Notice of Commission Staff Attendance, 76573 [2016-26588]

Download as PDF mstockstill on DSK3G9T082PROD with NOTICES Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices level be temporarily modified to 232.9 feet above mean sea level until January 1, 2017, or until the reservoir surface rises above its normal minimum elevation. l. Locations of the Applications: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. The filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/elibrary. asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502- 8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Motions To Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘MOTION TO INTERVENE’’, or ‘‘PROTEST’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the temporary variance request. Agencies may obtain copies of the application directly from VerDate Sep<11>2014 17:54 Nov 02, 2016 Jkt 241001 the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: October 28, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–26546 Filed 11–2–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): PJM Planning Committee November 3, 2016, 9:30 a.m.–12:00 p.m. (EST). PJM Transmission Expansion Advisory Committee November 3, 2016, 11:00 a.m.–3:00 p.m. (EST). The above-referenced meetings will be held at: PJM Conference and Training Center, PJM Interconnection, 2750 Monroe Boulevard, Audubon, PA 19403. The above-referenced meetings are open to stakeholders. Further information may be found at www.pjm.com. The discussions at the meetings described above may address matters at issue in the following proceedings: Docket No. ER16–453, PJM Interconnection, L.L.C. and Northeast Transmission Development, LLC Docket No. ER16–736, PJM Interconnection, L.L.C. Docket No. ER14–972, PJM Interconnection, L.L.C. Docket No. ER14–1485, PJM Interconnection, L.L.C. PO 00000 Frm 00021 Fmt 4703 Sfmt 9990 76573 Docket Nos. ER13–1944, et al., PJM Interconnection, L.L.C., et al. Docket No. ER15–1344, PJM Interconnection, L.L.C. Docket No. ER15–1387, PJM Interconnection, L.L.C. and Potomac Electric Power Company Docket No. ER15–2562, PJM Interconnection, L.L.C. Docket No. ER15–2563, PJM Interconnection, L.L.C. Docket No. EL15–18, Consolidated Edison Company of New York, Inc. v. PJM Interconnection, L.L.C. Docket No. EL15–41, Essential Power Rock Springs, LLC, et al. v. PJM Interconnection, L.L.C. Docket No. ER15–2114, PJM Interconnection, L.L.C. and Transource West Virginia, LLC Docket No. EL15–79, TransSource, LLC v. PJM Interconnection, L.L.C. Docket No. EL15–95, Delaware Public Service Commission, et al. v. PJM Interconnection, L.L.C., et al. Docket No. EL15–67, Linden VFT, LLC v. PJM Interconnection, L.L.C. Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. ER13–198, PJM Interconnection, L.L.C. Docket No. ER16–1335, PJM Interconnection, L.L.C. Docket No. ER16–2401, PJM Interconnection, L.L.C. Docket No. ER16–2716, PJM Interconnection, L.L.C. Docket No. ER16–1499, PJM Interconnection, L.L.C. Docket No. ER16–1807, First Energy Solutions Corp. Docket No. EL16–96, PJM Interconnection, L.L.C. Docket No. EL16–71, Monongahela Power Company et al. Docket No. ER16–2539, PJM Interconnection, L.L.C. For more information, contact the following: Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission, (202) 502– 6604 Jonathan.Fernandez@ferc.gov. Alina Halay, Office of Energy Market Regulation, Federal Energy Regulatory Commission, (202) 502–6474, Alina.Halay@ferc.gov. Dated: October 26, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–26588 Filed 11–2–16; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\03NON1.SGM 03NON1

Agencies

[Federal Register Volume 81, Number 213 (Thursday, November 3, 2016)]
[Notices]
[Page 76573]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26588]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission's staff may attend the following meetings 
related to the transmission planning activities of the PJM 
Interconnection, L.L.C. (PJM):

PJM Planning Committee

    November 3, 2016, 9:30 a.m.-12:00 p.m. (EST).

PJM Transmission Expansion Advisory Committee

    November 3, 2016, 11:00 a.m.-3:00 p.m. (EST).
    The above-referenced meetings will be held at: PJM Conference and 
Training Center, PJM Interconnection, 2750 Monroe Boulevard, Audubon, 
PA 19403.
    The above-referenced meetings are open to stakeholders.
    Further information may be found at www.pjm.com.
    The discussions at the meetings described above may address matters 
at issue in the following proceedings:

Docket No. ER16-453, PJM Interconnection, L.L.C. and Northeast 
Transmission Development, LLC
Docket No. ER16-736, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket Nos. ER13-1944, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-1344, PJM Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C. and Potomac Electric 
Power Company
Docket No. ER15-2562, PJM Interconnection, L.L.C.
Docket No. ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v. 
PJM Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, LLC, et al. v. PJM 
Interconnection, L.L.C.
Docket No. ER15-2114, PJM Interconnection, L.L.C. and Transource West 
Virginia, LLC
Docket No. EL15-79, TransSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Delaware Public Service Commission, et al. v. PJM 
Interconnection, L.L.C., et al.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER13-198, PJM Interconnection, L.L.C.
Docket No. ER16-1335, PJM Interconnection, L.L.C.
Docket No. ER16-2401, PJM Interconnection, L.L.C.
Docket No. ER16-2716, PJM Interconnection, L.L.C.
Docket No. ER16-1499, PJM Interconnection, L.L.C.
Docket No. ER16-1807, First Energy Solutions Corp.
Docket No. EL16-96, PJM Interconnection, L.L.C.
Docket No. EL16-71, Monongahela Power Company et al.
Docket No. ER16-2539, PJM Interconnection, L.L.C.

    For more information, contact the following:

Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy 
Regulatory Commission, (202) 502-6604 Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market Regulation, Federal Energy 
Regulatory Commission, (202) 502-6474, Alina.Halay@ferc.gov.

    Dated: October 26, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-26588 Filed 11-2-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.