Surface Transportation Project Delivery Program; TxDOT Audit #3 Report, 85303-85311 [2016-28353]
Download as PDF
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
transfer funds instantaneously, I
determine that no prior notice needs to
be provided to any person subject to this
determination who might have a
constitutional presence in the United
States, because to do so would render
ineffectual the measures authorized in
the Order.
This notice shall be published in the
Federal Register.
Dated: November 4, 2016.
John F. Kerry,
Secretary of State.
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Sixteenth Meeting of the RTCA Tactical
Operations Committee
Federal Aviation
Administration (FAA), U.S. Department
of Transportation (DOT).
ACTION: Sixteenth Meeting of the RTCA
Tactical Operations Committee.
AGENCY:
The FAA is issuing this notice
to advise the public of the Sixteenth
Meeting of the RTCA Tactical
Operations Committee.
DATES: The meeting will be held
December 13, 2016, 01:00 p.m.–03:00
p.m.
SUMMARY:
[FR Doc. 2016–28408 Filed 11–23–16; 8:45 am]
BILLING CODE 4710–AD–P
DEPARTMENT OF STATE
85303
section. Members
of the public may present a written
statement to the committee at any time.
Issued in Washington, DC on November
18, 2016.
INFORMATION CONTACT
Mohannad Dawoud,
Management & Program Analyst, Partnership
Contracts Branch, ANG–A17, NextGen,
Procurement Services Division, Federal
Aviation Administration.
[FR Doc. 2016–28286 Filed 11–23–16; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[FHWA Docket No. FHWA–2016–0025]
ADDRESS:
The meeting will be held at:
RTCA Headquarters, 1150 18th Street
NW., Suite 910, Washington, DC 20036.
[Public Notice: 9799]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
E.O. 13224 Designation of Victor
Quispe Palomino, aka Comrade Jose
as a Specially Designated Global
Terrorist
Acting under the authority of and in
accordance with section 1(b) of E.O.
13224 of September 23, 2001, as
amended by E.O. 13268 of July 2, 2002,
and E.O. 13284 of January 23, 2003, I
hereby determine that the person known
as Victor Quispe Palomino, also known
as Comrade Jose, committed, or poses a
significant risk of committing, acts of
terrorism that threaten the security of
U.S. nationals or the national security,
foreign policy, or economy of the United
States.
Consistent with the determination in
section 10 of E.O. 13224 that prior
notice to persons determined to be
subject to the Order who might have a
constitutional presence in the United
States would render ineffectual the
blocking and other measures authorized
in the Order because of the ability to
transfer funds instantaneously, I
determine that no prior notice needs to
be provided to any person subject to this
determination who might have a
constitutional presence in the United
States, because to do so would render
ineffectual the measures authorized in
the Order.
This notice shall be published in the
Federal Register.
Dated: October 31, 2016.
John F. Kerry,
Secretary of State.
[FR Doc. 2016–28401 Filed 11–23–16; 8:45 am]
BILLING CODE 4710–AD–P
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
Surface Transportation Project
Delivery Program; TxDOT Audit #3
Report
FOR FURTHER INFORMATION, CONTACT:
AGENCY:
Trin Mitra at tmitra@rtca.org or 202–
330–0655, the RTCA Secretariat, 1150
18th Street NW., Suite 910, Washington,
DC 20036, or by telephone at (202) 833–
9339, fax at (202) 833–9434, or Web site
at https://www.rtca.org.
SUPPLEMENTARY INFORMATION: Pursuant
to section 10(a)(2) of the Federal
Advisory Committee Act (Pub. L. 92–
463, 5 U.S.C., App.), notice is hereby
given for the Fifteenth Meeting of the
RTCA Tactical Operations Committee.
The agenda will include the following:
Tuesday, December 13, 2016—1:00
p.m.–3:00 p.m.
1. Opening of Meeting/Introduction of
TOC Members—Co-Chairs Dale
Wright and Bryan Quigley
2. Official Statement of Designated
Federal Official—Elizabeth Ray
3. Approval of October 27, 2016 Meeting
Summary
4. Graphical TFR Task Group—
Recommendation
5. GPS Adjacent Band Compatibility
Task Group—Ligado Proposal
Review Recommendation
6. Updates on Future TOC Tasks
7. Other Business
8. Adjourn
Attendance is open to the interested
public but limited to space availability.
Given limited space on-site, members of
the public that wish to participate
virtually can request dial-in and online
meeting information by contacting Trin
Mitra, TOC Secretary, at tmitra@
rtca.org. With the approval of the
chairman, members of the public may
present oral statements at the meeting.
Persons wishing to present statements
or obtain information should contact the
person listed in the FOR FURTHER
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice, request for comment.
The Surface Transportation
Project Delivery Program allows a State
to assume FHWA’s environmental
responsibilities for review, consultation,
and compliance for Federal highway
projects. When a State assumes these
Federal responsibilities, the State
becomes solely responsible and liable
for carrying out the responsibilities it
has assumed, in lieu of FHWA. Prior to
the Fixing America’s Surface
Transportation (FAST) Act of 2015, the
Program required semiannual audits
during each of the first 2 years of State
participation to ensure compliance by
each State participating in the Program.
This notice announces and solicits
comments on the third audit report for
the Texas Department of
Transportation’s (TxDOT) participation
in accordance to these pre-FAST Act
requirements.
DATES: Comments must be received on
or before December 27, 2016.
ADDRESSES: Mail or hand deliver
comments to Docket Management
Facility: U.S. Department of
Transportation, 1200 New Jersey
Avenue SE., Room W12–140,
Washington, DC 20590. You may also
submit comments electronically at
www.regulations.gov. All comments
should include the docket number that
appears in the heading of this
document. All comments received will
be available for examination and
copying at the above address from 9
a.m. to 5 p.m., e.t., Monday through
Friday, except Federal holidays. Those
desiring notification of receipt of
comments must include a selfSUMMARY:
E:\FR\FM\25NON1.SGM
25NON1
85304
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
addressed, stamped postcard or you
may print the acknowledgment page
that appears after submitting comments
electronically. Anyone is able to search
the electronic form of all comments in
any one of our dockets by the name of
the individual submitting the comment
(or signing the comment, if submitted
on behalf of an association, business, or
labor union). The DOT posts these
comments, without edits, including any
personal information the commenter
provides, to www.regulations.gov, as
described in the system of records
notice (DOT/ALL–14 FDMS), which can
be reviewed at www.dot.gov/privacy.
FOR FURTHER INFORMATION CONTACT: Dr.
Owen Lindauer, Office of Project
Development and Environmental
Review, (202) 366–2655,
owen.lindauer@dot.gov, or Mr. Alan
Strasser, Office of the Chief Counsel,
(202) 366–1356, alan.strasser@dot.gov,
Federal Highway Administration,
Department of Transportation, 1200
New Jersey Avenue SE., Washington,
DC 20590. Office hours are from 8:00
a.m. to 4:30 p.m., e.t., Monday through
Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this notice may
be downloaded from the specific docket
page at www.regulations.gov.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Background
The Surface Transportation Project
Delivery Program (or NEPA Assignment
Program) allows a State to assume
FHWA’s environmental responsibilities
for review, consultation, and
compliance for Federal highway
projects. This provision has been
codified at 23 U.S.C. 327. When a State
assumes these Federal responsibilities,
the State becomes solely responsible
and liable for carrying out the
responsibilities it has assumed, in lieu
of FHWA. The TxDOT published its
application for assumption under the
National Environmental Policy Act
(NEPA) Assignment Program on March
14, 2014, at Texas Register 39(11): 1992,
and made it available for public
comment for 30 days. After considering
public comments, TxDOT submitted its
application to FHWA on May 29, 2014.
The application served as the basis for
developing the Memorandum of
Understanding (MOU) that identifies the
responsibilities and obligations TxDOT
would assume. The FHWA published a
notice of the draft of the MOU in the
Federal Register on October 10, 2014, at
79 FR 61370 with a 30-day comment
period to solicit the views of the public
and Federal agencies. After the close of
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
the comment period, FHWA and TxDOT
considered comments and proceeded to
execute the MOU. Since December 16,
2014, TxDOT has assumed FHWA’s
responsibilities under NEPA and the
responsibilities for reviews under other
Federal environmental requirements.
Prior to December 4, 2015, 23 U.S.C.
327(g) required the Secretary to conduct
semiannual audits during each of the
first 2 years of State participation,
annual audits during years 3 and 4, and
monitoring each subsequent year of
State participation to ensure compliance
by each State participating in the
Program. The results of each audit were
required to be presented in the form of
an audit report and be made available
for public comment. On December 4,
2015, the President signed into law the
FAST Act, Public Law 114–94, 129 Stat.
1312 (2015). Section 1308 of the FAST
Act amended the audit provisions by
limiting the number of audits to one
audit each year during the first 4 years
of a State’s participation. However,
FHWA had already conducted the
second audit for TxDOT’s participation.
This notice announces the availability
of the report for the third audit for
TxDOT conducted prior to the FAST
Act and solicits public comment on
same.
Surface Transportation Project Delivery
Program FHWA Audit #3 of the Texas
Department of Transportation,
December 17, 2015 to June 16, 2016
corrective actions, is detailed at the end
of this report.
The FHWA Audit #3 team (team) was
formed in February 2016 and met
regularly to prepare for the on-site
portion of the audit. Prior to the on-site
visit, the team: (1) Performed reviews of
project files in TxDOT’s Environmental
Compliance Oversight System (ECOS),
(2) examined TxDOT’s responses to
FHWA’s information requests, and (3)
developed interview questions. The onsite portion of this audit, comprised of
TxDOT and other agency interviews,
was conducted on April 11–15, 2016.
The TxDOT continues to develop,
revise, and implement procedures and
processes required to carry out the
NEPA Assignment Program. Overall, the
team found continued evidence that
TxDOT is committed to establishing a
successful program. This report
summarizes the team’s assessment of
the current status of several aspects of
the NEPA Assignment Program,
including numerous successful
practices and six observations that
represent opportunities for TxDOT to
improve its program. The team
identified four non-compliance
observations that TxDOT will need to
address as corrective actions, if not
already addressed, in FHWA’s next
review or audit.
The TxDOT has continued to make
progress toward meeting the
responsibilities it has assumed in
accordance with the MOU. Through this
report, FHWA is notifying TxDOT of
several non-compliance observations
that require TxDOT to take corrective
action. By taking corrective action and
considering changes based on the
observations in this report, TxDOT
should continue to move the NEPA
Assignment Program forward
successfully.
Executive Summary
This report summarizes the findings
of FHWA’s third audit review (Audit #3)
to assess the performance by the Texas
Department of Transportation (TxDOT)
regarding its assumption of
responsibilities and obligations, as
assigned by Federal Highway
Administration (FHWA), under a
memorandum of understanding (MOU)
which took effect on December 16, 2014.
From that date, TxDOT assumed FHWA
National Environmental Policy Act
(NEPA) responsibilities assigned for the
environmental review and compliance,
and for other environmental laws
related to NEPA for highway projects in
Texas (NEPA Assignment Program). The
status of FHWA’s observations from the
second audit review (Audit #2),
including any TxDOT self-imposed
Background
The Surface Transportation Project
Delivery Program allows a State to
assume FHWA’s environmental
responsibilities for review, consultation,
and compliance for highway projects.
This Program is codified at 23 U.S.C.
327. When a State assumes these
Federal responsibilities for NEPA
project decisionmaking, the State
becomes solely responsible and liable
for carrying out these obligations in lieu
of and without further approval by
FHWA.
The State of Texas was assigned the
responsibility for making NEPA project
approvals and the responsibility for
making other related environmental
decisions for highway projects on
December 16, 2014. In enacting Texas
Transportation Code, § 201.6035, the
Authority: Section 1313 of Public Law
112–141; Section 6005 of Public Law 109–59;
Public Law 114–94; 23 U.S.C. 327; 49 CFR
1.85.
Issued on: November 17, 2016.
Gregory G. Nadeau,
Administrator, Federal Highway
Administration.
Draft
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
E:\FR\FM\25NON1.SGM
25NON1
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
asabaliauskas on DSK3SPTVN1PROD with NOTICES
State has waived its sovereign immunity
under the 11th Amendment of the U.S.
Constitution and consents to defend any
actions brought by its citizens for NEPA
decisions it has made in Federal court.
The FHWA responsibilities assigned
to TxDOT are specified in the MOU.
These responsibilities include:
Compliance with the Endangered
Species Act (ESA) Section 7
consultations with the U.S. Fish and
Wildlife Service (USFWS) and the
National Oceanic and Atmospheric
Administration’s National Marine
Fisheries Service, and Section 106
consultations with the Texas Historical
Commission (THC) regarding impacts to
historic properties. Other
responsibilities may not be assigned and
remain with FHWA. They include: (1)
Responsibility for project-level
conformity determinations under the
Clean Air Act and (2) the responsibility
for government-to-government
consultation with federally-recognized
Indian tribes. Based on 23 U.S.C.
327(a)(2)(D), any responsibility not
explicitly assigned in the MOU is
retained by FHWA.
The TxDOT’s MOU specifies that
FHWA is required to conduct six audit
reviews. These audits are part of
FHWA’s oversight responsibility for the
NEPA Assignment Program. The
reviews are to assess a State’s
compliance with the provisions of the
MOU as well as all applicable Federal
laws and policies. They also are used to
evaluate a State’s progress toward
achieving its performance measures as
specified in the MOU; to evaluate the
success of the NEPA Assignment
Program; and to inform the
administration of the findings regarding
the NEPA Assignment Program. In
December 2015, statutory changes in
Section 1308 of the Fixing America’s
Surface Transportation Act (FAST Act),
reduced the frequency of these audit
reviews to one audit per year during the
first four years of state participation in
the program.
Scope and Methodology
The overall scope of this audit review
is defined both in statute (23 U.S.C. 327)
and the MOU (Part 11). An audit
generally is defined as an official and
careful examination and verification of
accounts and records, especially of
financial accounts, by an independent
unbiased body. With regard to accounts
or financial records, audits may follow
a prescribed process or methodology,
and be conducted by ‘‘auditors’’ who
have special training in those processes
or methods. The FHWA considers this
review to meet the definition of an audit
because it is an unbiased, independent,
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
official, and careful examination and
verification of records and information
about TxDOT’s assumption of
environmental responsibilities.
Principal members of the team that
conducted this audit have completed
special training in audit processes and
methods.
The diverse composition of the team,
the process of developing the review
report, and publishing it in the Federal
Register help maintain an unbiased
review and establish the audit as an
official action taken by FHWA. The
team for Audit #3 included NEPA
subject-matter experts from the FHWA
Texas Division Office, as well as FHWA
offices in Washington, DC, Atlanta, GA,
and Tallahassee, FL. In addition to the
NEPA experts, the team included
FHWA planners, engineers, and air
quality specialists from the Texas
Division office.
Audits, as stated in the MOU (Parts
11.1.1 and 11.1.5), are the primary
mechanism used by FHWA to oversee
TxDOT’s compliance with the MOU and
ensure compliance with applicable
Federal laws and policies, evaluate
TxDOT’s progress toward achieving the
performance measures identified in the
MOU (Part 10.2), and collect
information needed for the Secretary’s
annual report to Congress. These audits
also must be designed and conducted to
evaluate TxDOT’s technical competency
and organizational capacity, adequacy
of the financial resources committed by
TxDOT to administer the
responsibilities assumed, quality
assurance/quality control process,
attainment of performance measures,
compliance with the MOU
requirements, and compliance with
applicable laws and policies in
administering the responsibilities
assumed. The four performance
measures identified in the MOU are: (1)
Compliance with NEPA and other
Federal environmental statutes and
regulations, (2) quality control and
quality assurance for NEPA decisions,
(3) relationships with agencies and the
general public, and (4) increased
efficiency, timeliness, and completion
of the NEPA process.
The scope and focus of this audit
included reviewing the processes and
procedures (i.e., toolkits) used by
TxDOT to reach and document its
independent project decisions. The
team conducted a careful examination
of highway project files in TxDOT’s
ECOS and verified information on the
TxDOT NEPA Assignment Program
through inspection of other records and
through interviews of TxDOT and other
staff. The team gathered information
that served as the basis for this audit
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
85305
from three primary sources: (1) TxDOT’s
response to a pre-audit #3 information
request, (2) a review of both a
judgmental and random sample of
project files in ECOS with approval
dates subsequent to the execution of the
MOU, and (3) interviews with TxDOT,
the USFWS, U.S. Environmental
Protection Agency (USEPA), and THC
staff. The TxDOT provided information
in response to FHWA pre-audit
questions and requests for documents.
That material covered the following six
topics: Program management,
documentation and records
management, quality assurance/quality
control, legal sufficiency review,
performance measurement, and training.
The team subdivided into working
groups that focused on considering
TxDOT’s performance according to each
of the six topics.
The intent of the review was to check
that TxDOT has the proper procedures
in place to implement the
responsibilities assumed through the
MOU, ensure that the staff is aware of
those procedures, and that staff
implements the procedures
appropriately to achieve compliance
with NEPA and other assigned
responsibilities. The review did not
evaluate the substance of projectspecific decisions or second guess those
decisions, as such decisions are the sole
responsibility of TxDOT. The team
focused on whether the procedures
TxDOT followed complied with Federal
statutes, regulation, policy, procedure,
process, guidance, and guidelines.
The team defined the timeframe for
highway project environmental
approvals subject to this third audit to
be between July 1, 2015, and January 29,
2016. The third audit intended to: (1)
Evaluate whether TxDOT’s NEPA
decisionmaking and other actions
comply with all the responsibilities it
assumed in the MOU, and (2) determine
the current status of observations in the
Audit #2 report, as well as required
corrective actions (see summary at end
of this report). The population of
environmental approvals included 1489
projects based on certified lists of NEPA
approvals reported monthly by TxDOT.
The NEPA approvals included 1423
categorical exclusion determinations
(CEs), approvals to circulate
Environmental Assessments (EAs),
findings of no significant impacts
(FONSI), re-evaluations of EAs, Section
4(f) decisions, approvals of a draft
environmental impact statement (EIS),
and records of decision (RODs). The
team drew a sample with a 95 percent
confidence interval with a 10 percent
margin of error. This sample included
93 randomly selected CE projects and
E:\FR\FM\25NON1.SGM
25NON1
85306
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
all 66 approvals that were not CEs. The
team reviewed 159 project files in this
review.
The interviews conducted by the team
focused on TxDOT’s leadership and
staff at the Environmental Affairs
Division (ENV) Headquarters in Austin
and staff in ten of TxDOT’s Districts.
The team divided into three groups to
complete the face-to-face interviews of
District staff in El Paso and Odessa;
Pharr and Yoakum; and San Angelo,
Abilene, and Brownwood. Staff from the
Wichita Falls, Atlanta, and Lufkin
Districts completed interviews via
remote tele-conference. The team
continued to use the same review form
and interview questions for Districts as
used in Audits #1 and 2. With these last
10 interviews completed, staff from all
25 TxDOT Districts were interviewed as
part of FHWA’s audits.
Overall Audit Opinion
The TxDOT continues to make
progress in the implementation of its
program that assumes FHWA’s NEPA
project-level decision authority and
other environmental responsibilities.
The team acknowledges TxDOT’s effort
to refine, and when necessary, establish
internal policies and procedures. The
team found ample evidence of TxDOT’s
continuing efforts to train staff in
clarifying the roles and responsibilities
of TxDOT staff, and in educating staff in
an effort to assure compliance with all
of the assigned responsibilities.
The team identified several noncompliant observations in this review
that TxDOT will need to address
through corrective actions. These
observations come from a review of
TxDOT procedures, project file
documentation, and interview
information. This report also identifies
several notable good practices that we
recommend be expanded upon.
Non-Compliance Observations
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Audit #3
Non-compliance observations are
instances where the team found the
TxDOT was out of compliance or
deficient with regard to a Federal
regulation, statute, guidance, policy, the
terms of the MOU, or TxDOT’s
procedures for compliance with the
NEPA process. Such observations may
also include instances where TxDOT
has failed to maintain technical
competency, adequate personnel, and/or
financial resources to carry out the
assumed responsibilities. Other noncompliance observations could suggest a
persistent failure to adequately consult,
coordinate, or take into account the
concerns of other Federal, State, tribal,
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
or local agencies with oversight,
consultation, or coordination
responsibilities. The FHWA expects
TxDOT to develop and implement
corrective actions to address all noncompliance observations. As part of
information gathered for this audit,
TxDOT has informed the team they are
still implementing some
recommendations made by FHWA on
Audit #2 to address non-compliance.
The FHWA will conduct follow up
reviews of non-compliance
observations.
The MOU (Part 3.1.1) states that
‘‘[p]ursuant to 23 U.S.C. 327(a)(2)(A), on
the Effective Date, FHWA assigns, and
TxDOT assumes, subject to the terms
and conditions set forth in 23 U.S.C. 327
and this MOU, all of the USDOT
Secretary’s responsibilities for
compliance with the National
Environmental Policy Act of 1969
(NEPA), 42 U.S.C. 4321 et seq. with
respect to the highway projects
specified under subpart 3.3. This
includes statutory provisions,
regulations, policies, and guidance
related to the implementation of NEPA
for Federal highway projects such as 23
U.S.C. 139, 40 CFR 1500–1508, DOT
Order 5610.1C, and 23 CFR 771 as
applicable.’’ Also, the performance
measure in MOU Part 10.2.1(A) for
compliance with NEPA and other
Federal environmental statutes and
regulations commits TxDOT to
maintaining documented compliance
with requirements of all applicable
statutes and regulations, as well as
procedures and processes set forth in
the MOU. The following four noncompliance observations were found by
the team based on review of TxDOT
ENV toolkit/handbook procedures,
documentation in project files, and
other sources.
Audit #3
#1
Non-Compliance Observation
Section 7 Consultation
The TxDOT has assumed the
responsibilities for compliance with the
ESA of 1973 (16 U.S.C. 1531–1544) and
developed a procedure, as part of the
TxDOT environmental toolkit, for staff
to make ESA determinations. Through
project file reviews, the team found that
TxDOT’s toolkit procedures do not
comply with the ESA requirements and
USFWS policy 1 in circumstances where
an endangered species or its habitat is
1 USFWS & NMFS 1998 Endangered Species
Consultation Handbook, Standard Operating
Procedure for Accessing USFWS Ecological
Services for Technical Assistance and Section 7
Consultations; 300.01 SOP Version 2, September
2015.
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
present. Pursuant to MOU part 3.1.1 (see
above), TxDOT’s procedures must also
be consistent with FHWA guidance and
the USFWS & NMFS 1998 Endangered
Species Consultation Handbook.
Specifically, when a species or its
habitat is present within a project’s
impact area and impact is possible, the
project file needs to show consultation
with USFWS or provide documentation
explaining how the project impacts will
have no effect on either species or their
habitat. The TxDOT needs to take action
to revise its ESA procedures when an
endangered species or its habitat is
present to make those procedures
consistent with Federal policy and
guidance. The team urges TxDOT staff
to meet with USFWS staff to discuss
how the revised procedures would
result in more a consistent set of
determinations.
In four of the five project files
reviewed, where an endangered species
or its habitat was present, TxDOT’s
procedure allowed for a professional
biologist’s judgment in making an ESA
determination of ‘‘no effect,’’ without
either supporting documentation or
consultation with USFWS. The team has
informed TxDOT of this deficiency and
TxDOT has indicated it has reviewed
similarly-made ESA determinations to
check for errors.
Audit #3
#2
Non-Compliance Observation
Noise Policy
Non-compliance observation #2
results from 11 project files where the
template letter fails to inform about the
non-eligibility for Federal-aid
participation in Type II traffic noise
abatement projects as required by 23
CFR 772.17(a)(3). Three of those same
projects did not follow TxDOT’s noise
wall policy previously approved by
FHWA. The FHWA complies with its
noise regulations (23 CFR 772) by
reviewing and approving each State’s
noise guidance and then relying on the
State to follow those procedures. For
Texas, its noise guidelines (Guidelines
for Analysis and Abatement of Roadway
Traffic Noise, 2011) represents the noise
policy reviewed and approved by
FHWA that serves as the basis for
compliance with 23 CFR 772. In 2016,
TxDOT updated its noise guidelines but
did not submit that material to FHWA
for review and approval pursuant to 23
CFR 772.7(b). Therefore, TxDOT cannot
use these guidelines as a basis for
compliance with 23 CFR 772. The team
found inconsistencies and incorrect
information in the ECOS project file of
record such as: notification to locals
with jurisdiction occurring before a
E:\FR\FM\25NON1.SGM
25NON1
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
NEPA decision was made; the date of
public knowledge improperly occurring
before the NEPA decision; and holding
a noise workshop before the public
hearing. Two of the three projects
followed the unapproved 2016 noise
policy rather than the 2011 noise policy
and were found to be non-compliant
with the 2011 policy. These noncompliant observations result from
TxDOT having two noise policies, one
that has been FHWA approved (2011)
and another more recent version that
has not been approved. If TxDOT
intends to update its 2011 noise policy,
FHWA must review and approve the
new policy before TxDOT may apply it
to projects. Until then, TxDOT needs to
take action to ensure compliance with
the 2011 policy.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Audit #3
#3
Non-Compliance Observation
Public Involvement
Non-compliance observation #3 is
based upon evidence in files for four
projects reviewed that TxDOT did not
follow its public involvement procedure
and toolkit requirements.2 The FHWA’s
regulation at 23 CFR 771.111(h)(1)
requires that each State have FHWA
approved public involvement
procedures to implement the public
involvement/public hearing
requirements in law and regulation. The
review team found that TxDOT
inconsistently applied its public
involvement procedures. Although
TxDOT has detailed public involvement
procedures in place, TxDOT staff
sometimes fails to follow those
procedures. In one project file, TxDOT
did not hold a public hearing for a
project on new alignment as required in
the State’s procedures.3 Another project
file lacked documentation of public
involvement required by the TxDOT
procedures.4
In addition, the team reviewed a
project file showing that TxDOT made
a finding of no significant impact
(FONSI) for an action described in 23
CFR 771.115(a) without evidence of a
required additional public notification.
The FHWA’s regulation at 23 CFR
771.119(h) requires public notification
to occur 30 days prior to issuing a
FONSI. The team reviewed the TxDOT
public involvement toolkit and found
no mention of the Federal requirement
for public notification under these
circumstances. The TxDOT is currently
modifying its public involvement
procedures and has requested that
2 TxDOT’s Environmental Handbook/Public
Involvement; 760.01 GUI Version 2, August 2015.
3 See id., Part 5.1.
4 See id., Part 11.
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
FHWA review and approve those
procedures pursuant to 23 CFR
771.111(h). The TxDOT needs to take
corrective action to comply with the
regulatory requirements for public
involvement consistent with either its
2015 handbook or a revised public
involvement policy that has been
reviewed and approved by FHWA.
Audit #3
#4
Non-Compliance Observation
Section 4(f)
Non-compliance observation #4
results from the review of one project
file that lacked the required
documentation for compliance with
Section 4(f) as specified in 23 CFR 774.7
and TxDOT’s Environmental Handbook/
U.S. Department of Transportation Act:
Section 4(f); 810.01 GUI Version 1 dated
May 2015. The project file lacked the
date and identity of the individual who
made a de minimis impact
determination. The TxDOT did not
follow established Section 4(f) toolkit
procedures. The TxDOT should ensure
that all required Section 4(f)
documentation is complete and
included in a project’s file.
Successful Practices and Other
Observations
This section summarizes the team’s
observations about issues or practices
that TxDOT may consider as areas to
improve. It also summarizes practices
that the team believes are successful, so
that TxDOT can consider continuing or
expanding those programs in the future.
Further information on these
observations and successful practices is
contained in the following subsections
that address these six topic areas:
Program management; documentation
and records management; quality
assurance/quality control; legal
sufficiency; performance management;
and training.
Throughout the following
subsections, the team lists nine
remaining observations that FHWA
recommends TxDOT consider in order
to make improvements. The FHWA’s
suggested implementation methods of
action include: Corrective action,
targeted training, revising procedures,
continued self-assessment, or some
other means. The team acknowledges
that, by sharing the preliminary draft
audit report with TxDOT, TxDOT has
begun the process of implementing
actions to address these observations to
improve its program prior to the
publication of this report.
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
85307
1. Program Management
Successful Practices and Observations
Over the course of interviewing all 25
Districts over the past 18 months, the
team noted that District staff welcomed
the opportunity to be responsible for
making CE approvals. Additionally,
TxDOT District staff members and
management have said in interviews
that they are more diligent with their
documentation because they know that
these approvals will be internally
assessed and the District held
accountable by the TxDOT ENV SelfAssessment Branch (SAB). District staff
indicated in interviews that the SAB
detailed reviews are highly valued
because they can learn from their
mistakes and improve. Accountability,
in part, is driving an enhanced desire
for TxDOT staff to correctly document
environmental compliance.
The team recognizes enhanced
communication among individuals in
the project development process as a
successful practice. Information gained
from interviews and materials provided
by TxDOT demonstrate improved
communication amongst Districts and
between Districts and ENV. Staff
interviewed in Rural Districts indicated
that in the past they received less
attention from ENV than Metropolitan
Districts. The team noted that ‘‘NEPA
Chats’’ (regular conference calls led by
ENV, providing a platform for Districts
to discuss complex NEPA
implementation issues) have helped
remove any perceived disparity. Urban
and Rural Districts feel more included
and a part of the conversation. The team
noted that Rural District staff developed
their own networks to keep each other
informed. District environmental and
planning staff told the team that they
take initiative and break down internal
District silos between planning, design,
construction, and maintenance. This
includes providing internal selfinitiated training across disciplines so
everyone in the District Office is aware
of TxDOT procedures to ensure that
staff follows NEPA-related processes
and either keeps projects on-schedule or
ensures that there are no surprises if
projected schedules slip. Finally, the
ENV Division Director initiated a new
approach to effective ENV-District staff
communication. The Director
established an informal three-member
advisory board with rotating
representatives from each of the
Metropolitan, Urban, and Rural
Districts. This board meets with the
Director to identify and discuss issues
and concerns that should be addressed
by ENV. This exchange and feedback
loop should prove informative, enable
E:\FR\FM\25NON1.SGM
25NON1
85308
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
the success of the NEPA Assignment
Program, and allow for any needed
changes or adaptations based on District
input.
The team noted that the Air Quality
reviewers at TxDOT ENV work
extremely well with FHWA in
processing this unassigned component
of the program. The ENV reviewers are
empowered to perform their own QA/
QC review of District-produced material
before it is sent to FHWA for approval.
Retaining and using highly skilled,
technical expertise in-house at ENV
promotes an efficient and consistent
interpretation of Federal regulations and
a successful procedure-driven process.
This ensures compliance from the outset
and should be seen as a model to be
duplicated in other areas.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Audit #3 Observation #1
The team identified one project file
that showed that the NEPA review was
incomplete despite the project
appearing on a list of projects certifying
that all environmental requirements had
been completed pursuant to the MOU
(See Part 8.2.6.). Projects that TxDOT
reports as certified may be processed to
receive Federal-aid funding from
FHWA. Through follow up
conversations with TxDOT, the team
learned that reporting this project was
an error that has since been rectified.
The team urges TxDOT to include a
quality control review step as part of its
process to ensure that only projects that
have satisfied all environmental
requirements are certified and reported
to FHWA.
2. Documentation and Records
Management
The team relied on information in
ECOS, TxDOT’s official file of record, to
evaluate project documentation and
records management practices. Many
TxDOT toolkit and handbook
procedures mention the requirement to
store official documentation in ECOS.
The ECOS is also a tool for storage and
management of information records, as
well as for disclosure within TxDOT
District Offices, between Districts and
ENV, and between TxDOT and the
public. The TxDOT staff noted that
ECOS is both adaptable and flexible.
The TxDOT must maintain and update
the ECOS operating protocols (for
consistency of use and document/data
location) and educate its users on
updates in a timely manner.
Successful Practices and Observations
A number of best practices
demonstrated by TxDOT were evident
as a result of the documentation and
records management review.
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
The team learned through interviews
that many TxDOT staff members
routinely use and are becoming
increasingly comfortable with the (still
optional) scope development tool. Some
staff indicated that they also utilized the
scope development tool to develop their
own checklists to ensure that all
environmental requirements have been
met prior to making a NEPA approval.
The team noted from interviews of
USFWS and ENV subject matter staff
that Biological Assessment (BA) and
Biological Opinion (BO) documentation
is more detailed and provides for
supportable conclusions. Specifically,
the team learned that information in the
BA was formatted so that it could be
incorporated directly into a BO, which
results in faster completion of ESA
compliance and thus reduced review
timeframes.
Audit #3
Observation #2
The team continued to find instances
in which individual project files
contained inconsistent and, in some
cases, contradictory Environmental
Permits Issues and Commitments
(EPICs) information. The TxDOT
procedures allow for documentation to
be uploaded into the documentation tab
as well as into an EPIC tab. The EPIC tab
indicates ‘‘No EPICs exist for this
project’’ as the default statement. The
ENV management stated that an
updated procedure allows for this
discrepancy. The team urges TxDOT to
develop a procedure where EPIC
information may be consistently
documented and found in ECOS.
3. Quality Assurance/Quality Control
(QA/QC)
Successful Practices and Observations
The team observed several successful
practices currently in place that align
with TxDOT’s QA/QC Control
Procedures for Environmental
Documents.
The team found evidence that
TxDOT’s approach to Quality Assurance
by SAB is functioning well as a postNEPA approval review. The team once
again heard positive feedback in District
staff interviews regarding the SAB,
noting that the SAB’s comments are
very helpful and timely. According to
TxDOT’s self-assessment report, the
SAB group reviewed 100 percent of all
CE documents in January 2016 and
reported the results to all Districts via
webinars to ensure that all District
personnel were up to date on proper
procedures and a consistent message
regarding corrective actions were
relayed to all District environmental
staff. The TxDOT also reports that there
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
was a SAB effort to train District staff in
public involvement procedures and to
provide information on the new Section
106 programmatic agreement. During
our interviews, we also learned that
close out meetings have been held for
EA projects to share lessons learned
among District, ENV, and TxDOT
subject matter expert environmental
staff. As a result of this team effort,
since Audit #1, we observed that
Districts have welcomed the
opportunity to be responsible for CE
decisions that are delegated to their
level. Additionally those Districts are
more careful with their documentation
and reviews because they know that the
TxDOT ENV SAB will internally assess
those decisions and hold them
accountable.
4. Legal Sufficiency Review
Based on the interviews and review of
documentation, the requirements for
legal sufficiency under the MOU are
being adequately fulfilled.
The level of legal expertise available
for reviews appears to be sufficient,
based on information gained from
interviews. Currently there are three
attorneys in TxDOT’s General Counsel
Division (GCD) (previously referred to
as Office of General Counsel, OGC) with
two of the attorneys having been hired
in the last six months. One of the new
attorneys has environmental law
experience (primarily in water quality
and water utilities issues) but no
highway or NEPA experience. Both new
attorneys have attended four NEPA
training courses that ENV provided (via
the FHWA Resource Center) and are
scheduled to attend two more. One of
the new attorneys was very
complimentary of the quality of the
training and its usefulness in guiding
her reviews. The GCD also has contracts
with three outside law firms on an ‘‘as
needed’’ basis and an outside contract
attorney who has provided legal
assistance on environmental issues for a
number of years to ENV.
The GCD assistance continues to be
guided by ENVs Project Delivery
Manual Sections 303.080 through
303.086. These sections provide
guidance on conducting legal
sufficiency review of FHWA-funded
projects and publishing a Notice of
Intent to prepare an EIS and a Notice of
Availability in the Federal Register.
In February 2016, TxDOT received a
notice of intent to sue by a NonGovernmental Organization for a
Federal project for which they made the
environmental decision. The TxDOT
notified the FHWA Office of the Chief
Counsel, as required by the MOU.
E:\FR\FM\25NON1.SGM
25NON1
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
Based on a report provided by GCD,
since April 2015, GCD had reviewed or
been involved in legal review for six
project actions. These included four
139(l) notices, an FEIS, and one NOI.
The ENV project managers make
requests for review of a document to the
lead attorney, who then assigns that
document for formal legal review. That
lead attorney then assigns the document
to one of the attorneys based on
workload and complexity. Attorney
comments are provided in the standard
comment response matrix back to ENV.
All comments must be satisfactorily
addressed for GCD to complete its legal
sufficiency review. The GCD does not
issue conditional legal sufficiency
determinations.
Successful Practice
Based on our discussions, GCD is very
involved with the Districts and ENV
throughout the NEPA project
development process and legal issues.
The team did note more open
communication between all GCD, ENV,
and District staff. All of the attorneys are
regular participants in the monthly ENV
NEPA Chats.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
5. Performance Measurement
As TxDOT explained in its response
to FHWA’s pre-audit #3 information
request, performance measurement
(evaluating how well TxDOT is
managing the program and determining
the value delivered for customers and
stakeholders) is a complex issue. The
TxDOT devotes a high level of effort
developing the metrics to measure
performance. Despite the challenges of
complexity and effort, TxDOT informed
the team that it uses performance
measurements to identify potential risk,
review areas needing improvement, and
recognize successful practices.
Successful Practices and Observations
The team acknowledges the utility of
TxDOT’s performance measures for
quality control and quality assurance in
its CE determinations. As explained in
their self-assessment summary report
and their response to FHWA’s pre-audit
#3 information request, TxDOT
conducted an extensive analysis of
whether project file errors were
substantive or not substantive. The team
generally found substantive errors to be
non-compliant with respect to the
validity of environmental decisions,
whereas non-substantive errors were
flaws in information that substantiated
those decisions. The TxDOT’s analysis
of these errors demonstrates that nonsubstantive errors largely affect TxDOT
efficiency in reporting and data
analysis. The TxDOT’s procedures
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
result in the identification and
correction of substantive errors. This
careful consideration of performance
regarding CE determination errors and
corrective actions demonstrates how
measurement and application of
corrective actions improved overall
performance. In addition, TxDOT is
applying this information to design
specific ECOS upgrades to eliminate
several categories of errors.
The specific consideration of errors is
just one example of what the team
learned from interviewing TxDOT’s
ENV Director and assessing TxDOT
leadership’s review measures to monitor
continuous improvement. The TxDOT’s
leadership, consultants, and District
staff all noted an improvement and a
higher consistency in the quality of
environmental decisions and
environmental documentation for CE
determinations. The TxDOT identified
issues that may require policy or
program attention. These issues are
memorialized in the self-assessment
report’s root cause analysis for
substantive and non-substantive errors.
Audit #3 Observation #3
The team considered TxDOT’s QA/QC
target measure of 95 percent of project
files determined to be complete and
accurate and TxDOT’s reported measure
of 77.7 percent. While the target of any
performance measure should be at or
close to 100 percent, FHWA
acknowledges that attaining this
measure may be extremely difficult,
especially given that the project class is
an EA or EIS. The TxDOT has analyzed
the range of errors and identified
missing or incomplete information as a
persistent problem. Given TxDOT’s
efforts to date and careful consideration
of FHWA’s observations on QA/QC,
TxDOT may consider error rates and/or
different measure(s) that demonstrate
continuous improvement.
Audit #3 Observation #4
Timeliness measures reported by
TxDOT in their recent self-assessment
summary report identify time frames for
completion of EA and EIS projects. Most
of these projects were initiated prior to
December 2014, when TxDOT was
assigned FHWA’s NEPA
responsibilities. The average time to
complete a FONSI before and after
assignment dropped from 1060 days to
686 days (eliminating an outlier project
that took 2590 days). While one expects
projects initiated and completed under
assignment to finish faster than any
previous average time frame, even
TxDOT recognizes that complex EAs
require more time to reach a FONSI than
projects with fewer impacts or
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
85309
complexities. The TxDOT’s summary
report contains too few data points to
determine trends, and there is no
control to differentiate between
‘‘complex’’ and ‘‘simple’’ EAs. The team
urges TxDOT to consider a timeliness
measure for CEs, recognizing the issues
of consistency within and among CE
actions listed in 23 CFR 771.117(c) and
23 CFR 771.117(d). Meaningful
timeliness measures should
accommodate the time TxDOT takes to
initiate and complete environmental
reviews, given that some reviews will
take less time and entail fewer tasks or
steps than others. The TxDOT could
consider ways to ‘‘control’’ for project
complexity, perhaps by stratifying their
data or by measuring the timeliness to
complete certain tasks (such as defining
purpose and need, the range of
alternatives, or the time to prepare an
Draft EIS, Final EIS, or ROD).
6. Training Program
The TxDOT has specifically designed
an environmental professional training
program for its environmental
professional staff and others. This
program was updated for 2016 and the
team learned about it through a fourpage description and share point site
information provided in TxDOT’s
response to FHWA’s pre-audit #3
information request. This information
was supplemented through interviews
with TxDOT ENV staff responsible for
the training program. This program,
FHWA was told, must satisfy
requirements in State law (Texas
Administrative Code, or TAC, title 43,
part 1, chapter 2, subchapter A, rule
§ 2.11) as well as requirements specified
in Part 12 of the MOU. Texas law
requires that TxDOT individuals be
‘‘certified’’ before they may make
environmental decisions and must
maintain ‘‘certification’’ to continue to
make decisions. It follows then that
TxDOT’s training focus is TxDOT staff’s
initial certification and continuing
certification. The MOU training
requirements establish ongoing
competency requirements for TxDOT’s
staff.
Successful Practices and Observations
The team recognizes the following
successful training practices and
observations. The team learned from an
interview that TxDOT’s new hire ‘‘onboarding’’ process is extraordinarily
responsive to delivering the ENV 207
training course. This course, which
provides a general overview of
environmental considerations in project
development, also entails practical
ECOS training in how to create a
project, use the optional scope
E:\FR\FM\25NON1.SGM
25NON1
85310
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
development tool, how to assign a task,
and how to complete a form.
Additionally, an interviewee told the
team that training updates to the ENV
207 course were continuous.
Another successful practice is to open
up the full range of TxDOT’s training
classes to enrollment by local
government and consultant staff (after
TxDOT staff has been provided an
initial opportunity to enroll). And
finally, TxDOT is archiving and
providing easy access of recordings from
all NEPA Chats/informal training
including, notes, and handouts from
those offerings/training.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Audit #3 Observation #5
The team learned through interviews
that TxDOT oversight and tracking of
environmental competency training/
competency assurance is de-centralized.
This means that individual TxDOT staff
and supervisors are responsible for
maintaining environmental
‘‘certification’’ under State law, as well
as general competencies and capabilities
to carry out MOU responsibilities (see
MOU Part 4.2.2). The team was unable
to assess the overall staff competency
and exposure to training because
information was spread across all 25
TxDOT Districts. These audit reviews
require details demonstrating that
TxDOT staff are capable, competent,
qualified, and certified (from the
perspective of TAC and the MOU) to
perform these assigned responsibilities.
Thus, TxDOT’s ability to monitor the
certification and competency status of
their qualified staff is important. The
TxDOT should consider at least an
annual assessment that compiles all the
environmental competency information
from across all Districts and ENV.
Audit #3 Observation #6
The TxDOT acknowledged in its
recent self-assessment summary report
that many of the errors it detects in
project files (both substantive and nonsubstantive) are tied to staff knowledge
and use of the ECOS program. In many
ways, TxDOT has demonstrated that
updating ECOS is the most efficient way
to head off errors and increase
consistency in TxDOT’s environmental
review process. The team learned from
interviews that the first wave of ECOS
changes will coincide with new
training. In addition to the other
recommendations made by FHWA,
TxDOT should engage its subject matter
experts, the self-assessment team, as
well as its overall policy and program
staff in crafting and delivering this
training to address the non-compliance
observations noted above. In addition,
TxDOT should take any lessons learned
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
from the corrective actions taken as a
result of this audit and incorporate them
into future training.
Status of Non-Compliance Observations
and Other Observations From Audit #2
(September 2015) and FHWA
Responses to TxDOT’s Audit #2
Comments
Audit #2 Non-Compliance
Observations
1. CE determination prior to
regulatory criteria being met—The
TxDOT indicated in its comment on the
Federal Register notice of the draft
Audit #2 report that it (1) circulated a
memo to its staff regarding conditional
clearances, (2) revised its standard
operating procedures to remove the
discussion of conditional clearances,
and (3) completed informal training on
this issue utilizing the NEPA Chats. The
TxDOT’s comment included discussion
on the timing of NEPA approvals, but
after FHWA discussed these comments
with TxDOT, TxDOT chose to withdraw
comments regarding the timing of NEPA
approvals.
2. NEPA Decision reporting—The
TxDOT reported to FHWA that it
revised its method of monthly NEPA
Approval certification reporting in an
effort to eliminate errors. The recurrence
of a reporting error in Audit #3 indicates
that under current reporting procedures,
it is still possible for TxDOT to
erroneously certify projects that are still
being processed as being complete. The
FHWA relies upon TxDOT’s
independent NEPA decision to advance
federally funded projects. If FHWA
advances a project that has been
improperly processed by TxDOT, this
may jeopardize Federal-aid
reimbursement or eligibility of Federal
funds on that project.
3. Project file records and missing
information—The TxDOT
acknowledged the concern for
incomplete project files in its comments
on Audit #2. The TxDOT states that it
has reviewed the projects under this
observation and has provided corrective
actions in the form of (1) individual
communications with staff affected, and
(2) through NEPA Chats.
Audit #2
Observations
All observations are purely for
TxDOT’s consideration only and should
not be deemed non-compliance
observations unless otherwise noted.
1. Relationships between TxDOT and
other Federal Agency staff—The TxDOT
indicated in its comments on Audit #2
that it has conducted follow up
meetings with U.S. Coast Guard staff. It
also disagrees with the characterization
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
that TxDOT’s relationship with the
Texas SHPO is ‘‘strained.’’ The FHWA
has continued to include interviews
with outside agency staff as part of this
and future reviews/audits to seek
information about relationships and to
convey information back to TxDOT. The
FHWA provides information for TxDOT
to consider in maintaining and/or
improving its working relationship with
both Federal and State regulatory
agencies. The FHWA interviews these
agencies in order to (1) provide feedback
about those relationships that TxDOT
may not otherwise hear directly and (2)
to review and assess TxDOT’s
procedures. The FHWA is also able to
observe program-level interactions
between TxDOT and other agencies and
to convey observations back to TxDOT
for consideration purposes.
2. Legacy projects and TxDOT’s ‘‘no
effect’’ determinations for ESA—The
TxDOT stated in its comments on Audit
#2 that it met with FHWA staff on this
matter and has assessed existing
procedures, rules, and policies related
to ESA consultation and reviewed
related training. The team found a
deficiency in the TxDOT procedure on
making ESA determinations as a result
of Audit #3. Since the procedure for
making ESA determinations is noncompliant, TxDOT will need to
implement a corrective action, which
will be considered as part of FHWA’s
next review or audit.
3. Consistency in TxDOT’s approach
to defining 23 CFR 771.117(e)(4) for
major traffic disruption—This TxDOT
response to the draft Audit #2 report
downplays the need for an agreed upon
standard or threshold on how to apply
the constraint in 23 CFR 771.117(e)(4)
regarding traffic disruption. The TxDOT
indicated that the decision is made by
‘‘professional judgement’’ according to
the criteria the CEQ has identified for a
determination of significant impact (i.e.,
context and intensity). However,
TxDOT’s approach does not fulfill
FHWA policy on how to set the
threshold for this constraint, stated in
the preamble to the notice of the final
rule (79 FR 60110, Oct. 6, 2014). Thus,
TxDOT should, at the minimum,
identify examples of instances of
substantial traffic disruption and
instances that do not arise to the level
of substantial disruption.
4. Addressing errors and corrections
to NEPA decisions in ECOS—This
TxDOT comment on Audit #2
acknowledges that a specific CE
determination was incorrect,
attributable to a typographical error.
Thus, TxDOT completed a new CE
determination for that project. As part of
the project file reviews for Audit #4,
E:\FR\FM\25NON1.SGM
25NON1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 227 / Friday, November 25, 2016 / Notices
FHWA proposes to engage with TxDOT
to have a shared set of expectations on
the process or procedures that addresses
various errors or omissions in TxDOT’s
NEPA decisionmaking at a programlevel, both before and after TxDOT
requests that FHWA approve Federalaid. The integrity of data in ECOS is
paramount to retaining an official file of
record for Federal-aid projects. It is
anticipated that ECOS upgrades will
also help to fully address this issue with
an improved quality control process
improvement by TxDOT.
5. Inadequate project description or
project scope—The TxDOT stated in its
comments on Audit #2 that discussions
of adequate project descriptions have
been the subject of several NEPA Chats
and will continue to be discussed as
long as this issue persists. The FHWA
and TxDOT collaborated to develop a
shared set of expectations for project
development that was presented at the
September 2015 TxDOT Environmental
Conference.
6. EPIC documentation and
decisionmaking—The TxDOT indicated
in its comment on the Audit #2 report
that TxDOT ECOS procedures allow
information to be loaded in two ways
that can be confusing for reviewers. The
TxDOT acknowledged this issue and
stated that it has established an EPIC
workgroup with the purpose of
identifying a more consistent method to
record and track EPICs. The results of
this workgroup will be incorporated
into a series of ECOS upgrades
scheduled over the next 2 years.
7. Multiple CE approval documents in
ECOS—The TxDOT stated in its
comment on Audit #2 that the project
file for this observation contained a
typographical error that made the initial
CE determination incorrect. The TxDOT
then made a new CE determination.
Having a shared set of expectations (see
number 4, above) between TxDOT and
FHWA on how to address errors and
omissions should improve both the
program and the review process.
8. Multiple reevaluations of a NEPA
approval—The TxDOT indicated in its
comment on Audit #2 that the multiple
reevaluations resulted from a designbuild project, where changes may occur
often. The TxDOT prefers to respond to
changes within a set time frame to keep
the project moving especially on designbuild projects. Reevaluations must look
at the entire project. This situation will
also be considered as part of the shared
set of FHWA-TxDOT expectations on
how to handle project changes.
9. ECOS upgrades schedule too
slow—This TxDOT response to Audit #2
disagreed that the pace of ECOS
upgrades might increase litigation risk.
VerDate Sep<11>2014
18:57 Nov 23, 2016
Jkt 241001
Based on information from Audit #3
interviews, this observation is tied to
TxDOT’s commitment of resources to
assume responsibilities under the MOU
(Part 4.2). This was presented as a
continued observation from previous
audits and is restated to draw TxDOT’s
attention to an identified problem. This
observation is not a statement of noncompliance, although it could lead to a
non-compliance observation in the
future. As ECOS is the official file of
record, FHWA is concerned that TxDOT
has not improved ECOS quickly enough.
The TxDOT should consider making
database updates more timely and
related procedures mandatory in
relation to documentation storage
within ECOS.
10. Difficulty locating information in
project files—This TxDOT comment on
Audit #2 states that it formed a
workgroup in the summer of 2015 for
the purpose of developing statewide
guidance regarding filing and naming
conventions in ECOS. The TxDOT
Districts themselves had issues locating
documentation within their own ECOS
project files during site visits in Audit
#2. The team continued to have
difficulty (and ENV management and
staff also confirmed the same difficulty)
finding key project documentation for
this audit, especially for large and
complex projects. The FHWA looks
forward to reviewing the
recommendations of this workgroup and
assessing any changes as part of a future
review or audit.
11. Evidence of recurring NonCompliance Observations related to QA
and QC application to individual
projects—This TxDOT comment on
Audit #2 commits to making project
specific comments in SAB feedback
reports available for Audit #3. These
reports were made available and the
TxDOT self-assessment report included
an extensive analysis of QC outcomes
for CE project reviews. The QC is still
an issue prior to NEPA decisions being
finalized for larger scale CEs as well as
for EAs and EISs.
12. Expectation for the timeframe
necessary for a legal review—This
TxDOT comment on Audit #2 commits
to revising the standard operating
procedure to establish an expected
review time for the TxDOT’s Office of
General Counsel (OGC) (now General
Counsel Division—GCD) to conduct a
legal sufficiency review. As
recommended during Audit #2, OGC
has issued a procedure establishing
legal review times for FEIS (30 days)
and for NOI and 139(l) documents (3
days). If necessary, OGC can request
additional time for the review.
PO 00000
Frm 00108
Fmt 4703
Sfmt 9990
85311
13. Measure for the TxDOT
relationship with the public—The
TxDOT continued to report the number
of complaints received year-to-year as
its performance measure for its
relationship with the public. None were
received, and the measure reported was
unchanged from the prior selfassessment summary report. The team
learned from interviews that it is
possible that the public may not
distinguish between performance preand post-assignment. The team was told
that TxDOT is still getting feedback
from the public and agencies and plans
to include the measures into a
continuous improvement process. The
TxDOT also noted, in its Federal
Register comment on the draft Audit #2
report, that (1) assessing change in
communication with the general public
is inherently difficult, (2) NEPA
assignment presents little external
differentiation to the general public, and
(3) finding success in measuring this
variable has proven difficult.
14. Implement ways to train local
government staff—The TxDOT’s
Environmental Professional Training
Program is described in a four-page
report provided to the team as part of
TxDOT’s pre-audit information request
response. That report identifies a series
of workshops and training events jointly
held with Texas Historical Commission
staff. The team learned through
interviews and the training program
report that TxDOT has established an
ENV training SharePoint site that is
accessible to the public for local
government staff to register for training
at no cost.
Next Steps
The FHWA provided a preliminary
draft audit report to TxDOT for a 14-day
review and comment period. The team
has considered TxDOT comments in
developing this draft Audit #3 report.
As the next step, FHWA will publish a
notice in the Federal Register to make
it available to the public for a 30-day
comment period review [23 U.S.C.
327(g)]. No later than 60 days after the
close of the comment period, FHWA
will respond to all comments submitted
in finalizing this draft audit report
[pursuant to 23 U.S.C. 327(g)(2)(B)].
Once finalized, the audit report will be
published in the Federal Register.
[FR Doc. 2016–28353 Filed 11–23–16; 8:45 am]
BILLING CODE 4910–22–P
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 81, Number 227 (Friday, November 25, 2016)]
[Notices]
[Pages 85303-85311]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-28353]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[FHWA Docket No. FHWA-2016-0025]
Surface Transportation Project Delivery Program; TxDOT Audit #3
Report
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice, request for comment.
-----------------------------------------------------------------------
SUMMARY: The Surface Transportation Project Delivery Program allows a
State to assume FHWA's environmental responsibilities for review,
consultation, and compliance for Federal highway projects. When a State
assumes these Federal responsibilities, the State becomes solely
responsible and liable for carrying out the responsibilities it has
assumed, in lieu of FHWA. Prior to the Fixing America's Surface
Transportation (FAST) Act of 2015, the Program required semiannual
audits during each of the first 2 years of State participation to
ensure compliance by each State participating in the Program. This
notice announces and solicits comments on the third audit report for
the Texas Department of Transportation's (TxDOT) participation in
accordance to these pre-FAST Act requirements.
DATES: Comments must be received on or before December 27, 2016.
ADDRESSES: Mail or hand deliver comments to Docket Management Facility:
U.S. Department of Transportation, 1200 New Jersey Avenue SE., Room
W12-140, Washington, DC 20590. You may also submit comments
electronically at www.regulations.gov. All comments should include the
docket number that appears in the heading of this document. All
comments received will be available for examination and copying at the
above address from 9 a.m. to 5 p.m., e.t., Monday through Friday,
except Federal holidays. Those desiring notification of receipt of
comments must include a self-
[[Page 85304]]
addressed, stamped postcard or you may print the acknowledgment page
that appears after submitting comments electronically. Anyone is able
to search the electronic form of all comments in any one of our dockets
by the name of the individual submitting the comment (or signing the
comment, if submitted on behalf of an association, business, or labor
union). The DOT posts these comments, without edits, including any
personal information the commenter provides, to www.regulations.gov, as
described in the system of records notice (DOT/ALL-14 FDMS), which can
be reviewed at www.dot.gov/privacy.
FOR FURTHER INFORMATION CONTACT: Dr. Owen Lindauer, Office of Project
Development and Environmental Review, (202) 366-2655,
owen.lindauer@dot.gov, or Mr. Alan Strasser, Office of the Chief
Counsel, (202) 366-1356, alan.strasser@dot.gov, Federal Highway
Administration, Department of Transportation, 1200 New Jersey Avenue
SE., Washington, DC 20590. Office hours are from 8:00 a.m. to 4:30
p.m., e.t., Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this notice may be downloaded from the
specific docket page at www.regulations.gov.
Background
The Surface Transportation Project Delivery Program (or NEPA
Assignment Program) allows a State to assume FHWA's environmental
responsibilities for review, consultation, and compliance for Federal
highway projects. This provision has been codified at 23 U.S.C. 327.
When a State assumes these Federal responsibilities, the State becomes
solely responsible and liable for carrying out the responsibilities it
has assumed, in lieu of FHWA. The TxDOT published its application for
assumption under the National Environmental Policy Act (NEPA)
Assignment Program on March 14, 2014, at Texas Register 39(11): 1992,
and made it available for public comment for 30 days. After considering
public comments, TxDOT submitted its application to FHWA on May 29,
2014. The application served as the basis for developing the Memorandum
of Understanding (MOU) that identifies the responsibilities and
obligations TxDOT would assume. The FHWA published a notice of the
draft of the MOU in the Federal Register on October 10, 2014, at 79 FR
61370 with a 30-day comment period to solicit the views of the public
and Federal agencies. After the close of the comment period, FHWA and
TxDOT considered comments and proceeded to execute the MOU. Since
December 16, 2014, TxDOT has assumed FHWA's responsibilities under NEPA
and the responsibilities for reviews under other Federal environmental
requirements.
Prior to December 4, 2015, 23 U.S.C. 327(g) required the Secretary
to conduct semiannual audits during each of the first 2 years of State
participation, annual audits during years 3 and 4, and monitoring each
subsequent year of State participation to ensure compliance by each
State participating in the Program. The results of each audit were
required to be presented in the form of an audit report and be made
available for public comment. On December 4, 2015, the President signed
into law the FAST Act, Public Law 114-94, 129 Stat. 1312 (2015).
Section 1308 of the FAST Act amended the audit provisions by limiting
the number of audits to one audit each year during the first 4 years of
a State's participation. However, FHWA had already conducted the second
audit for TxDOT's participation. This notice announces the availability
of the report for the third audit for TxDOT conducted prior to the FAST
Act and solicits public comment on same.
Authority: Section 1313 of Public Law 112-141; Section 6005 of
Public Law 109-59; Public Law 114-94; 23 U.S.C. 327; 49 CFR 1.85.
Issued on: November 17, 2016.
Gregory G. Nadeau,
Administrator, Federal Highway Administration.
Draft
Surface Transportation Project Delivery Program FHWA Audit #3 of the
Texas Department of Transportation, December 17, 2015 to June 16, 2016
Executive Summary
This report summarizes the findings of FHWA's third audit review
(Audit #3) to assess the performance by the Texas Department of
Transportation (TxDOT) regarding its assumption of responsibilities and
obligations, as assigned by Federal Highway Administration (FHWA),
under a memorandum of understanding (MOU) which took effect on December
16, 2014. From that date, TxDOT assumed FHWA National Environmental
Policy Act (NEPA) responsibilities assigned for the environmental
review and compliance, and for other environmental laws related to NEPA
for highway projects in Texas (NEPA Assignment Program). The status of
FHWA's observations from the second audit review (Audit #2), including
any TxDOT self-imposed corrective actions, is detailed at the end of
this report.
The FHWA Audit #3 team (team) was formed in February 2016 and met
regularly to prepare for the on-site portion of the audit. Prior to the
on-site visit, the team: (1) Performed reviews of project files in
TxDOT's Environmental Compliance Oversight System (ECOS), (2) examined
TxDOT's responses to FHWA's information requests, and (3) developed
interview questions. The on-site portion of this audit, comprised of
TxDOT and other agency interviews, was conducted on April 11-15, 2016.
The TxDOT continues to develop, revise, and implement procedures
and processes required to carry out the NEPA Assignment Program.
Overall, the team found continued evidence that TxDOT is committed to
establishing a successful program. This report summarizes the team's
assessment of the current status of several aspects of the NEPA
Assignment Program, including numerous successful practices and six
observations that represent opportunities for TxDOT to improve its
program. The team identified four non-compliance observations that
TxDOT will need to address as corrective actions, if not already
addressed, in FHWA's next review or audit.
The TxDOT has continued to make progress toward meeting the
responsibilities it has assumed in accordance with the MOU. Through
this report, FHWA is notifying TxDOT of several non-compliance
observations that require TxDOT to take corrective action. By taking
corrective action and considering changes based on the observations in
this report, TxDOT should continue to move the NEPA Assignment Program
forward successfully.
Background
The Surface Transportation Project Delivery Program allows a State
to assume FHWA's environmental responsibilities for review,
consultation, and compliance for highway projects. This Program is
codified at 23 U.S.C. 327. When a State assumes these Federal
responsibilities for NEPA project decisionmaking, the State becomes
solely responsible and liable for carrying out these obligations in
lieu of and without further approval by FHWA.
The State of Texas was assigned the responsibility for making NEPA
project approvals and the responsibility for making other related
environmental decisions for highway projects on December 16, 2014. In
enacting Texas Transportation Code, Sec. 201.6035, the
[[Page 85305]]
State has waived its sovereign immunity under the 11th Amendment of the
U.S. Constitution and consents to defend any actions brought by its
citizens for NEPA decisions it has made in Federal court.
The FHWA responsibilities assigned to TxDOT are specified in the
MOU. These responsibilities include: Compliance with the Endangered
Species Act (ESA) Section 7 consultations with the U.S. Fish and
Wildlife Service (USFWS) and the National Oceanic and Atmospheric
Administration's National Marine Fisheries Service, and Section 106
consultations with the Texas Historical Commission (THC) regarding
impacts to historic properties. Other responsibilities may not be
assigned and remain with FHWA. They include: (1) Responsibility for
project-level conformity determinations under the Clean Air Act and (2)
the responsibility for government-to-government consultation with
federally-recognized Indian tribes. Based on 23 U.S.C. 327(a)(2)(D),
any responsibility not explicitly assigned in the MOU is retained by
FHWA.
The TxDOT's MOU specifies that FHWA is required to conduct six
audit reviews. These audits are part of FHWA's oversight responsibility
for the NEPA Assignment Program. The reviews are to assess a State's
compliance with the provisions of the MOU as well as all applicable
Federal laws and policies. They also are used to evaluate a State's
progress toward achieving its performance measures as specified in the
MOU; to evaluate the success of the NEPA Assignment Program; and to
inform the administration of the findings regarding the NEPA Assignment
Program. In December 2015, statutory changes in Section 1308 of the
Fixing America's Surface Transportation Act (FAST Act), reduced the
frequency of these audit reviews to one audit per year during the first
four years of state participation in the program.
Scope and Methodology
The overall scope of this audit review is defined both in statute
(23 U.S.C. 327) and the MOU (Part 11). An audit generally is defined as
an official and careful examination and verification of accounts and
records, especially of financial accounts, by an independent unbiased
body. With regard to accounts or financial records, audits may follow a
prescribed process or methodology, and be conducted by ``auditors'' who
have special training in those processes or methods. The FHWA considers
this review to meet the definition of an audit because it is an
unbiased, independent, official, and careful examination and
verification of records and information about TxDOT's assumption of
environmental responsibilities. Principal members of the team that
conducted this audit have completed special training in audit processes
and methods.
The diverse composition of the team, the process of developing the
review report, and publishing it in the Federal Register help maintain
an unbiased review and establish the audit as an official action taken
by FHWA. The team for Audit #3 included NEPA subject-matter experts
from the FHWA Texas Division Office, as well as FHWA offices in
Washington, DC, Atlanta, GA, and Tallahassee, FL. In addition to the
NEPA experts, the team included FHWA planners, engineers, and air
quality specialists from the Texas Division office.
Audits, as stated in the MOU (Parts 11.1.1 and 11.1.5), are the
primary mechanism used by FHWA to oversee TxDOT's compliance with the
MOU and ensure compliance with applicable Federal laws and policies,
evaluate TxDOT's progress toward achieving the performance measures
identified in the MOU (Part 10.2), and collect information needed for
the Secretary's annual report to Congress. These audits also must be
designed and conducted to evaluate TxDOT's technical competency and
organizational capacity, adequacy of the financial resources committed
by TxDOT to administer the responsibilities assumed, quality assurance/
quality control process, attainment of performance measures, compliance
with the MOU requirements, and compliance with applicable laws and
policies in administering the responsibilities assumed. The four
performance measures identified in the MOU are: (1) Compliance with
NEPA and other Federal environmental statutes and regulations, (2)
quality control and quality assurance for NEPA decisions, (3)
relationships with agencies and the general public, and (4) increased
efficiency, timeliness, and completion of the NEPA process.
The scope and focus of this audit included reviewing the processes
and procedures (i.e., toolkits) used by TxDOT to reach and document its
independent project decisions. The team conducted a careful examination
of highway project files in TxDOT's ECOS and verified information on
the TxDOT NEPA Assignment Program through inspection of other records
and through interviews of TxDOT and other staff. The team gathered
information that served as the basis for this audit from three primary
sources: (1) TxDOT's response to a pre-audit #3 information request,
(2) a review of both a judgmental and random sample of project files in
ECOS with approval dates subsequent to the execution of the MOU, and
(3) interviews with TxDOT, the USFWS, U.S. Environmental Protection
Agency (USEPA), and THC staff. The TxDOT provided information in
response to FHWA pre-audit questions and requests for documents. That
material covered the following six topics: Program management,
documentation and records management, quality assurance/quality
control, legal sufficiency review, performance measurement, and
training. The team subdivided into working groups that focused on
considering TxDOT's performance according to each of the six topics.
The intent of the review was to check that TxDOT has the proper
procedures in place to implement the responsibilities assumed through
the MOU, ensure that the staff is aware of those procedures, and that
staff implements the procedures appropriately to achieve compliance
with NEPA and other assigned responsibilities. The review did not
evaluate the substance of project-specific decisions or second guess
those decisions, as such decisions are the sole responsibility of
TxDOT. The team focused on whether the procedures TxDOT followed
complied with Federal statutes, regulation, policy, procedure, process,
guidance, and guidelines.
The team defined the timeframe for highway project environmental
approvals subject to this third audit to be between July 1, 2015, and
January 29, 2016. The third audit intended to: (1) Evaluate whether
TxDOT's NEPA decisionmaking and other actions comply with all the
responsibilities it assumed in the MOU, and (2) determine the current
status of observations in the Audit #2 report, as well as required
corrective actions (see summary at end of this report). The population
of environmental approvals included 1489 projects based on certified
lists of NEPA approvals reported monthly by TxDOT. The NEPA approvals
included 1423 categorical exclusion determinations (CEs), approvals to
circulate Environmental Assessments (EAs), findings of no significant
impacts (FONSI), re-evaluations of EAs, Section 4(f) decisions,
approvals of a draft environmental impact statement (EIS), and records
of decision (RODs). The team drew a sample with a 95 percent confidence
interval with a 10 percent margin of error. This sample included 93
randomly selected CE projects and
[[Page 85306]]
all 66 approvals that were not CEs. The team reviewed 159 project files
in this review.
The interviews conducted by the team focused on TxDOT's leadership
and staff at the Environmental Affairs Division (ENV) Headquarters in
Austin and staff in ten of TxDOT's Districts. The team divided into
three groups to complete the face-to-face interviews of District staff
in El Paso and Odessa; Pharr and Yoakum; and San Angelo, Abilene, and
Brownwood. Staff from the Wichita Falls, Atlanta, and Lufkin Districts
completed interviews via remote tele-conference. The team continued to
use the same review form and interview questions for Districts as used
in Audits #1 and 2. With these last 10 interviews completed, staff from
all 25 TxDOT Districts were interviewed as part of FHWA's audits.
Overall Audit Opinion
The TxDOT continues to make progress in the implementation of its
program that assumes FHWA's NEPA project-level decision authority and
other environmental responsibilities. The team acknowledges TxDOT's
effort to refine, and when necessary, establish internal policies and
procedures. The team found ample evidence of TxDOT's continuing efforts
to train staff in clarifying the roles and responsibilities of TxDOT
staff, and in educating staff in an effort to assure compliance with
all of the assigned responsibilities.
The team identified several non-compliant observations in this
review that TxDOT will need to address through corrective actions.
These observations come from a review of TxDOT procedures, project file
documentation, and interview information. This report also identifies
several notable good practices that we recommend be expanded upon.
Non-Compliance Observations
Audit #3
Non-compliance observations are instances where the team found the
TxDOT was out of compliance or deficient with regard to a Federal
regulation, statute, guidance, policy, the terms of the MOU, or TxDOT's
procedures for compliance with the NEPA process. Such observations may
also include instances where TxDOT has failed to maintain technical
competency, adequate personnel, and/or financial resources to carry out
the assumed responsibilities. Other non-compliance observations could
suggest a persistent failure to adequately consult, coordinate, or take
into account the concerns of other Federal, State, tribal, or local
agencies with oversight, consultation, or coordination
responsibilities. The FHWA expects TxDOT to develop and implement
corrective actions to address all non-compliance observations. As part
of information gathered for this audit, TxDOT has informed the team
they are still implementing some recommendations made by FHWA on Audit
#2 to address non-compliance. The FHWA will conduct follow up reviews
of non-compliance observations.
The MOU (Part 3.1.1) states that ``[p]ursuant to 23 U.S.C.
327(a)(2)(A), on the Effective Date, FHWA assigns, and TxDOT assumes,
subject to the terms and conditions set forth in 23 U.S.C. 327 and this
MOU, all of the USDOT Secretary's responsibilities for compliance with
the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C. 4321 et
seq. with respect to the highway projects specified under subpart 3.3.
This includes statutory provisions, regulations, policies, and guidance
related to the implementation of NEPA for Federal highway projects such
as 23 U.S.C. 139, 40 CFR 1500-1508, DOT Order 5610.1C, and 23 CFR 771
as applicable.'' Also, the performance measure in MOU Part 10.2.1(A)
for compliance with NEPA and other Federal environmental statutes and
regulations commits TxDOT to maintaining documented compliance with
requirements of all applicable statutes and regulations, as well as
procedures and processes set forth in the MOU. The following four non-
compliance observations were found by the team based on review of TxDOT
ENV toolkit/handbook procedures, documentation in project files, and
other sources.
Audit #3 Non-Compliance Observation #1
Section 7 Consultation
The TxDOT has assumed the responsibilities for compliance with the
ESA of 1973 (16 U.S.C. 1531-1544) and developed a procedure, as part of
the TxDOT environmental toolkit, for staff to make ESA determinations.
Through project file reviews, the team found that TxDOT's toolkit
procedures do not comply with the ESA requirements and USFWS policy \1\
in circumstances where an endangered species or its habitat is present.
Pursuant to MOU part 3.1.1 (see above), TxDOT's procedures must also be
consistent with FHWA guidance and the USFWS & NMFS 1998 Endangered
Species Consultation Handbook. Specifically, when a species or its
habitat is present within a project's impact area and impact is
possible, the project file needs to show consultation with USFWS or
provide documentation explaining how the project impacts will have no
effect on either species or their habitat. The TxDOT needs to take
action to revise its ESA procedures when an endangered species or its
habitat is present to make those procedures consistent with Federal
policy and guidance. The team urges TxDOT staff to meet with USFWS
staff to discuss how the revised procedures would result in more a
consistent set of determinations.
---------------------------------------------------------------------------
\1\ USFWS & NMFS 1998 Endangered Species Consultation Handbook,
Standard Operating Procedure for Accessing USFWS Ecological Services
for Technical Assistance and Section 7 Consultations; 300.01 SOP
Version 2, September 2015.
---------------------------------------------------------------------------
In four of the five project files reviewed, where an endangered
species or its habitat was present, TxDOT's procedure allowed for a
professional biologist's judgment in making an ESA determination of
``no effect,'' without either supporting documentation or consultation
with USFWS. The team has informed TxDOT of this deficiency and TxDOT
has indicated it has reviewed similarly-made ESA determinations to
check for errors.
Audit #3 Non-Compliance Observation #2
Noise Policy
Non-compliance observation #2 results from 11 project files where
the template letter fails to inform about the non-eligibility for
Federal-aid participation in Type II traffic noise abatement projects
as required by 23 CFR 772.17(a)(3). Three of those same projects did
not follow TxDOT's noise wall policy previously approved by FHWA. The
FHWA complies with its noise regulations (23 CFR 772) by reviewing and
approving each State's noise guidance and then relying on the State to
follow those procedures. For Texas, its noise guidelines (Guidelines
for Analysis and Abatement of Roadway Traffic Noise, 2011) represents
the noise policy reviewed and approved by FHWA that serves as the basis
for compliance with 23 CFR 772. In 2016, TxDOT updated its noise
guidelines but did not submit that material to FHWA for review and
approval pursuant to 23 CFR 772.7(b). Therefore, TxDOT cannot use these
guidelines as a basis for compliance with 23 CFR 772. The team found
inconsistencies and incorrect information in the ECOS project file of
record such as: notification to locals with jurisdiction occurring
before a
[[Page 85307]]
NEPA decision was made; the date of public knowledge improperly
occurring before the NEPA decision; and holding a noise workshop before
the public hearing. Two of the three projects followed the unapproved
2016 noise policy rather than the 2011 noise policy and were found to
be non-compliant with the 2011 policy. These non-compliant observations
result from TxDOT having two noise policies, one that has been FHWA
approved (2011) and another more recent version that has not been
approved. If TxDOT intends to update its 2011 noise policy, FHWA must
review and approve the new policy before TxDOT may apply it to
projects. Until then, TxDOT needs to take action to ensure compliance
with the 2011 policy.
Audit #3 Non-Compliance Observation #3
Public Involvement
Non-compliance observation #3 is based upon evidence in files for
four projects reviewed that TxDOT did not follow its public involvement
procedure and toolkit requirements.\2\ The FHWA's regulation at 23 CFR
771.111(h)(1) requires that each State have FHWA approved public
involvement procedures to implement the public involvement/public
hearing requirements in law and regulation. The review team found that
TxDOT inconsistently applied its public involvement procedures.
Although TxDOT has detailed public involvement procedures in place,
TxDOT staff sometimes fails to follow those procedures. In one project
file, TxDOT did not hold a public hearing for a project on new
alignment as required in the State's procedures.\3\ Another project
file lacked documentation of public involvement required by the TxDOT
procedures.\4\
---------------------------------------------------------------------------
\2\ TxDOT's Environmental Handbook/Public Involvement; 760.01
GUI Version 2, August 2015.
\3\ See id., Part 5.1.
\4\ See id., Part 11.
---------------------------------------------------------------------------
In addition, the team reviewed a project file showing that TxDOT
made a finding of no significant impact (FONSI) for an action described
in 23 CFR 771.115(a) without evidence of a required additional public
notification. The FHWA's regulation at 23 CFR 771.119(h) requires
public notification to occur 30 days prior to issuing a FONSI. The team
reviewed the TxDOT public involvement toolkit and found no mention of
the Federal requirement for public notification under these
circumstances. The TxDOT is currently modifying its public involvement
procedures and has requested that FHWA review and approve those
procedures pursuant to 23 CFR 771.111(h). The TxDOT needs to take
corrective action to comply with the regulatory requirements for public
involvement consistent with either its 2015 handbook or a revised
public involvement policy that has been reviewed and approved by FHWA.
Audit #3 Non-Compliance Observation #4
Section 4(f)
Non-compliance observation #4 results from the review of one
project file that lacked the required documentation for compliance with
Section 4(f) as specified in 23 CFR 774.7 and TxDOT's Environmental
Handbook/U.S. Department of Transportation Act: Section 4(f); 810.01
GUI Version 1 dated May 2015. The project file lacked the date and
identity of the individual who made a de minimis impact determination.
The TxDOT did not follow established Section 4(f) toolkit procedures.
The TxDOT should ensure that all required Section 4(f) documentation is
complete and included in a project's file.
Successful Practices and Other Observations
This section summarizes the team's observations about issues or
practices that TxDOT may consider as areas to improve. It also
summarizes practices that the team believes are successful, so that
TxDOT can consider continuing or expanding those programs in the
future. Further information on these observations and successful
practices is contained in the following subsections that address these
six topic areas: Program management; documentation and records
management; quality assurance/quality control; legal sufficiency;
performance management; and training.
Throughout the following subsections, the team lists nine remaining
observations that FHWA recommends TxDOT consider in order to make
improvements. The FHWA's suggested implementation methods of action
include: Corrective action, targeted training, revising procedures,
continued self-assessment, or some other means. The team acknowledges
that, by sharing the preliminary draft audit report with TxDOT, TxDOT
has begun the process of implementing actions to address these
observations to improve its program prior to the publication of this
report.
1. Program Management
Successful Practices and Observations
Over the course of interviewing all 25 Districts over the past 18
months, the team noted that District staff welcomed the opportunity to
be responsible for making CE approvals. Additionally, TxDOT District
staff members and management have said in interviews that they are more
diligent with their documentation because they know that these
approvals will be internally assessed and the District held accountable
by the TxDOT ENV Self-Assessment Branch (SAB). District staff indicated
in interviews that the SAB detailed reviews are highly valued because
they can learn from their mistakes and improve. Accountability, in
part, is driving an enhanced desire for TxDOT staff to correctly
document environmental compliance.
The team recognizes enhanced communication among individuals in the
project development process as a successful practice. Information
gained from interviews and materials provided by TxDOT demonstrate
improved communication amongst Districts and between Districts and ENV.
Staff interviewed in Rural Districts indicated that in the past they
received less attention from ENV than Metropolitan Districts. The team
noted that ``NEPA Chats'' (regular conference calls led by ENV,
providing a platform for Districts to discuss complex NEPA
implementation issues) have helped remove any perceived disparity.
Urban and Rural Districts feel more included and a part of the
conversation. The team noted that Rural District staff developed their
own networks to keep each other informed. District environmental and
planning staff told the team that they take initiative and break down
internal District silos between planning, design, construction, and
maintenance. This includes providing internal self-initiated training
across disciplines so everyone in the District Office is aware of TxDOT
procedures to ensure that staff follows NEPA-related processes and
either keeps projects on-schedule or ensures that there are no
surprises if projected schedules slip. Finally, the ENV Division
Director initiated a new approach to effective ENV-District staff
communication. The Director established an informal three-member
advisory board with rotating representatives from each of the
Metropolitan, Urban, and Rural Districts. This board meets with the
Director to identify and discuss issues and concerns that should be
addressed by ENV. This exchange and feedback loop should prove
informative, enable
[[Page 85308]]
the success of the NEPA Assignment Program, and allow for any needed
changes or adaptations based on District input.
The team noted that the Air Quality reviewers at TxDOT ENV work
extremely well with FHWA in processing this unassigned component of the
program. The ENV reviewers are empowered to perform their own QA/QC
review of District-produced material before it is sent to FHWA for
approval. Retaining and using highly skilled, technical expertise in-
house at ENV promotes an efficient and consistent interpretation of
Federal regulations and a successful procedure-driven process. This
ensures compliance from the outset and should be seen as a model to be
duplicated in other areas.
Audit #3 Observation #1
The team identified one project file that showed that the NEPA
review was incomplete despite the project appearing on a list of
projects certifying that all environmental requirements had been
completed pursuant to the MOU (See Part 8.2.6.). Projects that TxDOT
reports as certified may be processed to receive Federal-aid funding
from FHWA. Through follow up conversations with TxDOT, the team learned
that reporting this project was an error that has since been rectified.
The team urges TxDOT to include a quality control review step as part
of its process to ensure that only projects that have satisfied all
environmental requirements are certified and reported to FHWA.
2. Documentation and Records Management
The team relied on information in ECOS, TxDOT's official file of
record, to evaluate project documentation and records management
practices. Many TxDOT toolkit and handbook procedures mention the
requirement to store official documentation in ECOS. The ECOS is also a
tool for storage and management of information records, as well as for
disclosure within TxDOT District Offices, between Districts and ENV,
and between TxDOT and the public. The TxDOT staff noted that ECOS is
both adaptable and flexible. The TxDOT must maintain and update the
ECOS operating protocols (for consistency of use and document/data
location) and educate its users on updates in a timely manner.
Successful Practices and Observations
A number of best practices demonstrated by TxDOT were evident as a
result of the documentation and records management review.
The team learned through interviews that many TxDOT staff members
routinely use and are becoming increasingly comfortable with the (still
optional) scope development tool. Some staff indicated that they also
utilized the scope development tool to develop their own checklists to
ensure that all environmental requirements have been met prior to
making a NEPA approval.
The team noted from interviews of USFWS and ENV subject matter
staff that Biological Assessment (BA) and Biological Opinion (BO)
documentation is more detailed and provides for supportable
conclusions. Specifically, the team learned that information in the BA
was formatted so that it could be incorporated directly into a BO,
which results in faster completion of ESA compliance and thus reduced
review timeframes.
Audit #3 Observation #2
The team continued to find instances in which individual project
files contained inconsistent and, in some cases, contradictory
Environmental Permits Issues and Commitments (EPICs) information. The
TxDOT procedures allow for documentation to be uploaded into the
documentation tab as well as into an EPIC tab. The EPIC tab indicates
``No EPICs exist for this project'' as the default statement. The ENV
management stated that an updated procedure allows for this
discrepancy. The team urges TxDOT to develop a procedure where EPIC
information may be consistently documented and found in ECOS.
3. Quality Assurance/Quality Control (QA/QC)
Successful Practices and Observations
The team observed several successful practices currently in place
that align with TxDOT's QA/QC Control Procedures for Environmental
Documents.
The team found evidence that TxDOT's approach to Quality Assurance
by SAB is functioning well as a post-NEPA approval review. The team
once again heard positive feedback in District staff interviews
regarding the SAB, noting that the SAB's comments are very helpful and
timely. According to TxDOT's self-assessment report, the SAB group
reviewed 100 percent of all CE documents in January 2016 and reported
the results to all Districts via webinars to ensure that all District
personnel were up to date on proper procedures and a consistent message
regarding corrective actions were relayed to all District environmental
staff. The TxDOT also reports that there was a SAB effort to train
District staff in public involvement procedures and to provide
information on the new Section 106 programmatic agreement. During our
interviews, we also learned that close out meetings have been held for
EA projects to share lessons learned among District, ENV, and TxDOT
subject matter expert environmental staff. As a result of this team
effort, since Audit #1, we observed that Districts have welcomed the
opportunity to be responsible for CE decisions that are delegated to
their level. Additionally those Districts are more careful with their
documentation and reviews because they know that the TxDOT ENV SAB will
internally assess those decisions and hold them accountable.
4. Legal Sufficiency Review
Based on the interviews and review of documentation, the
requirements for legal sufficiency under the MOU are being adequately
fulfilled.
The level of legal expertise available for reviews appears to be
sufficient, based on information gained from interviews. Currently
there are three attorneys in TxDOT's General Counsel Division (GCD)
(previously referred to as Office of General Counsel, OGC) with two of
the attorneys having been hired in the last six months. One of the new
attorneys has environmental law experience (primarily in water quality
and water utilities issues) but no highway or NEPA experience. Both new
attorneys have attended four NEPA training courses that ENV provided
(via the FHWA Resource Center) and are scheduled to attend two more.
One of the new attorneys was very complimentary of the quality of the
training and its usefulness in guiding her reviews. The GCD also has
contracts with three outside law firms on an ``as needed'' basis and an
outside contract attorney who has provided legal assistance on
environmental issues for a number of years to ENV.
The GCD assistance continues to be guided by ENVs Project Delivery
Manual Sections 303.080 through 303.086. These sections provide
guidance on conducting legal sufficiency review of FHWA-funded projects
and publishing a Notice of Intent to prepare an EIS and a Notice of
Availability in the Federal Register.
In February 2016, TxDOT received a notice of intent to sue by a
Non-Governmental Organization for a Federal project for which they made
the environmental decision. The TxDOT notified the FHWA Office of the
Chief Counsel, as required by the MOU.
[[Page 85309]]
Based on a report provided by GCD, since April 2015, GCD had
reviewed or been involved in legal review for six project actions.
These included four 139(l) notices, an FEIS, and one NOI. The ENV
project managers make requests for review of a document to the lead
attorney, who then assigns that document for formal legal review. That
lead attorney then assigns the document to one of the attorneys based
on workload and complexity. Attorney comments are provided in the
standard comment response matrix back to ENV. All comments must be
satisfactorily addressed for GCD to complete its legal sufficiency
review. The GCD does not issue conditional legal sufficiency
determinations.
Successful Practice
Based on our discussions, GCD is very involved with the Districts
and ENV throughout the NEPA project development process and legal
issues. The team did note more open communication between all GCD, ENV,
and District staff. All of the attorneys are regular participants in
the monthly ENV NEPA Chats.
5. Performance Measurement
As TxDOT explained in its response to FHWA's pre-audit #3
information request, performance measurement (evaluating how well TxDOT
is managing the program and determining the value delivered for
customers and stakeholders) is a complex issue. The TxDOT devotes a
high level of effort developing the metrics to measure performance.
Despite the challenges of complexity and effort, TxDOT informed the
team that it uses performance measurements to identify potential risk,
review areas needing improvement, and recognize successful practices.
Successful Practices and Observations
The team acknowledges the utility of TxDOT's performance measures
for quality control and quality assurance in its CE determinations. As
explained in their self-assessment summary report and their response to
FHWA's pre-audit #3 information request, TxDOT conducted an extensive
analysis of whether project file errors were substantive or not
substantive. The team generally found substantive errors to be non-
compliant with respect to the validity of environmental decisions,
whereas non-substantive errors were flaws in information that
substantiated those decisions. The TxDOT's analysis of these errors
demonstrates that non-substantive errors largely affect TxDOT
efficiency in reporting and data analysis. The TxDOT's procedures
result in the identification and correction of substantive errors. This
careful consideration of performance regarding CE determination errors
and corrective actions demonstrates how measurement and application of
corrective actions improved overall performance. In addition, TxDOT is
applying this information to design specific ECOS upgrades to eliminate
several categories of errors.
The specific consideration of errors is just one example of what
the team learned from interviewing TxDOT's ENV Director and assessing
TxDOT leadership's review measures to monitor continuous improvement.
The TxDOT's leadership, consultants, and District staff all noted an
improvement and a higher consistency in the quality of environmental
decisions and environmental documentation for CE determinations. The
TxDOT identified issues that may require policy or program attention.
These issues are memorialized in the self-assessment report's root
cause analysis for substantive and non-substantive errors.
Audit #3 Observation #3
The team considered TxDOT's QA/QC target measure of 95 percent of
project files determined to be complete and accurate and TxDOT's
reported measure of 77.7 percent. While the target of any performance
measure should be at or close to 100 percent, FHWA acknowledges that
attaining this measure may be extremely difficult, especially given
that the project class is an EA or EIS. The TxDOT has analyzed the
range of errors and identified missing or incomplete information as a
persistent problem. Given TxDOT's efforts to date and careful
consideration of FHWA's observations on QA/QC, TxDOT may consider error
rates and/or different measure(s) that demonstrate continuous
improvement.
Audit #3 Observation #4
Timeliness measures reported by TxDOT in their recent self-
assessment summary report identify time frames for completion of EA and
EIS projects. Most of these projects were initiated prior to December
2014, when TxDOT was assigned FHWA's NEPA responsibilities. The average
time to complete a FONSI before and after assignment dropped from 1060
days to 686 days (eliminating an outlier project that took 2590 days).
While one expects projects initiated and completed under assignment to
finish faster than any previous average time frame, even TxDOT
recognizes that complex EAs require more time to reach a FONSI than
projects with fewer impacts or complexities. The TxDOT's summary report
contains too few data points to determine trends, and there is no
control to differentiate between ``complex'' and ``simple'' EAs. The
team urges TxDOT to consider a timeliness measure for CEs, recognizing
the issues of consistency within and among CE actions listed in 23 CFR
771.117(c) and 23 CFR 771.117(d). Meaningful timeliness measures should
accommodate the time TxDOT takes to initiate and complete environmental
reviews, given that some reviews will take less time and entail fewer
tasks or steps than others. The TxDOT could consider ways to
``control'' for project complexity, perhaps by stratifying their data
or by measuring the timeliness to complete certain tasks (such as
defining purpose and need, the range of alternatives, or the time to
prepare an Draft EIS, Final EIS, or ROD).
6. Training Program
The TxDOT has specifically designed an environmental professional
training program for its environmental professional staff and others.
This program was updated for 2016 and the team learned about it through
a four-page description and share point site information provided in
TxDOT's response to FHWA's pre-audit #3 information request. This
information was supplemented through interviews with TxDOT ENV staff
responsible for the training program. This program, FHWA was told, must
satisfy requirements in State law (Texas Administrative Code, or TAC,
title 43, part 1, chapter 2, subchapter A, rule Sec. 2.11) as well as
requirements specified in Part 12 of the MOU. Texas law requires that
TxDOT individuals be ``certified'' before they may make environmental
decisions and must maintain ``certification'' to continue to make
decisions. It follows then that TxDOT's training focus is TxDOT staff's
initial certification and continuing certification. The MOU training
requirements establish ongoing competency requirements for TxDOT's
staff.
Successful Practices and Observations
The team recognizes the following successful training practices and
observations. The team learned from an interview that TxDOT's new hire
``on-boarding'' process is extraordinarily responsive to delivering the
ENV 207 training course. This course, which provides a general overview
of environmental considerations in project development, also entails
practical ECOS training in how to create a project, use the optional
scope
[[Page 85310]]
development tool, how to assign a task, and how to complete a form.
Additionally, an interviewee told the team that training updates to the
ENV 207 course were continuous.
Another successful practice is to open up the full range of TxDOT's
training classes to enrollment by local government and consultant staff
(after TxDOT staff has been provided an initial opportunity to enroll).
And finally, TxDOT is archiving and providing easy access of recordings
from all NEPA Chats/informal training including, notes, and handouts
from those offerings/training.
Audit #3 Observation #5
The team learned through interviews that TxDOT oversight and
tracking of environmental competency training/competency assurance is
de-centralized. This means that individual TxDOT staff and supervisors
are responsible for maintaining environmental ``certification'' under
State law, as well as general competencies and capabilities to carry
out MOU responsibilities (see MOU Part 4.2.2). The team was unable to
assess the overall staff competency and exposure to training because
information was spread across all 25 TxDOT Districts. These audit
reviews require details demonstrating that TxDOT staff are capable,
competent, qualified, and certified (from the perspective of TAC and
the MOU) to perform these assigned responsibilities. Thus, TxDOT's
ability to monitor the certification and competency status of their
qualified staff is important. The TxDOT should consider at least an
annual assessment that compiles all the environmental competency
information from across all Districts and ENV.
Audit #3 Observation #6
The TxDOT acknowledged in its recent self-assessment summary report
that many of the errors it detects in project files (both substantive
and non-substantive) are tied to staff knowledge and use of the ECOS
program. In many ways, TxDOT has demonstrated that updating ECOS is the
most efficient way to head off errors and increase consistency in
TxDOT's environmental review process. The team learned from interviews
that the first wave of ECOS changes will coincide with new training. In
addition to the other recommendations made by FHWA, TxDOT should engage
its subject matter experts, the self-assessment team, as well as its
overall policy and program staff in crafting and delivering this
training to address the non-compliance observations noted above. In
addition, TxDOT should take any lessons learned from the corrective
actions taken as a result of this audit and incorporate them into
future training.
Status of Non-Compliance Observations and Other Observations From Audit
#2 (September 2015) and FHWA Responses to TxDOT's Audit #2 Comments
Audit #2 Non-Compliance Observations
1. CE determination prior to regulatory criteria being met--The
TxDOT indicated in its comment on the Federal Register notice of the
draft Audit #2 report that it (1) circulated a memo to its staff
regarding conditional clearances, (2) revised its standard operating
procedures to remove the discussion of conditional clearances, and (3)
completed informal training on this issue utilizing the NEPA Chats. The
TxDOT's comment included discussion on the timing of NEPA approvals,
but after FHWA discussed these comments with TxDOT, TxDOT chose to
withdraw comments regarding the timing of NEPA approvals.
2. NEPA Decision reporting--The TxDOT reported to FHWA that it
revised its method of monthly NEPA Approval certification reporting in
an effort to eliminate errors. The recurrence of a reporting error in
Audit #3 indicates that under current reporting procedures, it is still
possible for TxDOT to erroneously certify projects that are still being
processed as being complete. The FHWA relies upon TxDOT's independent
NEPA decision to advance federally funded projects. If FHWA advances a
project that has been improperly processed by TxDOT, this may
jeopardize Federal-aid reimbursement or eligibility of Federal funds on
that project.
3. Project file records and missing information--The TxDOT
acknowledged the concern for incomplete project files in its comments
on Audit #2. The TxDOT states that it has reviewed the projects under
this observation and has provided corrective actions in the form of (1)
individual communications with staff affected, and (2) through NEPA
Chats.
Audit #2 Observations
All observations are purely for TxDOT's consideration only and
should not be deemed non-compliance observations unless otherwise
noted.
1. Relationships between TxDOT and other Federal Agency staff--The
TxDOT indicated in its comments on Audit #2 that it has conducted
follow up meetings with U.S. Coast Guard staff. It also disagrees with
the characterization that TxDOT's relationship with the Texas SHPO is
``strained.'' The FHWA has continued to include interviews with outside
agency staff as part of this and future reviews/audits to seek
information about relationships and to convey information back to
TxDOT. The FHWA provides information for TxDOT to consider in
maintaining and/or improving its working relationship with both Federal
and State regulatory agencies. The FHWA interviews these agencies in
order to (1) provide feedback about those relationships that TxDOT may
not otherwise hear directly and (2) to review and assess TxDOT's
procedures. The FHWA is also able to observe program-level interactions
between TxDOT and other agencies and to convey observations back to
TxDOT for consideration purposes.
2. Legacy projects and TxDOT's ``no effect'' determinations for
ESA--The TxDOT stated in its comments on Audit #2 that it met with FHWA
staff on this matter and has assessed existing procedures, rules, and
policies related to ESA consultation and reviewed related training. The
team found a deficiency in the TxDOT procedure on making ESA
determinations as a result of Audit #3. Since the procedure for making
ESA determinations is non-compliant, TxDOT will need to implement a
corrective action, which will be considered as part of FHWA's next
review or audit.
3. Consistency in TxDOT's approach to defining 23 CFR 771.117(e)(4)
for major traffic disruption--This TxDOT response to the draft Audit #2
report downplays the need for an agreed upon standard or threshold on
how to apply the constraint in 23 CFR 771.117(e)(4) regarding traffic
disruption. The TxDOT indicated that the decision is made by
``professional judgement'' according to the criteria the CEQ has
identified for a determination of significant impact (i.e., context and
intensity). However, TxDOT's approach does not fulfill FHWA policy on
how to set the threshold for this constraint, stated in the preamble to
the notice of the final rule (79 FR 60110, Oct. 6, 2014). Thus, TxDOT
should, at the minimum, identify examples of instances of substantial
traffic disruption and instances that do not arise to the level of
substantial disruption.
4. Addressing errors and corrections to NEPA decisions in ECOS--
This TxDOT comment on Audit #2 acknowledges that a specific CE
determination was incorrect, attributable to a typographical error.
Thus, TxDOT completed a new CE determination for that project. As part
of the project file reviews for Audit #4,
[[Page 85311]]
FHWA proposes to engage with TxDOT to have a shared set of expectations
on the process or procedures that addresses various errors or omissions
in TxDOT's NEPA decisionmaking at a program-level, both before and
after TxDOT requests that FHWA approve Federal-aid. The integrity of
data in ECOS is paramount to retaining an official file of record for
Federal-aid projects. It is anticipated that ECOS upgrades will also
help to fully address this issue with an improved quality control
process improvement by TxDOT.
5. Inadequate project description or project scope--The TxDOT
stated in its comments on Audit #2 that discussions of adequate project
descriptions have been the subject of several NEPA Chats and will
continue to be discussed as long as this issue persists. The FHWA and
TxDOT collaborated to develop a shared set of expectations for project
development that was presented at the September 2015 TxDOT
Environmental Conference.
6. EPIC documentation and decisionmaking--The TxDOT indicated in
its comment on the Audit #2 report that TxDOT ECOS procedures allow
information to be loaded in two ways that can be confusing for
reviewers. The TxDOT acknowledged this issue and stated that it has
established an EPIC workgroup with the purpose of identifying a more
consistent method to record and track EPICs. The results of this
workgroup will be incorporated into a series of ECOS upgrades scheduled
over the next 2 years.
7. Multiple CE approval documents in ECOS--The TxDOT stated in its
comment on Audit #2 that the project file for this observation
contained a typographical error that made the initial CE determination
incorrect. The TxDOT then made a new CE determination. Having a shared
set of expectations (see number 4, above) between TxDOT and FHWA on how
to address errors and omissions should improve both the program and the
review process.
8. Multiple reevaluations of a NEPA approval--The TxDOT indicated
in its comment on Audit #2 that the multiple reevaluations resulted
from a design-build project, where changes may occur often. The TxDOT
prefers to respond to changes within a set time frame to keep the
project moving especially on design-build projects. Reevaluations must
look at the entire project. This situation will also be considered as
part of the shared set of FHWA-TxDOT expectations on how to handle
project changes.
9. ECOS upgrades schedule too slow--This TxDOT response to Audit #2
disagreed that the pace of ECOS upgrades might increase litigation
risk. Based on information from Audit #3 interviews, this observation
is tied to TxDOT's commitment of resources to assume responsibilities
under the MOU (Part 4.2). This was presented as a continued observation
from previous audits and is restated to draw TxDOT's attention to an
identified problem. This observation is not a statement of non-
compliance, although it could lead to a non-compliance observation in
the future. As ECOS is the official file of record, FHWA is concerned
that TxDOT has not improved ECOS quickly enough. The TxDOT should
consider making database updates more timely and related procedures
mandatory in relation to documentation storage within ECOS.
10. Difficulty locating information in project files--This TxDOT
comment on Audit #2 states that it formed a workgroup in the summer of
2015 for the purpose of developing statewide guidance regarding filing
and naming conventions in ECOS. The TxDOT Districts themselves had
issues locating documentation within their own ECOS project files
during site visits in Audit #2. The team continued to have difficulty
(and ENV management and staff also confirmed the same difficulty)
finding key project documentation for this audit, especially for large
and complex projects. The FHWA looks forward to reviewing the
recommendations of this workgroup and assessing any changes as part of
a future review or audit.
11. Evidence of recurring Non-Compliance Observations related to QA
and QC application to individual projects--This TxDOT comment on Audit
#2 commits to making project specific comments in SAB feedback reports
available for Audit #3. These reports were made available and the TxDOT
self-assessment report included an extensive analysis of QC outcomes
for CE project reviews. The QC is still an issue prior to NEPA
decisions being finalized for larger scale CEs as well as for EAs and
EISs.
12. Expectation for the timeframe necessary for a legal review--
This TxDOT comment on Audit #2 commits to revising the standard
operating procedure to establish an expected review time for the
TxDOT's Office of General Counsel (OGC) (now General Counsel Division--
GCD) to conduct a legal sufficiency review. As recommended during Audit
#2, OGC has issued a procedure establishing legal review times for FEIS
(30 days) and for NOI and 139(l) documents (3 days). If necessary, OGC
can request additional time for the review.
13. Measure for the TxDOT relationship with the public--The TxDOT
continued to report the number of complaints received year-to-year as
its performance measure for its relationship with the public. None were
received, and the measure reported was unchanged from the prior self-
assessment summary report. The team learned from interviews that it is
possible that the public may not distinguish between performance pre-
and post-assignment. The team was told that TxDOT is still getting
feedback from the public and agencies and plans to include the measures
into a continuous improvement process. The TxDOT also noted, in its
Federal Register comment on the draft Audit #2 report, that (1)
assessing change in communication with the general public is inherently
difficult, (2) NEPA assignment presents little external differentiation
to the general public, and (3) finding success in measuring this
variable has proven difficult.
14. Implement ways to train local government staff--The TxDOT's
Environmental Professional Training Program is described in a four-page
report provided to the team as part of TxDOT's pre-audit information
request response. That report identifies a series of workshops and
training events jointly held with Texas Historical Commission staff.
The team learned through interviews and the training program report
that TxDOT has established an ENV training SharePoint site that is
accessible to the public for local government staff to register for
training at no cost.
Next Steps
The FHWA provided a preliminary draft audit report to TxDOT for a
14-day review and comment period. The team has considered TxDOT
comments in developing this draft Audit #3 report. As the next step,
FHWA will publish a notice in the Federal Register to make it available
to the public for a 30-day comment period review [23 U.S.C. 327(g)]. No
later than 60 days after the close of the comment period, FHWA will
respond to all comments submitted in finalizing this draft audit report
[pursuant to 23 U.S.C. 327(g)(2)(B)]. Once finalized, the audit report
will be published in the Federal Register.
[FR Doc. 2016-28353 Filed 11-23-16; 8:45 am]