Applied Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 75397-75398 [2016-26230]
Download as PDF
Federal Register / Vol. 81, No. 210 / Monday, October 31, 2016 / Notices
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on November 15, 2016.
Dated: October 25, 2016.
Kimberly Bose,
Secretary.
[FR Doc. 2016–26185 Filed 10–28–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14790–000]
sradovich on DSK3GMQ082PROD with NOTICES
City of Tuscaloosa, Alabama; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On June 29, 2016, the City of
Tuscaloosa, Alabama filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Lake Tuscaloosa Dam
Hydroelectric Project (Lake Tuscaloosa
Project or project) to be located on the
North River, near the City of Tuscaloosa
in Tuscaloosa County, Alabama. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
VerDate Sep<11>2014
17:53 Oct 28, 2016
Jkt 241001
The proposed project would consist of
the following: (1) The City of
Tuscaloosa’s existing 1,280-foot-long,
36-foot-wide earth filled embankment
dam; (2) a reservoir with a surface area
of 5,885 acres and a storage capacity of
122,755-acre-feet; (3) a 20-foot-long, 96foot-wide intake channel; (4) a 200-footlong, 66-inch-diameter penstock with a
66-inch-diameter butterfly valve at the
junction of the existing outlet; (5) a
powerhouse containing one generating
unit with a total capacity of 3.0
megawatts; (6) a 540-foot-long, 20-footwide tailrace; and (7) a 3.9-mile-long, 15
kV transmission line. The proposed
project would have an estimated average
annual generation of 18,207 megawatthours.
Applicant Contact: Mr. Scott B.
Holmes, City of Tuscaloosa., 2201
University Blvd., Tuscaloosa, Alabama
35401; Phone (205) 248–5140; Email:
sholmes@tuscaloosa.com
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Competing Application: This
application competes with Project No.
14750–000 filed December 22, 2015.
Competing applications had to be filed
on or before June 30, 2016.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14790) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
75397
Dated: October 25, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–26189 Filed 10–28–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–168–000]
Applied Energy LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Applied
Energy LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is November 14,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
E:\FR\FM\31OCN1.SGM
31OCN1
75398
Federal Register / Vol. 81, No. 210 / Monday, October 31, 2016 / Notices
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26230 Filed 10–28–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
sradovich on DSK3GMQ082PROD with NOTICES
Docket Numbers: RP17–49–000.
Applicants: Destin Pipeline Company,
L.L.C.
Description: § 4(d) Rate Filing: Tariff
Changes in Response to Audit Order
FA15–001–000 to be effective 12/1/
2016.
Filed Date: 10/24/16.
Accession Number: 20161024–5024.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–50–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Compliance filing
Columbia Gulf Section 5 Settlement
Implementation to be effective 7/1/2016.
Filed Date: 10/24/16.
Accession Number: 20161024–5025.
Comments Due: 5 p.m. ET 11/7/16.
Docket Numbers: RP17–51–000.
Applicants: Freeport-McMoRan
Exploration & Productio,Anadarko US
Offshore LLC.
Description: Joint Petition for
Temporary Waivers of Commission
Policies, et. al. of Freeport-McMoRan
Exploration & Production LLC, et. al.
under RP17–51.
Filed Date: 10/24/16.
Accession Number: 20161024–5148.
Comments Due: 5 p.m. ET 11/1/16.
Docket Numbers: RP17–52–000.
Applicants: Breitburn Operating LP v.
Florida Gas Tr.
Description: Formal Complaint of
Breitburn Operating LP under RP17–52.
Filed Date: 10/24/16.
Accession Number: 20161024–5178.
Comments Due: 5 p.m. ET 11/7/16.
17:53 Oct 28, 2016
Jkt 241001
Dated: October 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–26231 Filed 10–28–16; 8:45 am]
BILLING CODE 6717–01–P
Filings Instituting Proceedings
VerDate Sep<11>2014
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–22–000.
Applicants: Bluestem Wind Energy,
LLC.
Description: Application for
Authorization under Section 203 of the
Federal Power Act of Bluestem Wind
Energy, LLC.
Filed Date: 10/24/16.
Accession Number: 20161024–5187.
Comments Due: 5 p.m. ET 11/14/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2249–005.
Applicants: Portland General Electric
Company.
Description: Second Supplement to
June 30, 2016 Triennial Market Power
Analysis in the Northwest Region for
Portland General Electric Company.
Filed Date: 10/24/16.
Accession Number: 20161024–5065.
Comments Due: 5 p.m. ET 11/14/16.
Docket Numbers: ER16–2126–001.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Compliance filing:
Compliance Filing Re: Automatically
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Matching Capacity & Multi-Year Lock In
to be effective 12/27/2016.
Filed Date: 10/25/16.
Accession Number: 20161025–5022.
Comments Due: 5 p.m. ET 11/15/16.
Docket Numbers: ER17–169–000.
Applicants: ALLETE, Inc.
Description: § 205(d) Rate Filing:
ALLETE Maintenance Services
Agreement Filing to be effective 12/23/
2016.
Filed Date: 10/24/16.
Accession Number: 20161024–5143.
Comments Due: 5 p.m. ET 11/14/16.
Docket Numbers: ER17–170–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2016–10–24—Planning Coordinator
Agreement with MWD and CEII Request
to be effective 12/26/2016.
Filed Date: 10/24/16.
Accession Number: 20161024–5144.
Comments Due: 5 p.m. ET 11/14/16.
Docket Numbers: ER17–171–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Cancellation:
Notice of Termination of Lathrop IA and
WDT Service Agreement (SA 23) to be
effective 8/31/2016.
Filed Date: 10/24/16.
Accession Number: 20161024–5146.
Comments Due: 5 p.m. ET 11/14/16.
Docket Numbers: ER17–172–000.
Applicants: Lockhart Power
Company.
Description: § 205(d) Rate Filing:
Request for Revision to FERC Electric
Tariff, Original Volume No. 1 to be
effective 12/24/2016.
Filed Date: 10/24/16.
Accession Number: 20161024–5147.
Comments Due: 5 p.m. ET 11/14/16.
Docket Numbers: ER17–173–000.
Applicants: Wabash Valley Power
Association, Inc.
Description: Request for Revised and
Additional Depreciation Rates of
Wabash Valley Power Association, Inc.
Filed Date: 10/24/16.
Accession Number: 20161024–5170.
Comments Due: 5 p.m. ET 11/14/16.
Docket Numbers: ER17–174–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2236R8 Golden Spread Electric
Cooperative, Inc. NITSA NOA to be
effective 10/1/2016.
Filed Date: 10/25/16.
Accession Number: 20161025–5021.
Comments Due: 5 p.m. ET 11/15/16.
Docket Numbers: ER17–175–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1276R12 KCPL NITSA NOA to be
effective 10/1/2016.
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 81, Number 210 (Monday, October 31, 2016)]
[Notices]
[Pages 75397-75398]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26230]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER17-168-000]
Applied Energy LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Applied Energy LLC`s application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability is November 14, 2016.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's
[[Page 75398]]
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: October 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-26230 Filed 10-28-16; 8:45 am]
BILLING CODE 6717-01-P