Dairyland Power Cooperative: Notice of Intent To Prepare an Environmental Impact Statement and Hold Public Scoping Meetings, 71696-71697 [2016-25132]
Download as PDF
71696
Federal Register / Vol. 81, No. 201 / Tuesday, October 18, 2016 / Notices
Washington, DC 20250. Telephone:
(202) 401–0142. Email:
maureen.hessel@wdc.usda.gov.
VIII. Other Information
A. Paperwork Reduction Act
In accordance with the Paperwork
Reduction Act of 1995, the information
collection requirements associated with
renewable energy system and energy
efficiency improvements grants and
guaranteed loans, as covered in this
Notice, have been approved by the
Office of Management and Budget
(OMB) under OMB Control Number
0570–0050. The information collection
requirements associated with energy
audit and renewable energy
development assistance grants have also
been approved by OMB under OMB
Control Number 0570–0059.
B. Nondiscrimination Statement
The U.S. Department of Agriculture
(USDA) prohibits discrimination against
its customers, employees, and
applicants for employment on the basis
of race, color, national origin, age,
disability, sex, gender identity, reprisal
and where applicable, political beliefs,
marital status, familial or parental
status, religion, sexual orientation, or all
or part of an individual’s income is
derived from any public assistance
program, or protected genetic
information in employment or in any
program or activity conducted or funded
by the Department. (Not all prohibited
bases will apply to all programs and/or
employment activities.)
If you wish to file a Civil Rights
program complaint of discrimination,
complete the USDA Program
Discrimination Complaint Form (PDF),
found online at www.ascr.usda.gov/
complaint_filing_cust.html, or complete
the form at any USDA office, or call
(866) 632–9992 to request the form. You
may also write a letter containing all of
the information requested in the form.
Send your completed complaint form or
letter to us by mail at U.S. Department
of Agriculture, Director, Office of
Adjudication, 1400 Independence
Avenue SW., Washington, DC 20250–
9410, by fax (202) 690–7442 or email at
program.intake@usda.gov.
Individuals who are deaf, hard of
hearing or have speech disabilities and
wish to file either an EEO or program
complaint, please contact USDA
through the Federal Relay Service at
(800) 877–8339 or (800) 845–6136 (in
Spanish).
Persons with disabilities, who wish to
file a program complaint, please see
information above on how to contact us
directly by mail or by email. If you
require alternative means of
communication for program information
(e.g., Braille, large print, audiotape, etc.)
please contact USDA’s TARGET Center
at (202) 720–2600 (voice and TDD).
Dated: October 12, 2016.
Justin Hatmaker,
Acting Administrator, Rural BusinessCooperative Service.
[FR Doc. 2016–25163 Filed 10–17–16; 8:45 am]
BILLING CODE 3410–XY–P
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
Dairyland Power Cooperative: Notice
of Intent To Prepare an Environmental
Impact Statement and Hold Public
Scoping Meetings
AGENCY:
Rural Utilities Service, USDA.
Notice of Intent to Prepare an
Environmental Impact Statement and
Hold Public Scoping Meetings.
ACTION:
The Rural Utilities Service
(RUS) intends to prepare an
Environmental Impact Statement (EIS)
and hold public scoping meetings in
connection with possible impacts
related to the Cardinal-Hickory Creek
Transmission Line Project proposed by
Dairyland Power Cooperative (DPC).
Other utilities participating in the
Project are American Transmission
Company LLC, by its corporate manager
ATC Management Inc. and ITC Midwest
LLC.
The proposal consists of the
construction of a 345-kilovolt (kV)
transmission line and associated
infrastructure connecting the Hickory
Creek Substation in Dubuque County,
Iowa, with the Cardinal Substation in
the Town of Middleton, Wisconsin (near
Madison, Wisconsin). The Project also
includes a new intermediate 345/138-kV
substation near the Village of Montfort
in either Grant County or Iowa County,
Wisconsin. The total length of the 345kV transmission lines associated with
the proposed project will be
approximately 125 miles. DPC and the
other project participants have
identified proposed and alternate
segments and locations for transmission
lines and associated facilities and for
the intermediate substation. Dairyland
Power Cooperative is requesting RUS to
provide financing for its portion of the
proposed project.
SUMMARY:
RUS will conduct four public
scoping meetings in an open-house
format at the following locations:
DATES:
Date
Location
Time
Venue
October 31, 2016 .................
Peosta, Iowa ......................
3:00–6:00 p.m ...................
November 1, 2016 ...............
Cassville, Wisconsin ..........
4:00–7:00 p.m ...................
November 2, 2016 ...............
Dodgeville, Wisconsin .......
4:00–7:00 p.m ...................
November 3, 2016 ...............
Middleton, Wisconsin ........
4:00–7:00 p.m ...................
Peosta Community Center, 7896 Burds Road, Peosta,
IA 53068.
Cassville Middle School Cafeteria, 715 E. Amelia
Street, Cassville, WI 53806.
Dodgeville Middle School Cafeteria, 951 Chapel St.,
Dodgeville, WI 53533.
Madison Marriott West, 1313 John Q Hammons Dr.,
Middleton, WI 53562.
To send comments or for
further information, contact Dennis
Rankin, Environmental Protection
Specialist, U.S. Department of
Agriculture, Rural Utilities Service,
1400 Independence Avenue SW., Room
2244, Stop 1571, Washington, DC
20250–1571 Email: dennis.rankin@
wdc.usda.gov Washington, DC 20250–
1571.
Lhorne on DSK30JT082PROD with NOTICES
ADDRESSES:
VerDate Sep<11>2014
13:19 Oct 17, 2016
Jkt 241001
An Alternative Evaluation Study
(AES) and Macro Corridor Study (MCS),
prepared by Dairyland Power
Cooperative, will be presented at the
public scoping meetings. The reports are
available for public review at the RUS
address provided in this notice and at
Dairyland Power Cooperative, 3251 East
Avenue, South, La Crosse, WI 54602. In
addition, the reports will be available at
RUS’ Web site, https://www.rd.usda.gov/
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
publications/environmental-studies/
impact-statements and at local libraries
in the project area.
SUPPLEMENTARY INFORMATION:
Preliminary proposed transmission line
corridors, the siting area for the
intermediate substation, and the two
existing end-point substations have
been identified. The EIS will address
the construction, operation, and
E:\FR\FM\18OCN1.SGM
18OCN1
Lhorne on DSK30JT082PROD with NOTICES
Federal Register / Vol. 81, No. 201 / Tuesday, October 18, 2016 / Notices
management of the proposed project,
which includes the following: A new
345-kV terminal within the existing
Hickory Creek Substation in Dubuque
County, Iowa; a new intermediate 345/
138-kV substation near the Village of
Montfort in either Grant or Iowa County,
Wisconsin; a new 345-kV terminal
within the existing Cardinal Substation
in the Town of Middleton in Dane
County, Wisconsin; a new 45- to 65-mile
(depending on the final route) 345-kV
transmission line between the Hickory
Creek Substation and the intermediate
substation; a new 45- to 60-mile
(depending on the final route) 345-kV
transmission line between the
intermediate substation and the existing
Cardinal Substation; a short, less than
one-mile, 69-kV line in Iowa; facility
reinforcement needed in Iowa and
Wisconsin; construction and
maintenance of access roads for all
proposed transmission lines and rebuild
of the Turkey River Substation in
Dubuque County, Iowa with two 161/69
kV transformers, four 161-kV circuit
breakers, and three 69-kV circuit
breakers.
Total length of the transmission lines
for the proposed project will be
approximately 125 miles. The project
study area includes part or all of the
following counties in Iowa: Clayton and
Dubuque. In Wisconsin, the project area
includes parts of the following counties:
Dane, Grant, Iowa, and Lafayette.
Among the alternatives RUS will
address in the EIS is the No Action
alternative, under which the project
would not be undertaken. In the EIS, the
effects of the proposed project will be
compared to the existing conditions in
the area affected. Alternative
transmission line corridors and the
intermediate substation location will be
refined as part of the EIS scoping
process and will be addressed in the
Draft EIS. RUS will carefully study
public health and safety, environmental
impacts, and engineering aspects of the
proposed project and all related
facilities.
The U.S. Army Corps of Engineers
(USACE) and the U.S. Fish and Wildlife
Service (USFWS) are participating in
the environmental review process as
cooperating agencies, with RUS as the
lead Federal agency.
RUS will use input provided by
government agencies, private
organizations, and the public in the
preparation of the Draft EIS. The Draft
EIS will be available for review and
comment for 45 days. A Final EIS that
considers all comments received will
subsequently be prepared. The Final EIS
will be available for review and
comment for 30 days. Following the 30-
VerDate Sep<11>2014
13:19 Oct 17, 2016
Jkt 241001
day comment period, RUS will prepare
a Record of Decision (ROD). Notices
announcing the availability of the Draft
EIS, the Final EIS, and the ROD will be
published in the Federal Register and in
local newspapers.
Any final action by RUS related to the
proposed project will be subject to, and
contingent upon, compliance with all
relevant federal, state, and local
environmental laws and regulations and
completion of the environmental review
requirements as prescribed in the RUS
Environmental Policies and Procedures
(7 CFR part 1970).
Dated: October 12, 2016.
Kellie Kubena,
Director, Engineering and Environmental
Staff, Rural Utilities Service.
[FR Doc. 2016–25132 Filed 10–17–16; 8:45 am]
BILLING CODE P
DEPARTMENT OF COMMERCE
Bureau of Industry and Security
Discontinuance of Information
Collection 0694–0009: Triangular
Transactions ‘‘Stamp’’ Covered by a
U.S. Import Certificate
Bureau of Industry and
Security, Commere.
AGENCY:
ACTION:
Notice.
The Department of
Commerce, as part of its continuing
effort to reduce paperwork and
respondent burden, has discontinued
Information Collection 0694–0009,
‘‘Triangular Transactions Covered by a
U.S. Import Certificate.’’ Although this
collection has been discontinued, the
Triangular Transactions ‘‘Stamp’’ is still
valid and has been added to collection
0694–0017 as a supplemental
document.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Requests for additional information
should be directed to Mark Crace, BIS
ICB Liaison, (202)482–8093 or
Mark.Crace@bis.doc.gov.
Sheleen Dumas,
Departmental PRA Lead, Office of the Chief
Information Officer.
[FR Doc. 2016–25125 Filed 10–17–16; 8:45 am]
BILLING CODE 3510–33–P
PO 00000
71697
DEPARTMENT OF COMMERCE
International Trade Administration
[A–588–876, A–583–859, A–489–829]
Steel Concrete Reinforcing Bar From
Japan, Taiwan and the Republic of
Turkey: Initiation of Less-Than-FairValue Investigations
Enforcement and Compliance,
International Trade Administration,
Department of Commerce.
DATES: Effective October 11, 2016.
FOR FURTHER INFORMATION CONTACT:
Emily Halle at (202) 482–0176 (Japan);
Jun Jack Zhao at (202) 482–1396
(Taiwan); and Myrna Lobo at (202) 482–
2371 (Republic of Turkey), AD/CVD
Operations, Enforcement and
Compliance, U.S. Department of
Commerce, 14th Street and Constitution
Avenue NW., Washington, DC 20230.
SUPPLEMENTARY INFORMATION:
AGENCY:
The Petitions
On September 20, 2016, the
Department of Commerce (the
Department) received antidumping duty
(AD) petitions concerning imports of
steel concrete reinforcing bar (rebar)
from Japan, Taiwan, and the Republic of
Turkey (Turkey), filed in proper form on
behalf of the Rebar Trade Action
Coalition and its individual members
(Petitioners).1 The Petitions were
accompanied by a countervailing duty
(CVD) petition on rebar from Turkey.2
Petitioners are domestic producers of
rebar.3
On September 23 and 30, 2016, the
Department requested additional
information and clarification of certain
areas of the Petitions.4 Petitioners filed
1 See Petition for the Imposition of Antidumping
and Countervailing Duties: Steel Concrete
Reinforcing Bar from Japan, Taiwan, and the
Republic of Turkey, dated September 20, 2016 (the
Petitions). The individual members of the Rebar
Trade Action Coalition are Bayou Steel Group, Byer
Steel Group, Inc., Commercial Metals Company,
Gerdau Ameristeel U.S. Inc., Nucor Corporation,
and Steel Dynamics, Inc.
2 Id.
3 See Volume I of the Petitions, at 2 and Exhibits
I–1.
4 See Letter from the Department to Petitioners
entitled ‘‘Petitions for the Imposition of
Antidumping Duties on Imports of Steel Concrete
Reinforcing Bar from Japan, Taiwan, and the
Republic of Turkey and Countervailing Duties on
Imports of Steel Concrete Reinforcing Bar from the
Republic of Turkey: Supplemental Questions,’’
dated September 23, 2016 (General Issues
Supplemental Questionnaire); see also Letter from
the Department to Petitioners entitled ‘‘Petition for
the Imposition of Antidumping Duties on Imports
of Steel Concrete Reinforcing Bar from Japan:
Supplemental Questions,’’ dated September 23,
2016 (Japan Supplemental Questionnaire); see also
Letter from the Department to Petitioners entitled
Continued
Frm 00009
Fmt 4703
Sfmt 4703
E:\FR\FM\18OCN1.SGM
18OCN1
Agencies
[Federal Register Volume 81, Number 201 (Tuesday, October 18, 2016)]
[Notices]
[Pages 71696-71697]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-25132]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
Dairyland Power Cooperative: Notice of Intent To Prepare an
Environmental Impact Statement and Hold Public Scoping Meetings
AGENCY: Rural Utilities Service, USDA.
ACTION: Notice of Intent to Prepare an Environmental Impact Statement
and Hold Public Scoping Meetings.
-----------------------------------------------------------------------
SUMMARY: The Rural Utilities Service (RUS) intends to prepare an
Environmental Impact Statement (EIS) and hold public scoping meetings
in connection with possible impacts related to the Cardinal-Hickory
Creek Transmission Line Project proposed by Dairyland Power Cooperative
(DPC). Other utilities participating in the Project are American
Transmission Company LLC, by its corporate manager ATC Management Inc.
and ITC Midwest LLC.
The proposal consists of the construction of a 345-kilovolt (kV)
transmission line and associated infrastructure connecting the Hickory
Creek Substation in Dubuque County, Iowa, with the Cardinal Substation
in the Town of Middleton, Wisconsin (near Madison, Wisconsin). The
Project also includes a new intermediate 345/138-kV substation near the
Village of Montfort in either Grant County or Iowa County, Wisconsin.
The total length of the 345-kV transmission lines associated with the
proposed project will be approximately 125 miles. DPC and the other
project participants have identified proposed and alternate segments
and locations for transmission lines and associated facilities and for
the intermediate substation. Dairyland Power Cooperative is requesting
RUS to provide financing for its portion of the proposed project.
DATES: RUS will conduct four public scoping meetings in an open-house
format at the following locations:
----------------------------------------------------------------------------------------------------------------
Date Location Time Venue
----------------------------------------------------------------------------------------------------------------
October 31, 2016................... Peosta, Iowa.......... 3:00-6:00 p.m......... Peosta Community Center,
7896 Burds Road, Peosta,
IA 53068.
November 1, 2016................... Cassville, Wisconsin.. 4:00-7:00 p.m......... Cassville Middle School
Cafeteria, 715 E. Amelia
Street, Cassville, WI
53806.
November 2, 2016................... Dodgeville, Wisconsin. 4:00-7:00 p.m......... Dodgeville Middle School
Cafeteria, 951 Chapel St.,
Dodgeville, WI 53533.
November 3, 2016................... Middleton, Wisconsin.. 4:00-7:00 p.m......... Madison Marriott West, 1313
John Q Hammons Dr.,
Middleton, WI 53562.
----------------------------------------------------------------------------------------------------------------
ADDRESSES: To send comments or for further information, contact Dennis
Rankin, Environmental Protection Specialist, U.S. Department of
Agriculture, Rural Utilities Service, 1400 Independence Avenue SW.,
Room 2244, Stop 1571, Washington, DC 20250-1571 Email:
dennis.rankin@wdc.usda.gov Washington, DC 20250-1571.
An Alternative Evaluation Study (AES) and Macro Corridor Study
(MCS), prepared by Dairyland Power Cooperative, will be presented at
the public scoping meetings. The reports are available for public
review at the RUS address provided in this notice and at Dairyland
Power Cooperative, 3251 East Avenue, South, La Crosse, WI 54602. In
addition, the reports will be available at RUS' Web site, https://www.rd.usda.gov/publications/environmental-studies/impact-statements
and at local libraries in the project area.
SUPPLEMENTARY INFORMATION: Preliminary proposed transmission line
corridors, the siting area for the intermediate substation, and the two
existing end-point substations have been identified. The EIS will
address the construction, operation, and
[[Page 71697]]
management of the proposed project, which includes the following: A new
345-kV terminal within the existing Hickory Creek Substation in Dubuque
County, Iowa; a new intermediate 345/138-kV substation near the Village
of Montfort in either Grant or Iowa County, Wisconsin; a new 345-kV
terminal within the existing Cardinal Substation in the Town of
Middleton in Dane County, Wisconsin; a new 45- to 65-mile (depending on
the final route) 345-kV transmission line between the Hickory Creek
Substation and the intermediate substation; a new 45- to 60-mile
(depending on the final route) 345-kV transmission line between the
intermediate substation and the existing Cardinal Substation; a short,
less than one-mile, 69-kV line in Iowa; facility reinforcement needed
in Iowa and Wisconsin; construction and maintenance of access roads for
all proposed transmission lines and rebuild of the Turkey River
Substation in Dubuque County, Iowa with two 161/69 kV transformers,
four 161-kV circuit breakers, and three 69-kV circuit breakers.
Total length of the transmission lines for the proposed project
will be approximately 125 miles. The project study area includes part
or all of the following counties in Iowa: Clayton and Dubuque. In
Wisconsin, the project area includes parts of the following counties:
Dane, Grant, Iowa, and Lafayette.
Among the alternatives RUS will address in the EIS is the No Action
alternative, under which the project would not be undertaken. In the
EIS, the effects of the proposed project will be compared to the
existing conditions in the area affected. Alternative transmission line
corridors and the intermediate substation location will be refined as
part of the EIS scoping process and will be addressed in the Draft EIS.
RUS will carefully study public health and safety, environmental
impacts, and engineering aspects of the proposed project and all
related facilities.
The U.S. Army Corps of Engineers (USACE) and the U.S. Fish and
Wildlife Service (USFWS) are participating in the environmental review
process as cooperating agencies, with RUS as the lead Federal agency.
RUS will use input provided by government agencies, private
organizations, and the public in the preparation of the Draft EIS. The
Draft EIS will be available for review and comment for 45 days. A Final
EIS that considers all comments received will subsequently be prepared.
The Final EIS will be available for review and comment for 30 days.
Following the 30- day comment period, RUS will prepare a Record of
Decision (ROD). Notices announcing the availability of the Draft EIS,
the Final EIS, and the ROD will be published in the Federal Register
and in local newspapers.
Any final action by RUS related to the proposed project will be
subject to, and contingent upon, compliance with all relevant federal,
state, and local environmental laws and regulations and completion of
the environmental review requirements as prescribed in the RUS
Environmental Policies and Procedures (7 CFR part 1970).
Dated: October 12, 2016.
Kellie Kubena,
Director, Engineering and Environmental Staff, Rural Utilities Service.
[FR Doc. 2016-25132 Filed 10-17-16; 8:45 am]
BILLING CODE P