Proposed Flood Hazard Determinations, 84606-84607 [2016-28135]
Download as PDF
84606
Federal Register / Vol. 81, No. 226 / Wednesday, November 23, 2016 / Notices
the FIRM and FIS report, once effective,
will be used by insurance agents and
others to calculate appropriate flood
insurance premium rates for new
buildings and the contents of those
buildings.
Comments are to be submitted
on or before February 21, 2017.
ADDRESSES: The Preliminary FIRM, and
where applicable, the FIS report for
each community are available for
inspection at both the online location
and the respective Community Map
Repository address listed in the tables
below. Additionally, the current
effective FIRM and FIS report for each
community are accessible online
through the FEMA Map Service Center
at www.msc.fema.gov for comparison.
You may submit comments, identified
by Docket No. FEMA–B–1658, to Rick
Sacbibit, Chief, Engineering Services
Branch, Federal Insurance and
Mitigation Administration, FEMA, 400
C Street SW., Washington, DC 20472,
(202) 646–7659, or (email)
patrick.sacbibit@fema.dhs.gov.
FOR FURTHER INFORMATION CONTACT: Rick
Sacbibit, Chief, Engineering Services
Branch, Federal Insurance and
Mitigation Administration, FEMA, 400
C Street SW., Washington, DC 20472,
(202) 646–7659, or (email)
patrick.sacbibit@fema.dhs.gov; or visit
the FEMA Map Information eXchange
(FMIX) online at
www.floodmaps.fema.gov/fhm/fmx_
main.html.
DATES:
FEMA
proposes to make flood hazard
determinations for each community
listed below, in accordance with section
110 of the Flood Disaster Protection Act
of 1973, 42 U.S.C. 4104, and 44 CFR
67.4(a).
These proposed flood hazard
determinations, together with the
floodplain management criteria required
by 44 CFR 60.3, are the minimum that
are required. They should not be
construed to mean that the community
must change any existing ordinances
that are more stringent in their
floodplain management requirements.
The community may at any time enact
stricter requirements of its own or
pursuant to policies established by other
Federal, State, or regional entities.
These flood hazard determinations are
used to meet the floodplain
management requirements of the NFIP
and also are used to calculate the
appropriate flood insurance premium
rates for new buildings built after the
FIRM and FIS report become effective.
The communities affected by the
flood hazard determinations are
mstockstill on DSK3G9T082PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
18:04 Nov 22, 2016
Jkt 241001
provided in the tables below. Any
request for reconsideration of the
revised flood hazard information shown
on the Preliminary FIRM and FIS report
that satisfies the data requirements
outlined in 44 CFR 67.6(b) is considered
an appeal. Comments unrelated to the
flood hazard determinations also will be
considered before the FIRM and FIS
report become effective.
Use of a Scientific Resolution Panel
(SRP) is available to communities in
support of the appeal resolution
process. SRPs are independent panels of
experts in hydrology, hydraulics, and
other pertinent sciences established to
review conflicting scientific and
technical data and provide
recommendations for resolution. Use of
the SRP only may be exercised after
FEMA and local communities have been
engaged in a collaborative consultation
process for at least 60 days without a
mutually acceptable resolution of an
appeal. Additional information
regarding the SRP process can be found
online at https://floodsrp.org/pdfs/srp_
fact_sheet.pdf.
The watersheds and/or communities
affected are listed in the tables below.
The Preliminary FIRM, and where
applicable, FIS report for each
community are available for inspection
at both the online location and the
respective Community Map Repository
address listed in the tables. For
communities with multiple ongoing
Preliminary studies, the studies can be
identified by the unique project number
and Preliminary FIRM date listed in the
tables. Additionally, the current
effective FIRM and FIS report for each
community are accessible online
through the FEMA Map Service Center
at www.msc.fema.gov for comparison.
MORGAN COUNTY, COLORADO AND
INCORPORATED AREAS—Continued
[Maps Available for Inspection Online at: https://
www.fema.gov/preliminaryfloodhazarddata]
Community
Community map repository
address
Town of
Wiggins.
Unincorporated
Areas of
Morgan
County.
Town Hall, 304 Central Avenue, Wiggins, CO 80654.
Morgan County Planning
and Zoning Department,
231 Ensign Street, Fort
Morgan, CO 80701.
[FR Doc. 2016–28132 Filed 11–22–16; 8:45 am]
BILLING CODE 9110–12–P
DEPARTMENT OF HOMELAND
SECURITY
Federal Emergency Management
Agency
[Docket ID FEMA–2016–0002; Internal
Agency Docket No. FEMA–B–1659]
Proposed Flood Hazard
Determinations
Federal Emergency
Management Agency, DHS.
ACTION: Notice.
AGENCY:
Comments are requested on
proposed flood hazard determinations,
which may include additions or
modifications of any Base Flood
Elevation (BFE), base flood depth,
Special Flood Hazard Area (SFHA)
boundary or zone designation, or
regulatory floodway on the Flood
Insurance Rate Maps (FIRMs), and
where applicable, in the supporting
Flood Insurance Study (FIS) reports for
the communities listed in the table
(Catalog of Federal Domestic Assistance No.
below. The purpose of this notice is to
97.022, ‘‘Flood Insurance.’’)
seek general information and comment
Dated: October 31, 2016.
regarding the preliminary FIRM, and
Roy E. Wright,
where applicable, the FIS report that the
Deputy Associate Administrator for Insurance Federal Emergency Management Agency
and Mitigation, Department of Homeland
(FEMA) has provided to the affected
Security, Federal Emergency Management
communities. The FIRM and FIS report
Agency.
are the basis of the floodplain
management measures that the
MORGAN COUNTY, COLORADO AND
community is required either to adopt
INCORPORATED AREAS
or to show evidence of having in effect
[Maps Available for Inspection Online at: https:// in order to qualify or remain qualified
www.fema.gov/preliminaryfloodhazarddata]
for participation in the National Flood
Insurance Program (NFIP). In addition,
Community map repository
the FIRM and FIS report, once effective,
Community
address
will be used by insurance agents and
others to calculate appropriate flood
Project: 08–08–0407S Preliminary Date:
insurance premium rates for new
March 16, 2016
buildings and the contents of those
City of Brush .. City Hall, 600 Edison Street, buildings.
City of Fort
Morgan.
PO 00000
Frm 00060
Brush, CO 80723.
City Hall, 110 Main Street,
Fort Morgan, CO 80701.
Fmt 4703
Sfmt 4703
SUMMARY:
Comments are to be submitted
on or before February 21, 2017.
DATES:
E:\FR\FM\23NON1.SGM
23NON1
Federal Register / Vol. 81, No. 226 / Wednesday, November 23, 2016 / Notices
The Preliminary FIRM, and
where applicable, the FIS report for
each community are available for
inspection at both the online location
and the respective Community Map
Repository address listed in the tables
below. Additionally, the current
effective FIRM and FIS report for each
community are accessible online
through the FEMA Map Service Center
at www.msc.fema.gov for comparison.
You may submit comments, identified
by Docket No. FEMA–B–1659, to Rick
Sacbibit, Chief, Engineering Services
Branch, Federal Insurance and
Mitigation Administration, FEMA, 400
C Street SW., Washington, DC 20472,
(202) 646–7659, or (email)
patrick.sacbibit@fema.dhs.gov.
ADDRESSES:
Rick
Sacbibit, Chief, Engineering Services
Branch, Federal Insurance and
Mitigation Administration, FEMA, 400
C Street SW., Washington, DC 20472,
(202) 646–7659, or (email)
patrick.sacbibit@fema.dhs.gov; or visit
the FEMA Map Information eXchange
(FMIX) online at
www.floodmaps.fema.gov/fhm/fmx_
main.html.
FOR FURTHER INFORMATION CONTACT:
FEMA
proposes to make flood hazard
determinations for each community
listed below, in accordance with section
110 of the Flood Disaster Protection Act
of 1973, 42 U.S.C. 4104, and 44 CFR
67.4(a).
SUPPLEMENTARY INFORMATION:
These proposed flood hazard
determinations, together with the
floodplain management criteria required
by 44 CFR 60.3, are the minimum that
are required. They should not be
construed to mean that the community
must change any existing ordinances
that are more stringent in their
floodplain management requirements.
The community may at any time enact
stricter requirements of its own or
pursuant to policies established by other
Federal, State, or regional entities.
These flood hazard determinations are
used to meet the floodplain
management requirements of the NFIP
and also are used to calculate the
appropriate flood insurance premium
rates for new buildings built after the
FIRM and FIS report become effective.
The communities affected by the
flood hazard determinations are
provided in the tables below. Any
request for reconsideration of the
revised flood hazard information shown
on the Preliminary FIRM and FIS report
that satisfies the data requirements
outlined in 44 CFR 67.6(b) is considered
an appeal. Comments unrelated to the
flood hazard determinations also will be
considered before the FIRM and FIS
report become effective.
Use of a Scientific Resolution Panel
(SRP) is available to communities in
support of the appeal resolution
process. SRPs are independent panels of
experts in hydrology, hydraulics, and
other pertinent sciences established to
review conflicting scientific and
Community
84607
technical data and provide
recommendations for resolution. Use of
the SRP only may be exercised after
FEMA and local communities have been
engaged in a collaborative consultation
process for at least 60 days without a
mutually acceptable resolution of an
appeal. Additional information
regarding the SRP process can be found
online at https://floodsrp.org/pdfs/srp_
fact_sheet.pdf.
The watersheds and/or communities
affected are listed in the tables below.
The Preliminary FIRM, and where
applicable, FIS report for each
community are available for inspection
at both the online location and the
respective Community Map Repository
address listed in the tables. For
communities with multiple ongoing
Preliminary studies, the studies can be
identified by the unique project number
and Preliminary FIRM date listed in the
tables. Additionally, the current
effective FIRM and FIS report for each
community are accessible online
through the FEMA Map Service Center
at www.msc.fema.gov for comparison.
(Catalog of Federal Domestic Assistance No.
97.022, ‘‘Flood Insurance.’’)
Dated: October 31, 2016.
Roy E. Wright,
Deputy Associate Administrator for Insurance
and Mitigation, Department of Homeland
Security, Federal Emergency Management
Agency.
I. Non-watershed-based studies:
Community Map Repository Address
Jefferson County, Washington and Incorporated Areas
Maps Available for Inspection Online at: https://www.fema.gov/preliminaryfloodhazarddata
Project: 14–10–0586S
Preliminary Date: February 12, 2016
City of Port Townsend ..............................................................................
Hoh Indian Tribe .......................................................................................
Unincorporated Areas of Jefferson County ..............................................
City Hall, 250 Madison Street, Suite 2, Port Townsend, WA 98368.
Hoh Indian Tribe Natural Resources Department, 2267 Lower Hoh
Road, Forks, WA 98331.
Jefferson County Department of Community Development, 621 Sheridan Street, Port Townsend, WA 98368.
Thurston County, Washington and Incorporated Areas
Maps Available for Inspection Online at: https://www.fema.gov/preliminaryfloodhazarddata
mstockstill on DSK3G9T082PROD with NOTICES
Project: 12–10–0394S Preliminary Date: June 30, 2016
City of Lacey .............................................................................................
City of Olympia .........................................................................................
City of Tumwater ......................................................................................
Unincorporated Areas of Thurston County ..............................................
City Hall, 420 College Street Southeast, Lacey, WA 98503.
City Hall, 601 4th Avenue East, Olympia, WA 98501.
City Hall, 555 Israel Road Southwest, Tumwater, WA 98501.
Thurston County Courthouse, 2000 Lakeridge Drive Southwest, Building 1, Olympia, WA 98502.
[FR Doc. 2016–28135 Filed 11–22–16; 8:45 am]
BILLING CODE 9110–12–P
VerDate Sep<11>2014
18:04 Nov 22, 2016
Jkt 241001
PO 00000
Frm 00061
Fmt 4703
Sfmt 9990
E:\FR\FM\23NON1.SGM
23NON1
Agencies
[Federal Register Volume 81, Number 226 (Wednesday, November 23, 2016)]
[Notices]
[Pages 84606-84607]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-28135]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Federal Emergency Management Agency
[Docket ID FEMA-2016-0002; Internal Agency Docket No. FEMA-B-1659]
Proposed Flood Hazard Determinations
AGENCY: Federal Emergency Management Agency, DHS.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: Comments are requested on proposed flood hazard
determinations, which may include additions or modifications of any
Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area
(SFHA) boundary or zone designation, or regulatory floodway on the
Flood Insurance Rate Maps (FIRMs), and where applicable, in the
supporting Flood Insurance Study (FIS) reports for the communities
listed in the table below. The purpose of this notice is to seek
general information and comment regarding the preliminary FIRM, and
where applicable, the FIS report that the Federal Emergency Management
Agency (FEMA) has provided to the affected communities. The FIRM and
FIS report are the basis of the floodplain management measures that the
community is required either to adopt or to show evidence of having in
effect in order to qualify or remain qualified for participation in the
National Flood Insurance Program (NFIP). In addition, the FIRM and FIS
report, once effective, will be used by insurance agents and others to
calculate appropriate flood insurance premium rates for new buildings
and the contents of those buildings.
DATES: Comments are to be submitted on or before February 21, 2017.
[[Page 84607]]
ADDRESSES: The Preliminary FIRM, and where applicable, the FIS report
for each community are available for inspection at both the online
location and the respective Community Map Repository address listed in
the tables below. Additionally, the current effective FIRM and FIS
report for each community are accessible online through the FEMA Map
Service Center at www.msc.fema.gov for comparison.
You may submit comments, identified by Docket No. FEMA-B-1659, to
Rick Sacbibit, Chief, Engineering Services Branch, Federal Insurance
and Mitigation Administration, FEMA, 400 C Street SW., Washington, DC
20472, (202) 646-7659, or (email) patrick.sacbibit@fema.dhs.gov.
FOR FURTHER INFORMATION CONTACT: Rick Sacbibit, Chief, Engineering
Services Branch, Federal Insurance and Mitigation Administration, FEMA,
400 C Street SW., Washington, DC 20472, (202) 646-7659, or (email)
patrick.sacbibit@fema.dhs.gov; or visit the FEMA Map Information
eXchange (FMIX) online at www.floodmaps.fema.gov/fhm/fmx_main.html.
SUPPLEMENTARY INFORMATION: FEMA proposes to make flood hazard
determinations for each community listed below, in accordance with
section 110 of the Flood Disaster Protection Act of 1973, 42 U.S.C.
4104, and 44 CFR 67.4(a).
These proposed flood hazard determinations, together with the
floodplain management criteria required by 44 CFR 60.3, are the minimum
that are required. They should not be construed to mean that the
community must change any existing ordinances that are more stringent
in their floodplain management requirements. The community may at any
time enact stricter requirements of its own or pursuant to policies
established by other Federal, State, or regional entities. These flood
hazard determinations are used to meet the floodplain management
requirements of the NFIP and also are used to calculate the appropriate
flood insurance premium rates for new buildings built after the FIRM
and FIS report become effective.
The communities affected by the flood hazard determinations are
provided in the tables below. Any request for reconsideration of the
revised flood hazard information shown on the Preliminary FIRM and FIS
report that satisfies the data requirements outlined in 44 CFR 67.6(b)
is considered an appeal. Comments unrelated to the flood hazard
determinations also will be considered before the FIRM and FIS report
become effective.
Use of a Scientific Resolution Panel (SRP) is available to
communities in support of the appeal resolution process. SRPs are
independent panels of experts in hydrology, hydraulics, and other
pertinent sciences established to review conflicting scientific and
technical data and provide recommendations for resolution. Use of the
SRP only may be exercised after FEMA and local communities have been
engaged in a collaborative consultation process for at least 60 days
without a mutually acceptable resolution of an appeal. Additional
information regarding the SRP process can be found online at https://floodsrp.org/pdfs/srp_fact_sheet.pdf.
The watersheds and/or communities affected are listed in the tables
below. The Preliminary FIRM, and where applicable, FIS report for each
community are available for inspection at both the online location and
the respective Community Map Repository address listed in the tables.
For communities with multiple ongoing Preliminary studies, the studies
can be identified by the unique project number and Preliminary FIRM
date listed in the tables. Additionally, the current effective FIRM and
FIS report for each community are accessible online through the FEMA
Map Service Center at www.msc.fema.gov for comparison.
(Catalog of Federal Domestic Assistance No. 97.022, ``Flood
Insurance.'')
Dated: October 31, 2016.
Roy E. Wright,
Deputy Associate Administrator for Insurance and Mitigation, Department
of Homeland Security, Federal Emergency Management Agency.
I. Non-watershed-based studies:
------------------------------------------------------------------------
Community Map Repository
Community Address
------------------------------------------------------------------------
Jefferson County, Washington and Incorporated Areas
------------------------------------------------------------------------
Maps Available for Inspection Online at: https://www.fema.gov/preliminaryfloodhazarddata preliminaryfloodhazarddata
------------------------------------------------------------------------
Project: 14-10-0586S Preliminary Date: February 12, 2016
------------------------------------------------------------------------
City of Port Townsend.................. City Hall, 250 Madison Street,
Suite 2, Port Townsend, WA
98368.
Hoh Indian Tribe....................... Hoh Indian Tribe Natural
Resources Department, 2267
Lower Hoh Road, Forks, WA
98331.
Unincorporated Areas of Jefferson Jefferson County Department of
County. Community Development, 621
Sheridan Street, Port
Townsend, WA 98368.
------------------------------------------------------------------------
Thurston County, Washington and Incorporated Areas
------------------------------------------------------------------------
Maps Available for Inspection Online at: https://www.fema.gov/preliminaryfloodhazarddata preliminaryfloodhazarddata
------------------------------------------------------------------------
Project: 12-10-0394S Preliminary Date: June 30, 2016
------------------------------------------------------------------------
City of Lacey.......................... City Hall, 420 College Street
Southeast, Lacey, WA 98503.
City of Olympia........................ City Hall, 601 4th Avenue East,
Olympia, WA 98501.
City of Tumwater....................... City Hall, 555 Israel Road
Southwest, Tumwater, WA 98501.
Unincorporated Areas of Thurston County Thurston County Courthouse,
2000 Lakeridge Drive
Southwest, Building 1,
Olympia, WA 98502.
------------------------------------------------------------------------
[FR Doc. 2016-28135 Filed 11-22-16; 8:45 am]
BILLING CODE 9110-12-P