalizing separate leaker factors that are appropriate for reporters
using this alternative method (Method 21 with a leak definition of 500
ppmv). As described in further detail in section II.E.1 of this
preamble and in the document ``Greenhouse Gas Reporting Rule: Technical
Support for Leak Detection Methodology Revisions and Confidentiality
Determinations for Petroleum and Natural Gas Systems Final Rule'' in
Docket ID No. EPA-HQ-OAR-2015-0764, these additional emission factors
were developed from the same data set that was used to develop the
original population emission factors and the proposed leaker
factors.\17\ Therefore, this additional Method 21 monitoring method,
which includes a different leak definition than the other Method 21-
based method already available in subpart W at 40 CFR 98.234(a)(2), has
been specifically considered and new emission factors are provided in
the final rule to ensure that this new monitoring method's leak
definition will not undermine the quality of the emissions reported
under subpart W.
---------------------------------------------------------------------------
\17\ This data set was developed from monitoring conducted using
Method 21 with a leak definition of 10,000 ppmv.
---------------------------------------------------------------------------
If the EPA did not provide the ability for reporters to use the
monitoring methods required by the NSPS subpart OOOOa within subpart W,
reporters would not be able to use the NSPS subpart OOOOa monitoring
results directly; instead, they would have to measure each occurrence
of fugitive emissions individually to determine if it is a leak for
purposes of subpart W, which would increase the burden for those
reporters.
D. Summary of Final Amendments for Components To Be Surveyed
1. Summary of Final Amendments
The EPA proposed to align the subpart W equipment components with
the NSPS subpart OOOOa definition of ``fugitive emissions component,''
with certain exceptions.\18\ After careful consideration of comments,
the EPA is finalizing that provision consistent with the final NSPS
subpart OOOOa definition of ``fugitive emissions component'' with
certain exceptions consistent with the proposal, as described in
further detail in this section below. A ``fugitive emissions
component'' is defined in 40 CFR 60.5430a of the final NSPS subpart
[[Page 86501]]
OOOOa to include any component that has the potential to emit fugitive
emissions of CH4 or volatile organic compounds at a well site or
compressor station, including but not limited to valves, connectors,
pressure relief devices, open-ended lines, flanges, covers and closed
vent systems not subject to 40 CFR 60.5411a, thief hatches or other
openings on a controlled storage vessel not subject to 40 CFR 60.5395a,
compressors, instruments, and meters. Devices that vent as part of
normal operations, such as natural gas-driven pneumatic controllers or
natural gas-driven pumps, are not fugitive emissions components, as the
natural gas discharged from the device's vent is not considered a
fugitive emission. Emissions originating from a location other than the
vent are considered fugitive emissions.
---------------------------------------------------------------------------
\18\ See 81 FR 4994 for a discussion of the differences between
the proposed definition of ``fugitive emissions component'' and the
proposed components subject to equipment leak reporting in subpart
W.
---------------------------------------------------------------------------
As noted in the preamble to the proposed subpart W amendments, some
of the components listed in the NSPS subpart OOOOa definition of
fugitive emissions component are already included as part of the
subpart W equipment leaks calculation methodologies (either based on
equipment leak surveys or on population counts), while other fugitive
emissions components are specifically addressed in other calculation
methodologies in subpart W. As part of developing the proposed
amendments for subpart W, we compared the list of components in the
NSPS subpart OOOOa proposed definition of fugitive emissions component
with the current methodologies in subpart W to identify which fugitive
emissions components were already covered by an existing requirement in
subpart W and which fugitive emissions components would be specifically
covered in subpart W when using the OGI method as specified in the
proposed NSPS subpart OOOOa.
Table 3 of this preamble provides a summary of the applicable
subpart W calculation methodologies for components subject to the
fugitive emissions standards in the final NSPS subpart OOOOa. The basis
for excluding certain components that are subject to the fugitive
emissions standards in the final NSPS subpart OOOOa from the final
equipment leak survey requirements in 40 CFR 98.233(q) is discussed
below.
Table 3--Final Subpart W Calculation Methodology Requirements for Components Subject to the Fugitive Emissions
Standards in NSPS Subpart OOOOa
----------------------------------------------------------------------------------------------------------------
Applicable GHG emissions calculation methodology in subpart W by industry
segment for components that are also subject to the fugitive emissions
standards for well sites or compressor stations in the NSPS subpart
Type of component in definition of OOOOaa
fugitive emissions component and --------------------------------------------------------------------------
subject to the fugitive emissions Onshore petroleum and
standards in NSPS subpart OOOOa natural gas production, Underground natural gas Onshore natural gas
onshore petroleum and storage, LNG storage, transmission
natural gas gathering LNG import and export compression
and boosting equipment
----------------------------------------------------------------------------------------------------------------
Thief hatches or other openings on 40 CFR 40 CFR 40 CFR
controlled storage vessels not 98.233(j). 98.233(q) (use factor 98.233(k).
subject to 40 CFR 60.5395a. for ``other''
components in Tables W-
4A, W-5A, and W-6A to
subpart W) b.
Compressors, excluding emissions from 40 CFR 40 CFR 40 CFR
vents that are part of normal 98.233(q) for blowdown 98.233(o) for blowdown 98.233(o) for blowdown
operations (i.e., wet seal oil valve leakage and valve leakage and valve leakage and
degassing vents). isolation valve isolation valve isolation valve
leakage (use factor leakage from leakage from
for ``open-ended centrifugal centrifugal
line'' in Table W-1E compressors. compressors
to subpart W) b. 40 CFR 40 CFR
40 CFR 98.233(p) for blowdown 98.233(p) for blowdown
98.233(q) for all valve leakage, valve leakage,
other leaks from the isolation valve isolation valve
housing (use factor leakage, and rod leakage, and rod
for ``other'' packing venting from packing venting from
components in Table W- reciprocating reciprocating
1E to subpart W) b. compressors. compressors
40 CFR 40 CFR 40 CFR
98.233(p)(10) for rod 98.233(q) for all 98.233(q) for all
packing venting from other leaks from the other leaks from the
reciprocating housing (use factor housing (use factor
compressors. for ``other'' for ``other''
components in Table W- components in Tables W-
4A, W-5A, and W-6A to 3A, to subpart W) b
subpart W) b.
All other components................. 40 CFR 40 CFR 40 CFR
98.233(q) (use factors 98.233(q) (use factors 98.233(q) (use factors
for applicable for applicable for applicable
component types in component types in component types in
Table W-1E to subpart Tables W-4A, W-5A, and Table W-3A to subpart
W) b. W-6A to subpart W) c. W) c.
----------------------------------------------------------------------------------------------------------------
\a\ Onshore Natural Gas Processing and Natural Gas Distribution are not included in this table because we are
not revising the calculation methodology and monitoring method for leak detection for these industry segments
in this action. The current requirements are still applicable to components in these industry segments.
\b\ The leaker emission factors for ``other'' components are being finalized in this revision.
\c\ The leaker emission factors include both factors in the current rule and factors that are being finalized in
this action, depending on the specific component and the monitoring method used to conduct the survey, as
discussed in section II.E.1 of this preamble.
At proposal, we determined that the subpart W calculation
methodology for storage tanks in 40 CFR 98.233(j) already includes
emissions from thief hatches or other openings on storage vessels in
the Onshore Petroleum and Natural Gas Production and Onshore Petroleum
and Natural Gas Gathering and Boosting industry segments. However, we
requested comment on whether the agency should consider separate
approaches for controlled storage tanks and uncontrolled storage tanks.
The final definition of ``fugitive emissions component'' in the NSPS
subpart OOOOa (40 CFR 60.5430a) includes only thief hatches or other
openings on a controlled storage vessel; it does not specifically list
openings on uncontrolled storage vessels. We reviewed the subpart W
calculation methodology specifically for storage tanks with a vapor
recovery system (40 CFR 98.233(j)(4)) and storage tanks with a flare
(40 CFR 98.233(j)(5)). The procedure for determining emissions from a
tank with a vapor recovery system instructs reporters to adjust the
storage tank emissions downward by the magnitude of emissions recovered
using
[[Page 86502]]
a vapor recovery system as determined by engineering estimate based on
best available data (40 CFR 98.233(j)(4)(i)). The procedure for
determining emissions from a tank with a flare references 40 CFR
98.233(n), which instructs reporters to use engineering calculations
based on process knowledge, company records, and best available data to
determine the flow to the flare if the flare does not have a continuous
flow measurement device. If a reporter sees fugitive emissions from a
thief hatch or other opening on a controlled storage vessel during an
equipment leak survey conducted using OGI, the reporter should consider
that information as part of the ``best available data'' used to
calculate emissions from that storage tank. Therefore, we have
concluded that emissions from thief hatches or other openings on
storage vessels in the Onshore Petroleum and Natural Gas Production and
Onshore Petroleum and Natural Gas Gathering and Boosting industry
segments are already included in the subpart W storage tank emission
calculations in 40 CFR 98.233(j) and are finalizing, consistent with
the proposal, that they are not to be considered when determining
emissions from equipment leaks for purposes of subpart W.
We are also finalizing as proposed the exclusion of thief hatches
and other openings on transmission storage tanks from the equipment
leak reporting requirements.\19\ We note that, for purposes of subpart
W reporting, a leaking thief hatch or other opening is functionally a
secondary vent, and thus subject to annual screening on an uncontrolled
tank according to 40 CFR 98.233(k)(1). If screening shows vapors from
the thief hatch or opening are continuous for 5 minutes, then a method
in 40 CFR 98.233(k)(2) must be used to quantify the leak rate, and this
amount must be combined with any other vent leak rates for reporting.
---------------------------------------------------------------------------
\19\ The exceptions to equipment leak reporting requirements
were included in Tables W-1E and W-3 through W-6 of the proposal.
The final rule moves these exceptions to 40 CFR 98.232, to increase
clarity and reduce confusion while achieving the same purpose and
effect.
---------------------------------------------------------------------------
We are also finalizing the proposed distinction between equipment
leak emissions and compressor emissions. Specifically, for centrifugal
compressors, emission sources include wet seal oil degassing vents (for
centrifugal compressors with wet seals), blowdown valve leakage, and
isolation valve leakage. For reciprocating compressors, emission
sources include reciprocating compressor rod packing vents, blowdown
valve leakage, and isolation valve leakage.
For compressors in the Onshore Petroleum and Natural Gas Production
and the Onshore Petroleum and Natural Gas Gathering and Boosting
industry segments under subpart W, the compressor methodologies only
cover emissions from centrifugal compressor wet seal oil degassing
vents and from reciprocating compressor rod packing vents. Thus, the
EPA is finalizing as proposed, for these industry segments, that
blowdown valve leakage and isolation valve leakage are considered
equipment leaks (i.e., open-ended lines), and finalizing as proposed
that emissions from centrifugal compressor wet seal oil degassing vents
and from reciprocating compressor rod packing vents are not considered
equipment leaks when using the calculation methodology based on
equipment leak surveys in 40 CFR 98.233(q).\20\
---------------------------------------------------------------------------
\20\ 40 CFR 98.233(q) specifies which subsections in 40 CFR
98.232 (i.e., which components) must follow the calculation
methodology based on equipment leak surveys in 40 CFR 98.233(q), and
40 CFR 98.232 subsections identify exceptions from the list of
components for which equipment leak reporting is required.
---------------------------------------------------------------------------
For the Onshore Natural Gas Transmission Compression, Underground
Natural Gas Storage, LNG Storage, and LNG Import and Export Equipment
segments, subpart W requires reporters to make ``as found'' or
continuous measurements for compressor emission sources, so the
reporters will have either direct measurement data or site-specific
emission factors by which to calculate emissions from all of the
compressor sources listed above (i.e., wet seal oil degassing vents for
centrifugal compressors with wet seals, rod packing vents for
reciprocating compressors, and blowdown valve leakage and isolation
valve leakage for both centrifugal and reciprocating compressors).
Therefore, we are finalizing as proposed to exclude these compressor
emission sources from the requirements in the calculation methodology
based on equipment leak surveys so that reporters do not double-count
emissions from these sources in their GHGRP reports.
Finally, as noted in section II.C.1 of this preamble, we are
finalizing the proposed determination that for purposes of subpart W,
all other fugitive emissions components as defined in the NSPS subpart
OOOOa not specifically identified above (e.g., thief hatches or other
openings on a controlled storage vessel, compressor sources with
explicit calculation methodologies in subpart W) will be considered
equipment components when conducting an equipment leak survey using the
OGI method as specified in the NSPS subpart OOOOa or EPA Method 21 with
a leak definition of 500 ppmv. In other words, we consider the
provision requiring monitoring of fugitive emissions components as
defined in the NSPS subpart OOOOa in 40 CFR 60.5397a(e) to be an
inherent part of the NSPS subpart OOOOa OGI method and EPA Method 21
with a leak definition of 500 ppmv. Therefore, if a reporter with
components not subject to the NSPS subpart OOOOa well site or
compressor station fugitive emission requirements elects to use the
NSPS subpart OOOOa OGI method or EPA Method 21 with a leak definition
of 500 ppmv for purposes of subpart W, they are also electing to survey
these additional components.
2. Summary of Comments and Responses
Comment: Several commenters stated that the NSPS subpart OOOOa
proposed definition of ``fugitive emissions component'' is too
expansive. Because it includes many more emission sources than a more
traditional definition of equipment, the commenters asserted that it is
inconsistent with current subpart W requirements. The commenters stated
that aligning subpart W with the NSPS subpart OOOOa in this respect
will complicate the question of which components must be monitored at
subpart W facilities and will result in facilities having higher
numbers of leaks than they would have if they used any other equipment
leak detection method in subpart W. Some commenters stated that even
for well sites and compressor station sites subject to the NSPS subpart
OOOOa, component types considered to be equipment under subpart W
should be consistent with a more traditional definition of equipment.
Other commenters requested that equipment under subpart W only include
component types for which the EPA can provide specific population
factors and leaker emission factors.
Response: As noted in section II.D.1 of this preamble, the final
definition of ``fugitive emissions component'' in the NSPS subpart
OOOOa (40 CFR 60.5430a) does not list as many explicit individual
component types, as originally proposed. The EPA is finalizing, with
the exceptions discussed in section II.D.1 of this preamble and
consistent with the extent proposed, this alignment with the NSPS
subpart OOOOa, so that reporters may directly use the NSPS subpart
OOOOa monitoring results to count the number of leaks under subpart W.
Reporters using the calculation methodology based on equipment leak
surveys for
[[Page 86503]]
components not subject to the NSPS subpart OOOOa may choose which
monitoring method to use. If a reporter chooses to use one of the
monitoring methods listed in 40 CFR 98.234(a)(1) through (5), that
reporter would use the current list of equipment components for the
appropriate industry segment in 40 CFR 98.232 (e.g., the list of
equipment at 40 CFR 98.232(e)(7) for the Onshore Natural Gas
Transmission Compression industry segment). If a reporter chooses to
use the OGI method as specified in the NSPS subpart OOOOa or EPA Method
21 with a leak definition of 500 ppmv, the reporter would use both the
current list and the newly added list of equipment components for the
appropriate industry segment in 40 CFR 98.232, which in conjunction
include the NSPS subpart OOOOa definition of ``fugitive emissions
component'' in 40 CFR 60.5430a with the exceptions discussed in section
II.D.1 of this preamble (e.g., the list of equipment at 40 CFR
98.232(e)(7) and (8) for the Onshore Natural Gas Transmission
Compression industry segment).
E. Summary of Final Amendments to Leaker Emission Factors and the
Calculation Methodology Based on Equipment Leak Surveys
1. Summary of Final Amendments
To quantify emissions from leaking equipment components, subpart W
includes leaker emission factors for each component type in each
industry segment currently required to use the calculation methodology
based on equipment leak surveys. In contrast to the population emission
factors, which are multiplied by the total facility component counts,
leaker emission factors are multiplied by the actual number of leaks
for each component type, as identified by the equipment leak survey.
These amendments increase the component types that are required or may
elect to use the calculation methodology based on equipment leak
surveys, including most of the component types currently using the
subpart W calculation methodology based on population counts.\21\
Therefore, new leaker emission factors are being added so that
reporters can calculate their GHG emissions for these new component
types.
---------------------------------------------------------------------------
\21\ The NSPS subpart OOOOa fugitive emission requirements do
not apply to fugitive emissions components in the Natural Gas
Distribution industry segment.
---------------------------------------------------------------------------
Specifically, the EPA proposed to add new sets of leaker emission
factors to subpart W for: (1) The Onshore Petroleum and Natural Gas
Production industry segment; (2) the Onshore Petroleum and Natural Gas
Gathering and Boosting industry segment; (3) storage wellheads in gas
service in the Underground Natural Gas Storage industry segment; (4)
LNG storage components in gas service in the LNG Storage industry
segment; and (5) LNG terminals components in gas service for the LNG
Import and Export Equipment industry segment. For industry segments
that already include a set of leaker emission factors, the EPA also
proposed to expand that set of leaker emission factors to include
certain additional components to better align with the definition of
fugitive emissions components in the NSPS subpart OOOOa. See the
document ``Greenhouse Gas Reporting Rule: Technical Support for Leak
Detection Methodology Revisions and Confidentiality Determinations for
Petroleum and Natural Gas Systems'' in Docket Item No. EPA-HQ-OAR-2015-
0764-0028, for more information on the development of the proposed
leaker emission factors.
We are finalizing the leaker emission factors for the Onshore
Petroleum and Natural Gas Production and the Onshore Petroleum and
Natural Gas Gathering and Boosting industry segments as proposed, with
clarifications for flanges and connectors noted below. We are also
finalizing the following leaker emission factors as proposed: (1) The
leaker emission factors for ``other'' components in Tables W-3A, W-4A,
W-5A, and W-6A to subpart W; (2) the leaker emission factors for
storage wellhead equipment in gas service within Table W-4A to subpart
W; and (3) the leaker emission factors for equipment in gas service for
LNG storage components within Table W-5A to subpart W and for LNG
terminal components within Table W-6A to subpart W. We are also
finalizing the proposal to expand the existing leaker emission factor
for meters to also include instruments in Tables W-3A and W-4A to
subpart W for the Onshore Natural Gas Transmission Compression and
Underground Natural Gas Storage industry segments, respectively. All
but one of the proposed leaker factors for flanges in Tables W-3
through W-6 to subpart W (Tables W-3A, W-4A, W-5A, and W-6A to subpart
W in these final amendments) were the same as the leaker factors for
connectors; the exception was for flanges in gas service associated
with storage wellheads at Underground Natural Gas Storage facilities,
which had a proposed leaker factor that differed from the proposed
leaker factor for connectors in the same service. Flanges are a type of
connector, which means the proposed flange factors that were identical
to the existing connector factors were redundant. Therefore, we have
not finalized the proposed separate factors for flanges where the
factor was the same as the factor for connectors and are finalizing
that flanges must use the final connector factor, meaning the effect of
the final amendments is the same as the proposal. The separate factors
for connectors and flanges for storage wellheads in gas service at
Underground Natural Gas Storage facilities are finalized as proposed,
but to clarify that the factor for connectors applies only to all types
of connectors other than flanges, the component name has been changed
from ``connector'' in the proposal to ``connector (other)'' in Table W-
4A of the final amendments. This change also makes the terminology in
Table W-4A consistent with the terminology in Tables W-1A and W-1E,
which also specify factors for flanges that differ from the factors for
other types of connectors.
We are not finalizing the proposed addition of pumps to the leaker
factors in Table W-2 for the Onshore Natural Gas Processing industry
segment. As described in section II.B.1 of this preamble, we are not
taking final action on the Onshore Natural Gas Processing revisions at
this time.
In addition to finalizing nearly all of the proposed leaker
factors, we are also finalizing an additional set of emission factors
corresponding to the average emissions rates of components identified
using Method 21 with a leak definition of 500 ppmv. The proposed leaker
factors were developed based on Method 21 monitoring using a leak
definition of 10,000 ppmv and were to be applied by all reporters
regardless of the leak survey monitoring method used. As noted in
section II.C of this preamble, the final NSPS subpart OOOOa includes an
additional alternative that allows reporters to use Method 21 with a
leak definition of 500 ppmv. On average, the emissions from a leak
identified with a Method 21 reading above 500 ppmv are less than the
emissions from a leak identified with a Method 21 reading of 10,000
ppmv or higher. Consequently, the leaker factor (which is the average
emissions rate) for leaks identified when using a leak definition of
500 ppmv is smaller than the leaker factor for leaks identified when
using a leak definition of 10,000 ppmv. Therefore, in order to use the
NSPS subpart OOOOa survey results directly to calculate equipment leak
emissions for subpart W when Method 21 with a leak definition of 500
[[Page 86504]]
ppmv is used, leaker factors were developed consistent with the average
emissions rate of a ``leak'' defined as a measurement reading of 500
ppmv or more using Method 21. We developed these new leaker factors
using data from EPA's Protocol for Equipment Leak Emissions Estimates
\22\ consistent with the data used to develop the proposed leaker
factors for Onshore Petroleum and Natural Gas Production and the
Onshore Petroleum and Natural Gas Gathering and Boosting industry
segments. See the document ``Greenhouse Gas Reporting Rule: Technical
Support for Leak Detection Methodology Revisions and Confidentiality
Determinations for Petroleum and Natural Gas Systems Final Rule'' in
Docket ID No. EPA-HQ-OAR-2015-0764, which provides more information on
the development of the final leaker emission factors. The inclusion of
leaker factors specific to Method 21 with a leak definition of 500 ppmv
is consistent with our proposal to align subpart W calculation
methodologies with the monitoring requirements in the NSPS subpart
OOOOa.
---------------------------------------------------------------------------
\22\ U.S. Environmental Protection Agency. Protocol for
Equipment Leak Emissions Estimates. EPA-453/R-95-017. November 1995.
Docket Item No. EPA-HQ-OAR-2009-0927-0043.
---------------------------------------------------------------------------
We are also finalizing the proposed amendments to the time variable
Tp,z in Equation W-30 to clarify the total time a surveyed
component found leaking is assumed to be leaking and operational. The
previous language for the definition of the time variable specifically
considers a first leak survey and a last leak survey in the year but
does not provide specific language with respect to the duration of any
``intermediate'' survey conducted between the first and last survey.
Therefore, the EPA proposed to amend the definition of the time
variable to clarify how to determine the duration of a leak if more
than two leak surveys are conducted in a year and to instruct reporters
to sum the individual durations to determine the total time the
component was leaking during the year.
The EPA is finalizing this amendment as proposed. The amendments to
the time variable Tp,z define each equipment leak survey as
covering a unique, non-overlapping time period and we are clarifying
our intent that a leak detected in the first or any intermediate survey
is not considered to continue leaking past the date of that specific
equipment leak survey. For the last survey conducted in the calendar
year, the leak is assumed to continue until the end of the year. For
example, if a reporter conducts three equipment leak surveys in a
calendar year and a particular component is found to be leaking in the
first and second surveys but not the third, the total leak duration is
the sum of the time from January 1 to the date of the second survey. If
a reporter conducts three equipment leak surveys in a calendar year and
a particular component is found to be leaking in the first and last
surveys but not the second, then the total leak duration is the sum of
the time from January 1 to the date of the first survey and the time
from the date of the second survey to December 31.
See ``Response to Public Comments on Greenhouse Gas Reporting Rule:
Leak Detection Methodology Revisions and Confidentiality Determinations
for Petroleum and Natural Gas Systems'' in Docket ID No. EPA-HQ-OAR-
2015-0764 for all comments and the EPA's responses to comments on other
aspects of the time variable Tp,z in Equation W-30.
Finally, 40 CFR 98.233(q) includes a provision requiring reporters
to conduct one equipment leak survey in a calendar year (which must
include ``all component types'' subject to 40 CFR 98.233(q)) or
multiple ``complete'' equipment leak surveys in a calendar year. In
response to comments as part of the 2010 subpart W final rule, the EPA
noted that subsequent equipment leak surveys should be ``conducted for
an entire facility.'' \23\
---------------------------------------------------------------------------
\23\ U.S. Environmental Protection Agency. Mandatory Greenhouse
Gas Reporting Rule Subpart W--Petroleum and Natural Gas: EPA's
Response to Public Comments. November 2010. Docket Item No. EPA-HQ-
OAR-2009-0923-3608. Response to Comment Number EPA-HQ-OAR-2009-0923-
1014-9, pp. 1281-1282.
---------------------------------------------------------------------------
The EPA has reviewed how this interpretation could interact with
these final amendments for components subject to the NSPS subpart OOOOa
well site or compressor station fugitive emissions requirements and
finds that additional clarification is necessary. For example, a
facility in the Onshore Petroleum and Natural Gas Production industry
segment or the Onshore Petroleum and Natural Gas Gathering and Boosting
industry segment may have some components that are subject to the NSPS
subpart OOOOa well site or compressor station fugitive emissions
requirements and some components that are not. In such a case, multiple
equipment leak surveys would be conducted for the components subject to
the NSPS subpart OOOOa well site or compressor station fugitive
emissions requirements, to fulfill the requirements of the NSPS subpart
OOOOa for those components, that would be consistent with subpart W
monitoring methods under these final revisions.
However, under the current interpretation of a ``complete'' survey,
it would appear that these reporters would either: (1) Be unable to use
the NSPS subpart OOOOa fugitive emissions monitoring results as
directed, because they did not survey all components at the facility;
or (2) be forced to monitor all components at the facility on the same
frequency as the components subject to the NSPS subpart OOOOa well site
or compressor station fugitive emissions requirements to meet the
subpart W requirement to use all additional leak surveys conducted in
accordance with NSPS OOOOa. The first interpretation would render these
final amendments useless, and the second interpretation would increase
the burden beyond the EPA's intentions, and could also have unintended
consequences for the components subject to the NSPS subpart OOOOa
(e.g., a subpart W facility with some components subject to the NSPS
subpart OOOOa well site fugitive emissions requirements and others
subject to the NSPS subpart OOOOa compressor station fugitive emissions
requirements could end up being required to monitor the fugitive
emissions components at a well site four times a year instead of
twice). Therefore, the EPA is clarifying in 40 CFR 98.233(q)(2)(i) that
any monitoring conducted pursuant to and in compliance with the NSPS
subpart OOOOa well site or compressor station fugitive emissions
requirements constitutes a ``complete'' survey for purposes of subpart
W and must be used for subpart W reporting. The EPA is further
clarifying that, to meet the requirements of 40 CFR 98.233(q), at least
one equipment leak survey must be conducted in a calendar year.
2. Summary of Comments and Responses
Comment: Several commenters addressed the EPA's proposed leaker
emission factors. Some of the commenters indicated that the EPA/Gas
Research Institute (GRI) data set upon which the proposed factors are
based is an older data set and asserted that it may not be
representative of operating practices and procedures that have changed
significantly over the past 20 years. In addition, the commenters
stated that the EPA/GRI data set includes a limited population of
measurements, so the proposed leaker emission factors may not account
for operational variability on a regional or national level. Some
commenters requested that the EPA consider newer studies, including
those cited in
[[Page 86505]]
``Greenhouse Gas Reporting Rule: Technical Support for Leak Detection
Methodology Revisions and Confidentiality Determinations for Petroleum
and Natural Gas Systems'' (Docket Item No. EPA-HQ-OAR-2015-0764-0028)
either instead of or in combination with the EPA/GRI data set.
Several commenters urged the EPA to work with the regulated
community to improve the default leaker emission factors in subpart W.
One commenter noted that the proposed leaker emission factors may be a
viable interim solution but recommended that the EPA analyze more
robust data sets consisting of the combined results of all studies for
each industry segment and evaluate whether the subpart W leaker
emission factors should be revised.
Response: As described in the preamble to the proposed rule and the
document ``Greenhouse Gas Reporting Rule: Technical Support for Leak
Detection Methodology Revisions and Confidentiality Determinations for
Petroleum and Natural Gas Systems Final Rule'' (Docket ID No. EPA-HQ-
OAR-2015-0764), the EPA has determined that the EPA/GRI data set is
appropriate to base leaker emission factors in these subpart W
amendments. We note that the EPA/GRI data set provides sufficient data
to develop leaker emission factors and that using this data set for the
leaker emission factors provides consistency with the population
emission factors used by reporters that do not conduct equipment leak
surveys.
The EPA agrees that there are numerous recent studies that could be
used to either replace or supplement the EPA/GRI study data, and many
of these are described in the technical support document. The EPA
evaluated these other studies and found that the leaker emission
factors determined from these data sets agreed reasonably well with the
leaker emission factors developed from the EPA/GRI data set, suggesting
that the EPA/GRI leaker emission factors are still valid. Commenters
that supported a different basis for the leaker emission factors than
the EPA/GRI data set did not provide specific information explaining
why another study would be a better basis or address any of the
specific considerations listed above, although the comments received
suggest that stakeholders are interested in further involvement in the
assessment of the available data. Therefore, for the reasons stated in
the preamble to the proposed rule and the document ``Greenhouse Gas
Reporting Rule: Technical Support for Leak Detection Methodology
Revisions and Confidentiality Determinations for Petroleum and Natural
Gas Systems Final Rule'' in Docket ID No. EPA-HQ-OAR-2015-0764, the EPA
is finalizing the leaker emission factors as proposed.
The EPA appreciates the commenters' interest in providing a
thorough review of the available study data to develop an accurate set
of leaker emission factors. The EPA is committed to working with
stakeholders to ensure that GHGRP requirements and calculation methods
are based upon the most robust data available. If the EPA determines
that revisions to the subpart W leaker emission factors are appropriate
in the future based on additional information, we anticipate that we
will propose to amend the rule accordingly.
Comment: Numerous commenters stated that reporters should be
allowed to use site-specific leak quantification data if available,
either directly for each individual leak (i.e., direct measurement
data) or to develop their own leaker emission factors on a facility-
specific, company-specific, or product-specific basis. Most of these
commenters supported the EPA's proposal to include default leaker
emission factors, but stated that reporters should not be limited to
using them if the facility has more accurate, site-specific
information. Some commenters further noted that the site-specific data
reported to the GHGRP could be used to improve the default leaker
emission factors in the future. One commenter also requested that the
EPA require quantification of any leak that a reporter elects not to
repair.
Response: The EPA did not propose and, after review and
consideration of comments, is not finalizing provisions allowing
reporters to use site-specific information to calculate equipment leak
emissions for subpart W. While we agree that direct measurement has the
potential to provide more accurate emissions data than using emission
factors, we would need to develop criteria and guidelines for using
direct measurement data consistently across subpart W reporters for
calculating equipment leak emissions. Similarly, we agree that using
site-specific emission factors can provide more accurate emissions data
than using default emission factors, but a robust set of requirements
would be needed for reporters to use when developing their own emission
factors to ensure that those factors are as unbiased and representative
as possible. In addition, if reporters are using direct measurement or
their own emission factors, we would most likely need to amend the
reporting requirements (e.g., to require reporters to provide site-
specific emission factors), and we would need to consider whether any
other amendments would be needed to enable us to review and verify
reported data. In either of these cases, we would provide the
opportunity for the public to comment on those amended requirements
before finalizing them within subpart W.
F. Summary of Final Amendments to Reporting Requirements
1. Summary of Final Amendments
The EPA is finalizing largely as proposed the new reporting
requirements for facilities conducting equipment leak surveys under
subpart W. Reporters in the Onshore Petroleum and Natural Gas
Production and the Onshore Petroleum and Natural Gas Gathering and
Boosting industry segments, reporters with storage wellheads in the
Underground Natural Gas Storage industry segment, and reporters with
components in gas service in the LNG Storage and LNG Import and Export
Equipment industry segments that begin using the calculation
methodology based on equipment leak surveys must report the information
currently listed in 40 CFR 98.236(q)(1) and (2), which includes the
number of equipment leak surveys, component types, number of leaking
components, average time the components were assumed to be leaking, and
annual CO2 and CH4 emissions. Facilities that
conduct surveys using the new monitoring methods in 40 CFR 98.234(a)(6)
or (7) must also report the data elements in 40 CFR 98.236(q)(2) for
additional component types specified in 40 CFR 98.232. Reporters may
elect to report the data elements in 40 CFR 98.236(q)(2) for the
additional component types if they conduct surveys using a monitoring
method in 40 CFR 98.234(a)(1) through (5).
The data elements in 40 CFR 98.236(q)(1) and (2) are already
required to be reported by facilities conducting equipment leak surveys
in the Onshore Natural Gas Transmission Compression, Underground
Natural Gas Storage (storage stations), and LNG Storage and LNG Import
and Export Equipment (components in LNG service) industry segments.
However, facilities in those segments conducting equipment leak surveys
using the new OGI method or Method 21, as specified in the NSPS subpart
OOOOa (finalized in subpart W as 40 CFR 98.234(a)(6) or (7)), must
begin reporting the data elements in 40 CFR 98.236(q)(2) for component
types with the new leaker emission factors, including component types
that are not currently subject to reporting. Facilities conducting
equipment leak surveys using a monitoring method in 40 CFR
[[Page 86506]]
98.234(a)(1) through (5) may elect to begin reporting the data elements
in 40 CFR 98.236(q)(2) for other components that are not currently
subject to reporting.
In addition, the EPA is finalizing as proposed three new reporting
requirements for facilities conducting equipment leak surveys in all of
the above segments as well as the Onshore Natural Gas Processing and
Natural Gas Distribution segments. First, facilities in those segments
will be required to report the monitoring method(s) in 40 CFR 98.234(a)
used to conduct the survey(s). Second, facilities in the above segments
except for Onshore Natural Gas Processing and Natural Gas Distribution
will be required to indicate whether any of their component types are
subject to the NSPS subpart OOOOa well site or compressor station
fugitive emissions requirements. Finally, facilities with components
for which the calculation methodology based on equipment leak surveys
is optional (e.g., facilities in the Onshore Petroleum and Natural Gas
Production segment) will be required to indicate whether they elected
to use the calculation methodology based on equipment leak surveys for
any of their component types at the facility.
Additionally, in reviewing specific reporting requirements while
responding to public comments, we recognized that the reporting
requirements at 40 CFR 98.236(r)(3)(ii) were unclear, and could be
misinterpreted with respect to how this reporting element relates to
the calculated emissions. Therefore, we are revising 40 CFR
98.236(r)(3)(ii) by adding the phrase ``. . . for which equipment leak
emissions are calculated using the methodology in Sec. 98.233(r)'' to
clarify our original intent that the major equipment counts reported
under this requirement are specific to equipment for which emissions
are calculated using the population count methodology.
2. Summary of Comments and Responses
Comment: Two commenters addressed the proposed requirement in 40
CFR 98.236(q)(1)(iii) to indicate whether any component types at a
facility are subject to the NSPS subpart OOOOa. One commenter opposed
the addition, stating that it is overly burdensome to require reporters
to delineate reporting of emission sources subject to the NSPS subpart
OOOOa, especially if this is intended to be a numeric response
regarding the number of individual components subject to the NSPS
subpart OOOOa. Another commenter asserted that it is not clear if the
response to proposed 40 CFR 98.236(q)(1)(iii) is a single yes or no for
each facility or if the EPA will be expecting a yes or no response for
each component type.
Response: In the final rule, the EPA has revised the proposed
requirement in 40 CFR 98.236(q)(1)(iii) (indicate whether any component
types are subject to the NSPS subpart OOOOa) to be clear that the EPA
expects only one yes or no response for an entire facility. While the
EPA understands that the number of leaking components and equipment
leak emissions may increase as the number of components subject to the
NSPS subpart OOOOa increases, this response will allow the EPA to
provide transparent data related to changes in emissions for facilities
with components subject to the NSPS subpart OOOOa well site or
compressor station fugitive emissions requirements over time. This data
element will also support verification that the appropriate GHGRP
monitoring method was used by the facility.
III. Confidentiality Determinations
A. Summary of Final Confidentiality Determinations for New Subpart W
Data Elements
As noted in the proposed rule, we are applying the same approach as
previously used for making confidentiality determinations for data
elements reported under the GHGRP. In the ``Confidentiality
Determinations for Data Required Under the Mandatory Greenhouse Gas
Reporting Rule and Amendments to Special Rules Governing Certain
Information Obtained Under the Clean Air Act'' (hereafter referred to
as ``2011 Final CBI Rulemaking'') (76 FR 30782, May 26, 2011), the EPA
grouped part 98 data elements for which EPA was determining
confidentiality status through that rulemaking into 22 data categories
(11 direct emitter data categories and 11 supplier data categories)
with each of the 22 data categories containing data elements that are
similar in type or characteristics. The EPA then made categorical
confidentiality determinations for eight direct emitter data categories
and eight supplier data categories and applied the categorical
confidentiality determination to all data elements assigned to the
category. Of these data categories with categorical determinations, the
EPA determined that four direct emitter data categories are comprised
of those data elements that meet the definition of ``emission data,''
as defined at 40 CFR 2.301(a), and are, therefore, not entitled to
confidential treatment under section 114(c) of the CAA.\24\ The EPA
determined that the other four direct emitter data categories and the
eight supplier data categories do not meet the definition of ``emission
data.'' For these data categories that are determined not to be
emission data, the EPA determined categorically that data in three
direct emitter data categories and five supplier data categories are
eligible for confidential treatment as CBI, and that the data in one
direct emitter data category and three supplier data categories are
ineligible for confidential treatment as CBI. For two direct emitter
data categories, ``Unit/Process `Static' Characteristics that Are Not
Inputs to Emission Equations'' and ``Unit/Process Operating
Characteristics that Are Not Inputs to Emission Equations,'' and three
supplier data categories, ``GHGs Reported,'' ``Production/Throughput
Quantities and Composition,'' and ``Unit/Process Operating
Characteristics,'' the EPA determined in the 2011 Final CBI Rulemaking
that the data elements assigned to those categories are not emission
data, but the EPA did not make categorical CBI determinations for them.
Rather, the EPA made CBI determinations for each individual data
element included in those categories on a case-by-case basis taking
into consideration the criteria in 40 CFR 2.208. The EPA did not make a
final confidentiality determination for data elements assigned to the
inputs to emission equation data category (a direct emitter data
category) in the 2011 Final CBI Rulemaking. However, the EPA has since
proposed and finalized an approach for addressing disclosure concerns
associated with inputs to emissions equations.\25\
---------------------------------------------------------------------------
\24\ Direct emitter data categories that meet the definition of
``emission data'' in 40 CFR 2.301(a) are ``Facility and Unit
Identifier Information,'' ``Emissions,'' ``Calculation Methodology
and Methodological Tier,'' and ``Data Elements Reported for Periods
of Missing Data that are not Inputs to Emission Equations.''
\25\ Revisions to Reporting and Recordkeeping Requirements, and
Confidentiality Determinations Under the Greenhouse Gas Reporting
Program; Final Rule. (79 FR 63750, October 24, 2014).
---------------------------------------------------------------------------
In the proposed rule, we assigned the nine proposed new or
substantially revised data elements to the appropriate direct emitter
data categories created in the 2011 Final CBI Rulemaking based on the
type and characteristics of each data element. For the seven data
elements the EPA assigned to a direct emitter category with a
categorical determination, the EPA proposed that the categorical
determination for the category be applied to the proposed new or
substantially revised data elements,
[[Page 86507]]
as shown in Table 4 of this preamble. For the two data elements
assigned to the ``Unit/Process Operating Characteristics that Are Not
Inputs to Emission Equations,'' we proposed confidentiality
determinations on a case-by-case basis taking into consideration the
criteria in 40 CFR 2.208, consistent with the approach used for data
elements previously assigned to these two data categories, as shown in
Table 5 of this preamble. Refer to the preamble to the proposed rule
(81 FR 4987; January 29, 2016) for additional information regarding the
proposed confidentiality determinations.
With consideration of the information provided by commenters, the
EPA is finalizing the confidentiality determinations as proposed.
Specifically, the EPA is finalizing the proposed determination for each
of the nine new or substantially revised data elements to be designated
as ``emission data'' or ``not CBI.''
Table 4--Final Data Category Assignments and Confidentiality Determinations for New Data Elements Assigned to
Categories With Categorical Determinations
----------------------------------------------------------------------------------------------------------------
Categorical
Final category determination (as
Citation Data element assignment established in 2011)
\26\
----------------------------------------------------------------------------------------------------------------
Sec. 98.236(q)(1)(i)............. The number of complete Test and Calibration Not Emission Data and
equipment leak surveys Methods. Not CBI.
performed during the
calendar year.
Sec. 98.236(q)(1)(iii)........... Whether any component types Facility and Unit Emission Data.
were subject to 40 CFR Identifier
part 60, subpart OOOOa. Information.
Sec. 98.236(q)(1)(iv)............ Whether you elected to Facility and Unit Emission Data.
comply with Sec. Identifier
98.233(q) per Sec. Information.
98.233(q)(1)(iii).
Sec. 98.236(q)(1)(v)............. Each type of method Test and Calibration Not Emission Data and
described in Sec. Methods. Not CBI.
98.234(a) that was used to
conduct leak surveys.
Sec. 98.236(q)(2)(i)............. For each component type Facility and Unit Emission Data.
that is located at your Identifier
facility, component type. Information.
Sec. 98.236(q)(2)(iv)............ For each component type Emissions............. Emission Data.
that is located at your
facility, annual CO2
emissions, in metric tons
CO2.
Sec. 98.236(q)(2)(v)............. For each component type Emissions............. Emission Data.
that is located at your
facility, annual CH4
emissions, in metric tons
CH4.
----------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------
\26\ The categorical confidentiality determinations for the data
categories listed in this table were finalized on May 26, 2011 (see
76 FR 30782).
Table 5--Final Confidentiality for Data Elements Assigned to the ``Unit/Process Operating Characteristics That
Are Not Inputs to Emission Equations'' Data Category
----------------------------------------------------------------------------------------------------------------
Final confidentiality determination and
Citation Data element rationale
----------------------------------------------------------------------------------------------------------------
Sec. 98.236(q)(2)(ii)................. For each component type Not Emission Data (Categorical
that is located at your Determination as Established in 2011).
facility, total number of Not CBI. The term ``equipment leaks''
the surveyed component refers to those emissions which could
type that were identified not reasonably pass through a stack,
as leaking in the calendar chimney, vent, or other functionally-
year (``xp'' in Equation W- equivalent opening. Leaking components
30). at a facility may have a correlation to
the level of maintenance at a facility.
However, there is no direct correlation
between the level of maintenance and
process efficiency, i.e., a higher
number of leaks in one facility do not
indicate that the processes have been
running longer or more frequently than
those processes at another facility that
has a lower number of leaks.
Furthermore, Department of
Transportation (DOT) regulations require
natural gas distribution companies and
transmission pipeline companies to
conduct periodic leak detection and fix
any leaking equipment. The number of
leaks detected and fixed is reported to
the DOT and is publicly available.
Finally, 40 CFR part 60, subpart OOOOa
requires reporting for each component
with visible emissions at affected well
sites and compressor station sites. The
EPA is finalizing that this data element
is not confidential; and that it will be
considered ``not CBI.''
Sec. 98.236(q)(2)(iii)................ For each component type Not Emission Data (Categorical
that is located at your Determination as Established in 2011).
facility, average time the Not CBI. This data element will provide
surveyed components are information on the amount of time
assumed to be leaking and operational components were found to be
operational, in hours leaking. This information provides
(average of ``Tp,z'' from little insight into maintenance
Equation W-30). practices at a facility because it does
not identify the cause of the leaks or
the nature and cost of repairs.
Therefore, this information would not be
likely to cause substantial competitive
harm to reporters. For this reason, we
are finalizing the average time
operational components were found
leaking be designated as ``not CBI.''
----------------------------------------------------------------------------------------------------------------
B. Summary of Comments and Responses
This section summarizes the major comments and responses related to
the proposed categorical assignments and confidentiality
determinations. See ``Response to Public Comments on Greenhouse Gas
Reporting Rule: Leak Detection Methodology Revisions and
Confidentiality Determinations for Petroleum and Natural Gas Systems''
in Docket ID No. EPA-HQ-OAR-2015-
[[Page 86508]]
0764 for a complete listing of all comments and responses. See the
memorandum ``Final Data Category Assignments and Confidentiality
Determinations for Data Elements in the `Greenhouse Gas Reporting Rule:
Leak Detection Methodology Revisions and Confidentiality Determinations
for Petroleum and Natural Gas Systems; Final Rule' '' in Docket ID No.
EPA-HQ-OAR-2015-0764 for a complete listing of final data category
assignments and confidentiality determinations.
Comment: One commenter stated that the EPA should reconsider the
proposed determination of ``not CBI'' for the number of components
identified as leaking in a calendar year and the average time the
surveyed components are assumed to be leaking. The commenter asserted
that designating this information as CBI would encourage more reporters
to voluntarily conduct leak surveys. The commenter also noted that this
information is publically available for some sources and suggested that
the rule provide an exception from classification as CBI for components
subject to State programs or NSPS that already require public
disclosure. Another commenter requested that the EPA protect the
community's right to know and not allow companies to keep the public
from finding out about leaks from hydrocarbon facilities.
Response: While it is possible that the requirement to report the
number of leaking components and the average time those components were
leaking could discourage some reporters from conducting voluntary
equipment leak surveys, this is not a valid reason to allow reporters
to claim these data elements as confidential. As noted in section III.C
of the preamble to the proposed rule, the EPA proposed that disclosure
of these data elements is unlikely to cause substantial harm to a
business's competitive position, and the commenter did not indicate
that the EPA's determination was incorrect. Therefore, the EPA is
finalizing the confidentiality determinations for these data elements
as ``not CBI.''
IV. Impacts of the Final Amendments to Subpart W
A. Impacts of the Final Amendments
The final amendments to subpart W revise costs associated with the
use of the monitoring methods and the calculation methodology based on
equipment leak surveys for reporters in the following industry
segments: Onshore Petroleum and Natural Gas Production, Onshore
Petroleum and Natural Gas Gathering and Boosting, Onshore Natural Gas
Transmission Compression, Underground Natural Gas Storage, LNG Storage,
and LNG Import and Export Equipment. Reporters in these industry
segments are required to use the results of fugitive emissions
component monitoring required for well sites and compressor stations
under the NSPS subpart OOOOa. Reporters in these segments with
components not subject to the NSPS subpart OOOOa well site or
compressor station fugitive emissions requirements and for which they
are currently required to use the calculation methodology based on
population counts under subpart W may voluntarily use the calculation
methodology based on equipment leak surveys for those components if the
equipment leak survey is conducted following a monitoring method listed
in subpart W.
The EPA received comments from one commenter regarding the specific
impacts of the proposed amendments. After evaluating these comments and
reviewing other changes from proposal, the EPA revised the impacts
assessment from proposal. The EPA estimates that the costs of the final
amendments to subpart W are slightly more burdensome than we estimated
at proposal, but they do not significantly change the overall burden to
subpart W reporters. The EPA estimated that the additional costs to
subpart W reporters in the Onshore Petroleum and Natural Gas Production
and the Onshore Petroleum and Natural Gas Gathering and Boosting
industry segments to transition their existing equipment leak
recordkeeping, calculating, and reporting systems to use the
calculation methodology based on equipment leak surveys and to
determine which components are subject to the NSPS subpart OOOOa well
site or compressor station fugitive emissions requirements and which
are not, will be approximately $110,000 per year, or about $410 per
reporter. The EPA estimated that the additional costs for subpart W
reporters in the other industry segments (i.e., Onshore Natural Gas
Transmission Compression, Underground Natural Gas Storage, Liquefied
Natural Gas (LNG) Storage, and LNG Import and Export Equipment) to add
a few new emission factors to their existing systems (rather than
transitioning their recordkeeping, calculating, and reporting systems)
and to determine which components are covered by the NSPS subpart OOOOa
well site or compressor station fugitive emissions requirements and
which are not, will be approximately $20,000 per year or about $110 per
reporter. The total costs are approximately $128,400 per year for all
reporters, or about $286 per reporter. See the memorandum, ``Assessment
of Impacts of the Final Leak Detection Methodology Revisions and
Confidentiality Determinations for Petroleum and Natural Gas Systems''
in Docket ID No. EPA-HQ-OAR-2015-0764 for additional information.
B. Summary of Comments and Responses
This section summarizes the major comments and responses related to
the impacts of the proposed amendments to subpart W of part 98. We note
that while several commenters asserted that the proposed rule would be
burdensome for many operators and suggested revisions to the rule
requirements that would reduce the burden, only one commenter provided
comments on the EPA's impacts estimate and supporting statement, and
that commenter's major comments are summarized in this section. See
``Response to Public Comments on Greenhouse Gas Reporting Rule: Leak
Detection Methodology Revisions and Confidentiality Determinations for
Petroleum and Natural Gas Systems'' in Docket ID No. EPA-HQ-OAR-2015-
0764 for a complete listing of all comments and responses.
Comment: One commenter stated that the EPA's estimate of two hours
of labor and $198 per reporter significantly underestimates and
misrepresents the amount of time and effort that goes into implementing
a new rule. The commenter provided a cost estimate that assumes more
labor hours than in the EPA's memorandum ``Assessment of Impacts of the
Leak Detection Methodology Revisions and Confidentiality Determinations
for Petroleum and Natural Gas Systems'' (Docket Item No. EPA-HQ-OAR-
2015-0764-0025). The commenter noted that as more sites become subject
to the NSPS subpart OOOOa at a facility, the costs of managing the data
and processing it into a usable format for the GHGRP will increase each
year for that reporter. The commenter also noted that the EPA was
incorrect in assuming that there would be no costs for facilities in
the Onshore Natural Gas Processing segment.
Response: The EPA has evaluated the comments and has made changes
to the estimate of burden in the supporting statement. The following
paragraphs address each of the points in the commenter's detailed cost
estimate included with the comment letter and explain how the points
are being addressed in the final burden and cost estimate.
[[Page 86509]]
The commenter suggested adding burden of two hours in the first
year related to the initial monitoring plan development and burden of
0.5 hours in subsequent years related to yearly monitoring plan
revisions. The EPA did not include costs at proposal related to the
monitoring plan because the subpart W amendments do not require the
development of a separate monitoring plan. Instead, the subpart W
amendments cross reference the monitoring plan that is already being
developed according to the NSPS subpart OOOOa. The EPA recognizes that
reporters that are not subject to the NSPS subpart OOOOa would not
already be required to develop a monitoring plan under the NSPS subpart
OOOOa; however, reporters that elect to use one of the new leak
detection methods are also electing to incur the burden of developing a
monitoring plan. Therefore, there is no monitoring plan burden
associated with the subpart W amendments and the final burden and cost
estimate has not changed from proposal as a result of this comment.
The commenter suggested changing the number of hours to revise the
reporting system to five hours and to allow one hour for maintenance in
each subsequent year. At proposal, the EPA estimated that revising the
reporting system to use the calculation methodology based on equipment
leak surveys would require two hours. The commenter did not provide the
basis for their estimate of five hours to update the data management
system. The overall reporting costs for compliance already include a
burden of ten hours per year and the EPA disagrees that updating the
data management system would encompass half of that allotment because
EPA anticipates that reporters would only need to add a few emission
factors for leaking components to their existing system, rather than
something more time-intensive such as creating a new data management
system. We reviewed the revisions expected to be needed in the data
management system. While we maintain that two hours are sufficient to
implement the calculation methodology based on equipment leak surveys
into a reporter's existing system, we recognize that this process will
also require quality assurance reviews and testing to ensure the data
are stored properly and the calculations are performed correctly.
Therefore, we increased the number of hours estimated to revise the
reporting system from two hours to 3.5 hours to account for these
additional quality reviews of the data management system. However, the
EPA has made no changes to burden associated with maintenance of the
revised reporting system because the EPA asserts that any reporting
system maintenance related to subpart W is already reflected in the
twenty hours per year allotted to each subpart W reporter for
recordkeeping and reporting activities.
The commenter suggested that the EPA adjust the proposed burden and
cost estimate by adding the following activities and burden estimates:
(1) Time for staff to process the survey data resulting from the
calculation methodology based on equipment leak surveys and to enter it
into the GHGRP system at a burden of three hours per year; (2) time for
staff training at a burden of two hours for initial training and one
hour per year in subsequent years; and (3) time for staff to review the
data for quality assurance, follow missing data requirements, report
data to the EPA, and retain all records at a burden of four total hours
per year.
At proposal, the EPA did not include burden related to these
activities because they are covered by the twenty hours per year
already accounted for in the overall subpart W reporter burden for
recordkeeping and reporting activities. Therefore, the final burden and
cost estimate has not changed from proposal as a result of these
comments.
However, at proposal, the EPA did not account for the time
associated with determining which components in the reporting system
are covered by the NSPS subpart OOOOa well site or compressor station
fugitive emissions requirements and which are not. As a result, the EPA
has added 0.5 hours per reporter in the first year that the reporter
has an affected collection of fugitive emissions components subject to
the NSPS subpart OOOOa well site or compressor station fugitive
emissions requirements and 0.1 hours per reporter in subsequent years.
Finally, for the reasons described in section II.B.2 of this
preamble, the final rule language specifies that the requirement to use
the NSPS subpart OOOOa results as part of the calculation methodology
based on equipment leak surveys only applies to components subject to
the NSPS subpart OOOOa well site or compressor station fugitive
emissions requirements. The subpart W equipment leak survey
requirements for facilities in the Onshore Natural Gas Processing
segment do not change as a result of these amendments. Therefore, the
EPA is not including any burden estimate for Onshore Natural Gas
Processing reporters (i.e., the revisions to the burden estimate
described in this response do not apply to the Onshore Natural Gas
Processing segment).
Overall, the burden and cost estimate has been revised as discussed
above from 502 hours and $50,000 per year at proposal to approximately
1,295 hours and $128,400 per year for all reporters.
V. Statutory and Executive Order Reviews
Additional information about these statutes and Executive Orders
can be found at https://www2.epa.gov/laws-and-executive orders.
A. Executive Order 12866: Regulatory Planning and Review and Executive
Order 13563: Improving Regulation and Regulatory Review
This action is not a significant regulatory action and was
therefore not submitted to the Office of Management and Budget (OMB)
for review.
B. Paperwork Reduction Act (PRA)
The information collection activities in this rule have been
submitted for approval to the OMB under the PRA. The Information
Collection Request (ICR) document that the EPA prepared has been
assigned EPA ICR number 2300.19. You can find a copy of the ICR in the
docket for this rule, and it is briefly summarized here. The
information collection requirements are not enforceable until OMB
approves them.
This action increases burden for industry segments that conduct
equipment leak surveys. These revisions are expected to increase
respondent burden for subpart W reporters that become subject to the
NSPS subpart OOOOa well site or compressor station fugitive
requirements. To accommodate the new methods and emission factors added
by these final amendments, the EPA expects that each affected subpart W
reporter will either revise their reporter-specific calculation
mechanism (i.e., calculation spreadsheet, recordkeeping database, etc.)
or add a few new emission factors to the reporter-specific calculation
mechanism, when and if the reporter becomes subject to the NSPS subpart
OOOOa well site or compressor station fugitive requirements. The
recordkeeping and reporting requirements are being finalized as
proposed. Impacts associated with the final revisions to the
recordkeeping and reporting requirements are detailed in the memorandum
``Assessment of Impacts of the Final Leak Detection Methodology
Revisions and Confidentiality Determinations for Petroleum and Natural
Gas Systems''
[[Page 86510]]
(see Docket ID No. EPA-HQ-OAR-2015-0764).
Data collection provides a critical tool for communities to
identify nearby sources of GHGs and provides information to state and
local governments. The data can be used to complement atmospheric GHG
studies and inform updates to emission inventories such as the
Inventory of U.S. Greenhouse Gas Emissions and Sinks (Inventory).
Various activity data are collected that can be used to improve
understanding of the occurrence of emissions from a variety of sources.
Data collected must be made available to the public unless the data
qualify for CBI treatment under the CAA and EPA regulations. All data
determined by the EPA to be CBI are safeguarded in accordance with
regulations in 40 CFR chapter 1, part 2, subpart B.
Respondents/affected entities: The respondents in this information
collection include owners and operators of petroleum and natural gas
systems facilities that report their GHG emissions from equipment leaks
to the EPA to comply with subpart W.
Respondent's obligation to respond: The respondent's obligation to
respond is mandatory under the authority provided in CAA section 114.
Estimated number of respondents: Approximately 899 respondents per
year.
Frequency of response: Annual.
Total estimated burden: 1,295 hours (per year). Burden is defined
at 5 CFR 1320.3(b).
Total estimated cost: $128,400 (per year), includes $0 annualized
capital or operation and maintenance costs.
An agency may not conduct or sponsor, and a person is not required
to respond to, a collection of information unless it displays a
currently valid OMB control number. The OMB control numbers for the
EPA's regulations in 40 CFR are listed in 40 CFR part 9. When OMB
approves this ICR, the EPA will announce that approval in the Federal
Register and publish a technical amendment to 40 CFR part 9 to display
the OMB control number for the approved information collection
activities contained in this final rule.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have a significant economic
impact on a substantial number of small entities under the RFA. The
small entities directly regulated by this final rule include small
businesses in the petroleum and natural gas industry. The EPA has
determined that some small businesses will be affected because their
production processes emit GHGs exceeding the reporting threshold. This
action includes amendments that may result in a small burden increase
on some subpart W reporters, but the EPA has determined that the
increased cost of less than $286 per reporter is not a significant
impact. Details of this analysis are presented in ``Assessment of
Impacts of the Final Leak Detection Methodology Revisions and
Confidentiality Determinations for Petroleum and Natural Gas Systems''
in Docket ID No. EPA-HQ-OAR-2015-0764.
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain an unfunded mandate of $100 million or
more as described in UMRA, 2 U.S.C. 1531-1538, and does not
significantly or uniquely affect small governments. As shown in
sections IV.A and V.B of this preamble, the annual cost of this action
is $128,400, which is well under $100 million per year.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have
substantial direct effects on the states, on the relationship between
the national government and the states, or on the distribution of power
and responsibilities among the various levels of government.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action has tribal implications. However, it will neither
impose substantial direct compliance costs on federally recognized
tribal governments, nor preempt tribal law. This regulation will apply
directly to petroleum and natural gas facilities that emit GHGs.
Although few facilities that will be subject to the rule are likely to
be owned by tribal governments, the EPA sought opportunities to provide
information to tribal governments and representatives during the
development of the proposed and final subpart W that was promulgated on
November 30, 2010 (75 FR 74458).
The EPA consulted with tribal officials under the EPA Policy on
Consultation and Coordination with Indian Tribes early in the process
of developing this regulation to permit them to have meaningful and
timely input into its development. A summary of that consultation is
provided in section IV.F of the preamble to the re-proposal of subpart
W published on April 12, 2010 (75 FR 18608), and section IV.F of the
preamble to the subpart W 2010 final rule published on November 30,
2010 (75 FR 74458).
G. Executive Order 13045: Protection of Children From Environmental
Health Risks and Safety Risks
The EPA interprets Executive Order 13045 as applying only to those
regulatory actions that concern environmental health or safety risks
that the EPA has reason to believe may disproportionately affect
children, per the definition of ``covered regulatory action'' in
section 2-202 of the Executive Order. This action is not subject to
Executive Order 13045 because it does not concern an environmental
health risk or safety risk.
H. Executive Order 13211: Actions That Significantly Affect Energy
Supply, Distribution, or Use
This action is not subject to Executive Order 13211, because it is
not a significant regulatory action under Executive Order 12866.
I. National Technology Transfer and Advancement Act (NTTAA)
This rulemaking does not involve technical standards.
J. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations
The EPA believes that this action is not subject to Executive Order
12898 (59 FR 7629, February 16, 1994) because it does not establish an
environmental health or safety standard. Instead, this rule addresses
information collection and reporting and verification procedures.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and the EPA will submit a rule
report to each House of the Congress and to the Comptroller General of
the United States. This action is not a ``major rule'' as defined by 5
U.S.C. 804(2).
List of Subjects in 40 CFR Part 98
Environmental protection, Administrative practice and procedure,
Greenhouse gases, Reporting and recordkeeping requirements.
Dated: November 10, 2016.
Gina McCarthy,
Administrator.
For the reasons stated in the preamble, title 40, chapter I, of the
Code of Federal Regulations is amended as follows:
[[Page 86511]]
PART 98--MANDATORY GREENHOUSE GAS REPORTING
0
1. The authority citation for part 98 continues to read as follows:
Authority: 42 U.S.C. 7401-7671q.
Subpart W--Petroleum and Natural Gas Systems
0
2. Section 98.232 is amended by:
0
a. Revising paragraph (c)(21);
0
b. Adding paragraph (e)(8);
0
c. Revising paragraph (f)(5);
0
d. Adding paragraphs (f)(6) through (8);
0
e. Revising paragraphs (g)(3) and (4);
0
f. Adding paragraphs (g)(5) through (7);
0
g. Revising paragraphs (h)(4) and (5);
0
h. Adding paragraphs (h)(6) through (8); and
0
i. Revising paragraph (j)(10).
The revisions and additions read as follows:
Sec. 98.232 GHGs to report.
* * * * *
(c) * * *
(21) Equipment leaks from valves, connectors, open ended lines,
pressure relief valves, pumps, flanges, and other components (such as
instruments, loading arms, stuffing boxes, compressor seals, dump lever
arms, and breather caps, but does not include components listed in
paragraph (c)(11) or (19) of this section, and it does not include
thief hatches or other openings on a storage vessel).
* * * * *
(e) * * *
(8) Equipment leaks from all other components that are not listed
in paragraph (e)(1), (2), or (7) of this section and are either subject
to the well site or compressor station fugitive emissions standards in
Sec. 60.5397a of this chapter or you elect to survey using a leak
detection method described in Sec. 98.234(a)(6) or (7). The other
components subject to this paragraph (e)(8) also do not include thief
hatches or other openings on a storage vessel. If these other
components are not subject to the well site or compressor station
fugitive emissions standards in Sec. 60.5397a of this chapter, you may
also elect to report emissions from these other components if you elect
to survey them using a leak detection method described in Sec.
98.234(a)(1) through (5).
(f) * * *
(5) Equipment leaks from valves, connectors, open ended lines,
pressure relief valves, and meters associated with storage stations.
(6) Equipment leaks from all other components that are associated
with storage stations, are not listed in paragraph (f)(1), (2), or (5)
of this section, and are either subject to the well site or compressor
station fugitive emissions standards in Sec. 60.5397a of this chapter
or you elect to survey using a leak detection method described in Sec.
98.234(a)(6) or (7). If these other components are not subject to the
well site or compressor station fugitive emissions standards in Sec.
60.5397a of this chapter, you may also elect to report emissions from
these other components if you elect to survey them using a leak
detection method described in Sec. 98.234(a)(1) through (5).
(7) Equipment leaks from valves, connectors, open-ended lines, and
pressure relief valves associated with storage wellheads.
(8) Equipment leaks from all other components that are associated
with storage wellheads, are not listed in paragraph (f)(1), (2), or (7)
of this section, and are either subject to the well site or compressor
station fugitive emissions standards in Sec. 60.5397a, of this chapter
or you elect to survey using a leak detection method described in Sec.
98.234(a)(6) or (7). If these other components are not subject to the
well site or compressor station fugitive emissions standards in Sec.
60.5397a of this chapter, you may also elect to report emissions from
these other components if you elect to survey them using a leak
detection method described in Sec. 98.234(a)(1) through (5).
(g) * * *
(3) Flare stack emissions.
(4) Equipment leaks from valves, pump seals, connectors, and other
equipment leak sources in LNG service.
(5) Equipment leaks from vapor recovery compressors, if you do not
survey components associated with vapor recovery compressors in
accordance with paragraph (g)(6) of this section.
(6) Equipment leaks from all components in gas service that are
associated with a vapor recovery compressor, are not listed in
paragraph (g)(1) or (2) of this section, and that are either subject to
the well site or compressor station fugitive emissions standards in
Sec. 60.5397a of this chapter or you elect to survey using a leak
detection method described in Sec. 98.234(a).
(7) Equipment leaks from all components in gas service that are not
associated with a vapor recovery compressor, are not listed in
paragraph (g)(1) or (2) of this section, and are either subject to the
well site or compressor station fugitive emissions standards in Sec.
60.5397a of this chapter or you elect to survey using a leak detection
method described in Sec. 98.234(a)(6) or (7). If these components are
not subject to the well site or compressor station fugitive emissions
standards in Sec. 60.5397a of this chapter, you may also elect to
report emissions from these components if you elect to survey them
using a leak detection method described in Sec. 98.234(a)(1) through
(5).
(h) * * *
(4) Flare stack emissions.
(5) Equipment leaks from valves, pump seals, connectors, and other
equipment leak sources in LNG service.
(6) Equipment leaks from vapor recovery compressors, if you do not
survey components associated with vapor recovery compressors in
accordance with paragraph (h)(7) of this section.
(7) Equipment leaks from all components in gas service that are
associated with a vapor recovery compressor, are not listed in
paragraph (h)(1) or (2) of this section, and that are either subject to
the well site or compressor station fugitive emissions standards in
Sec. 60.5397a of this chapter or you elect to survey using a leak
detection method described in Sec. 98.234(a).
(8) Equipment leaks from all components in gas service that are not
associated with a vapor recovery compressor, are not listed in
paragraph (h)(1) or (2) of this section, and that are either subject to
the well site or compressor station fugitive emissions standards in
Sec. 60.5397a of this chapter or you elect to survey using a leak
detection method described in Sec. 98.234(a)(6) or (7). If these
components are not subject to the well site or compressor station
fugitive emissions standards in Sec. 60.5397a of this chapter, you may
also elect to report emissions from these components if you elect to
survey them using a leak detection method described in Sec.
98.234(a)(1) through (5).
* * * * *
(j) * * *
(10) Equipment leaks from valves, connectors, open ended lines,
pressure relief valves, pumps, flanges, and other components (such as
instruments, loading arms, stuffing boxes, compressor seals, dump lever
arms, and breather caps, but does not include components in paragraph
(j)(8) or (9) of this section, and it does not include thief hatches or
other openings on a storage vessel).
* * * * *
0
3. Section 98.233 is amended by:
0
a. Revising the parameter EFt of Equation W-1 in paragraph
(a) introductory text, and paragraph (q);
[[Page 86512]]
0
b. Removing the first two sentences of paragraph (r) introductory text
and adding four sentences in their place; and
0
c. Revising the parameters Counte and EFs,e of
Equation W-32A in paragraph (r) introductory text, and paragraphs
(r)(3) through (5).
The revisions read as follows:
Sec. 98.233 Calculating GHG emissions.
* * * * *
(a) * * *
* * * * *
EFt = Population emission factors for natural gas
pneumatic device vents (in standard cubic feet per hour per device)
of each type ``t'' listed in Tables W-1A, W-3B, and W-4B to this
subpart for onshore petroleum and natural gas production, onshore
natural gas transmission compression, and underground natural gas
storage facilities, respectively. Onshore petroleum and natural gas
gathering and boosting facilities must use the population emission
factors listed in Table W-1A to this subpart.
* * * * *
(q) Equipment leak surveys. For the components identified in
paragraphs (q)(1)(i) through (iii) of this section, you must conduct
equipment leak surveys using the leak detection methods specified in
paragraphs (q)(1)(i) through (iii) of this section. For the components
identified in paragraph (q)(1)(iv) of this section, you may elect to
conduct equipment leak surveys, and if you elect to conduct surveys,
you must use a leak detection method specified in paragraph (q)(1)(iv)
of this section. This paragraph (q) applies to components in streams
with gas content greater than 10 percent CH4 plus
CO2 by weight. Components in streams with gas content less
than or equal to 10 percent CH4 plus CO2 by
weight are exempt from the requirements of this paragraph (q) and do
not need to be reported. Tubing systems equal to or less than one half
inch diameter are exempt from the requirements of this paragraph (q)
and do not need to be reported.
(1) Survey requirements. (i) For the components listed in Sec.
98.232(e)(7), (f)(5), (g)(4), and (h)(5), that are not subject to the
well site or compressor station fugitive emissions standards in Sec.
60.5397a of this chapter, you must conduct surveys using any of the
leak detection methods listed in Sec. 98.234(a) and calculate
equipment leak emissions using the procedures specified in paragraph
(q)(2) of this section.
(ii) For the components listed in Sec. 98.232(d)(7) and (i)(1),
you must conduct surveys using any of the leak detection methods listed
in Sec. 98.234(a)(1) through (5) and calculate equipment leak
emissions using the procedures specified in paragraph (q)(2) of this
section.
(iii) For the components listed in Sec. 98.232(c)(21), (e)(7),
(e)(8), (f)(5), (f)(6), (f)(7), (f)(8), (g)(4), (g)(6), (g)(7), (h)(5),
(h)(7), (h)(8), and (j)(10) that are subject to the well site or
compressor station fugitive emissions standards in Sec. 60.5397a of
this chapter, you must conduct surveys using any of the leak detection
methods in Sec. 98.234(a)(6) or (7) and calculate equipment leak
emissions using the procedures specified in paragraph (q)(2) of this
section.
(iv) For the components listed in Sec. 98.232(c)(21), (e)(8),
(f)(6), (f)(7), (f)(8), (g)(6), (g)(7), (h)(7), (h)(8), or (j)(10),
that are not subject to fugitive emissions standards in Sec. 60.5397a
of this chapter, you may elect to conduct surveys according to this
paragraph (q), and, if you elect to do so, then you must use one of the
leak detection methods in Sec. 98.234(a).
(A) If you elect to use a leak detection method in Sec.
98.234(a)(1) through (5) for the surveyed component types in Sec.
98.232(c)(21), (f)(7), (g)(6), (h)(7), or (j)(10) in lieu of the
population count methodology specified in paragraph (r) of this
section, then you must calculate emissions for the surveyed component
types in Sec. 98.232(c)(21), (f)(7), (g)(6), (h)(7), or (j)(10) using
the procedures in paragraph (q)(2) of this section.
(B) If you elect to use a leak detection method in Sec.
98.234(a)(1) through (5) for the surveyed component types in Sec.
98.232(e)(8), (f)(6), (f)(8), (g)(7), and (h)(8), then you must use the
procedures in paragraph (q)(2) of this section to calculate those
emissions.
(C) If you elect to use a leak detection method in Sec.
98.234(a)(6) or (7) for any elective survey under this subparagraph
(q)(1)(iv), then you must survey the component types in Sec.
98.232(c)(21), (e)(8), (f)(6), (f)(7), (f)(8), (g)(6), (g)(7), (h)(7),
(h)(8), and (j)(10) that are not subject to fugitive emissions
standards in Sec. 60.5397a of this chapter, and you must calculate
emissions from the surveyed component types in Sec. 98.232(c)(21),
(e)(8), (f)(6), (f)(7), (f)(8), (g)(6), (g)(7), (h)(7), (h)(8), and
(j)(10) using the emission calculation requirements in paragraph (q)(2)
of this section.
(2) Emission calculation methodology. For industry segments listed
in Sec. 98.230(a)(2) through (9), if equipment leaks are detected
during surveys required or elected for components listed in paragraphs
(q)(1)(i) through (iv) of this section, then you must calculate
equipment leak emissions per component type per reporting facility
using Equation W-30 of this section and the requirements specified in
paragraphs (q)(2)(i) through (xi) of this section. For the industry
segment listed in Sec. 98.230(a)(8), the results from Equation W-30
are used to calculate population emission factors on a meter/regulator
run basis using Equation W-31 of this section. If you chose to conduct
equipment leak surveys at all above grade transmission-distribution
transfer stations over multiple years, ``n,'' according to paragraph
(q)(2)(x)(A) of this section, then you must calculate the emissions
from all above grade transmission-distribution transfer stations as
specified in paragraph (q)(2)(xi) of this section.
[GRAPHIC] [TIFF OMITTED] TR30NO16.000
Where:
Es,p,i = Annual total volumetric emissions of GHGi from
specific component type ``p'' (in accordance with paragraphs
(q)(1)(i) through (iv) of this section) in standard (``s'') cubic
feet, as specified in paragraphs (q)(2)(ii) through (x) of this
section.
xp = Total number of specific component type ``p''
detected as leaking in any leak survey during the year. A component
found leaking in two or more surveys during the year is counted as
one leaking component.
EFs,p = Leaker emission factor for specific component
types listed in Tables W-1E, W-2, W-3A, W-4A, W-5A, W-6A, and W-7 to
this subpart.
GHGi = For onshore petroleum and natural gas production
facilities and onshore petroleum and natural gas gathering and
boosting facilities, concentration of GHGi,
CH4, or CO2, in produced natural gas as
defined in paragraph (u)(2) of this section; for onshore natural gas
processing facilities, concentration of GHGi,
CH4 or CO2, in the total hydrocarbon of the
feed natural gas; for onshore natural gas transmission compression
and underground natural
[[Page 86513]]
gas storage, GHGi equals 0.975 for CH4 and 1.1
x 10-2 for CO2; for LNG storage and LNG import
and export equipment, GHGi equals 1 for CH4
and 0 for CO2; and for natural gas distribution,
GHGi equals 1 for CH4 and 1.1 x
10-2 CO2.
Tp,z = The total time the surveyed component ``z,''
component type ``p,'' was assumed to be leaking and operational, in
hours. If one leak detection survey is conducted in the calendar
year, assume the component was leaking for the entire calendar year.
If multiple leak detection surveys are conducted in the calendar
year, assume a component found leaking in the first survey was
leaking since the beginning of the year until the date of the
survey; assume a component found leaking in the last survey of the
year was leaking from the preceding survey through the end of the
year; assume a component found leaking in a survey between the first
and last surveys of the year was leaking since the preceding survey
until the date of the survey; and sum times for all leaking periods.
For each leaking component, account for time the component was not
operational (i.e., not operating under pressure) using an
engineering estimate based on best available data.
(i) You must conduct at least one leak detection survey in a
calendar year. The leak detection surveys selected must be conducted
during the calendar year. If you conduct multiple complete leak
detection surveys in a calendar year, you must use the results from
each complete leak detection survey when calculating emissions using
Equation W-30. For components subject to the well site and compressor
station fugitive emissions standards in Sec. 60.5397a of this chapter,
each survey conducted in accordance with Sec. 60.5397a of this chapter
will be considered a complete leak detection survey for purposes of
this section.
(ii) Calculate both CO2 and CH4 mass
emissions using calculations in paragraph (v) of this section.
(iii) Onshore petroleum and natural gas production facilities must
use the appropriate default whole gas leaker emission factors for
components in gas service, light crude service, and heavy crude service
listed in Table W-1E to this subpart.
(iv) Onshore petroleum and natural gas gathering and boosting
facilities must use the appropriate default whole gas leaker factors
for components in gas service listed in Table W-1E to this subpart.
(v) Onshore natural gas processing facilities must use the
appropriate default total hydrocarbon leaker emission factors for
compressor components in gas service and non-compressor components in
gas service listed in Table W-2 to this subpart.
(vi) Onshore natural gas transmission compression facilities must
use the appropriate default total hydrocarbon leaker emission factors
for compressor components in gas service and non-compressor components
in gas service listed in Table W-3A to this subpart.
(vii) Underground natural gas storage facilities must use the
appropriate default total hydrocarbon leaker emission factors for
storage stations or storage wellheads in gas service listed in Table W-
4A to this subpart.
(viii) LNG storage facilities must use the appropriate default
methane leaker emission factors for LNG storage components in LNG
service or gas service listed in Table W-5A to this subpart.
(ix) LNG import and export facilities must use the appropriate
default methane leaker emission factors for LNG terminals components in
LNG service or gas service listed in Table W-6A to this subpart.
(x) Natural gas distribution facilities must use Equation W-30 of
this section and the default methane leaker emission factors for
transmission-distribution transfer station components in gas service
listed in Table W-7 to this subpart to calculate component emissions
from annual equipment leak surveys conducted at above grade
transmission-distribution transfer stations. Natural gas distribution
facilities are required to perform equipment leak surveys only at above
grade stations that qualify as transmission-distribution transfer
stations. Below grade transmission-distribution transfer stations and
all metering-regulating stations that do not meet the definition of
transmission-distribution transfer stations are not required to perform
equipment leak surveys under this section.
(A) Natural gas distribution facilities may choose to conduct
equipment leak surveys at all above grade transmission-distribution
transfer stations over multiple years ``n,'' not exceeding a five year
period to cover all above grade transmission-distribution transfer
stations. If the facility chooses to use the multiple year option, then
the number of transmission-distribution transfer stations that are
monitored in each year should be approximately equal across all years
in the cycle.
(B) Use Equation W-31 of this section to determine the meter/
regulator run population emission factors for each GHGi. As
additional survey data become available, you must recalculate the
meter/regulator run population emission factors for each
GHGi annually according to paragraph (q)(2)(x)(C) of this
section.
[GRAPHIC] [TIFF OMITTED] TR30NO16.001
Where:
EFs,MR,i = Meter/regulator run population emission factor
for GHGi based on all surveyed above grade transmission-
distribution transfer stations over ``n'' years, in standard cubic
feet of GHGi per operational hour of all meter/regulator
runs.
Es,p,i,y = Annual total volumetric emissions at standard
conditions of GHGi from component type ``p'' during year
``y'' in standard (``s'') cubic feet, as calculated using Equation
W-30 of this section.
p = Seven component types listed in Table W-7 to this subpart for
transmission-distribution transfer stations.
Tw,y = The total time the surveyed meter/regulator run
``w'' was operational, in hours during survey year ``y'' using an
engineering estimate based on best available data.
CountMR,y = Count of meter/regulator runs surveyed at
above grade transmission-distribution transfer stations in year
``y''.
y = Year of data included in emission factor ``EFs,MR,i''
according to paragraph (q)(2)(x)(C) of this section.
n = Number of years of data, according to paragraph (q)(2)(x)(A) of
this section, whose results are used to calculate emission factor
``EFs,MR,i'' according to paragraph (q)(2)(x)(C) of this
section.
(C) The emission factor ``EFs,MR,i,'' based on annual
equipment leak surveys at above grade transmission-distribution
transfer stations, must be calculated
[[Page 86514]]
annually. If you chose to conduct equipment leak surveys at all above
grade transmission-distribution transfer stations over multiple years,
``n,'' according to paragraph (q)(2)(x)(A) of this section and you have
submitted a smaller number of annual reports than the duration of the
selected cycle period of 5 years or less, then all available data from
the current year and previous years must be used in the calculation of
the emission factor ``EFs,MR,i'' from Equation W-31 of this
section. After the first survey cycle of ``n'' years is completed and
beginning in calendar year (n+1), the survey will continue on a rolling
basis by including the survey results from the current calendar year
``y'' and survey results from all previous (n-1) calendar years, such
that each annual calculation of the emission factor
``EFs,MR,i'' from Equation W-31 is based on survey results
from ``n'' years. Upon completion of a cycle, you may elect to change
the number of years in the next cycle period (to be 5 years or less).
If the number of years in the new cycle is greater than the number of
years in the previous cycle, calculate ``EFs,MR,i'' from
Equation W-31 in each year of the new cycle using the survey results
from the current calendar year and the survey results from the
preceding number years that is equal to the number of years in the
previous cycle period. If the number of years, ``nnew,'' in
the new cycle is smaller than the number of years in the previous
cycle, ``n,'' calculate ``EFs,MR,i'' from Equation W-31 in
each year of the new cycle using the survey results from the current
calendar year and survey results from all previous (nnew-1)
calendar years.
(xi) If you chose to conduct equipment leak surveys at all above
grade transmission-distribution transfer stations over multiple years,
``n,'' according to paragraph (q)(2)(x)(A) of this section, you must
use the meter/regulator run population emission factors calculated
using Equation W-31 of this section and the total count of all meter/
regulator runs at above grade transmission-distribution transfer
stations to calculate emissions from all above grade transmission-
distribution transfer stations using Equation W-32B in paragraph (r) of
this section.
(r) * * * This paragraph (r) applies to emissions sources listed in
Sec. 98.232(c)(21), (f)(7), (g)(5), (h)(6), and (j)(10) if you are not
required to comply with paragraph (q) of this section and if you do not
elect to comply with paragraph (q) of this section for these components
in lieu of this paragraph (r). This paragraph (r) also applies to
emission sources listed in Sec. 98.232(i)(2), (i)(3), (i)(4), (i)(5),
(i)(6), and (j)(11). To be subject to the requirements of this
paragraph (r), the listed emissions sources also must contact streams
with gas content greater than 10 percent CH plus
CO2 by weight. Emissions sources that contact streams with
gas content less than or equal to 10 percent CH4 plus
CO2 by weight are exempt from the requirements of this
paragraph (r) and do not need to be reported. * * *
* * * * *
Counte = Total number of the emission source type at the
facility. For onshore petroleum and natural gas production
facilities and onshore petroleum and natural gas gathering and
boosting facilities, average component counts are provided by major
equipment piece in Tables W-1B and Table W-1C to this subpart. Use
average component counts as appropriate for operations in Eastern
and Western U.S., according to Table W-1D to this subpart. Onshore
petroleum and natural gas gathering and boosting facilities must
also count the miles of gathering pipelines by material type
(protected steel, unprotected steel, plastic, or cast iron).
Underground natural gas storage facilities must count each component
listed in Table W-4B to this subpart. LNG storage facilities must
count the number of vapor recovery compressors. LNG import and
export facilities must count the number of vapor recovery
compressors. Natural gas distribution facilities must count: (1) The
number of distribution services by material type; (2) miles of
distribution mains by material type; and (3) number of below grade
metering-regulating stations, by pressure type; as listed in Table
W-7 to this subpart.
* * * * *
EFs,e = Population emission factor for the specific
emission source type, as listed in Tables W-1A, W-4B, W-5B, W-6B,
and W-7 to this subpart. Use appropriate population emission factor
for operations in Eastern and Western U.S., according to Table W-1D
to this subpart.
* * * * *
(3) Underground natural gas storage facilities must use the
appropriate default total hydrocarbon population emission factors for
storage wellheads in gas service listed in Table W-4B to this subpart.
(4) LNG storage facilities must use the appropriate default methane
population emission factor for LNG storage compressors in gas service
listed in Table W-5B to this subpart.
(5) LNG import and export facilities must use the appropriate
default methane population emission factor for LNG terminal compressors
in gas service listed in Table W-6B to this subpart.
* * * * *
0
4. Section 98.234 is amended by:
0
a. Revising paragraph (a) introductory text, the paragraph (a)(1)
heading, and the fourth sentence in paragraph (a)(2); and
0
b. Adding paragraphs (a)(6) and (7).
The revisions and additions read as follows:
* * * * *
Sec. 98.234 Monitoring and QA/QC requirements.
(a) You must use any of the methods described in paragraphs (a)(1)
through (5) of this section to conduct leak detection(s) of through-
valve leakage from all source types listed in Sec. 98.233(k), (o), and
(p) that occur during a calendar year. You must use any of the methods
described in paragraphs (a)(1) through (7) of this section to conduct
leak detection(s) of equipment leaks from components as specified in
Sec. 98.233(q)(1)(i) that occur during a calendar year. You must use
any of the methods described in paragraphs (a)(1) through (5) of this
section to conduct leak detection(s) of equipment leaks from components
as specified in Sec. 98.233(q)(1)(ii) that occur during a calendar
year. You must use one of the methods described in paragraph (a)(6) or
(7) of this section to conduct leak detection(s) of equipment leaks
from components as specified in Sec. 98.233(q)(1)(iii). If electing to
comply with Sec. 98.233(q) as specified in Sec. 98.233(q)(1)(iv), you
must use any of the methods described in paragraphs (a)(1) through (7)
of this section to conduct leak detection(s) of equipment leaks from
component types as specified in Sec. 98.233(q)(1)(iv) that occur
during a calendar year.
(1) Optical gas imaging instrument as specified in Sec. 60.18 of
this chapter. * * *
* * * * *
(2) * * * If the equipment leak detection methods in this paragraph
cannot be used, you must use alternative leak detection devices as
described in paragraph (a)(1) of this section to monitor inaccessible
equipment leaks or vented emissions.
* * * * *
(6) Optical gas imaging instrument as specified in Sec. 60.5397a
of this chapter. Use an optical gas imaging instrument for equipment
leak detection in accordance with Sec. 60.5397a(b), (c)(3), (c)(7),
and (e) of this chapter and paragraphs (a)(6)(i) through (iii) of this
section. Unless using methods in paragraph (a)(7) of this section, an
optical gas imaging instrument must be used for all source types that
are inaccessible and cannot be monitored without elevating the
monitoring
[[Page 86515]]
personnel more than 2 meters above a support surface.
(i) For the purposes of this subpart, any visible emissions from a
component listed in Sec. 98.232 observed by the optical gas imaging
instrument is a leak.
(ii) For the purposes of this subpart, the term ``fugitive
emissions component'' in Sec. 60.5397a of this chapter means
``component.''
(iii) For the purpose of complying with Sec. 98.233(q)(1)(iv), the
phrase ``the collection of fugitive emissions components at well sites
and compressor stations'' in Sec. 60.5397a(b) of this chapter means
``the collection of components for which you elect to comply with Sec.
98.233(q)(1)(iv).''
(7) Method 21 as specified in Sec. 60.5397a of this chapter. Use
the equipment leak detection methods in appendix A-7 to part 60 of this
chapter, Method 21, in accordance with Sec. 60.5397a(b), (c)(8), and
(e) of this chapter and paragraphs (a)(7)(i) through (iii) of this
section. Inaccessible emissions sources, as defined in part 60 of this
chapter, are not exempt from this subpart. If the equipment leak
detection methods in this paragraph cannot be used, you must use
alternative leak detection devices as described in paragraph (a)(6) of
this section to monitor inaccessible equipment leaks.
(i) For the purposes of this subpart, any instrument reading from a
component listed in Sec. 98.232 of this chapter of 500 ppm or greater
using Method 21 is a leak.
(ii) For the purposes of this subpart, the term ``fugitive
emissions component'' in Sec. 60.5397a of this chapter means
``component.''
(iii) For the purpose of complying with Sec. 98.233(q)(1)(iv), the
phrase ``the collection of fugitive emissions components at well sites
and compressor stations'' in Sec. 60.5397a(b) of this chapter means
``the collection of components for which you elect to comply with Sec.
98.233(q)(1)(iv).''
* * * * *
0
5. Section 98.236 is amended by:
0
a. Redesignating paragraphs (a)(1)(xiv) through (xvii) as paragraphs
(a)(1)(xv) through (xviii), respectively;
0
b. Adding new paragraph (a)(1)(xiv);
0
c. Redesignating paragraphs (a)(9)(x) and (xi) as paragraphs (a)(9)(xi)
and (xii), respectively;
0
d. Adding new paragraph (a)(9)(x);
0
e. Revising paragraph (q) introductory text, paragraph (q)(1),
paragraph (q)(2) introductory text, paragraph (r)(3)(ii) introductory
text, and the second sentence of paragraph (z) introductory text.
The revisions and additions read as follows:
Sec. 98.236 Data reporting requirements.
* * * * *
(a) * * *
(1) * * *
(xiv) Equipment leak surveys. Report the information specified in
paragraph (q) of this section.
* * * * *
(9) * * *
(x) Equipment leak surveys. Report the information specified in
paragraph (q) of this section.
* * * * *
(q) Equipment leak surveys. For any components subject to or
complying with the requirements of Sec. 98.233(q), you must report the
information specified in paragraphs (q)(1) and (2) of this section.
Natural gas distribution facilities with emission sources listed in
Sec. 98.232(i)(1) must also report the information specified in
paragraph (q)(3) of this section.
(1) You must report the information specified in paragraphs
(q)(1)(i) through (v) of this section.
(i) Except as specified in paragraph (q)(1)(ii) of this section,
the number of complete equipment leak surveys performed during the
calendar year.
(ii) Natural gas distribution facilities performing equipment leak
surveys across a multiple year leak survey cycle must report the number
of years in the leak survey cycle.
(iii) Except for onshore natural gas processing facilities and
natural gas distribution facilities, indicate whether any equipment
components at your facility are subject to the well site or compressor
station fugitive emissions standards in Sec. 60.5397a of this chapter.
Report the indication per facility, not per component type.
(iv) For facilities in onshore petroleum and natural gas
production, onshore petroleum and natural gas gathering and boosting,
onshore natural gas transmission compression, underground natural gas
storage, LNG storage, and LNG import and export equipment, indicate
whether you elected to comply with Sec. 98.233(q) according to Sec.
98.233(q)(1)(iv) for any equipment components at your facility.
(v) Report each type of method described in Sec. 98.234(a) that
was used to conduct leak surveys.
(2) You must indicate whether your facility contains any of the
component types subject to or complying with Sec. 98.233(q) that are
listed in Sec. 98.232(c)(21), (d)(7), (e)(7), (e)(8), (f)(5), (f)(6),
(f)(7), (f)(8), (g)(4), (g)(6), (g)(7), (h)(5), (h)(7), (h)(8), (i)(1),
or (j)(10) for your facility's industry segment. For each component
type that is located at your facility, you must report the information
specified in paragraphs (q)(2)(i) through (v) of this section. If a
component type is located at your facility and no leaks were identified
from that component, then you must report the information in paragraphs
(q)(2)(i) through (v) of this section but report a zero (``0'') for the
information required according to paragraphs (q)(2)(ii) through (v) of
this section.
* * * * *
(r) * * *
(3) * * *
(ii) Onshore petroleum and natural gas production facilities and
onshore petroleum and natural gas gathering and boosting facilities
must report the information specified in paragraphs (r)(3)(ii)(A) and
(B) of this section, for each major equipment type, production type
(i.e., natural gas or crude oil), and geographic location combination
in Tables W-1B and W-1C to this subpart for which equipment leak
emissions are calculated using the methodology in Sec. 98.233(r).
* * * * *
(z) * * * If your facility contains any combustion units subject to
reporting according to paragraph (a)(1)(xviii), (a)(8)(i), or
(a)(9)(xii) of this section, then you must report the information
specified in paragraphs (z)(1) and (2) of this section, as applicable.
* * * * *
0
6. Add Table W-1E to subpart W of part 98 in numerical order to read as
follows:
[[Page 86516]]
Table W-1E to Subpart W of Part 98--Default Whole Gas Leaker Emission
Factors for Onshore Petroleum and Natural Gas Production and Onshore
Petroleum and Natural Gas Gathering and Boosting
------------------------------------------------------------------------
Emission factor (scf/hour/component)
-------------------------------------------
If you survey using
Equipment components any of the methods If you survey using
in Sec. Method 21 as
98.234(a)(1) specified in Sec.
through (6) 98.234(a)(7)
------------------------------------------------------------------------
Leaker Emission Factors--All Components, Gas Service
------------------------------------------------------------------------
Valve....................... 4.9 3.5
Flange...................... 4.1 2.2
Connector (other)........... 1.3 0.8
Open-Ended Line 2........... 2.8 1.9
Pressure Relief Valve....... 4.5 2.8
Pump Seal................... 3.7 1.4
Other 3..................... 4.5 2.8
------------------------------------------------------------------------
Leaker Emission Factors--All Components, Light Crude Service
------------------------------------------------------------------------
Valve....................... 3.2 2.2
Flange...................... 2.7 1.4
Connector (other)........... 1.0 0.6
Open-Ended Line............. 1.6 1.1
Pump........................ 3.7 2.6
Agitator Seal............... 3.7 2.6
Other 3..................... 3.1 2.0
------------------------------------------------------------------------
Leaker Emission Factors--All Components, Heavy Crude Service
------------------------------------------------------------------------
Valve....................... 3.2 2.2
Flange...................... 2.7 1.4
Connector (other)........... 1.0 0.6
Open-Ended Line............. 1.6 1.1
Pump........................ 3.7 2.6
Agitator Seal............... 3.7 2.6
Other 3..................... 3.1 2.0
------------------------------------------------------------------------
1 For multi-phase flow that includes gas, use the gas service emission
factors.
2 The open-ended lines component type includes blowdown valve and
isolation valve leaks emitted through the blowdown vent stack for
centrifugal and reciprocating compressors.
3 ``Others'' category includes any equipment leak emission point not
specifically listed in this table, as specified in Sec.
98.232(c)(21) and (j)(10).
4 Hydrocarbon liquids greater than or equal to 20[deg]API are considered
``light crude.''
5 Hydrocarbon liquids less than 20[deg]API are considered ``heavy
crude.''
0
7. Remove Table W-3 to subpart W of part 98 and add Table W-3A and
Table W-3B to subpart W of part 98 in numerical order to read as
follows:
Table W-3A to Subpart W of Part 98--Default Total Hydrocarbon Leaker
Emission Factors for Onshore Natural Gas Transmission Compression
------------------------------------------------------------------------
Emission factor (scf/hour/component)
-------------------------------------------
If you survey using
Onshore natural gas any of the methods If you survey using
transmission compression in Sec. Method 21 as
98.234(a)(1) specified in Sec.
through (6) 98.234(a)(7)
------------------------------------------------------------------------
Leaker Emission Factors--Compressor Components, Gas Service
------------------------------------------------------------------------
Valve \1\................... 14.84 9.51
Connector................... 5.59 3.58
Open-Ended Line............. 17.27 11.07
Pressure Relief Valve....... 39.66 25.42
Meter or Instrument......... 19.33 12.39
Other \2\................... 4.1 2.63
------------------------------------------------------------------------
Leaker Emission Factors--Non-Compressor Components, Gas Service
------------------------------------------------------------------------
Valve \1\................... 6.42 4.12
Connector................... 5.71 3.66
Open-Ended Line............. 11.27 7.22
[[Page 86517]]
Pressure Relief Valve....... 2.01 1.29
Meter or Instrument......... 2.93 1.88
Other \2\................... 4.1 2.63
------------------------------------------------------------------------
\1\ Valves include control valves, block valves and regulator valves.
\2\ Other includes any potential equipment leak emission point in gas
service that is not specifically listed in this table, as specified in
Sec. 98.232(e)(8).
Table W-3B to Subpart W of Part 98--Default Total Hydrocarbon Population
Emission Factors for Onshore Natural Gas Transmission Compression
------------------------------------------------------------------------
Population emission factors--gas service onshore Emission factor (scf/
natural gas transmission compression hour/component)
------------------------------------------------------------------------
Low Continuous Bleed Pneumatic Device Vents \1\... 1.37
High Continuous Bleed Pneumatic Device Vents \1\.. 18.20
Intermittent Bleed Pneumatic Device Vents \1\..... 2.35
------------------------------------------------------------------------
1 Emission Factor is in units of ``scf/hour/device.''
0
8. Remove Table W-4 to subpart W of part 98 and add Table W-4A and
Table W-4B to subpart W of part 98 in numerical order to read as
follows:
Table W-4A to Subpart W of Part 98--Default Total Hydrocarbon Leaker
Emission Factors for Underground Natural Gas Storage
------------------------------------------------------------------------
Emission factor (scf/hour/component)
-------------------------------------------
If you survey using
Underground natural gas any of the methods If you survey using
storage in Sec. Method 21 as
98.234(a)(1) specified in Sec.
through (6) 98.234(a)(7)
------------------------------------------------------------------------
Leaker Emission Factors--Storage Station, Gas Service
------------------------------------------------------------------------
Valve \1\................... 14.84 9.51
Connector (other)........... 5.59 3.58
Open-Ended Line............. 17.27 11.07
Pressure Relief Valve....... 39.66 25.42
Meter and Instrument........ 19.33 12.39
Other \2\................... 4.1 2.63
------------------------------------------------------------------------
Leaker Emission Factors--Storage Wellheads, Gas Service
------------------------------------------------------------------------
Valve \1\................... 4.5 3.2
Connector (other than 1.2 0.7
flanges)...................
Flange...................... 3.8 2.0
Open-Ended Line............. 2.5 1.7
Pressure Relief Valve....... 4.1 2.5
Other \2\................... 4.1 2.5
------------------------------------------------------------------------
\1\ Valves include control valves, block valves and regulator valves.
\2\ Other includes any potential equipment leak emission point in gas
service that is not specifically listed in this table, as specified in
Sec. 98.232(f)(6) and (8).
Table W-4B to Subpart W of Part 98--Default Total Hydrocarbon Population
Emission Factors for Underground Natural Gas Storage
------------------------------------------------------------------------
Emission factor
Underground natural gas storage (scf/hour/component)
------------------------------------------------------------------------
Population Emission Factors--Storage Wellheads, Gas Service
------------------------------------------------------------------------
Connector......................................... 0.01
[[Page 86518]]
Valve............................................. 0.1
Pressure Relief Valve............................. 0.17
Open-Ended Line................................... 0.03
------------------------------------------------------------------------
Population Emission Factors--Other Components, Gas Service
------------------------------------------------------------------------
Low Continuous Bleed Pneumatic Device Vents \1\... 1.37
High Continuous Bleed Pneumatic Device Vents \1\.. 18.20
Intermittent Bleed Pneumatic Device Vents \1\..... 2.35
------------------------------------------------------------------------
\1\ Emission Factor is in units of ``scf/hour/device.''
0
9. Remove Table W-5 to subpart W of part 98 and add Table W-5A and
Table W-5B to subpart W of part 98 in numerical order to read as
follows:
Table W-5A to Subpart W of Part 98--Default Methane Leaker Emission
Factors for Liquefied Natural Gas (LNG) Storage
------------------------------------------------------------------------
Emission factor (scf/hour/component)
-------------------------------------------
If you survey using
LNG storage any of the methods If you survey using
in Sec. Method 21 as
98.234(a)(1) specified in Sec.
through (6) 98.234(a)(7)
------------------------------------------------------------------------
Leaker Emission Factors--LNG Storage Components, LNG Service
------------------------------------------------------------------------
Valve....................... 1.19 0.23
Pump Seal................... 4.00 0.73
Connector................... 0.34 0.11
Other \1\................... 1.77 0.99
------------------------------------------------------------------------
Leaker Emission Factors--LNG Storage Components, Gas Service
------------------------------------------------------------------------
Valve \2\................... 14.84 9.51
Connector................... 5.59 3.58
Open-Ended Line............. 17.27 11.07
Pressure Relief Valve....... 39.66 25.42
Meter and Instrument........ 19.33 12.39
Other \3\................... 4.1 2.63
------------------------------------------------------------------------
\1\ ``Other'' equipment type for components in LNG service should be
applied for any equipment type other than connectors, pumps, or
valves.
\2\ Valves include control valves, block valves and regulator valves.
\3\ ``Other'' equipment type for components in gas service should be
applied for any equipment type other than valves, connectors, flanges,
open-ended lines, pressure relief valves, and meters and instruments,
as specified in Sec. 98.232(g)(6) and (7).
Table W-5B to Subpart W of Part 98--Default Methane Population Emission
Factors for Liquefied Natural Gas (LNG) Storage
------------------------------------------------------------------------
Emission factor
LNG storage (scf/hour/component)
------------------------------------------------------------------------
Population Emission Factors--LNG Storage Compressor, Gas Service
------------------------------------------------------------------------
Vapor Recovery Compressor \1\..................... 4.17
------------------------------------------------------------------------
\1\ Emission Factor is in units of ``scf/hour/device.''
0
10. Remove Table W-6 to subpart W of part 98 and add Table W-6A and
Table W-6B to subpart W of part 98 in numerical order to read as
follows:
[[Page 86519]]
Table W-6A to Subpart W of Part 98--Default Methane Leaker Emission
Factors for LNG Import and Export Equipment
------------------------------------------------------------------------
Emission factor (scf/hour/component)
-------------------------------------------
If you survey using
LNG import and export any of the methods If you survey using
equipment in Sec. Method 21 as
98.234(a)(1) specified in Sec.
through (6) 98.234(a)(7)
------------------------------------------------------------------------
Leaker Emission Factors--LNG Terminals Components, LNG Service
------------------------------------------------------------------------
Valve....................... 1.19 0.23
Pump Seal................... 4.00 0.73
Connector................... 0.34 0.11
Other \1\................... 1.77 0.99
------------------------------------------------------------------------
Leaker Emission Factors--LNG Terminals Components, Gas Service
------------------------------------------------------------------------
Valve \2\................... 14.84 9.51
Connector................... 5.59 3.58
Open-Ended Line............. 17.27 11.07
Pressure Relief Valve....... 39.66 25.42
Meter and Instrument........ 19.33 12.39
Other \3\................... 4.1 2.63
------------------------------------------------------------------------
\1\ ``Other'' equipment type for components in LNG service should be
applied for any equipment type other than connectors, pumps, or
valves.
\2\ Valves include control valves, block valves and regulator valves.
\3\ ``Other'' equipment type for components in gas service should be
applied for any equipment type other than valves, connectors, flanges,
open-ended lines, pressure relief valves, and meters and instruments,
as specified in Sec. 98.232(h)(7) and (8).
Table W-6B to Subpart W of Part 98--Default Methane Population Emission
Factors for LNG Import and Export Equipment
------------------------------------------------------------------------
Emission factor
LNG import and export equipment (scf/hour/component)
------------------------------------------------------------------------
Population Emission Factors--LNG Terminals Compressor, Gas Service
------------------------------------------------------------------------
Vapor Recovery Compressor \1\..................... 4.17
------------------------------------------------------------------------
\1\ Emission Factor is in units of ``scf/hour/compressor.''
[FR Doc. 2016-27981 Filed 11-29-16; 8:45 am]
BILLING CODE 6560-50-P