Messalonskee Stream Hydro, LLC: Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 76572-76573 [2016-26546]
Download as PDF
mstockstill on DSK3G9T082PROD with NOTICES
76572
Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–65–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing: Shell
Energy North Negotiated Rate to be
effective 11/1/2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5043.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–66–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate Perm Partial CR ARM to be
effective 11/1/2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5050.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–67–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2016–10–26 Encana for 10–27 to be
effective 10/27/2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5062.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–68–000.
Applicants: Natural Gas Pipeline
Company of America
Description: § 4(d) Rate Filing:
Munich RE Trading Negotiated Rate to
be effective 11/1/2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5064.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–69–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 10/26/
16 Negotiated Rates—Hartree Partners,
LP (RTS) 7090–02 to be effective 11/1/
2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5116.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–70–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 10/26/
16 Negotiated Rates—Hartree Partners,
LP (RTS) 7090–03 to be effective 11/1/
2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5117.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–71–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: AGT
FRQ 2016 Filing to be effective 12/1/
2016.
Filed Date: 10/26/16.
Accession Number: 20161026–5120.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–72–000.
VerDate Sep<11>2014
17:54 Nov 02, 2016
Jkt 241001
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing: Seven
Generations Negotiated Rate to be
effective 11/1/2016.
Filed Date: 10/27/16.
Accession Number: 20161027–5000.
Comments Due: 5 p.m. ET 11/8/16.
Docket Numbers: RP17–73–000.
Applicants: Southern LNG Company,
L.L.C.
Description: § 4(d) Rate Filing: SLNG
Electric Power Cost Adjustment—2016
to be effective 12/1/2016.
Filed Date: 10/27/16.
Accession Number: 20161027–5050.
Comments Due: 5 p.m. ET 11/8/16.
Docket Numbers: RP17–74–000.
Applicants: Viking Gas Transmission
Company.
Description: Compliance filing 2015–
2016 Gas Sales and Purchases Report.
Filed Date: 10/27/16.
Accession Number: 20161027–5057.
Comments Due: 5 p.m. ET 11/8/16.
Docket Numbers: RP17–75–000.
Applicants: Midwestern Gas
Transmission Company.
Description: Compliance filing 2015–
2016 Gas Sales and Purchases Report.
Filed Date: 10/27/16.
Accession Number: 20161027–5059.
Comments Due: 5 p.m. ET 11/8/16.
Docket Numbers: RP17–76–000.
Applicants: Midwestern Gas
Transmission Company.
Description: Compliance filing 2015–
2016 Cashout Report.
Filed Date: 10/27/16.
Accession Number: 20161027–5071.
Comments Due: 5 p.m. ET 11/8/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 27, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26542 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–2556–080]
Messalonskee Stream Hydro, LLC:
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Temporary
Variance of License.
b. Project No.: 2556–080.
c. Date Filed: October 7, 2016.
d. Applicant: Messalonskee Stream
Hydro, LLC.
e. Name of Project: Messalonskee
Hydroelectric Project.
f. Location: The project is located on
the Messalonskee Stream in Kennebec
County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Andrew Locke,
President, Messalonskee Stream Hydro,
LLC, 55 Union Street 4th Floor, Boston,
MA 02108 (617) 284–6778.
i. FERC Contact: Steven Sachs, (202)
502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 14
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2556–080.
k. Description of Request: The
applicant requests a temporary variance
of the Messalonskee Lake elevation
requirement as a result of drought
conditions. The normal minimum
elevation for Messalonskee Lake is 234.4
feet above mean sea level. The applicant
states the reservoir surface has already
fallen below this level due to low
inflow, and proposes the minimum
E:\FR\FM\03NON1.SGM
03NON1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 81, No. 213 / Thursday, November 3, 2016 / Notices
level be temporarily modified to 232.9
feet above mean sea level until January
1, 2017, or until the reservoir surface
rises above its normal minimum
elevation.
l. Locations of the Applications: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. The filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.
asp to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
call 1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502- 8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions To Intervene,
or Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the temporary
variance request. Agencies may obtain
copies of the application directly from
VerDate Sep<11>2014
17:54 Nov 02, 2016
Jkt 241001
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26546 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee
November 3, 2016, 9:30 a.m.–12:00
p.m. (EST).
PJM Transmission Expansion Advisory
Committee
November 3, 2016, 11:00 a.m.–3:00
p.m. (EST).
The above-referenced meetings will
be held at: PJM Conference and Training
Center, PJM Interconnection, 2750
Monroe Boulevard, Audubon, PA
19403.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.pjm.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER16–453, PJM
Interconnection, L.L.C. and Northeast
Transmission Development, LLC
Docket No. ER16–736, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket No. ER14–1485, PJM
Interconnection, L.L.C.
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
76573
Docket Nos. ER13–1944, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–1344, PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C. and Potomac
Electric Power Company
Docket No. ER15–2562, PJM
Interconnection, L.L.C.
Docket No. ER15–2563, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et al. v. PJM
Interconnection, L.L.C.
Docket No. ER15–2114, PJM
Interconnection, L.L.C. and
Transource West Virginia, LLC
Docket No. EL15–79, TransSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Delaware Public
Service Commission, et al. v. PJM
Interconnection, L.L.C., et al.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. ER16–1335, PJM
Interconnection, L.L.C.
Docket No. ER16–2401, PJM
Interconnection, L.L.C.
Docket No. ER16–2716, PJM
Interconnection, L.L.C.
Docket No. ER16–1499, PJM
Interconnection, L.L.C.
Docket No. ER16–1807, First Energy
Solutions Corp.
Docket No. EL16–96, PJM
Interconnection, L.L.C.
Docket No. EL16–71, Monongahela
Power Company et al.
Docket No. ER16–2539, PJM
Interconnection, L.L.C.
For more information, contact the
following:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission, (202) 502–
6604 Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, (202) 502–6474,
Alina.Halay@ferc.gov.
Dated: October 26, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26588 Filed 11–2–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 81, Number 213 (Thursday, November 3, 2016)]
[Notices]
[Pages 76572-76573]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26546]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-2556-080]
Messalonskee Stream Hydro, LLC: Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Temporary Variance of License.
b. Project No.: 2556-080.
c. Date Filed: October 7, 2016.
d. Applicant: Messalonskee Stream Hydro, LLC.
e. Name of Project: Messalonskee Hydroelectric Project.
f. Location: The project is located on the Messalonskee Stream in
Kennebec County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Andrew Locke, President, Messalonskee Stream
Hydro, LLC, 55 Union Street 4th Floor, Boston, MA 02108 (617) 284-6778.
i. FERC Contact: Steven Sachs, (202) 502-8666,
Steven.Sachs@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests
is 14 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. The first page of any
filing should include docket number P-2556-080.
k. Description of Request: The applicant requests a temporary
variance of the Messalonskee Lake elevation requirement as a result of
drought conditions. The normal minimum elevation for Messalonskee Lake
is 234.4 feet above mean sea level. The applicant states the reservoir
surface has already fallen below this level due to low inflow, and
proposes the minimum
[[Page 76573]]
level be temporarily modified to 232.9 feet above mean sea level until
January 1, 2017, or until the reservoir surface rises above its normal
minimum elevation.
l. Locations of the Applications: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. The filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502- 8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Motions To Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``MOTION TO
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the temporary variance
request. Agencies may obtain copies of the application directly from
the applicant. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. If an intervener files comments or documents
with the Commission relating to the merits of an issue that may affect
the responsibilities of a particular resource agency, they must also
serve a copy of the document on that resource agency. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Dated: October 28, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-26546 Filed 11-2-16; 8:45 am]