Drawbridge Operation Regulation; Great Channel, Between Stone Harbor and Nummy Island, NJ, 78912 [2016-27184]

Download as PDF 78912 Federal Register / Vol. 81, No. 218 / Thursday, November 10, 2016 / Rules and Regulations Environmental Policy Act does not apply because the rule does not have an adverse impact on the environment. D. Paperwork Reduction Act It has been certified that this rule does impose reporting or recordkeeping requirements under the Paperwork Reduction Act of 1995. OMB has approved these requirements under OMB Control Number 0702–0128. E. Executive Order 12630 (Government Actions and Interference With Constitutionally Protected Property Rights) The Department of the Army has determined that Executive Order 12630 does not apply because the rule does not impair private property rights. F. Executive Order 12866 (Regulatory Planning and Review) and Executive Order 13563 (Improving Regulation and Regulatory Review) The Department of the Army has determined that according to the criteria defined in Executive Order 12866 and Executive Order 13563, this rule is not a significant regulatory action. 2. Amend § 635.6 by revising paragraph (a) to read as follows: ■ § 635.6 Registration of sex offenders on Army installations (inside and outside the Continental United States) (a) Sex Offenders on US Army Installations. Garrison Commander’s responsibilities: Garrison Commanders will ensure that sex offenders, as defined in paragraph (b) of this section that reside or are employed on an Army Installation register with the installation PM/DES. This includes service members, civilian employees, accompanying dependent family members, and contractors subject to the incorporation of the sex offender registration requirement into the contract. * * * * * Thomas S. Blair, Chief, Law Enforcement Branch. [FR Doc. 2016–27165 Filed 11–9–16; 8:45 am] BILLING CODE 5001–03–P DEPARTMENT OF HOMELAND SECURITY G. Executive Order 13045 (Protection of Children From Environmental Health Risk and Safety Risks) Coast Guard The Department of the Army has determined that the criteria of Executive Order 13045 do not apply because this rule does not implement or require actions impacting environmental health and safety risks on children. [Docket No. USCG–2016–1004] H. Executive Order 13132 (Federalism) ACTION: The Department of the Army has determined that the criteria of Executive Order 13132 do not apply because this rule will not have a substantial effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. List of Subjects in 32 CFR Part 635 asabaliauskas on DSK3SPTVN1PROD with RULES Crime, Law, Law enforcement, Law enforcement officers, Military law. For reasons stated in the preamble the Department of the Army amends 32 CFR part 635 as follows: PART 635—LAW ENFORCEMENT REPORTING 1. The authority citation for part 635 continues to read as follows: ■ Authority: 28 U.S.C. 534, 42 U.S.C. 10601, 18 U.S.C. 922, 10 U.S.C. 1562, 10 U.S.C. Chap. 47, 42 U.S.C. 16901 et seq., 10 U.S.C. 1565, 42 U.S.C. 14135a. VerDate Sep<11>2014 16:33 Nov 09, 2016 Jkt 241001 33 CFR Part 117 Drawbridge Operation Regulation; Great Channel, Between Stone Harbor and Nummy Island, NJ Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Cape May County (Ocean Drive/CR619) Bridge across the Great Channel, mile 0.7, between Stone Harbor and Nummy Island, NJ. This deviation is necessary to avoid bridge failure and perform emergency bridge repairs. This deviation allows the bridge to remain in the closed-to-navigation position. DATES: This deviation is effective without actual notice from November 10, 2016 through 4 p.m. on December 2, 2016. For the purposes of enforcement, actual notice will be used from November 7, 2016 at 9 a.m., until November 10, 2016. ADDRESSES: The docket for this deviation, [USCG–2016–1004] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. SUMMARY: PO 00000 Frm 00014 Fmt 4700 Sfmt 9990 If you have questions on this temporary deviation, call or email Mr. Hal R. Pitts, Bridge Administration Branch Fifth District, Coast Guard, telephone 757– 398–6222, email Hal.R.Pitts@uscg.mil. FOR FURTHER INFORMATION CONTACT: The County of Cape May, NJ, that owns and operates the Cape May County (Ocean Drive/CR619) Bridge, across the Great Channel, mile 0.7, between Stone Harbor and Nummy Island, NJ, has requested a temporary deviation from the current operating regulations to avoid bridge failure and perform emergency repairs to the bridge, due to mechanical failure of the bascule span motor break, machinery brakes, and span lock mechanisms. The bridge is a bascule draw bridge and has a vertical clearance in the closed position of 11 feet above mean high water. The current operating schedule is set out in 33 CFR 117.720. Under this temporary deviation, the bridge will remain in the closed-to-navigation position until 4 p.m. on December 2, 2016. The Great Channel is used by a variety of vessels including small public vessels, commercial vessels, and recreational vessels. The Coast Guard has carefully considered the nature and volume of vessel traffic on the waterway in publishing this temporary deviation. Vessels able to safely pass through the bridge in the closed position may do so at any time. The bridge will not be able to open for emergencies and Grassy Sound Channel (Ocean Drive/CR619) Bridge, across Grassy Sound Channel, mile 1.0, at North Wildwood, NJ, can be used as an alternate route for vessels unable to pass through the bridge in the closed position. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transit to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. SUPPLEMENTARY INFORMATION: Dated: November 7, 2016. Hal R. Pitts, Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2016–27184 Filed 11–9–16; 8:45 am] BILLING CODE 9110–04–P E:\FR\FM\10NOR1.SGM 10NOR1

Agencies

[Federal Register Volume 81, Number 218 (Thursday, November 10, 2016)]
[Rules and Regulations]
[Page 78912]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-27184]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-1004]


Drawbridge Operation Regulation; Great Channel, Between Stone 
Harbor and Nummy Island, NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Cape May County (Ocean Drive/CR619) 
Bridge across the Great Channel, mile 0.7, between Stone Harbor and 
Nummy Island, NJ. This deviation is necessary to avoid bridge failure 
and perform emergency bridge repairs. This deviation allows the bridge 
to remain in the closed-to-navigation position.

DATES: This deviation is effective without actual notice from November 
10, 2016 through 4 p.m. on December 2, 2016. For the purposes of 
enforcement, actual notice will be used from November 7, 2016 at 9 
a.m., until November 10, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-1004] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Hal R. Pitts, Bridge 
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6222, email Hal.R.Pitts@uscg.mil.

SUPPLEMENTARY INFORMATION: The County of Cape May, NJ, that owns and 
operates the Cape May County (Ocean Drive/CR619) Bridge, across the 
Great Channel, mile 0.7, between Stone Harbor and Nummy Island, NJ, has 
requested a temporary deviation from the current operating regulations 
to avoid bridge failure and perform emergency repairs to the bridge, 
due to mechanical failure of the bascule span motor break, machinery 
brakes, and span lock mechanisms. The bridge is a bascule draw bridge 
and has a vertical clearance in the closed position of 11 feet above 
mean high water.
    The current operating schedule is set out in 33 CFR 117.720. Under 
this temporary deviation, the bridge will remain in the closed-to-
navigation position until 4 p.m. on December 2, 2016.
    The Great Channel is used by a variety of vessels including small 
public vessels, commercial vessels, and recreational vessels. The Coast 
Guard has carefully considered the nature and volume of vessel traffic 
on the waterway in publishing this temporary deviation.
    Vessels able to safely pass through the bridge in the closed 
position may do so at any time. The bridge will not be able to open for 
emergencies and Grassy Sound Channel (Ocean Drive/CR619) Bridge, across 
Grassy Sound Channel, mile 1.0, at North Wildwood, NJ, can be used as 
an alternate route for vessels unable to pass through the bridge in the 
closed position. The Coast Guard will also inform the users of the 
waterways through our Local and Broadcast Notices to Mariners of the 
change in operating schedule for the bridge so that vessel operators 
can arrange their transit to minimize any impact caused by the 
temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: November 7, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2016-27184 Filed 11-9-16; 8:45 am]
 BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.