Download as PDF 80660 Federal Register / Vol. 81, No. 221 / Wednesday, November 16, 2016 / Notices other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 8, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL17–9–000] Central Hudson Gas & Electric Corporation; Tucson Electric Power Company; UNS Electric, Inc.; UniSource Energy Development Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date asabaliauskas on DSK3SPTVN1PROD with NOTICES On November 8, 2016, the Commission issued an order in Docket No. EL17–9–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of Central Hudson Gas & Electric Corporation’s, Tucson Electric Power Company’s, UNS Electric, Inc.’s, and UniSource Energy Development Company’s market-based rate authority in the Tucson Electric balancing authority area. Central Hudson Gas & Electric Corporation et al., 157 FERC ¶ 61,092 (2016). The refund effective date in Docket No. EL17–9–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL17–9–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2016), within 30 days of the date of issuance of the order. Dated: November 8, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–27480 Filed 11–15–16; 8:45 am] BILLING CODE 6717–01–P 16:23 Nov 15, 2016 Federal Energy Regulatory Commission Combined Notice of Filings #1 [FR Doc. 2016–27479 Filed 11–15–16; 8:45 am] VerDate Sep<11>2014 DEPARTMENT OF ENERGY Jkt 241001 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–323–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Member/Vendor Operating Agreement Section 3.1(b)(iii) Revisions to be effective 1/8/2017. Filed Date: 11/8/16. Accession Number: 20161108–5130. Comments Due: 5 p.m. ET 11/29/16. Docket Numbers: ER17–324–000. Applicants: Pinewood Wind, LLC, Long Prairie Wind I, LLC, Rocky Forge Wind, LLC. Description: Petition for Limited Waiver of Tariff Provisions and Request for Expedited Action of Pinewood Wind, LLC, et al. Filed Date: 11/8/16. Accession Number: 20161108–5159. Comments Due: 5 p.m. ET 11/29/16. Docket Numbers: ER17–325–000. Applicants: Arizona Public Service Company. Description: Tariff Cancellation: Cancellation of Service Agreement No. 355 to be effective 10/10/2016. Filed Date: 11/9/16. Accession Number: 20161109–5052. Comments Due: 5 p.m. ET 11/30/16. Docket Numbers: ER17–326–000. Applicants: Southwestern Public Service Company. Description: § 205(d) Rate Filing: 2016–11–09_SPS–RWSE–ChvCtySlr– 680,681–0.1.0–NOC to be effective 11/ 10/2016. Filed Date: 11/9/16. Accession Number: 20161109–5057. Comments Due: 5 p.m. ET 11/30/16. Docket Numbers: ER17–327–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Service Agreement No. 356, Ocotillo Modernization Project to be effective 10/ 10/2016. Filed Date: 11/9/16. Accession Number: 20161109–5058. Comments Due: 5 p.m. ET 11/30/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 9, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–27484 Filed 11–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice November 10, 2016. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission, DOE. DATE AND TIME: November 17, 2016, 10:00 a.m. PLACE: Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: OPEN. MATTERS TO BE CONSIDERED: Agenda. * NOTE—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https:// ferc.capitolconnection.org/ using the eLibrary link, or may be examined in the Commission’s Public Reference Room. E:\FR\FM\16NON1.SGM 16NON1 Federal Register / Vol. 81, No. 221 / Wednesday, November 16, 2016 / Notices 80661 1032ND—MEETING REGULAR MEETING [November 17, 2016 10:00 a.m.] Item No. Docket No. Company Administrative A–1 ............... A–2 ............... A–3 ............... A–4 ............... AD16–1–000 AD16–7–000 AD07–13– 010 AD17–3–000 Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. 2016 Report on Enforcement. Presentation on the Commission’s Dam Safety Program. Electric E–1 ............... E–2 ............... E–3 ............... E–4 ............... E–5 ............... E–6 ............... E–7 ............... E–8 ............... E–9 ............... E–10 ............. E–11 ............. E–12 ............. E–13 ............. E–14 ............. E–15 ............. RM16–23– 000 AD16–20– 000 RM16–5–000 RM16–6–000 RM16–15– 000 RM15–25– 001 ER16–2528– 000 ER17–144– 000 TS16–1–000 TS15–3–000 ER16–2437– 000 ER13–108– 001 EL16–105– 000 ER16–453– 000 ER16–453– 001 ER15–2294– 000 ER15–2294– 002 ER05–6–124 EL04–135– 126 EL02–111– 145 EL03–212– 140 ER15–2239– 000 ER15–2239– 001 Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators. Electric Storage Participation in Regions with Organized Wholesale Electric Markets. Offer Caps in Markets Operated by Regional Transmission Organizations and Independent System Operators. Essential Reliability Services and the Evolving Bulk-Power System—Primary Frequency Response. Regulations Implementing FAST Act Section 61003—Critical Electric Infrastructure Security and Amending Critical Energy Infrastructure Information. Availability of Certain North American Electric Reliability Corporation Databases to the Commission. Midcontinent Independent System Operator, Inc. New York Independent System Operator, Inc. NorthWestern Corporation. City of Rochester, Minnesota Board of Public Utilities. Alcoa Power Generating Inc. Alcoa Power Generating Inc. Goodyear Tire & Rubber Company v. Entergy Texas, Inc. PJM Interconnection, L.L.C. and Northeast Transmission Development, LLC. Pacific Gas and Electric Company. Midwest Independent Transmission System Operator, Inc. Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, LLC. Ameren Services Company. NextEra Energy Transmission West, LLC. Miscellaneous M–1 ............... RM17–5–000 Regulations Implementing the FOIA Improvement Act of 2016 and Clarifying the FOIA Regulations. Hydro H–1 ............... asabaliauskas on DSK3SPTVN1PROD with NOTICES H–2 ............... H–3 ............... VerDate Sep<11>2014 RM16–19– 000 P–2307–075 P–12379–051 P–8221–098 P–2170–054 P–420–088 P–1922–048 P–11841–031 P–2742–037 P–2911–042 3015–018 RM17–4–000 16:23 Nov 15, 2016 Annual Charges for Use of Government Lands in Alaska. Alaska Electric Light and Power. Alaska Energy Authority. Chugach Electric Association. Ketchikan Public Utilities. Copper Valley Electric Association. Southeast Alaska Power Agency. Establishing the Length of License Terms for Hydroelectric Projects. Jkt 241001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\16NON1.SGM 16NON1 80662 Federal Register / Vol. 81, No. 221 / Wednesday, November 16, 2016 / Notices 1032ND—MEETING REGULAR MEETING—Continued [November 17, 2016 10:00 a.m.] Item No. Docket No. H–4 ............... H–5 ............... P–2114–279 P–14754–001 Company Public Utility District No. 2 of Grant County, Washington. Rivertec Partners, LLC. Certificates C–1 ............... CP16–18– 000 Magnum Gas Storage, LLC. Kimberly D. Bose, Secretary. A free webcast of this event is available through https:// ferc.capitolconnection.org/. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https:// ferc.capitolconnection.org/ or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2016–27625 Filed 11–14–16; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission asabaliauskas on DSK3SPTVN1PROD with NOTICES [Project No. 10674–016] Kaukauna Utilities; Notice of Intent To File License Application, Filing of PreApplication Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 10674–016. c. Date Filed: September 23, 2016. d. Submitted By: Kaukauna Utilities. e. Name of Project: Kimberly Hydroelectric Project. VerDate Sep<11>2014 16:23 Nov 15, 2016 Jkt 241001 f. Location: On the Fox River, at the U.S. Army Corps of Engineers’ Cedars Dam in the Village of Kimberly in Outagamie County, Wisconsin. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mike Pedersen, Manager of Generation and Operations, Kaukauna Utilities, 777 Island Street, P.O. Box 1777, Kaukauna, WI 54130–7077, phone: (920) 462–0220. i. FERC Contact: Colleen Corballis at (202) 502–8598; or email at colleen.corballis@ferc.gov. j. Kaukauna Utilities filed its request to use the Traditional Licensing Process on September 23, 2016. Kaukauna Utilities provided public notice of its request on October 25, 2016. In a letter dated November 8, 2016, the Director of the Division of Hydropower Licensing approved Kaukauna Utilities’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Wisconsin State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Kaukauna Utilities as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act; section 305 of the Magnuson-Stevens Fishery Conservation and Management Act; and section 106 of the National Historic Preservation Act. m. Kaukauna Utilities filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 10674. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by September 30, 2019. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: November 8, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–27448 Filed 11–15–16; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2016–0511; FRL–9954–84] Certain New Chemicals or Significant New Uses; Statements of Findings for October 2016 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: Section 5(g) of the Toxic Substances Control Act (TSCA) requires SUMMARY: E:\FR\FM\16NON1.SGM 16NON1

Agencies

[Federal Register Volume 81, Number 221 (Wednesday, November 16, 2016)]
[Notices]
[Pages 80660-80662]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-27625]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

November 10, 2016.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission, DOE.

DATE AND TIME: November 17, 2016, 10:00 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: OPEN.

MATTERS TO BE CONSIDERED: Agenda.
    * NOTE--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://ferc.capitolconnection.org/ using the 
eLibrary link, or may be examined in the Commission's Public Reference 
Room.

[[Page 80661]]



                     1032ND--Meeting Regular Meeting
                     [November 17, 2016 10:00 a.m.]
------------------------------------------------------------------------
     Item No.           Docket No.                   Company
------------------------------------------------------------------------
                             Administrative
------------------------------------------------------------------------
A-1...............  AD16-1-000          Agency Administrative Matters.
A-2...............  AD16-7-000          Customer Matters, Reliability,
                                         Security and Market Operations.
A-3...............  AD07-13-010         2016 Report on Enforcement.
A-4...............  AD17-3-000          Presentation on the Commission's
                                         Dam Safety Program.
------------------------------------------------------------------------
                                Electric
------------------------------------------------------------------------
E-1...............  RM16-23-000         Electric Storage Participation
                                         in Markets Operated by Regional
                                         Transmission Organizations and
                                         Independent System Operators.
                    AD16-20-000         Electric Storage Participation
                                         in Regions with Organized
                                         Wholesale Electric Markets.
E-2...............  RM16-5-000          Offer Caps in Markets Operated
                                         by Regional Transmission
                                         Organizations and Independent
                                         System Operators.
E-3...............  RM16-6-000          Essential Reliability Services
                                         and the Evolving Bulk-Power
                                         System--Primary Frequency
                                         Response.
E-4...............  RM16-15-000         Regulations Implementing FAST
                                         Act Section 61003--Critical
                                         Electric Infrastructure
                                         Security and Amending Critical
                                         Energy Infrastructure
                                         Information.
                    RM15-25-001         Availability of Certain North
                                         American Electric Reliability
                                         Corporation Databases to the
                                         Commission.
E-5...............  ER16-2528-000       Midcontinent Independent System
                                         Operator, Inc.
E-6...............  ER17-144-000        New York Independent System
                                         Operator, Inc.
E-7...............  TS16-1-000          NorthWestern Corporation.
E-8...............  TS15-3-000          City of Rochester, Minnesota
                                         Board of Public Utilities.
E-9...............  ER16-2437-000       Alcoa Power Generating Inc.
E-10..............  ER13-108-001        Alcoa Power Generating Inc.
E-11..............  EL16-105-000        Goodyear Tire & Rubber Company
                                         v. Entergy Texas, Inc.
E-12..............  ER16-453-000        PJM Interconnection, L.L.C. and
                                         Northeast Transmission
                                         Development, LLC.
                    ER16-453-001
E-13..............  ER15-2294-000       Pacific Gas and Electric
                                         Company.
                    ER15-2294-002
E-14..............  ER05-6-124          Midwest Independent Transmission
                                         System Operator, Inc.
                    EL04-135-126        Midwest Independent Transmission
                                         System Operator, Inc. and PJM
                                         Interconnection, LLC.
                    EL02-111-145
                    EL03-212-140        Ameren Services Company.
E-15..............  ER15-2239-000       NextEra Energy Transmission
                                         West, LLC.
                    ER15-2239-001
------------------------------------------------------------------------
                              Miscellaneous
------------------------------------------------------------------------
M-1...............  RM17-5-000          Regulations Implementing the
                                         FOIA Improvement Act of 2016
                                         and Clarifying the FOIA
                                         Regulations.
------------------------------------------------------------------------
                                  Hydro
------------------------------------------------------------------------
H-1...............  RM16-19-000         Annual Charges for Use of
                                         Government Lands in Alaska.
H-2...............  P-2307-075          Alaska Electric Light and Power.
                    P-12379-051
                    P-8221-098          Alaska Energy Authority.
                    P-2170-054          Chugach Electric Association.
                    P-420-088           Ketchikan Public Utilities.
                    P-1922-048
                    P-11841-031
                    P-2742-037          Copper Valley Electric
                                         Association.
                    P-2911-042          Southeast Alaska Power Agency.
                    3015-018
H-3...............  RM17-4-000          Establishing the Length of
                                         License Terms for Hydroelectric
                                         Projects.

[[Page 80662]]

 
H-4...............  P-2114-279          Public Utility District No. 2 of
                                         Grant County, Washington.
H-5...............  P-14754-001         Rivertec Partners, LLC.
------------------------------------------------------------------------
                              Certificates
------------------------------------------------------------------------
C-1...............  CP16-18-000         Magnum Gas Storage, LLC.
------------------------------------------------------------------------


Kimberly D. Bose,
Secretary.

    A free webcast of this event is available through https://ferc.capitolconnection.org/. Anyone with Internet access who desires to 
view this event can do so by navigating to www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://ferc.capitolconnection.org/ or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2016-27625 Filed 11-14-16; 11:15 am]
BILLING CODE 6717-01-P