Applicants: Exelon West Medway II,
LLC.
Description: Compliance filing:
Exelon West Medway II LLC Revised
Tariff to be effective 11/8/2016.
Filed Date: 11/7/16.
Accession Number: 20161107–5139.
Comments Due: 5 p.m. ET 11/28/16.
Docket Numbers: ER17–3–001.
Applicants: ESS Lewes Project, LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective
12/2/2016.
Filed Date: 11/7/16.
Accession Number: 20161107–5208.
Comments Due: 5 p.m. ET 11/28/16.
Docket Numbers: ER17–94–001.
Applicants: ESS Snook Project, LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective
12/13/2016.
Filed Date: 11/7/16.
Accession Number: 20161107–5205.
Comments Due: 5 p.m. ET 11/28/16.
Docket Numbers: ER17–313–000.
Applicants: AEP Texas Central
Company.
Description: § 205(d) Rate Filing: TCCPatriot Wind Farm Second Amend &
Restated IA to be effective 10/13/2016.
Filed Date: 11/7/16.
Accession Number: 20161107–5149.
Comments Due: 5 p.m. ET 11/28/16.
Docket Numbers: ER17–314–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA SA No. 3333; Queue
No. W3–003 to be effective 6/24/2014.
Filed Date: 11/7/16.
Accession Number: 20161107–5154.
Comments Due: 5 p.m. ET 11/28/16.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM17–2–000.
Applicants: East Kentucky Power
Cooperative, Inc.
Description: Application of East
Kentucky Power Cooperative, Inc. for
the termination of the obligation to
purchase power from qualifying
facilities.
Filed Date: 11/4/16.
Accession Number: 20161104–5214.
Comments Due: 5 p.m. ET 12/2/16.
Take notice that the Commission
received the following electric
reliability filings
Docket Numbers: RD16–6–001.
Applicants: North American Electric
Reliability Corporation.
Description: Revisions of the North
American Electric Reliability
Corporation to the Violations Risk
Factors for Reliability Standards IRO–
018–1 and TOP–010–1.
VerDate Sep<11>2014
17:26 Nov 10, 2016
Jkt 241001
Filed Date: 11/7/16.
Accession Number: 20161107–5195.
Comments Due: 5 p.m. ET 12/7/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 7, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–27290 Filed 11–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Petition for Enforcement
Docket Nos.
Otter Creek Solar LLC .......
Allco Finance Limited PLH
LLC.
Otter Creek Solar LLC .......
Otter Creek Solar LLC .......
Otter Creek Solar LLC .......
Otter Creek Solar LLC .......
Otter Creek Solar LLC .......
EL17–16–000
Frm 00057
Fmt 4703
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 25, 2016.
Dated: November 7, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–27291 Filed 11–10–16; 8:45 am]
QF13–402–006
QF16–353–001
QF16–354–001
QF16–355–001
QF16–356–001
Take notice that on November 4,
2016, pursuant to section 210(h)(2)(B) of
the Public Utility Regulatory Policies
Act of 1978 (PURPA), Otter Creek Solar
LLC, Allco Finance Limited, and PLH
LLC (Petitioners) filed a Petition for
Enforcement, requesting the Federal
Energy Regulatory Commission
(Commission) to exercise its authority
and initiate enforcement action against
the Vermont Public Service Board to
remedy their alleged improper
implementation of PURPA, all as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
PO 00000
79467
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–14–000]
East Texas Electric Cooperative, Inc.;
Notice of Filing
Take notice that on October 31, 2016,
East Texas Electric Cooperative, Inc.
filed an application for cost-based
revenue requirements schedule for
reactive power production capability.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
E:\FR\FM\14NON1.SGM
14NON1
Agencies
[Federal Register Volume 81, Number 219 (Monday, November 14, 2016)]
[Notices]
[Page 79467]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-27291]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Petition for Enforcement
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Otter Creek Solar LLC.................. EL17-16-000
Allco Finance Limited PLH LLC..........
Otter Creek Solar LLC.................. QF13-402-006
Otter Creek Solar LLC.................. QF16-353-001
Otter Creek Solar LLC.................. QF16-354-001
Otter Creek Solar LLC.................. QF16-355-001
Otter Creek Solar LLC.................. QF16-356-001
------------------------------------------------------------------------
Take notice that on November 4, 2016, pursuant to section
210(h)(2)(B) of the Public Utility Regulatory Policies Act of 1978
(PURPA), Otter Creek Solar LLC, Allco Finance Limited, and PLH LLC
(Petitioners) filed a Petition for Enforcement, requesting the Federal
Energy Regulatory Commission (Commission) to exercise its authority and
initiate enforcement action against the Vermont Public Service Board to
remedy their alleged improper implementation of PURPA, all as more
fully explained in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Petitioners.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on November 25, 2016.
Dated: November 7, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-27291 Filed 11-10-16; 8:45 am]