Applied Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 75397-75398 [2016-26230]

Download as PDF Federal Register / Vol. 81, No. 210 / Monday, October 31, 2016 / Notices Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on November 15, 2016. Dated: October 25, 2016. Kimberly Bose, Secretary. [FR Doc. 2016–26185 Filed 10–28–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14790–000] sradovich on DSK3GMQ082PROD with NOTICES City of Tuscaloosa, Alabama; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On June 29, 2016, the City of Tuscaloosa, Alabama filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Lake Tuscaloosa Dam Hydroelectric Project (Lake Tuscaloosa Project or project) to be located on the North River, near the City of Tuscaloosa in Tuscaloosa County, Alabama. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. VerDate Sep<11>2014 17:53 Oct 28, 2016 Jkt 241001 The proposed project would consist of the following: (1) The City of Tuscaloosa’s existing 1,280-foot-long, 36-foot-wide earth filled embankment dam; (2) a reservoir with a surface area of 5,885 acres and a storage capacity of 122,755-acre-feet; (3) a 20-foot-long, 96foot-wide intake channel; (4) a 200-footlong, 66-inch-diameter penstock with a 66-inch-diameter butterfly valve at the junction of the existing outlet; (5) a powerhouse containing one generating unit with a total capacity of 3.0 megawatts; (6) a 540-foot-long, 20-footwide tailrace; and (7) a 3.9-mile-long, 15 kV transmission line. The proposed project would have an estimated average annual generation of 18,207 megawatthours. Applicant Contact: Mr. Scott B. Holmes, City of Tuscaloosa., 2201 University Blvd., Tuscaloosa, Alabama 35401; Phone (205) 248–5140; Email: sholmes@tuscaloosa.com FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202) 502– 8577. Competing Application: This application competes with Project No. 14750–000 filed December 22, 2015. Competing applications had to be filed on or before June 30, 2016. Deadline for filing comments and motions to intervene: 60 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14790) in the docket number field to access the document. For assistance, contact FERC Online Support. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 75397 Dated: October 25, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–26189 Filed 10–28–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER17–168–000] Applied Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Applied Energy LLC‘s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is November 14, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s E:\FR\FM\31OCN1.SGM 31OCN1 75398 Federal Register / Vol. 81, No. 210 / Monday, October 31, 2016 / Notices Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 25, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–26230 Filed 10–28–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: sradovich on DSK3GMQ082PROD with NOTICES Docket Numbers: RP17–49–000. Applicants: Destin Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Tariff Changes in Response to Audit Order FA15–001–000 to be effective 12/1/ 2016. Filed Date: 10/24/16. Accession Number: 20161024–5024. Comments Due: 5 p.m. ET 11/7/16. Docket Numbers: RP17–50–000. Applicants: Columbia Gulf Transmission, LLC. Description: Compliance filing Columbia Gulf Section 5 Settlement Implementation to be effective 7/1/2016. Filed Date: 10/24/16. Accession Number: 20161024–5025. Comments Due: 5 p.m. ET 11/7/16. Docket Numbers: RP17–51–000. Applicants: Freeport-McMoRan Exploration & Productio,Anadarko US Offshore LLC. Description: Joint Petition for Temporary Waivers of Commission Policies, et. al. of Freeport-McMoRan Exploration & Production LLC, et. al. under RP17–51. Filed Date: 10/24/16. Accession Number: 20161024–5148. Comments Due: 5 p.m. ET 11/1/16. Docket Numbers: RP17–52–000. Applicants: Breitburn Operating LP v. Florida Gas Tr. Description: Formal Complaint of Breitburn Operating LP under RP17–52. Filed Date: 10/24/16. Accession Number: 20161024–5178. Comments Due: 5 p.m. ET 11/7/16. 17:53 Oct 28, 2016 Jkt 241001 Dated: October 25, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–26231 Filed 10–28–16; 8:45 am] BILLING CODE 6717–01–P Filings Instituting Proceedings VerDate Sep<11>2014 The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–22–000. Applicants: Bluestem Wind Energy, LLC. Description: Application for Authorization under Section 203 of the Federal Power Act of Bluestem Wind Energy, LLC. Filed Date: 10/24/16. Accession Number: 20161024–5187. Comments Due: 5 p.m. ET 11/14/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2249–005. Applicants: Portland General Electric Company. Description: Second Supplement to June 30, 2016 Triennial Market Power Analysis in the Northwest Region for Portland General Electric Company. Filed Date: 10/24/16. Accession Number: 20161024–5065. Comments Due: 5 p.m. ET 11/14/16. Docket Numbers: ER16–2126–001. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: Compliance filing: Compliance Filing Re: Automatically PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Matching Capacity & Multi-Year Lock In to be effective 12/27/2016. Filed Date: 10/25/16. Accession Number: 20161025–5022. Comments Due: 5 p.m. ET 11/15/16. Docket Numbers: ER17–169–000. Applicants: ALLETE, Inc. Description: § 205(d) Rate Filing: ALLETE Maintenance Services Agreement Filing to be effective 12/23/ 2016. Filed Date: 10/24/16. Accession Number: 20161024–5143. Comments Due: 5 p.m. ET 11/14/16. Docket Numbers: ER17–170–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2016–10–24—Planning Coordinator Agreement with MWD and CEII Request to be effective 12/26/2016. Filed Date: 10/24/16. Accession Number: 20161024–5144. Comments Due: 5 p.m. ET 11/14/16. Docket Numbers: ER17–171–000. Applicants: Pacific Gas and Electric Company. Description: Tariff Cancellation: Notice of Termination of Lathrop IA and WDT Service Agreement (SA 23) to be effective 8/31/2016. Filed Date: 10/24/16. Accession Number: 20161024–5146. Comments Due: 5 p.m. ET 11/14/16. Docket Numbers: ER17–172–000. Applicants: Lockhart Power Company. Description: § 205(d) Rate Filing: Request for Revision to FERC Electric Tariff, Original Volume No. 1 to be effective 12/24/2016. Filed Date: 10/24/16. Accession Number: 20161024–5147. Comments Due: 5 p.m. ET 11/14/16. Docket Numbers: ER17–173–000. Applicants: Wabash Valley Power Association, Inc. Description: Request for Revised and Additional Depreciation Rates of Wabash Valley Power Association, Inc. Filed Date: 10/24/16. Accession Number: 20161024–5170. Comments Due: 5 p.m. ET 11/14/16. Docket Numbers: ER17–174–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2236R8 Golden Spread Electric Cooperative, Inc. NITSA NOA to be effective 10/1/2016. Filed Date: 10/25/16. Accession Number: 20161025–5021. Comments Due: 5 p.m. ET 11/15/16. Docket Numbers: ER17–175–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1276R12 KCPL NITSA NOA to be effective 10/1/2016. E:\FR\FM\31OCN1.SGM 31OCN1

Agencies

[Federal Register Volume 81, Number 210 (Monday, October 31, 2016)]
[Notices]
[Pages 75397-75398]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-26230]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER17-168-000]


Applied Energy LLC; Supplemental Notice That Initial Market-Based 
Rate Filing Includes Request for Blanket Section 204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Applied Energy LLC`s application for market-based rate authority, with 
an accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability is November 14, 2016.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's

[[Page 75398]]

Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive email notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: October 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-26230 Filed 10-28-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.