FFP Project 124, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 76570-76571 [2016-26591]
Download as PDF
mstockstill on DSK3G9T082PROD with NOTICES
76570
Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices
and 157.216 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act (NGA) and
Gulf South’s blanket authorizations
issued in Docket Nos. CP82–430–000.
Gulf South seeks authorization to
abandon on compressor units and
associated facilities, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Gulf South proposes to abandon
facilities at its Napoleonville
Compressor Station, located in
Assumption Parish, Louisiana. Gulf
South proposes to abandon two 1,100
horsepower reciprocating units and
abandon appurtenant facilities. Gulf
South states the units have been idle
since 2006 and are now in need of
repair or replacement, it claims that the
most prudent course of action is to
abandon the units and that the proposed
abandonment will not result in a
material decrease in service to
customers.
Any questions regarding this
Application should be directed to Kathy
D. Fort, Manager, Certificates and
Tariffs, Gulf South Pipeline Company,
LP, 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, by phone (270)
688–6825, by fax (713) 479–1745, or by
email at kathy.fort@bwpmlp.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
VerDate Sep<11>2014
17:54 Nov 02, 2016
Jkt 241001
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: October 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26603 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14510–001]
FFP Project 124, LLC; Notice of Intent
To File License Application, Filing of
Pre-Application Document, Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14510–001.
c. Date Filed: August 24, 2016.
d. Submitted By: FFP Project 124,
LLC.
e. Name of Project: Red River Lock
and Dam No. 1 Hydroelectric Project.
f. Location: On the Red River, at the
U.S. Army Corps of Engineers’ Red
River Lock and Dam No. 1, near the
Town of Marksville in Catahoula Parish,
Louisiana.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Erik
Steimle, Vice President, Development,
Rye Development, LLC, 745 Atlantic
Avenue, 8th Floor, Boston, MA 02111;
(617) 701–3288; email—erik@
ryedevelopment.com.
i. FERC Contact: Allan Creamer at
(202) 502–8365; or email at
allan.creamer@ferc.gov.
j. FFP Project 124, LLC filed its
request to use the Traditional Licensing
Process on August 24, 2016. FFP Project
124, LLC provided public notice of its
request on October 20, 2016. In a letter
dated October 26, 2016, the Director of
the Division of Hydropower Licensing
approved FFP Project 124, LLC’s request
to use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Louisiana State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
FFP Project 124, LLC as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
E:\FR\FM\03NON1.SGM
03NON1
Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. FFP Project 124, LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: October 26, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26591 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7656–013]
mstockstill on DSK3G9T082PROD with NOTICES
John A. Dodson; Notice of Meeting
a. Project Name and Number:
Buttermilk Falls Project No. 7656.
b. Date and Time of Meeting:
November 30, 2016, 2:00 p.m.–3:00 p.m.
EST.
c. Place: Teleconference.
d. FERC Contact: Ashish Desai,
Ashish.Desai@ferc.gov, (202) 502–8370.
e. Purpose of Meeting: Commission
staff is holding the teleconference to
discuss potentially the rerouting of the
penstock, repairing the powerhouse,
and the property rights of lands within
the project boundary. In addition, staff
will discuss the application to transfer
the project license from Mr. John A.
Dodson to the Village of Highland
Falls—High Point Utility.
f. All local, state, and federal agencies,
Indian tribes, and other interested
VerDate Sep<11>2014
17:54 Nov 02, 2016
Jkt 241001
parties are invited to participate by
phone. Please call Ashish Desai at (202)
502–8370 or email at Ashish.Desai@
ferc.gov by November 25, 2016 to
receive specific instructions on how to
participate.
Dated: October 26, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26590 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–12–000]
Lee County, Florida; Notice of Petition
for Declaratory Order
Take notice that on October 27, 2016,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure,1 Lee County, Florida filed a
petition for declaratory order confirming
that, as a political subdivision of the
State of Florida, section 201(f) of the
Federal Power Act (FPA), 16 U.S.C.
824(f) exempts it from Commission rate
regulation under section 205 and 206 of
the FPA, 16 U.S.C. 824(d) and (c), all as
more fully explained in the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
1 18
PO 00000
CFR 385.207 (2016).
Frm 00019
Fmt 4703
Sfmt 4703
76571
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov.or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on November 25, 2016.
Dated: October 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26544 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR16–73–001.
Applicants: Bridgeline Holdings, L.P.
Description: Tariff filing per
284.123(b), (e): Bridgeline Holdings
Amended SOC 10–25–16 to be effective
10/1/2016; Filing Type: 1270.
Filed Date: 10/26/2016.
Accession Number: 201610265026.
Comments Due: 5 p.m. ET 11/16/16.
284.123(g) Protests Due: 5 p.m. ET 11/
16/16.
Docket Numbers: RP17–63–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2016–10–28 Green Plains to be
effective 11/1/2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5035.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–64–000.
Applicants: DBM Pipeline, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing to be effective 11/
1/2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5038.
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 81, Number 213 (Thursday, November 3, 2016)]
[Notices]
[Pages 76570-76571]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26591]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14510-001]
FFP Project 124, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 14510-001.
c. Date Filed: August 24, 2016.
d. Submitted By: FFP Project 124, LLC.
e. Name of Project: Red River Lock and Dam No. 1 Hydroelectric
Project.
f. Location: On the Red River, at the U.S. Army Corps of Engineers'
Red River Lock and Dam No. 1, near the Town of Marksville in Catahoula
Parish, Louisiana.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Erik Steimle, Vice President,
Development, Rye Development, LLC, 745 Atlantic Avenue, 8th Floor,
Boston, MA 02111; (617) 701-3288; email_erik@ryedevelopment.com.
i. FERC Contact: Allan Creamer at (202) 502-8365; or email at
allan.creamer@ferc.gov.
j. FFP Project 124, LLC filed its request to use the Traditional
Licensing Process on August 24, 2016. FFP Project 124, LLC provided
public notice of its request on October 20, 2016. In a letter dated
October 26, 2016, the Director of the Division of Hydropower Licensing
approved FFP Project 124, LLC's request to use the Traditional
Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Louisiana State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating FFP Project 124, LLC as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the
[[Page 76571]]
Endangered Species Act and section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management Act; and consultation pursuant to
section 106 of the National Historic Preservation Act.
m. FFP Project 124, LLC filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field, to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: October 26, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-26591 Filed 11-2-16; 8:45 am]
BILLING CODE 6717-01-P