Notice of Petition for Enforcement; Allco Renewable Energy Limited Allco Finance Limited, Ecos Energy, LLC, 74423 [2016-25835]
Download as PDF
Federal Register / Vol. 81, No. 207 / Wednesday, October 26, 2016 / Notices
Dated: October 20, 2016.
Kimberly D. Bose,
Secretary.
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2016–25837 Filed 10–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–104–000]
Dated: October 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Broadview Energy KW, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2016–25878 Filed 10–25–16; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of
Broadview Energy KW, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 7,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
VerDate Sep<11>2014
18:25 Oct 25, 2016
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL17–6–000; QF11–193–002;
QF11–194–002; QF11–195–002; QF11–196–
002;QF11–197–002; QF11–198–002; QF11–
199–002; QF11–200–002; QF11–201–002;
QF1–202–002; QF11–203–002]
Notice of Petition for Enforcement;
Allco Renewable Energy Limited Allco
Finance Limited, Ecos Energy, LLC
Take notice that on October 19, 2016,
pursuant to section 210(h)(2)(B) of the
Public Utility Regulatory Policies Act of
1978 (PURPA),1 Allco Renewable
Energy Limited and Allco Finance
Limited filed a Petition for Enforcement
requesting the Federal Energy
Regulatory Commission (Commission)
exercise its authority and initiate
enforcement action against the
Massachusetts Department of Public
Utilities and the Massachusetts
Department of Energy Resources to
remedy their alleged improper
implementation of PURPA, all as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 9, 2016.
Dated: October 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–25835 Filed 10–25–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL17–5–000; QF16–876–001;
QF16–877–001; QF16–879–001; QF16–880–
001; QF16–881–001; QF16–882–001; QF16–
883–001; QF16–884–001; QF16–885–001;
QF16–886–001; QF16–887–001; QF16–888–
001; QF16–889–001; QF16–899–001]
FLS Energy, Inc.; Notice of Petition for
Enforcement
Take notice that on October 17, 2016,
pursuant to section 210(h)(2)(B) of the
Public Utility Regulatory Policies Act of
1978 (PURPA) 1 and sections 206, 306,
and 309 of the Federal Power Act,2 FLS
Energy, Inc. filed a Petition for
Enforcement requesting the Federal
Energy Regulatory Commission
(Commission) exercise its authority and
initiate enforcement action against the
Montana Public Service Commission
and NorthWestern Corporation, alleging
that they failed to implement PURPA,
all as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
1 16
1 16
PO 00000
U.S.C. 824a–3(h)(2)(B) (2012).
Frm 00033
Fmt 4703
Sfmt 4703
74423
2 16
E:\FR\FM\26OCN1.SGM
U.S.C. 824a–3(h)(2)(B) (2012).
U.S.C. 824e, 824k, 825e, 825h.
26OCN1
Agencies
[Federal Register Volume 81, Number 207 (Wednesday, October 26, 2016)]
[Notices]
[Page 74423]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-25835]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL17-6-000; QF11-193-002; QF11-194-002; QF11-195-002;
QF11-196-002;QF11-197-002; QF11-198-002; QF11-199-002; QF11-200-002;
QF11-201-002; QF1-202-002; QF11-203-002]
Notice of Petition for Enforcement; Allco Renewable Energy
Limited Allco Finance Limited, Ecos Energy, LLC
Take notice that on October 19, 2016, pursuant to section
210(h)(2)(B) of the Public Utility Regulatory Policies Act of 1978
(PURPA),\1\ Allco Renewable Energy Limited and Allco Finance Limited
filed a Petition for Enforcement requesting the Federal Energy
Regulatory Commission (Commission) exercise its authority and initiate
enforcement action against the Massachusetts Department of Public
Utilities and the Massachusetts Department of Energy Resources to
remedy their alleged improper implementation of PURPA, all as more
fully explained in the petition.
---------------------------------------------------------------------------
\1\ 16 U.S.C. 824a-3(h)(2)(B) (2012).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on November 9, 2016.
Dated: October 20, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-25835 Filed 10-25-16; 8:45 am]
BILLING CODE 6717-01-P