Download as PDF 78802 Federal Register / Vol. 81, No. 217 / Wednesday, November 9, 2016 / Notices DEPARTMENT OF ENERGY Background Federal Energy Regulatory Commission On February 23, 2016, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Planned Cedar Station Upgrade Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting (NOI). The NOI was issued during the pre-filing review of the Project in Docket No. PF15–32– 000 and was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments from Dakota and Goodhue Counties, Thomas Lake Country Homes Homeowners Association, Winnebago Tribe of Nebraska, Minnesota Department of Natural Resources, and over 350 concerned landowners/ stakeholders. The primary issues raised by the commentors are: Impacts on residential areas from construction; alternatives that avoid residential areas; and impacts on Lebanon Hills Regional Park and alternatives that would avoid this park. [Docket No. CP16–487–000; PF15–32–000] Northern Natural Gas Company; Notice of Schedule for Environmental Review of the Cedar Station Upgrade Project On July 29, 2016, Northern Natural Gas Company (Northern) filed an application in Docket No. CP16–487– 000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. The project is known as the Cedar Station Upgrade Project (Project), and would involve the construction of a new 20-inch-diameter pipeline loop 1 to fulfill Northern’s contractual obligation to provide an increased gas pressure of 650 pounds per square inch gauge to Northern States Power Company. On August 11, 2016, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA December 9, 2016 90-day Federal Authorization Decision Deadline March 9, 2017 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. sradovich on DSK3GMQ082PROD with NOTICES Project Description Northern proposes to construct the following facilities: • About 7.86 miles of 20-inchdiameter pipeline loop; • a pig 2 launcher and takeoff valve at milepost 0.0; and • a pig receiver and tie-in valve, and modifications to regulators and piping within the existing Cedar Meter Station boundaries. 1 A pipeline ‘‘loop’’ is a segment of pipe installed parallel to an existing pipeline. 2 A pig is an internal pipeline tool used to clean a pipeline and/or to inspect for damage or corrosion. VerDate Sep<11>2014 16:29 Nov 08, 2016 Jkt 241001 Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP16–487), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Dated: November 3, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–27066 Filed 11–8–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2343–086] PE Hydro Generation, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License. b. Project No.: 2343–086. c. Date filed: December 30, 2015. d. Applicant: PE Hydro Generation, LLC. e. Name of Project: Millville Hydroelectric Project. f. Location: The existing project is located on the Shenandoah River, near the town of Harpers Ferry in Jefferson County, West Virginia. No federal lands are occupied by project works or located within the project boundary. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: John Collins, Executive Vice President, Cube Hydro Partners, LLC, 2 Bethesda Metro Center, Suite 1330, Bethesda, MD 20814; Telephone—(240) 482–2703. i. FERC Contact: Michael Spencer, (202) 502–6093, or michael.spencer@ ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: 60 Days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ E:\FR\FM\09NON1.SGM 09NON1 Federal Register / Vol. 81, No. 217 / Wednesday, November 9, 2016 / Notices ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2343–086. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The Millville project consists of: (1) A 14.0-foot-high concrete and stone dam consisting of three sections: a 36-footlong non-overflow abutment on the east bank; an 813-foot long, non-gated spillway section; and a 122-foot-long intake structure, equipped with four vertical lift gates and one canal gate, and extending to the west riverbank; (2) a 100 acre reservoir with gross storage capacity of 900 acre-feet at elevation 324.0 mean sea level; (3) a 1,600-footlong, 30-foot-wide, 12-foot-high masonry and concrete sided headrace canal; (4) a 125-foot-long, 40-foot-wide brick powerhouse containing 3 turbinegenerating units with a combined capacity of 2.84 megawatts; (5) a 550foot-long tailrace, excavated in bedrock and returning flow to the river channel; and (6) a 1,006-foot-long, 2.4 kilovolt (kV) transmission line to a transformer, with a 794-foot-long, 34.5 kV transmission line to the interconnection with the local grid. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date sradovich on DSK3GMQ082PROD with NOTICES Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions .................................... Commission issues EA .............................................................................................................................................................. Comments on EA or EIS ........................................................................................................................................................... Modified terms and conditions ................................................................................................................................................... p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: November 2, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–26992 Filed 11–8–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG17–23–000. VerDate Sep<11>2014 16:29 Nov 08, 2016 Jkt 241001 PO 00000 Frm 00032 Fmt 4703 78803 Sfmt 4703 January, 2016. May, 2017. June, 2017. August, 2017. Applicants: Pima Energy Storage System, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Pima Energy Storage System, LLC. Filed Date: 11/2/16. Accession Number: 20161102–5166. Comments Due: 5 p.m. ET 11/23/16. Docket Numbers: EG17–24–000. Applicants: Portal Ridge Solar A, LLC. Description: Portal Ridge Solar A, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 11/3/16. Accession Number: 20161103–5077. Comments Due: 5 p.m. ET 11/25/16. E:\FR\FM\09NON1.SGM 09NON1

Agencies

[Federal Register Volume 81, Number 217 (Wednesday, November 9, 2016)]
[Notices]
[Pages 78802-78803]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26992]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2343-086]


PE Hydro Generation, LLC; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major License.
    b. Project No.: 2343-086.
    c. Date filed: December 30, 2015.
    d. Applicant: PE Hydro Generation, LLC.
    e. Name of Project: Millville Hydroelectric Project.
    f. Location: The existing project is located on the Shenandoah 
River, near the town of Harpers Ferry in Jefferson County, West 
Virginia. No federal lands are occupied by project works or located 
within the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: John Collins, Executive Vice President, Cube 
Hydro Partners, LLC, 2 Bethesda Metro Center, Suite 1330, Bethesda, MD 
20814; Telephone--(240) 482-2703.
    i. FERC Contact: Michael Spencer, (202) 502-6093, or 
michael.spencer@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 Days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/

[[Page 78803]]

ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2343-086.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The Millville project consists of: (1) A 14.0-foot-high concrete 
and stone dam consisting of three sections: a 36-foot-long non-overflow 
abutment on the east bank; an 813-foot long, non-gated spillway 
section; and a 122-foot-long intake structure, equipped with four 
vertical lift gates and one canal gate, and extending to the west 
riverbank; (2) a 100 acre reservoir with gross storage capacity of 900 
acre-feet at elevation 324.0 mean sea level; (3) a 1,600-foot-long, 30-
foot-wide, 12-foot-high masonry and concrete sided headrace canal; (4) 
a 125-foot-long, 40-foot-wide brick powerhouse containing 3 turbine-
generating units with a combined capacity of 2.84 megawatts; (5) a 550-
foot-long tailrace, excavated in bedrock and returning flow to the 
river channel; and (6) a 1,006-foot-long, 2.4 kilovolt (kV) 
transmission line to a transformer, with a 794-foot-long, 34.5 kV 
transmission line to the interconnection with the local grid.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations,             January, 2016.
 preliminary terms and conditions,
 and preliminary fishway
 prescriptions.
Commission issues EA.................  May, 2017.
Comments on EA or EIS................  June, 2017.
Modified terms and conditions........  August, 2017.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: November 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-26992 Filed 11-8-16; 8:45 am]
 BILLING CODE 6717-01-P