Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 81758-81759 [2016-27812]

Download as PDF 81758 Federal Register / Vol. 81, No. 223 / Friday, November 18, 2016 / Notices docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 10, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–27813 Filed 11–17–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER17–242–000] mstockstill on DSK3G9T082PROD with NOTICES Gavin Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding Gavin Power, LLC‘s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is November 30, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. VerDate Sep<11>2014 20:21 Nov 17, 2016 Jkt 241001 The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 10, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–27814 Filed 11–17–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–11–000] Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on November 3, 2016 Columbia Gas Transmission, LLC (Columbia Gas), 5151 San Felipe, Suite 2500, Houston, Texas 77056 filed a prior notice request pursuant to sections 157.205 and 157.213(b) of the Commission’s regulations under the Natural Gas Act for authorization to construct and operate certain natural gas storage facilities located in Jackson County, West Virginia. Specifically, Columbia proposes to construct and operate three new storage wells and related pipeline to tie the wells into existing pipelines at Columbia’s Ripley Storage Field. It is estimated that the three new directional wells will provide a combined total of 15 MMcf per day of improved deliverability to the Columbia system, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Robert D. Jackson, Manager, Certificates PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 & Regulatory Administration, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002, by calling (832) 320–5487, or by fax (832) 320–6487, or by email at Robert_ jackson@transcanada.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents E:\FR\FM\18NON1.SGM 18NON1 Federal Register / Vol. 81, No. 223 / Friday, November 18, 2016 / Notices filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: November 10, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–27812 Filed 11–17–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC16–12–000] Commission Information Collection Activities (FERC–511, FERC–515, & FERC–574); Comment Request Federal Energy Regulatory Commission, Department of Energy. ACTION: Comment request. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collections [FERC–511 (Transfer of Electric License), FERC–515 (Rules of Practice and Procedure: Declaration of Intention), and FERC–574 (Gas Pipeline Certificates: Hinshaw Exemption)] to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (81 FR 45145, 7/12/ 2016) requesting public comments. The Commission received no comments on the FERC–511, the FERC–515, or the FERC–574 and is making this notation in its submittal to OMB. mstockstill on DSK3G9T082PROD with NOTICES SUMMARY: 1 16 U.S.C. 797(e) and 801. to facilities across, along, from, or in any of the streams or other bodies of water over which 2 Refers VerDate Sep<11>2014 20:21 Nov 17, 2016 Jkt 241001 Comments on the collection of information are due by December 19, 2016. DATES: 81759 assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Comments filed with OMB, identified by the OMB Control No. 1902–0069 (FERC–511), 1902–0079 (FERC–515), or 1902–0116 (FERC–574) should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202–395– 4718. A copy of the comments should also be sent to the Commission, in Docket No. IC16–12–000, by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, by telephone at (202) 502–8663, and by fax at (202) 273–0873. SUPPLEMENTARY INFORMATION: Type of Request: Three-year extension of the information collection requirements for all collections described below with no changes to the current reporting requirements. Please note that each collection is distinct from the next. Comments: Comments are invited on: (1) Whether the collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden and cost of the collections of information, including the validity of the methodology and OMB Control No.: 1902–0069. Type of Request: Three-year extension of the FERC–511 information collection requirements with no changes to the current reporting requirements. Abstract: The Commission uses the information collected under the requirements of FERC–511 to implement the statutory provisions of Sections 4(e) and 8 of the Federal Power Act (FPA).1 Section 4(e) authorizes the Commission to issue licenses for the construction, operation and maintenance of reservoirs, powerhouses, and transmission lines or other facilities necessary for the development and improvement of navigation and for the development, transmission, and utilization of power.2 Section 8 of the FPA provides that the voluntary transfer of any license is made only with the written approval of the Commission. Any successor to the licensee may assign the rights of the original licensee but is subject to all of the conditions of the license. The information filed with the Commission is a mandatory requirement contained in the format of a written application for transfer of license, executed jointly by the parties of the proposed transfer. The sale or merger of a licensed hydroelectric project may occasion the transfer of a license. The Commission’s staff uses the information collection to determine the qualifications of the proposed transferee to hold the license and to prepare the transfer of the license order. Approval by the Commission of transfer of a license is contingent upon the transfer of title to the properties under license, delivery of all license instruments, and evidence that such transfer is in the public interest. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR part 9. Type of Respondents: Hydropower Project Licensees. Estimate of Annual Burden: The Commission estimates the annual public reporting burden for the information collection as: Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of public lands and reservations of the United States, or for the purpose of utilizing the surplus water or water power from any Government dam. ADDRESSES: PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 FERC–511, Transfer of Electric License E:\FR\FM\18NON1.SGM 18NON1

Agencies

[Federal Register Volume 81, Number 223 (Friday, November 18, 2016)]
[Notices]
[Pages 81758-81759]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-27812]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-11-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on November 3, 2016 Columbia Gas Transmission, LLC 
(Columbia Gas), 5151 San Felipe, Suite 2500, Houston, Texas 77056 filed 
a prior notice request pursuant to sections 157.205 and 157.213(b) of 
the Commission's regulations under the Natural Gas Act for 
authorization to construct and operate certain natural gas storage 
facilities located in Jackson County, West Virginia. Specifically, 
Columbia proposes to construct and operate three new storage wells and 
related pipeline to tie the wells into existing pipelines at Columbia's 
Ripley Storage Field. It is estimated that the three new directional 
wells will provide a combined total of 15 MMcf per day of improved 
deliverability to the Columbia system, all as more fully set forth in 
the application which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this Application should be directed to 
Robert D. Jackson, Manager, Certificates & Regulatory Administration, 
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, 
Houston, Texas 77002, by calling (832) 320-5487, or by fax (832) 320-
6487, or by email at Robert_jackson@transcanada.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with he Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents

[[Page 81759]]

filed by other parties or issued by the Commission (except for the 
mailing of environmental documents issued by the Commission) and will 
not have the right to seek court review of the Commission's final 
order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file 
electronically should submit original and 5 copies of the protest or 
intervention to the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426.

    Dated: November 10, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-27812 Filed 11-17-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.