Federal Register / Vol. 81, No. 204 / Friday, October 21, 2016 / Notices
Arlington, VA 22230. Telephone: (703)
292–7000.
Chris Blair,
Executive Assistant to the NSB Office.
I. Obtaining Information and
Submitting Comments
[FR Doc. 2016–25635 Filed 10–19–16; 4:15 pm]
BILLING CODE 7555–01–P
A. Obtaining Information
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–457; NRC–2016–0215]
Exelon Generation Company, LLC;
Braidwood Station, Unit 2
Nuclear Regulatory
Commission.
ACTION: License amendment application;
opportunity to comment, request a
hearing, and petition for leave to
intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Renewed
Facility Operating License No. NPF–77,
issued to Exelon Generation Company,
LLC, for operation of Braidwood
Station, Unit 2, located in Will County,
Illinois. The proposed amendment
would allow a one-time extension from
72 hours to 200 hours of the technical
specification (TS) completion time
associated with the 2A service water
(SX) pump in support of maintenance
activities.
SUMMARY:
Submit comments by November
21, 2016. Requests for a hearing or
petition for leave to intervene must be
filed by December 20, 2016.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2016–0215. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT: Joel
S. Wiebe, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington DC 20555–
asabaliauskas on DSK3SPTVN1PROD with NOTICES
DATES:
VerDate Sep<11>2014
19:06 Oct 20, 2016
0001; telephone: 301–415–6606, email:
Joel.Wiebe@nrc.gov.
SUPPLEMENTARY INFORMATION:
Jkt 241001
Please refer to Docket ID NRC–2016–
0215 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2016–0215.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
application for license amendment
dated September 30, 2016 is available in
ADAMS under Accession No.
ML16274A474.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2016–
0215 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
II. Introduction
The NRC is considering issuance of an
amendment to Renewed Facility
Operating License No. NPF–77, issued
to Exelon Generation Company, LLC, for
operation of Braidwood Station, Unit 2,
located in Will County, Illinois.
The proposed amendment would
allow a one-time extension from 72
hours to 200 hours of the TS completion
time associated with the 2A SX pump
in support of maintenance activities.
Before any issuance of the proposed
license amendment, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and NRC’s regulations.
The NRC has made a proposed
determination that the license
amendment request involves no
significant hazards consideration. Under
the NRC’s regulations in section 50.92 of
title 10 of the Code of Federal
Regulations (10 CFR), this means that
operation of the facility in accordance
with the proposed amendment would
not: (1) Involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes have been evaluated
using the risk informed processes described
in RG [Regulatory Guide] 1.174, ‘‘An
Approach for Using Probabilistic Risk
Assessment in Risk-Informed Decisions on
Plant-Specific Changes to the Licensing
Basis,’’ Revision 2 dated May 2011, RG 1.
177, ‘‘An Approach for Plant-Specific, RiskInformed Decisionmaking: Technical
Specifications,’’ Revision 1 dated May 2011
and NRC Regulatory Guide 1.200, ‘‘An
Approach for Determining the Technical
Adequacy of Probabilistic Risk Assessment
Results for Risk-Informed Activities,’’
Revision 2 dated March 2009. The risk
associated with the proposed change was
found to be acceptable.
The previously analyzed accidents are
initiated by the failure of plant structures,
systems, or components. The SX System is
not considered an initiator for any of these
previously analyzed events. The proposed
change does not have a detrimental impact
on the integrity of any plant structure,
system, or component that initiates an
analyzed event. No active or passive failure
mechanisms that could lead to an accident
are affected. The proposed change will not
E:\FR\FM\21OCN1.SGM
21OCN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 204 / Friday, October 21, 2016 / Notices
alter the operation of, or otherwise increase
the failure probability of any plant
equipment that initiates an analyzed
accident.
Therefore, the proposed change does not
involve a significant increase in the
probability of an accident previously
evaluated.
The proposed change does not alter or
prevent the ability of structures, systems, and
components (SSCs) from performing their
intended function to mitigate the
consequences of an initiating event within
the assumed acceptance limits. The proposed
change does not require any physical change
to any plant SSCs nor does it require any
change in systems or plant operations. The
proposed one-time increase in the CT
[completion time] is consistent with the
philosophy of the current TS LCO [limiting
condition for operation] which allows one SX
train to be inoperable for 72 hours. This
change only extends the 72 hour CT to 200
hours which has been shown to be acceptable
from a risk perspective. The minimum
equipment required to mitigate the
consequences of an accident and/or safely
shut down the plant will be Operable or
available during the extended CT. The
proposed change is consistent with the safety
analysis assumptions and resultant
consequences. Based on the above, the
proposed change does not involve a
significant increase in the consequences of an
accident previously evaluated.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes do not involve the
use or installation of new equipment and the
currently installed equipment will not be
operated in a new or different manner. No
new or different system interactions are
created and no new processes are introduced.
The proposed changes will not introduce any
new failure mechanisms, malfunctions, or
accident initiators not already considered in
the design and licensing bases. Based on this
evaluation, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change does not alter any
existing setpoints at which protective actions
are initiated and no new setpoints or
protective actions are introduced. The design
and operation of the SX System remains
unchanged. The risk associated with the
proposed increase in the time the 2A SX
pump is allowed to be inoperable was
evaluated using the risk informed processes
described in RG 1.174, ‘‘An Approach for
Using Probabilistic Risk Assessment in RiskInformed Decisions on Plant-Specific
Changes to the Licensing Basis,’’ Revision 2
dated May 2011, RG 1.177, ‘‘An Approach for
Plant-Specific, Risk-Informed
VerDate Sep<11>2014
19:06 Oct 20, 2016
Jkt 241001
Decisionmaking: Technical Specifications,’’
Revision 1 dated May 2011 and NRC
Regulatory Guide 1.200, ‘‘An Approach for
Determining the Technical Adequacy of
Probabilistic Risk Assessment Results for
Risk-Informed Activities,’’ Revision 2 dated
March 2009. The risk was shown to be
acceptable. Based on this evaluation, the
proposed change does not involve a
significant reduction in a margin of safety.
Based on the above, EGC [Exelon
Generation Company, LLC] concludes that
the proposed amendment does not involve a
significant hazards consideration under the
standards set forth in 10 CFR 50.92(c), and,
accordingly, a finding of no significant
hazards consideration is justified.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the license
amendment request involves a No
Significant Hazards Consideration.
The NRC is seeking public comments
on this proposed determination that the
license amendment request involves no
significant hazards consideration. Any
comments received within 30 days after
the date of publication of this notice
will be considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day notice period if the Commission
concludes the amendment involves no
significant hazards consideration. In
addition, the Commission may issue the
amendment prior to the expiration of
the 30-day comment period if
circumstances change during the 30-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. If the Commission takes action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. If the Commission
makes a final No Significant Hazards
Consideration Determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur
infrequently.
II. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and a petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
72839
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309, which is available at
the NRC’s PDR, located at One White
Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s Web site at
https://www.nrc.gov/reading-rm/doccollections/cfr/. If a petition is filed
within 60 days, the Commission or a
presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the petition; and the Secretary
or the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel will issue a notice of a hearing or
an appropriate order.
As required by 10 CFR 2.309, a
petition shall set forth with particularity
the interest of the petitioner in the
proceeding, and how that interest may
be affected by the results of the
proceeding. The petition should
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
general requirements: (1) The name,
address, and telephone number of the
petitioner; (2) the nature of the
petitioner’s right under the Act to be
made a party to the proceeding; (3) the
nature and extent of the petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
petitioner’s interest. The petition must
also set forth the specific contentions
which the petitioner seeks to have
litigated at the proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner shall provide a
brief explanation of the bases for the
contention and a concise statement of
the alleged facts or expert opinion
which support the contention and on
which the petitioner intends to rely in
proving the contention at the hearing.
The petitioner must also provide
references to those specific sources and
documents of which the petitioner is
aware and on which the petitioner
intends to rely to establish those facts or
expert opinion to support its position on
the issue. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
proceeding. The contention must be one
E:\FR\FM\21OCN1.SGM
21OCN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
72840
Federal Register / Vol. 81, No. 204 / Friday, October 21, 2016 / Notices
which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy these requirements with
respect to at least one contention will
not be permitted to participate as a
party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing with respect to resolution of
that person’s admitted contentions
consistent with the NRC’s regulations,
policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Requests for hearing,
petitions for leave to intervene, and
motions for leave to file new or
amended contentions that are filed after
the 60-day deadline will not be
entertained absent a determination by
the presiding officer that the filing
demonstrates good cause by satisfying
the three factors in 10 CFR 2.309(c)(1)(i)
through (iii).
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment unless the Commission
finds an imminent danger to the health
or safety of the public, in which case it
will issue an appropriate order or rule
under 10 CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission by December 20, 2016. The
petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
VerDate Sep<11>2014
19:06 Oct 20, 2016
Jkt 241001
governmental body, or Federallyrecognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. A State, local
governmental body, Federallyrecognized Indian Tribe, or agency
thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person
who does not wish, or is not qualified,
to become a party to the proceeding
may, in the discretion of the presiding
officer, be permitted to make a limited
appearance pursuant to the provisions
of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or
written statement of position on the
issues, but may not otherwise
participate in the proceeding. A limited
appearance may be made at any session
of the hearing or at any prehearing
conference, subject to the limits and
conditions as may be imposed by the
presiding officer. Details regarding the
opportunity to make a limited
appearance will be provided by the
presiding officer if such sessions are
scheduled.
III. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene
(hereinafter ‘‘petition’’), and documents
filed by interested governmental entities
participating under 10 CFR 2.315(c),
must be filed in accordance with the
NRC’s E-Filing rule (72 FR 49139;
August 28, 2007, as amended at 77 FR
46562, August 3, 2012). The E-Filing
process requires participants to submit
and serve all adjudicatory documents
over the internet, or in some cases to
mail copies on electronic storage media.
Participants may not submit paper
copies of their filings unless they seek
an exemption in accordance with the
procedures described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a petition (even in instances
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
in which the participant, or its counsel
or representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
adjudicatory-sub.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC
Electronic Filing Help Desk will not be
able to offer assistance in using unlisted
software.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a petition. Submissions should
be in Portable Document Format (PDF).
Additional guidance on PDF
submissions is available on the NRC’s
public Web site at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the documents are submitted through
the NRC’s E-Filing system. To be timely,
an electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing petition to
intervene is filed so that they can obtain
access to the document via the E-Filing
system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-
E:\FR\FM\21OCN1.SGM
21OCN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 204 / Friday, October 21, 2016 / Notices
free call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 7 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, One White Flint North, 11555
Rockville Pike, Rockville, Maryland,
20852, Attention: Rulemaking and
Adjudications Staff. Participants filing a
document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as Social
Security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, in some
instances, a petition will require
including information on local
residence in order to demonstrate a
proximity assertion of interest in the
proceeding. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
For further details with respect to this
action, see the application for license
VerDate Sep<11>2014
19:06 Oct 20, 2016
Jkt 241001
amendment dated September 30, 2016
(ADAMS Accession No. ML16274A474).
Attorney for licensee: Tamra Domeyer,
Associate General Counsel, Exelon
Generation Company, LLC, 4300
Winfield Road, Warrenville, IL 60555.
NRC Branch Chief: G. Edward Miller
Dated at Rockville, Maryland, this 12th day
of October 2016.
For the Nuclear Regulatory Commission.
Joel S. Wiebe,
Senior Project Manager, Plant Licensing
Branch III–2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2016–25503 Filed 10–20–16; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2016–0001]
Sunshine Act Meeting Notice
Week of October 17, 2016.
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public.
DATES:
PLACE:
72841
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify
Kimberly Meyer, NRC Disability
Program Manager, at 301–287–0739, by
videophone at 240–428–3217, or by
email at Kimberly.Meyer-Chambers@
nrc.gov. Determinations on requests for
reasonable accommodation will be
made on a case-by-case basis.
*
*
*
*
*
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555 (301–
415–1969), or email
Brenda.Akstulewicz@nrc.gov or
Patricia.Jimenez@nrc.gov.
Dated: October 19, 2016.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2016–25624 Filed 10–19–16; 4:15 pm]
BILLING CODE 7590–01–P
Week of October 17, 2016
Thursday, October 20, 2016
9:25 a.m.
Affirmation Session (Public Meeting)
(Tentative)
Duke Energy Florida, LLC (Levy
Nuclear Plant, Units 1 and 2):
Mandatory Hearing Decision
(Tentative)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
*
*
*
*
*
The schedule for Commission
meetings is subject to change on short
notice. For more information or to verify
the status of meetings, contact Denise
McGovern at 301–415–0681 or via email
at Denise.McGovern@nrc.gov.
*
*
*
*
*
Additional Information
By a vote of 3–0 on October 19, 2016,
the Commission determined pursuant to
U.S.C. 552b(e) and ’9.107(a) of the
Commission’s rules that the above
referenced Affirmation Session be held
with less than one week notice to the
public. The meeting is scheduled on
October 20, 2016.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
POSTAL REGULATORY COMMISSION
[Docket Nos. MC2017–5 and CP2017–11;
MC2017–6 and CP2017–12; CP2017–13;
CP2017–14; CP2017–15; CP2017–16; and
CP2017–17]
New Postal Products
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing
recent Postal Service filings for the
Commission’s consideration concerning
negotiated service agreements. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: October 24,
2016 (Comment due date applies to
Docket Nos. MC2017–5 and CP2017–11;
Docket Nos. MC2017–6 and CP2017–
12); October 25, 2016 (Comment due
date applies to Docket No. CP2017–13;
Docket No. CP2017–14; Docket No.
CP2017–15; Docket No. CP2017–16);
October 26, 2016 (Comment due date
applies to Docket No. CP2017–17).
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
SUMMARY:
E:\FR\FM\21OCN1.SGM
21OCN1
Agencies
[Federal Register Volume 81, Number 204 (Friday, October 21, 2016)]
[Notices]
[Pages 72838-72841]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-25503]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-457; NRC-2016-0215]
Exelon Generation Company, LLC; Braidwood Station, Unit 2
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to comment, request
a hearing, and petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Renewed Facility Operating License No. NPF-
77, issued to Exelon Generation Company, LLC, for operation of
Braidwood Station, Unit 2, located in Will County, Illinois. The
proposed amendment would allow a one-time extension from 72 hours to
200 hours of the technical specification (TS) completion time
associated with the 2A service water (SX) pump in support of
maintenance activities.
DATES: Submit comments by November 21, 2016. Requests for a hearing or
petition for leave to intervene must be filed by December 20, 2016.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2016-0215. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Joel S. Wiebe, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC
20555-0001; telephone: 301-415-6606, email: Joel.Wiebe@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2016-0215 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2016-0215.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
application for license amendment dated September 30, 2016 is available
in ADAMS under Accession No. ML16274A474.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2016-0215 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Introduction
The NRC is considering issuance of an amendment to Renewed Facility
Operating License No. NPF-77, issued to Exelon Generation Company, LLC,
for operation of Braidwood Station, Unit 2, located in Will County,
Illinois.
The proposed amendment would allow a one-time extension from 72
hours to 200 hours of the TS completion time associated with the 2A SX
pump in support of maintenance activities.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in section 50.92 of title 10 of the Code of
Federal Regulations (10 CFR), this means that operation of the facility
in accordance with the proposed amendment would not: (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes have been evaluated using the risk informed
processes described in RG [Regulatory Guide] 1.174, ``An Approach
for Using Probabilistic Risk Assessment in Risk-Informed Decisions
on Plant-Specific Changes to the Licensing Basis,'' Revision 2 dated
May 2011, RG 1. 177, ``An Approach for Plant-Specific, Risk-Informed
Decisionmaking: Technical Specifications,'' Revision 1 dated May
2011 and NRC Regulatory Guide 1.200, ``An Approach for Determining
the Technical Adequacy of Probabilistic Risk Assessment Results for
Risk-Informed Activities,'' Revision 2 dated March 2009. The risk
associated with the proposed change was found to be acceptable.
The previously analyzed accidents are initiated by the failure
of plant structures, systems, or components. The SX System is not
considered an initiator for any of these previously analyzed events.
The proposed change does not have a detrimental impact on the
integrity of any plant structure, system, or component that
initiates an analyzed event. No active or passive failure mechanisms
that could lead to an accident are affected. The proposed change
will not
[[Page 72839]]
alter the operation of, or otherwise increase the failure
probability of any plant equipment that initiates an analyzed
accident.
Therefore, the proposed change does not involve a significant
increase in the probability of an accident previously evaluated.
The proposed change does not alter or prevent the ability of
structures, systems, and components (SSCs) from performing their
intended function to mitigate the consequences of an initiating
event within the assumed acceptance limits. The proposed change does
not require any physical change to any plant SSCs nor does it
require any change in systems or plant operations. The proposed one-
time increase in the CT [completion time] is consistent with the
philosophy of the current TS LCO [limiting condition for operation]
which allows one SX train to be inoperable for 72 hours. This change
only extends the 72 hour CT to 200 hours which has been shown to be
acceptable from a risk perspective. The minimum equipment required
to mitigate the consequences of an accident and/or safely shut down
the plant will be Operable or available during the extended CT. The
proposed change is consistent with the safety analysis assumptions
and resultant consequences. Based on the above, the proposed change
does not involve a significant increase in the consequences of an
accident previously evaluated.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes do not involve the use or installation of
new equipment and the currently installed equipment will not be
operated in a new or different manner. No new or different system
interactions are created and no new processes are introduced. The
proposed changes will not introduce any new failure mechanisms,
malfunctions, or accident initiators not already considered in the
design and licensing bases. Based on this evaluation, the proposed
change does not create the possibility of a new or different kind of
accident from any accident previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change does not alter any existing setpoints at
which protective actions are initiated and no new setpoints or
protective actions are introduced. The design and operation of the
SX System remains unchanged. The risk associated with the proposed
increase in the time the 2A SX pump is allowed to be inoperable was
evaluated using the risk informed processes described in RG 1.174,
``An Approach for Using Probabilistic Risk Assessment in Risk-
Informed Decisions on Plant-Specific Changes to the Licensing
Basis,'' Revision 2 dated May 2011, RG 1.177, ``An Approach for
Plant-Specific, Risk-Informed Decisionmaking: Technical
Specifications,'' Revision 1 dated May 2011 and NRC Regulatory Guide
1.200, ``An Approach for Determining the Technical Adequacy of
Probabilistic Risk Assessment Results for Risk-Informed
Activities,'' Revision 2 dated March 2009. The risk was shown to be
acceptable. Based on this evaluation, the proposed change does not
involve a significant reduction in a margin of safety.
Based on the above, EGC [Exelon Generation Company, LLC]
concludes that the proposed amendment does not involve a significant
hazards consideration under the standards set forth in 10 CFR
50.92(c), and, accordingly, a finding of no significant hazards
consideration is justified.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves a No Significant Hazards
Consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period if circumstances change during the 30-day comment period such
that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. If the Commission takes action
prior to the expiration of either the comment period or the notice
period, it will publish in the Federal Register a notice of issuance.
If the Commission makes a final No Significant Hazards Consideration
Determination, any hearing will take place after issuance. The
Commission expects that the need to take this action will occur
infrequently.
II. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and a petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309, which is available at the NRC's PDR,
located at One White Flint North, Room O1-F21, 11555 Rockville Pike
(first floor), Rockville, Maryland 20852. The NRC's regulations are
accessible electronically from the NRC Library on the NRC's Web site at
https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is
filed within 60 days, the Commission or a presiding officer designated
by the Commission or by the Chief Administrative Judge of the Atomic
Safety and Licensing Board Panel, will rule on the petition; and the
Secretary or the Chief Administrative Judge of the Atomic Safety and
Licensing Board Panel will issue a notice of a hearing or an
appropriate order.
As required by 10 CFR 2.309, a petition shall set forth with
particularity the interest of the petitioner in the proceeding, and how
that interest may be affected by the results of the proceeding. The
petition should specifically explain the reasons why intervention
should be permitted with particular reference to the following general
requirements: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest. The petition
must also set forth the specific contentions which the petitioner seeks
to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner shall provide a brief explanation of the bases for the
contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to those specific sources and
documents of which the petitioner is aware and on which the petitioner
intends to rely to establish those facts or expert opinion to support
its position on the issue. The petition must include sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact. Contentions shall be limited to
matters within the scope of the proceeding. The contention must be one
[[Page 72840]]
which, if proven, would entitle the petitioner to relief. A petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions consistent with the NRC's regulations, policies, and
procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Requests for hearing, petitions for leave
to intervene, and motions for leave to file new or amended contentions
that are filed after the 60-day deadline will not be entertained absent
a determination by the presiding officer that the filing demonstrates
good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i)
through (iii).
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of any amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by
December 20, 2016. The petition must be filed in accordance with the
filing instructions in the ``Electronic Submissions (E-Filing)''
section of this document, and should meet the requirements for
petitions set forth in this section, except that under 10 CFR
2.309(h)(2) a State, local governmental body, or Federally-recognized
Indian Tribe, or agency thereof does not need to address the standing
requirements in 10 CFR 2.309(d) if the facility is located within its
boundaries. A State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person who does not wish, or is not
qualified, to become a party to the proceeding may, in the discretion
of the presiding officer, be permitted to make a limited appearance
pursuant to the provisions of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or written statement of position on
the issues, but may not otherwise participate in the proceeding. A
limited appearance may be made at any session of the hearing or at any
prehearing conference, subject to the limits and conditions as may be
imposed by the presiding officer. Details regarding the opportunity to
make a limited appearance will be provided by the presiding officer if
such sessions are scheduled.
III. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene (hereinafter
``petition''), and documents filed by interested governmental entities
participating under 10 CFR 2.315(c), must be filed in accordance with
the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562, August 3, 2012). The E-Filing process requires participants
to submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Participants may
not submit paper copies of their filings unless they seek an exemption
in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition (even
in instances in which the participant, or its counsel or
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will establish an electronic
docket for the hearing in this proceeding if the Secretary has not
already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are available on the NRC's public Web site at
https://www.nrc.gov/site-help/e-submittals/adjudicatory-sub.html.
Participants may attempt to use other software not listed on the Web
site, but should note that the NRC's E-Filing system does not support
unlisted software, and the NRC Electronic Filing Help Desk will not be
able to offer assistance in using unlisted software.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a petition.
Submissions should be in Portable Document Format (PDF). Additional
guidance on PDF submissions is available on the NRC's public Web site
at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing
is considered complete at the time the documents are submitted through
the NRC's E-Filing system. To be timely, an electronic filing must be
submitted to the E-Filing system no later than 11:59 p.m. Eastern Time
on the due date. Upon receipt of a transmission, the E-Filing system
time-stamps the document and sends the submitter an email notice
confirming receipt of the document. The E-Filing system also
distributes an email notice that provides access to the document to the
NRC's Office of the General Counsel and any others who have advised the
Office of the Secretary that they wish to participate in the
proceeding, so that the filer need not serve the documents on those
participants separately. Therefore, applicants and other participants
(or their counsel or representative) must apply for and receive a
digital ID certificate before a hearing petition to intervene is filed
so that they can obtain access to the document via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals.html, by
email to MSHD.Resource@nrc.gov, or by a toll-
[[Page 72841]]
free call at 1-866-672-7640. The NRC Electronic Filing Help Desk is
available between 9 a.m. and 7 p.m., Eastern Time, Monday through
Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and Adjudications Staff. Participants filing a
document in this manner are responsible for serving the document on all
other participants. Filing is considered complete by first-class mail
as of the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as Social Security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a petition will require including
information on local residence in order to demonstrate a proximity
assertion of interest in the proceeding. With respect to copyrighted
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their submission.
For further details with respect to this action, see the
application for license amendment dated September 30, 2016 (ADAMS
Accession No. ML16274A474).
Attorney for licensee: Tamra Domeyer, Associate General Counsel,
Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL
60555.
NRC Branch Chief: G. Edward Miller
Dated at Rockville, Maryland, this 12th day of October 2016.
For the Nuclear Regulatory Commission.
Joel S. Wiebe,
Senior Project Manager, Plant Licensing Branch III-2, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.