Drawbridge Operation Regulation; Great Channel, New Jersey Intracoastal Waterway, Stone Harbor, NJ, 79393 [2016-27281]
Download as PDF
Federal Register / Vol. 81, No. 219 / Monday, November 14, 2016 / Rules and Regulations
reviewed by the Office of Management
and Budget (OMB).
This action will not have substantial
direct effects on the States, on the
relationship between the national
government and the States, or on the
distribution of power and
responsibilities among the various
levels of government. Therefore, in
accordance with Executive Order 13132
(Federalism) it is determined that this
action does not have sufficient
federalism implications to warrant the
preparation of a Federalism Assessment.
As noted above, this action is an
order, not a rule. Accordingly, the
Congressional Review Act (CRA) is
inapplicable, as it applies only to rules.
However, if this were a rule, pursuant
to the Congressional Review Act, ‘‘any
rule for which an agency for good cause
finds that notice and public procedure
thereon are impracticable, unnecessary,
or contrary to the public interest, shall
take effect at such time as the federal
agency promulgating the rule
determines.’’ 5 U.S.C. 808(2). It is in the
public interest to schedule this
substance immediately because it poses
a public health risk. This temporary
scheduling action is taken pursuant to
21 U.S.C. 811(h), which is specifically
designed to enable the DEA to act in an
expeditious manner to avoid an
imminent hazard to the public safety. 21
U.S.C. 811(h) exempts the temporary
scheduling order from standard notice
and comment rulemaking procedures to
ensure that the process moves swiftly.
For the same reasons that underlie 21
U.S.C. 811(h), that is, the DEA’s need to
move quickly to place this substance
into schedule I because it poses an
imminent hazard to the public safety
and it would be contrary to the public
interest to delay implementation of the
temporary scheduling order. Therefore,
this order shall take effect immediately
upon its publication. The DEA has
submitted a copy of this final order to
both Houses of Congress and to the
Comptroller General, although such
filing is not required under the Small
Business Regulatory Enforcement
Fairness Act of 1996 (Congressional
Review Act), 5 U.S.C. 801–808, because,
as noted above, this action is an order,
not a rule.
Lhorne on DSK30JT082PROD with RULES
List of Subjects in 21 CFR Part 1308
Administrative practice and
procedure, Drug traffic control,
Reporting and recordkeeping
requirements.
For the reasons set out above, the DEA
amends 21 CFR part 1308 as follows:
VerDate Sep<11>2014
15:02 Nov 10, 2016
Jkt 241001
79393
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
■ 1. The authority citation for part 1308
you have questions on this temporary
continues to read as follows:
deviation, call or email Mr. Hal R. Pitts,
Authority: 21 U.S.C. 811, 812, 871(b),
Bridge Administration Branch Fifth
unless otherwise noted.
District, Coast Guard, telephone 757–
398–6222, email Hal.R.Pitts@uscg.mil.
■ 2. Amend § 1308.11 by adding
SUPPLEMENTARY INFORMATION: The
paragraph (h)(18) to read as follows:
County of Cape May, NJ, that owns and
§ 1308.11 Schedule I.
operates the Stone Harbor Boulevard
*
*
*
*
*
(CR657) Bridge across the Great
(h) * * *
Channel, mile 102.0, New Jersey
(18)
3,4-Dichloro-N-[2Intracoastal Waterway, at Stone Harbor,
(dimethylamino)cyclohexyl]-NNJ, has requested a temporary deviation
methylbenzamide, its isomers,
from the current operating regulations to
esters, ethers, salts and salts of
avoid bridge failure and perform
isomers, esters and ethers
emergency repairs to the bridge, due to
(Other name: U–47700) .............
(9547)
a serious crack in one of two main
*
*
*
*
*
bridge girders, causing the bridge to be
unsafe for vehicular traffic and
Dated: November 7, 2016.
movement of the bascule spans. The
Chuck Rosenberg,
bridge is a bascule drawbridge and has
Acting Administrator.
a vertical clearance in the closed
[FR Doc. 2016–27357 Filed 11–10–16; 8:45 am]
position of 10 feet above mean high
BILLING CODE 4410–09–P
water.
The current operating schedule is set
out in 33 CFR 117.733(h). Under this
DEPARTMENT OF HOMELAND
temporary deviation, the bridge will
SECURITY
remain in the closed-to-navigation
position until 4 p.m. on December 2,
Coast Guard
2016.
The Great Channel, New Jersey
33 CFR Part 117
Intracoastal Waterway is used by a
[Docket No. USCG–2016–1008]
variety of vessels including small public
vessels, small commercial vessels, tug
Drawbridge Operation Regulation;
and barge traffic, and recreational
Great Channel, New Jersey
vessels. The Coast Guard has carefully
Intracoastal Waterway, Stone Harbor,
considered the nature and volume of
NJ
vessel traffic on the waterway in
publishing this temporary deviation.
AGENCY: Coast Guard, DHS.
Vessels able to safely pass through the
ACTION: Notice of deviation from
bridge in the closed position may do so
drawbridge regulation.
at any time. The bridge will not be able
to open for emergencies and there is no
SUMMARY: The Coast Guard has issued a
immediate alternate route for vessels to
temporary deviation from the operating
pass. The Coast Guard will also inform
schedule that governs the Stone Harbor
the users of the waterways through our
Boulevard (CR657) Bridge across the
Local and Broadcast Notices to Mariners
Great Channel, mile 102.0, New Jersey
Intracoastal Waterway, at Stone Harbor, of the change in operating schedule for
the bridge so that vessel operators can
NJ. This deviation is necessary to avoid
arrange their transit to minimize any
bridge failure and perform emergency
bridge repairs. This deviation allows the impact caused by the temporary
deviation.
bridge to remain in the closed-toIn accordance with 33 CFR 117.35(e),
navigation position.
the drawbridge must return to its regular
DATES: This deviation is effective
operating schedule immediately at the
without actual notice from November
14, 2016 through 4 p.m. on December 2, end of the effective period of this
temporary deviation. This deviation
2016. For the purposes of enforcement,
from the operating regulations is
actual notice will be used from
authorized under 33 CFR 117.35.
November 8, 2016, until November 14,
Dated: November 8, 2016.
2016.
Hal R. Pitts,
ADDRESSES: The docket for this
Bridge Program Manager, Fifth Coast Guard
deviation, [USCG–2016–1008] is
available at https://www.regulations.gov. District.
[FR Doc. 2016–27281 Filed 11–10–16; 8:45 am]
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
BILLING CODE 9110–04–P
PART 1308—SCHEDULES OF
CONTROLLED SUBSTANCES
PO 00000
Frm 00013
Fmt 4700
Sfmt 9990
E:\FR\FM\14NOR1.SGM
14NOR1
Agencies
[Federal Register Volume 81, Number 219 (Monday, November 14, 2016)]
[Rules and Regulations]
[Page 79393]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-27281]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-1008]
Drawbridge Operation Regulation; Great Channel, New Jersey
Intracoastal Waterway, Stone Harbor, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Stone Harbor Boulevard (CR657)
Bridge across the Great Channel, mile 102.0, New Jersey Intracoastal
Waterway, at Stone Harbor, NJ. This deviation is necessary to avoid
bridge failure and perform emergency bridge repairs. This deviation
allows the bridge to remain in the closed-to-navigation position.
DATES: This deviation is effective without actual notice from November
14, 2016 through 4 p.m. on December 2, 2016. For the purposes of
enforcement, actual notice will be used from November 8, 2016, until
November 14, 2016.
ADDRESSES: The docket for this deviation, [USCG-2016-1008] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Hal R. Pitts, Bridge
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6222, email Hal.R.Pitts@uscg.mil.
SUPPLEMENTARY INFORMATION: The County of Cape May, NJ, that owns and
operates the Stone Harbor Boulevard (CR657) Bridge across the Great
Channel, mile 102.0, New Jersey Intracoastal Waterway, at Stone Harbor,
NJ, has requested a temporary deviation from the current operating
regulations to avoid bridge failure and perform emergency repairs to
the bridge, due to a serious crack in one of two main bridge girders,
causing the bridge to be unsafe for vehicular traffic and movement of
the bascule spans. The bridge is a bascule drawbridge and has a
vertical clearance in the closed position of 10 feet above mean high
water.
The current operating schedule is set out in 33 CFR 117.733(h).
Under this temporary deviation, the bridge will remain in the closed-
to-navigation position until 4 p.m. on December 2, 2016.
The Great Channel, New Jersey Intracoastal Waterway is used by a
variety of vessels including small public vessels, small commercial
vessels, tug and barge traffic, and recreational vessels. The Coast
Guard has carefully considered the nature and volume of vessel traffic
on the waterway in publishing this temporary deviation.
Vessels able to safely pass through the bridge in the closed
position may do so at any time. The bridge will not be able to open for
emergencies and there is no immediate alternate route for vessels to
pass. The Coast Guard will also inform the users of the waterways
through our Local and Broadcast Notices to Mariners of the change in
operating schedule for the bridge so that vessel operators can arrange
their transit to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: November 8, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2016-27281 Filed 11-10-16; 8:45 am]