Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Hackensack Meadowlands Ecosystem Restoration Project, Hackensack Meadowlands District, Bergen and Hudson Counties, NJ: Feasibility Phase, 85944-85945 [2016-28729]
Download as PDF
85944
Federal Register / Vol. 81, No. 229 / Tuesday, November 29, 2016 / Notices
Special Accommodations
DEPARTMENT OF DEFENSE
Individuals requiring special
accommodations to access the public
meeting should contact Ms. Kendal
Brown at least five (5) business days
prior to the meeting so that appropriate
arrangements can be made.
Department of the Army, U.S. Army
Corps of Engineers
Written Statements
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Any member of the public wishing to
provide comments to the DHB Health
Care Delivery Subcommittee may do so
in accordance with section 10(a)(3) of
the Federal Advisory Committee Act, 41
CFR 102–3.105(j) and 102–3.140, and
the procedures described in this notice.
Individuals desiring to provide
comments to the DHB Health Care
Delivery Subcommittee may do so by
submitting a written statement to the
DHB Designated Federal Officer (DFO)
(see FOR FURTHER INFORMATION CONTACT).
Written statements should not be longer
than two type-written pages and address
the following details: The issue,
discussion, and a recommended course
of action. Supporting documentation
may also be included, as needed, to
establish the appropriate historical
context and to provide any necessary
background information.
If the written statement is not
received at least five (5) business days
prior to the meeting, the DFO may
choose to postpone consideration of the
statement until the next open meeting.
The DFO will review all timely
submissions with the Subcommittee
Chair and ensure they are provided to
members of the Health Care Delivery
Subcommittee before the meeting that is
subject to this notice. After reviewing
the written comments, the
Subcommittee Chair and the DFO may
choose to invite the submitter to orally
present their issue during an open
portion of this meeting or at a future
meeting. The DFO, in consultation with
the Subcommittee Chair, may allot time
for members of the public to present
their issues for review and discussion
by the Health Care Delivery
Subcommittee.
Dated: November 23, 2016.
Aaron Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2016–28674 Filed 11–28–16; 8:45 am]
BILLING CODE 5001–06–P
VerDate Sep<11>2014
17:48 Nov 28, 2016
Jkt 241001
Withdrawal of Notice of Intent To
Prepare an Environmental Impact
Statement for the Proposed Lower
Passaic River Ecosystem Restoration
Project, Essex, Hudson, Passaic, and
Bergen Counties, NJ: Feasibility Phase
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of Intent; Withdrawal.
AGENCY:
The U.S. Army Corps of
Engineers, New York District (NY
District), is withdrawing its intent to
prepare a Draft Environmental Impact
Statement (EIS) for the Study. The
Notice of Intent to prepare the Draft EIS
was published in the Tuesday,
December 28, 2004 issue of the Federal
Register (69 FR 77744).
ADDRESSES: U.S. Army Corps of
Engineers, New York District, Planning
Division, Environmental Analysis
Branch, 26 Federal Plaza, Room 2151,
New York, NY 10278–0090.
FOR FURTHER INFORMATION CONTACT:
Diana Kohtio, Project Biologist, at
diana.m.kohtio@usace.army.mil or
917.790.8619.
SUPPLEMENTARY INFORMATION: The U.S.
Army Corps of Engineers, NY District
published a notice of intent to prepare
a Draft Environmental Impact Statement
in the December 28, 2004 issue of the
Federal Register (FR Doc. 2004–28332).
In an effort to streamline work in early
2015, the U.S. Army Corps of Engineers,
New York District, consolidated
multiple parallel USACE ecosystem
restoration feasibility studies into the
Hudson Raritan Estuary Ecosystem
Restoration Feasibility Study (HRE)
Study.
This streamlining is consistent with
the Civil Works Transformation
Initiative and Specific, Measurable,
Attainable, Risk Informed, Timely
(SMART) Planning principles, and
maximizes efficiencies, resources and
benefits. The other feasibility studies
include:
• HRE—Lower Passaic River
Ecosystem Restoration Feasibility
Study;
• HRE—Hackensack Meadowlands
Ecosystem Restoration Feasibility
Study;
• Flushing Creek and Bay Ecosystem
Restoration Feasibility Study;
• Bronx River Basin Ecosystem
Restoration Feasibility Study;
• Jamaica Bay, Marine Park, Plumb
Beach Ecosystem Restoration Feasibility
Study.
SUMMARY:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
As such, a Draft EIS is no longer
necessary. Each Feasibility Study was at
a different stage prior to the decision to
consolidate into the HRE Feasibility
Report/Environmental Assessment (FR/
EA). The planning was conducted
independently with their non-federal
sponsor and resulted in the selection of
specific recommendations within each
watershed. These combined efforts
resulted in the recommendations
included in the broader HRE FR/EA.
The HRE FR/EA will be prepared and
circulated for review by agencies and
the public. The New York District
invites participation and consultation of
agencies and individuals that have
special expertise, legal jurisdiction, or
interest in the preparation of the draft
environmental assessment. Comments
received, including the names and
addresses of those who comment, will
be considered part of the public record
for this proposal. As a result of the
process, if it is determined that the
project may have significant impacts,
the EIS process will be reinitiated and
a NOI published.
Peter Weppler,
Chief, Environmental Analysis Branch.
[FR Doc. 2016–28730 Filed 11–28–16; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, U.S. Army
Corps of Engineers
Withdrawal of Notice of Intent To
Prepare an Environmental Impact
Statement for the Proposed
Hackensack Meadowlands Ecosystem
Restoration Project, Hackensack
Meadowlands District, Bergen and
Hudson Counties, NJ: Feasibility
Phase
U.S. Army Corps of Engineers,
Department of the Army, DoD.
ACTION: Notice of intent; withdrawal.
AGENCY:
The U.S. Army Corps of
Engineers, New York District (NY
District), is withdrawing its intent to
prepare a Draft Environmental Impact
Statement (EIS) for the Study. The
Notice of Intent to prepare the Draft EIS
was published in the Tuesday,
December 28, 2004 issue of the Federal
Register (69 FR 77744).
ADDRESSES: U.S. Army Corps of
Engineers, New York District, Planning
Division, Environmental Analysis
Branch, 26 Federal Plaza, Room 2151,
New York, NY 10278–0090.
FOR FURTHER INFORMATION CONTACT:
Diana Kohtio, Project Biologist, at
SUMMARY:
E:\FR\FM\29NON1.SGM
29NON1
Federal Register / Vol. 81, No. 229 / Tuesday, November 29, 2016 / Notices
diana.m.kohtio@usace.army.mil or
917.790.8619.
the EIS process will be reinitiated and
a NOI published.
The U.S.
Army Corps of Engineers, NY District
published a notice of intent to prepare
a Draft Environmental Impact Statement
in the December 28, 2004 issue of the
Federal Register (FR Doc. 2004–28331).
In an effort to streamline work in early
2015, the U.S. Army Corps of Engineers,
New York District, consolidated
multiple parallel USACE ecosystem
restoration feasibility studies into the
Hudson Raritan Estuary Ecosystem
Restoration Feasibility Study (HRE)
Study.
This streamlining is consistent with
the Civil Works Transformation
Initiative and Specific, Measurable,
Attainable, Risk Informed, Timely
(SMART) Planning principles, and
maximizes efficiencies, resources and
benefits. The other feasibility studies
include:
• HRE—Lower Passaic River
Ecosystem Restoration Feasibility
Study;
• HRE—Hackensack Meadowlands
Ecosystem Restoration Feasibility
Study;
• Flushing Creek and Bay Ecosystem
Restoration Feasibility Study;
• Bronx River Basin Ecosystem
Restoration Feasibility Study;
• Jamaica Bay, Marine Park, Plumb
Beach Ecosystem Restoration Feasibility
Study.
As such, a Draft EIS is no longer
necessary. Each Feasibility Study was at
a different stage prior to the decision to
consolidate into the HRE Feasibility
Report/Environmental Assessment (FR/
EA). The planning was conducted
independently with their non-federal
sponsor and resulted in the selection of
specific recommendations within each
watershed. These combined efforts
resulted in the recommendations
included in the broader HRE FR/EA.
The HRE FR/EA will be prepared and
circulated for review by agencies and
the public. The New York District
invites participation and consultation of
agencies and individuals that have
special expertise, legal jurisdiction, or
interest in the preparation of the draft
environmental assessment. Comments
received, including the names and
addresses of those who comment, will
be considered part of the public record
for this proposal. As a result of the
process, if it is determined that the
project may have significant impacts,
Peter Weppler,
Chief, Environmental Analysis Branch.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
17:48 Nov 28, 2016
Jkt 241001
[FR Doc. 2016–28729 Filed 11–28–16; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Notice of Intent To Grant Exclusive
Patent License; Anasys Instruments
ACTION:
Department of the Navy, DoD.
Notice.
The Department of the Navy
hereby gives notice of its intent to grant
to Anasys Instruments, a revocable,
nonassignable, exclusive license to
practice in the field of use of photothermal infrared spectroscopy and
microscopy of solids, liquids, and gases
in the United States, the Governmentowned inventions described in U.S.
Patent No. 9,091,594: Chemical
Mapping Using Thermal Microscopy at
the Micro and Nano Scales, Navy Case
No. 101,493 and U.S. Patent Application
No. 14/748,430: Chemical Mapping
Using Thermal Microscopy at the Micro
and Nano Scales, Navy Case No.
101,493 and any continuations,
divisionals or re-issues thereof.
SUMMARY:
Anyone wishing to object to the
grant of this license must file written
objections along with supporting
evidence, if any, not later than
December 14, 2016.
DATES:
Written objections are to be
filed with the Naval Research
Laboratory, Code 1004, 4555 Overlook
Avenue SW., Washington, DC 20375–
5320.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Charles Steenbuck, Acting Head,
Technology Transfer Office, NRL Code
1004, 4555 Overlook Avenue SW.,
Washington, DC 20375–5320, telephone
202–767–3083. Due to U.S. Postal
delays, please fax 202–404–7920, email:
NRL1004@research.nrl.navy.mil or use
courier delivery to expedite response.
Authority: 35 U.S.C. 207, 37 CFR part 404.
Dated: November 22, 2016.
C.D. Mora,
Commander, Judge Advocate General’s Corps,
U.S. Navy, Federal Register Liaison Officer.
[FR Doc. 2016–28676 Filed 11–28–16; 8:45 am]
BILLING CODE 3810–FF–P
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
DEPARTMENT OF EDUCATION
National Advisory Council on Indian
Education Meeting Notice
National Advisory Council on
Indian Education (NACIE), U.S.
Department of Education.
ACTION: Announcement of closed video/
teleconference meetings.
AGENCY:
This notice sets forth the
schedule of an upcoming closed
meeting of NACIE. Notice of the meeting
is required by Section 10(a)(2) of the
Federal Advisory Committee Act. In
order to ensure there are sufficient
members in attendance to meet the
quorum requirement, this notice is
being published in less than 15 calendar
days prior to the scheduled meeting
dates.
SUMMARY:
Department of the Navy
AGENCY:
85945
The NACIE video/teleconference
meetings will be held on November 29,
2016 and November 30, 2016, from 1:00
p.m.–4:00 p.m. Eastern Daylight Saving
Time.
FOR FURTHER INFORMATION CONTACT: Tina
Hunter, Designated Federal Official,
Office of Elementary and Secondary
Education, U.S. Department of
Education, 400 Maryland Avenue SW.,
Washington, DC 20202. Telephone:
202–205–8527. Fax: 202–205–0310.
SUPPLEMENTARY INFORMATION: NACIE’s
Statutory Authority and Function:
NACIE is authorized by Section 6141 of
the Elementary and Secondary
Education Act of 1965 (ESEA), as
amended by the Every Student Succeeds
Act (ESSA), 20 U.S.C. 7471. NACIE is
governed by the provisions of the
Federal Advisory Committee Act
(FACA), 5 U.S.C. App. 2, which sets
forth requirements for the formation and
use of advisory committees. NACIE is
established within the Department of
Education (Department) to advise the
Secretary of Education (Secretary) on
the funding and administration
(including the development of
regulations, and administrative policies
and practices) of any program over
which the Secretary has jurisdiction and
that includes Indian children or adults
as participants or that may benefit
Indian children or adults, including any
program established under Title VI, Part
A of the ESEA. NACIE also makes
recommendations to the Secretary for
filling the position of Director of Indian
Education whenever a vacancy occurs.
Finally, NACIE submits to the Congress,
not later than June 30 of each year, a
report on the activities of NACIE,
including recommendations that NACIE
considers appropriate for the
improvement of Federal education
DATES:
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 81, Number 229 (Tuesday, November 29, 2016)]
[Notices]
[Pages 85944-85945]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-28729]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, U.S. Army Corps of Engineers
Withdrawal of Notice of Intent To Prepare an Environmental Impact
Statement for the Proposed Hackensack Meadowlands Ecosystem Restoration
Project, Hackensack Meadowlands District, Bergen and Hudson Counties,
NJ: Feasibility Phase
AGENCY: U.S. Army Corps of Engineers, Department of the Army, DoD.
ACTION: Notice of intent; withdrawal.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers, New York District (NY
District), is withdrawing its intent to prepare a Draft Environmental
Impact Statement (EIS) for the Study. The Notice of Intent to prepare
the Draft EIS was published in the Tuesday, December 28, 2004 issue of
the Federal Register (69 FR 77744).
ADDRESSES: U.S. Army Corps of Engineers, New York District, Planning
Division, Environmental Analysis Branch, 26 Federal Plaza, Room 2151,
New York, NY 10278-0090.
FOR FURTHER INFORMATION CONTACT: Diana Kohtio, Project Biologist, at
[[Page 85945]]
diana.m.kohtio@usace.army.mil or 917.790.8619.
SUPPLEMENTARY INFORMATION: The U.S. Army Corps of Engineers, NY
District published a notice of intent to prepare a Draft Environmental
Impact Statement in the December 28, 2004 issue of the Federal Register
(FR Doc. 2004-28331). In an effort to streamline work in early 2015,
the U.S. Army Corps of Engineers, New York District, consolidated
multiple parallel USACE ecosystem restoration feasibility studies into
the Hudson Raritan Estuary Ecosystem Restoration Feasibility Study
(HRE) Study.
This streamlining is consistent with the Civil Works Transformation
Initiative and Specific, Measurable, Attainable, Risk Informed, Timely
(SMART) Planning principles, and maximizes efficiencies, resources and
benefits. The other feasibility studies include:
HRE--Lower Passaic River Ecosystem Restoration Feasibility
Study;
HRE--Hackensack Meadowlands Ecosystem Restoration
Feasibility Study;
Flushing Creek and Bay Ecosystem Restoration Feasibility
Study;
Bronx River Basin Ecosystem Restoration Feasibility Study;
Jamaica Bay, Marine Park, Plumb Beach Ecosystem
Restoration Feasibility Study.
As such, a Draft EIS is no longer necessary. Each Feasibility Study
was at a different stage prior to the decision to consolidate into the
HRE Feasibility Report/Environmental Assessment (FR/EA). The planning
was conducted independently with their non-federal sponsor and resulted
in the selection of specific recommendations within each watershed.
These combined efforts resulted in the recommendations included in the
broader HRE FR/EA. The HRE FR/EA will be prepared and circulated for
review by agencies and the public. The New York District invites
participation and consultation of agencies and individuals that have
special expertise, legal jurisdiction, or interest in the preparation
of the draft environmental assessment. Comments received, including the
names and addresses of those who comment, will be considered part of
the public record for this proposal. As a result of the process, if it
is determined that the project may have significant impacts, the EIS
process will be reinitiated and a NOI published.
Peter Weppler,
Chief, Environmental Analysis Branch.
[FR Doc. 2016-28729 Filed 11-28-16; 8:45 am]
BILLING CODE 3720-58-P