Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Hackensack Meadowlands Ecosystem Restoration Project, Hackensack Meadowlands District, Bergen and Hudson Counties, NJ: Feasibility Phase, 85944-85945 [2016-28729]

Download as PDF 85944 Federal Register / Vol. 81, No. 229 / Tuesday, November 29, 2016 / Notices Special Accommodations DEPARTMENT OF DEFENSE Individuals requiring special accommodations to access the public meeting should contact Ms. Kendal Brown at least five (5) business days prior to the meeting so that appropriate arrangements can be made. Department of the Army, U.S. Army Corps of Engineers Written Statements asabaliauskas on DSK3SPTVN1PROD with NOTICES Any member of the public wishing to provide comments to the DHB Health Care Delivery Subcommittee may do so in accordance with section 10(a)(3) of the Federal Advisory Committee Act, 41 CFR 102–3.105(j) and 102–3.140, and the procedures described in this notice. Individuals desiring to provide comments to the DHB Health Care Delivery Subcommittee may do so by submitting a written statement to the DHB Designated Federal Officer (DFO) (see FOR FURTHER INFORMATION CONTACT). Written statements should not be longer than two type-written pages and address the following details: The issue, discussion, and a recommended course of action. Supporting documentation may also be included, as needed, to establish the appropriate historical context and to provide any necessary background information. If the written statement is not received at least five (5) business days prior to the meeting, the DFO may choose to postpone consideration of the statement until the next open meeting. The DFO will review all timely submissions with the Subcommittee Chair and ensure they are provided to members of the Health Care Delivery Subcommittee before the meeting that is subject to this notice. After reviewing the written comments, the Subcommittee Chair and the DFO may choose to invite the submitter to orally present their issue during an open portion of this meeting or at a future meeting. The DFO, in consultation with the Subcommittee Chair, may allot time for members of the public to present their issues for review and discussion by the Health Care Delivery Subcommittee. Dated: November 23, 2016. Aaron Siegel, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 2016–28674 Filed 11–28–16; 8:45 am] BILLING CODE 5001–06–P VerDate Sep<11>2014 17:48 Nov 28, 2016 Jkt 241001 Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Lower Passaic River Ecosystem Restoration Project, Essex, Hudson, Passaic, and Bergen Counties, NJ: Feasibility Phase Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice of Intent; Withdrawal. AGENCY: The U.S. Army Corps of Engineers, New York District (NY District), is withdrawing its intent to prepare a Draft Environmental Impact Statement (EIS) for the Study. The Notice of Intent to prepare the Draft EIS was published in the Tuesday, December 28, 2004 issue of the Federal Register (69 FR 77744). ADDRESSES: U.S. Army Corps of Engineers, New York District, Planning Division, Environmental Analysis Branch, 26 Federal Plaza, Room 2151, New York, NY 10278–0090. FOR FURTHER INFORMATION CONTACT: Diana Kohtio, Project Biologist, at diana.m.kohtio@usace.army.mil or 917.790.8619. SUPPLEMENTARY INFORMATION: The U.S. Army Corps of Engineers, NY District published a notice of intent to prepare a Draft Environmental Impact Statement in the December 28, 2004 issue of the Federal Register (FR Doc. 2004–28332). In an effort to streamline work in early 2015, the U.S. Army Corps of Engineers, New York District, consolidated multiple parallel USACE ecosystem restoration feasibility studies into the Hudson Raritan Estuary Ecosystem Restoration Feasibility Study (HRE) Study. This streamlining is consistent with the Civil Works Transformation Initiative and Specific, Measurable, Attainable, Risk Informed, Timely (SMART) Planning principles, and maximizes efficiencies, resources and benefits. The other feasibility studies include: • HRE—Lower Passaic River Ecosystem Restoration Feasibility Study; • HRE—Hackensack Meadowlands Ecosystem Restoration Feasibility Study; • Flushing Creek and Bay Ecosystem Restoration Feasibility Study; • Bronx River Basin Ecosystem Restoration Feasibility Study; • Jamaica Bay, Marine Park, Plumb Beach Ecosystem Restoration Feasibility Study. SUMMARY: PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 As such, a Draft EIS is no longer necessary. Each Feasibility Study was at a different stage prior to the decision to consolidate into the HRE Feasibility Report/Environmental Assessment (FR/ EA). The planning was conducted independently with their non-federal sponsor and resulted in the selection of specific recommendations within each watershed. These combined efforts resulted in the recommendations included in the broader HRE FR/EA. The HRE FR/EA will be prepared and circulated for review by agencies and the public. The New York District invites participation and consultation of agencies and individuals that have special expertise, legal jurisdiction, or interest in the preparation of the draft environmental assessment. Comments received, including the names and addresses of those who comment, will be considered part of the public record for this proposal. As a result of the process, if it is determined that the project may have significant impacts, the EIS process will be reinitiated and a NOI published. Peter Weppler, Chief, Environmental Analysis Branch. [FR Doc. 2016–28730 Filed 11–28–16; 8:45 am] BILLING CODE 3720–58–P DEPARTMENT OF DEFENSE Department of the Army, U.S. Army Corps of Engineers Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Hackensack Meadowlands Ecosystem Restoration Project, Hackensack Meadowlands District, Bergen and Hudson Counties, NJ: Feasibility Phase U.S. Army Corps of Engineers, Department of the Army, DoD. ACTION: Notice of intent; withdrawal. AGENCY: The U.S. Army Corps of Engineers, New York District (NY District), is withdrawing its intent to prepare a Draft Environmental Impact Statement (EIS) for the Study. The Notice of Intent to prepare the Draft EIS was published in the Tuesday, December 28, 2004 issue of the Federal Register (69 FR 77744). ADDRESSES: U.S. Army Corps of Engineers, New York District, Planning Division, Environmental Analysis Branch, 26 Federal Plaza, Room 2151, New York, NY 10278–0090. FOR FURTHER INFORMATION CONTACT: Diana Kohtio, Project Biologist, at SUMMARY: E:\FR\FM\29NON1.SGM 29NON1 Federal Register / Vol. 81, No. 229 / Tuesday, November 29, 2016 / Notices diana.m.kohtio@usace.army.mil or 917.790.8619. the EIS process will be reinitiated and a NOI published. The U.S. Army Corps of Engineers, NY District published a notice of intent to prepare a Draft Environmental Impact Statement in the December 28, 2004 issue of the Federal Register (FR Doc. 2004–28331). In an effort to streamline work in early 2015, the U.S. Army Corps of Engineers, New York District, consolidated multiple parallel USACE ecosystem restoration feasibility studies into the Hudson Raritan Estuary Ecosystem Restoration Feasibility Study (HRE) Study. This streamlining is consistent with the Civil Works Transformation Initiative and Specific, Measurable, Attainable, Risk Informed, Timely (SMART) Planning principles, and maximizes efficiencies, resources and benefits. The other feasibility studies include: • HRE—Lower Passaic River Ecosystem Restoration Feasibility Study; • HRE—Hackensack Meadowlands Ecosystem Restoration Feasibility Study; • Flushing Creek and Bay Ecosystem Restoration Feasibility Study; • Bronx River Basin Ecosystem Restoration Feasibility Study; • Jamaica Bay, Marine Park, Plumb Beach Ecosystem Restoration Feasibility Study. As such, a Draft EIS is no longer necessary. Each Feasibility Study was at a different stage prior to the decision to consolidate into the HRE Feasibility Report/Environmental Assessment (FR/ EA). The planning was conducted independently with their non-federal sponsor and resulted in the selection of specific recommendations within each watershed. These combined efforts resulted in the recommendations included in the broader HRE FR/EA. The HRE FR/EA will be prepared and circulated for review by agencies and the public. The New York District invites participation and consultation of agencies and individuals that have special expertise, legal jurisdiction, or interest in the preparation of the draft environmental assessment. Comments received, including the names and addresses of those who comment, will be considered part of the public record for this proposal. As a result of the process, if it is determined that the project may have significant impacts, Peter Weppler, Chief, Environmental Analysis Branch. asabaliauskas on DSK3SPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: VerDate Sep<11>2014 17:48 Nov 28, 2016 Jkt 241001 [FR Doc. 2016–28729 Filed 11–28–16; 8:45 am] BILLING CODE 3720–58–P DEPARTMENT OF DEFENSE Notice of Intent To Grant Exclusive Patent License; Anasys Instruments ACTION: Department of the Navy, DoD. Notice. The Department of the Navy hereby gives notice of its intent to grant to Anasys Instruments, a revocable, nonassignable, exclusive license to practice in the field of use of photothermal infrared spectroscopy and microscopy of solids, liquids, and gases in the United States, the Governmentowned inventions described in U.S. Patent No. 9,091,594: Chemical Mapping Using Thermal Microscopy at the Micro and Nano Scales, Navy Case No. 101,493 and U.S. Patent Application No. 14/748,430: Chemical Mapping Using Thermal Microscopy at the Micro and Nano Scales, Navy Case No. 101,493 and any continuations, divisionals or re-issues thereof. SUMMARY: Anyone wishing to object to the grant of this license must file written objections along with supporting evidence, if any, not later than December 14, 2016. DATES: Written objections are to be filed with the Naval Research Laboratory, Code 1004, 4555 Overlook Avenue SW., Washington, DC 20375– 5320. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Charles Steenbuck, Acting Head, Technology Transfer Office, NRL Code 1004, 4555 Overlook Avenue SW., Washington, DC 20375–5320, telephone 202–767–3083. Due to U.S. Postal delays, please fax 202–404–7920, email: NRL1004@research.nrl.navy.mil or use courier delivery to expedite response. Authority: 35 U.S.C. 207, 37 CFR part 404. Dated: November 22, 2016. C.D. Mora, Commander, Judge Advocate General’s Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 2016–28676 Filed 11–28–16; 8:45 am] BILLING CODE 3810–FF–P PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 DEPARTMENT OF EDUCATION National Advisory Council on Indian Education Meeting Notice National Advisory Council on Indian Education (NACIE), U.S. Department of Education. ACTION: Announcement of closed video/ teleconference meetings. AGENCY: This notice sets forth the schedule of an upcoming closed meeting of NACIE. Notice of the meeting is required by Section 10(a)(2) of the Federal Advisory Committee Act. In order to ensure there are sufficient members in attendance to meet the quorum requirement, this notice is being published in less than 15 calendar days prior to the scheduled meeting dates. SUMMARY: Department of the Navy AGENCY: 85945 The NACIE video/teleconference meetings will be held on November 29, 2016 and November 30, 2016, from 1:00 p.m.–4:00 p.m. Eastern Daylight Saving Time. FOR FURTHER INFORMATION CONTACT: Tina Hunter, Designated Federal Official, Office of Elementary and Secondary Education, U.S. Department of Education, 400 Maryland Avenue SW., Washington, DC 20202. Telephone: 202–205–8527. Fax: 202–205–0310. SUPPLEMENTARY INFORMATION: NACIE’s Statutory Authority and Function: NACIE is authorized by Section 6141 of the Elementary and Secondary Education Act of 1965 (ESEA), as amended by the Every Student Succeeds Act (ESSA), 20 U.S.C. 7471. NACIE is governed by the provisions of the Federal Advisory Committee Act (FACA), 5 U.S.C. App. 2, which sets forth requirements for the formation and use of advisory committees. NACIE is established within the Department of Education (Department) to advise the Secretary of Education (Secretary) on the funding and administration (including the development of regulations, and administrative policies and practices) of any program over which the Secretary has jurisdiction and that includes Indian children or adults as participants or that may benefit Indian children or adults, including any program established under Title VI, Part A of the ESEA. NACIE also makes recommendations to the Secretary for filling the position of Director of Indian Education whenever a vacancy occurs. Finally, NACIE submits to the Congress, not later than June 30 of each year, a report on the activities of NACIE, including recommendations that NACIE considers appropriate for the improvement of Federal education DATES: E:\FR\FM\29NON1.SGM 29NON1

Agencies

[Federal Register Volume 81, Number 229 (Tuesday, November 29, 2016)]
[Notices]
[Pages 85944-85945]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-28729]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, U.S. Army Corps of Engineers


Withdrawal of Notice of Intent To Prepare an Environmental Impact 
Statement for the Proposed Hackensack Meadowlands Ecosystem Restoration 
Project, Hackensack Meadowlands District, Bergen and Hudson Counties, 
NJ: Feasibility Phase

AGENCY: U.S. Army Corps of Engineers, Department of the Army, DoD.

ACTION: Notice of intent; withdrawal.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers, New York District (NY 
District), is withdrawing its intent to prepare a Draft Environmental 
Impact Statement (EIS) for the Study. The Notice of Intent to prepare 
the Draft EIS was published in the Tuesday, December 28, 2004 issue of 
the Federal Register (69 FR 77744).

ADDRESSES: U.S. Army Corps of Engineers, New York District, Planning 
Division, Environmental Analysis Branch, 26 Federal Plaza, Room 2151, 
New York, NY 10278-0090.

FOR FURTHER INFORMATION CONTACT: Diana Kohtio, Project Biologist, at

[[Page 85945]]

diana.m.kohtio@usace.army.mil or 917.790.8619.

SUPPLEMENTARY INFORMATION: The U.S. Army Corps of Engineers, NY 
District published a notice of intent to prepare a Draft Environmental 
Impact Statement in the December 28, 2004 issue of the Federal Register 
(FR Doc. 2004-28331). In an effort to streamline work in early 2015, 
the U.S. Army Corps of Engineers, New York District, consolidated 
multiple parallel USACE ecosystem restoration feasibility studies into 
the Hudson Raritan Estuary Ecosystem Restoration Feasibility Study 
(HRE) Study.
    This streamlining is consistent with the Civil Works Transformation 
Initiative and Specific, Measurable, Attainable, Risk Informed, Timely 
(SMART) Planning principles, and maximizes efficiencies, resources and 
benefits. The other feasibility studies include:
     HRE--Lower Passaic River Ecosystem Restoration Feasibility 
Study;
     HRE--Hackensack Meadowlands Ecosystem Restoration 
Feasibility Study;
     Flushing Creek and Bay Ecosystem Restoration Feasibility 
Study;
     Bronx River Basin Ecosystem Restoration Feasibility Study;
     Jamaica Bay, Marine Park, Plumb Beach Ecosystem 
Restoration Feasibility Study.
    As such, a Draft EIS is no longer necessary. Each Feasibility Study 
was at a different stage prior to the decision to consolidate into the 
HRE Feasibility Report/Environmental Assessment (FR/EA). The planning 
was conducted independently with their non-federal sponsor and resulted 
in the selection of specific recommendations within each watershed. 
These combined efforts resulted in the recommendations included in the 
broader HRE FR/EA. The HRE FR/EA will be prepared and circulated for 
review by agencies and the public. The New York District invites 
participation and consultation of agencies and individuals that have 
special expertise, legal jurisdiction, or interest in the preparation 
of the draft environmental assessment. Comments received, including the 
names and addresses of those who comment, will be considered part of 
the public record for this proposal. As a result of the process, if it 
is determined that the project may have significant impacts, the EIS 
process will be reinitiated and a NOI published.

Peter Weppler,
Chief, Environmental Analysis Branch.
[FR Doc. 2016-28729 Filed 11-28-16; 8:45 am]
 BILLING CODE 3720-58-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.