Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant License Renewal; Notice of Meeting, 75860 [2016-26360]

Download as PDF 75860 Federal Register / Vol. 81, No. 211 / Tuesday, November 1, 2016 / Notices contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (Telephone 240–888–9835) to be escorted to the meeting room. Dated: October 25, 2016. Mark Banks, Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2016–26365 Filed 10–31–16; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–387, 50–388, and 72–28; ASLBP No. 16–949–01–LT–BD01] Susquehanna Nuclear, LLC; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission’s regulations, see 10 CFR 2.104, 2.105, 2.309, 2.313, 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over an appeal from the NRC Staff’s denial of a request for access to sensitive unclassified nonsafeguards information (SUNSI) in the following proceeding: asabaliauskas on DSK3SPTVN1PROD with NOTICES Susquehanna Nuclear, LLC (Susquehanna Steam Electric Station, Units 1 and 2) This appeal arises from an ‘‘Order Imposing Procedures for Access to [SUNSI] and Safeguards Information for Contention Preparation’’ that was included as part of a Federal Register notice providing an opportunity to petition for leave to intervene in a hearing on the application for an indirect license transfer of the interests of Susquehanna Nuclear, LLC (SN), in the operating licenses of Susquehanna Steam Electric Station, Units 1 and 2 (SSES) and the general license for the SSES independent spent fuel storage installation from current SN parent holder Talen Energy Corporation to Riverstone Holdings, LLC. See 81 FR 68,462, 68,465 (Oct. 4, 2016). By email dated October 11, 2016, Mr. Sabatini VerDate Sep<11>2014 00:01 Nov 01, 2016 Jkt 241001 Monatesti requested access to SUNSI material, and he supplemented the request with another email dated October 17, 2016. By letter dated October 20, 2016, the NRC Staff denied the requests. On October 23, 2016, Mr. Sabatini appealed the Staff’s determination by sending an email directly to the NRR Staff. He repeated his appeal and supplemented it by two additional emails sent to all parties on October 24, 2016. The Board is comprised of the following Administrative Judges: William J. Froehlich, Chairman, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001 G. Paul Bollwerk, III, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001 Dr. Gary S. Arnold, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001 All correspondence, documents, and other materials shall be filed in accordance with the NRC E-Filing rule. See 10 CFR 2.302. Rockville, Maryland. Dated: October 26, 2016. E. Roy Hawkens, Chief Administrative Judge, Atomic Safety and Licensing Board Panel. [FR Doc. 2016–26362 Filed 10–31–16; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant License Renewal; Notice of Meeting The ACRS Subcommittee on Plant License Renewal will hold a meeting on November 17, 2016, Room T–2B1, 11545 Rockville Pike, Rockville, Maryland. The meeting will be open to public attendance. The agenda for the subject meeting shall be as follows: Thursday, November 17, 2016—8:30 a.m. until 12:00 p.m. The Subcommittee will review the safety evaluation report with open items regarding the South Texas Project Units 1 and 2, License Renewal Application. The Subcommittee will hear presentations by and hold discussions with representatives of the NRC staff, South Texas Project Nuclear Operating Company, and other interested persons regarding this matter. The Subcommittee will gather information, PO 00000 Frm 00056 Fmt 4703 Sfmt 9990 analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Kent Howard (Telephone 301–415–2989 or Email: Kent.Howard@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 17, 2016 (81 FR 71543). Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained from the Web site cited above or by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (Telephone 240–888–9835) to be escorted to the meeting room. Dated: October 19, 2016. Mark L. Banks, Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2016–26360 Filed 10–31–16; 8:45 am] BILLING CODE 7590–01–P E:\FR\FM\01NON1.SGM 01NON1

Agencies

[Federal Register Volume 81, Number 211 (Tuesday, November 1, 2016)]
[Notices]
[Page 75860]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26360]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards (ACRS); Meeting of the 
ACRS Subcommittee on Plant License Renewal; Notice of Meeting

    The ACRS Subcommittee on Plant License Renewal will hold a meeting 
on November 17, 2016, Room T-2B1, 11545 Rockville Pike, Rockville, 
Maryland.
    The meeting will be open to public attendance.
    The agenda for the subject meeting shall be as follows: Thursday, 
November 17, 2016--8:30 a.m. until 12:00 p.m.
    The Subcommittee will review the safety evaluation report with open 
items regarding the South Texas Project Units 1 and 2, License Renewal 
Application. The Subcommittee will hear presentations by and hold 
discussions with representatives of the NRC staff, South Texas Project 
Nuclear Operating Company, and other interested persons regarding this 
matter. The Subcommittee will gather information, analyze relevant 
issues and facts, and formulate proposed positions and actions, as 
appropriate, for deliberation by the Full Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated Federal Official (DFO), 
Kent Howard (Telephone 301-415-2989 or Email: Kent.Howard@nrc.gov) five 
days prior to the meeting, if possible, so that appropriate 
arrangements can be made. Thirty-five hard copies of each presentation 
or handout should be provided to the DFO thirty minutes before the 
meeting. In addition, one electronic copy of each presentation should 
be emailed to the DFO one day before the meeting. If an electronic copy 
cannot be provided within this timeframe, presenters should provide the 
DFO with a CD containing each presentation at least thirty minutes 
before the meeting. Electronic recordings will be permitted only during 
those portions of the meeting that are open to the public. Detailed 
procedures for the conduct of and participation in ACRS meetings were 
published in the Federal Register on October 17, 2016 (81 FR 71543).
    Detailed meeting agendas and meeting transcripts are available on 
the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/acrs. 
Information regarding topics to be discussed, changes to the agenda, 
whether the meeting has been canceled or rescheduled, and the time 
allotted to present oral statements can be obtained from the Web site 
cited above or by contacting the identified DFO. Moreover, in view of 
the possibility that the schedule for ACRS meetings may be adjusted by 
the Chairman as necessary to facilitate the conduct of the meeting, 
persons planning to attend should check with these references if such 
rescheduling would result in a major inconvenience.
    If attending this meeting, please enter through the One White Flint 
North building, 11555 Rockville Pike, Rockville, MD. After registering 
with security, please contact Mr. Theron Brown (Telephone 240-888-9835) 
to be escorted to the meeting room.

    Dated: October 19, 2016.
Mark L. Banks,
Chief, Technical Support Branch, Advisory Committee on Reactor 
Safeguards.
[FR Doc. 2016-26360 Filed 10-31-16; 8:45 am]
 BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.