Consolidated Hydro New Hampshire, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 71498-71499 [2016-25028]
Download as PDF
71498
Federal Register / Vol. 81, No. 200 / Monday, October 17, 2016 / Notices
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or PDF. To use PDF you must have
Adobe Acrobat Reader, which is
available free at this site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
feature at this site, you can limit your
search to documents published by the
Department.
Dated: October 12, 2016.
Lynn B. Mahaffie,
Deputy Assistant Secretary for Policy,
Planning and Innovation, Delegated the
Duties of the Assistant Secretary for
Postsecondary Education.
[FR Doc. 2016–25058 Filed 10–14–16; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF EDUCATION
[Docket No.: ED–2016–ICCD–0089]
Agency Information Collection
Activities; Submission to the Office of
Management and Budget for Review
and Approval; Comment Request;
Federal Direct Loan Program
Regulations for Forbearance and Loan
Rehabilitation
Department of Education (ED),
Federal Student Aid (FSA).
ACTION: Notice.
AGENCY:
In accordance with the
Paperwork Reduction Act of 1995 (44
U.S.C. chapter 3501 et seq.), ED is
proposing an extension of an existing
information collection.
DATES: Interested persons are invited to
submit comments on or before
November 16, 2016.
ADDRESSES: To access and review all the
documents related to the information
collection listed in this notice, please
use https://www.regulations.gov by
searching the Docket ID number ED–
2016–ICCD–0089. Comments submitted
in response to this notice should be
submitted electronically through the
Federal eRulemaking Portal at https://
www.regulations.gov by selecting the
Docket ID number or via postal mail,
commercial delivery, or hand delivery.
Please note that comments submitted by
fax or email and those submitted after
the comment period will not be
accepted. Written requests for
information or comments submitted by
jstallworth on DSK7TPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
14:22 Oct 14, 2016
Jkt 241001
postal mail or delivery should be
addressed to the Director of the
Information Collection Clearance
Division, U.S. Department of Education,
400 Maryland Avenue SW., LBJ, Room
2E–349, Washington, DC 20202–4537.
FOR FURTHER INFORMATION CONTACT: For
specific questions related to collection
activities, please contact Beth
Grebeldinger, 202–377–4018.
SUPPLEMENTARY INFORMATION: The
Department of Education (ED), in
accordance with the Paperwork
Reduction Act of 1995 (PRA) (44 U.S.C.
3506(c)(2)(A)), provides the general
public and Federal agencies with an
opportunity to comment on proposed,
revised, and continuing collections of
information. This helps the Department
assess the impact of its information
collection requirements and minimize
the public’s reporting burden. It also
helps the public understand the
Department’s information collection
requirements and provide the requested
data in the desired format. ED is
soliciting comments on the proposed
information collection request (ICR) that
is described below. The Department of
Education is especially interested in
public comment addressing the
following issues: (1) Is this collection
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: Federal Direct
Loan Program Regulations for
Forbearance and Loan Rehabilitation.
OMB Control Number: 1845–0119.
Type of Review: An extension of an
existing information collection.
Respondents/Affected Public:
Individuals or Households.
Total Estimated Number of Annual
Responses: 129,027.
Total Estimated Number of Annual
Burden Hours: 35,094.
Abstract: This information collection
for the Direct Loan (DL) Program is
related to regulations for dealing with
defaulted loans and forbearance in
§ 685.205 and reasonable and affordable
loan rehabilitation in § 685.211. We are
requesting an extension of the current
burden calculated for this information
collection. These regulations provide
additional flexibilities for Direct Loan
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
borrowers and permit oral requests for
forbearance, as well as allow a borrower
to object to the initially established
reasonable and affordable loan
repayment amount. In addition, if a
borrower incurs changes to his or her
financial circumstances, the borrower
can provide supporting documentation
to change the amount of the reasonable
and affordable loan monthly repayment
amount. There has been no change to
the regulatory language.
Dated: October 12, 2016.
Tomakie Washington,
Acting Director, Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2016–25038 Filed 10–14–16; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3777–010]
Consolidated Hydro New Hampshire,
LLC; Notice of Intent To File License
Application, Filing of Pre-Application
Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3777–010.
c. Date Filed: August 31, 2016.
d. Submitted By: Consolidated Hydro
New Hampshire, LLC.
e. Name of Project: Rollinsford
Hydroelectric Project.
f. Location: On the Salmon Falls
River, in Strafford County, New
Hampshire and York County, Maine. No
federal lands are occupied by the project
works or located within the project
boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Kevin
Webb, Enel Green Power North
America, Inc., One Tech Drive, Suite
200, Andover, MA 01810; (978) 681–
1900; email—kevin.webb@enel.com.
i. FERC Contact: Dr. Nicholas Palso at
(202) 502–8854; or email at
nicholas.palso@ferc.gov.
j. Consolidated Hydro New
Hampshire, LLC filed its request to use
the Traditional Licensing Process on
August 31, 2016. Consolidated Hydro
New Hampshire, LLC provided public
notice of its request on August 24, 2016.
In a letter issued on October 11, 2016,
the Director of the Division of
Hydropower Licensing approved
Consolidated Hydro New Hampshire,
E:\FR\FM\17OCN1.SGM
17OCN1
jstallworth on DSK7TPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 200 / Monday, October 17, 2016 / Notices
LLC’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New Hampshire and Maine State
Historic Preservation Officers, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Consolidated Hydro New Hampshire,
LLC as the Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Consolidated Hydro New
Hampshire, LLC filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 3777.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by August 31,
2019.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
VerDate Sep<11>2014
14:22 Oct 14, 2016
Jkt 241001
For assistance, contact FERC Online
Support.
Dated: October 11, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–25028 Filed 10–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13212–005]
Kenai Hydro, LLC; Notice of Technical
Meeting
a. Project Name and Number: Grant
Lake Hydroelectric Project No. 13212.
b. Date and Time of Meeting:
November 1, 2016; 8:00 a.m.—12:00
p.m., AKDT.
c. Place: Teleconference.
d. FERC Contact: Kenneth Hogan,
Kenneth.Hogan@ferc.gov .
e. Purpose of Meeting: Commission
Staff is hosting a Technical Meeting(s)
in an effort to seek resolution of
conflicts between the proposed Grant
Lake Hydroelectric Project and the
Iditarod National Historic Trail.
f. A stenographer will record the
technical meeting, and meeting
transcripts will be placed into the
Commission’s public record for the
proceeding.
g. All local, state, and federal
agencies, Indian tribes, interested nongovernmental organizations, and other
interested parties are invited to
participate.
h. Access to the teleconference will be
provided upon an emailed request to the
FERC Contact in Item d above.
Dated: October 11, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–25029 Filed 10–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–501–000]
Texas Eastern Transmission, LP;
Notice of Application
Take notice that on September 15,
2016, Texas Eastern Transmission, LP
(Texas Eastern), 5400 Westheimer Court,
Houston, TX 77056–5310, filed an
application in Docket No. CP16–501–
000 pursuant to Section 7(c) of the
Natural Gas Act (NGA), and Part 157 of
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
71499
the Commission’s regulations, for a
certificate of public convenience and
necessity to construct its Marshall
County Mine Panel 17W Project. Texas
Eastern states its project is designed to
ensure the safe and efficient operation
of Texas Eastern’s existing pipeline
facilities during the longwall mining
activities planned by Marshall County
Coal Company in the area beneath Texas
Eastern’s pipelines in Marshall County,
West Virginia. Texas Eastern proposes
to excavate, elevate, and/or replace
certain sections of four different
pipelines and appurtenant facilities, all
as more fully set forth in the
application, which is on file with the
Commission and open for public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Lisa A.
Connolly, General Manager, Rates and
Certificates, Texas Eastern
Transmission, LP, P.O. Box 1642,
Houston, TX 77251–1642, or by calling
(713) 627–4102 (telephone), or (713)
627–5947 (fax), or by email at
laconnolly@spectraenergy.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 81, Number 200 (Monday, October 17, 2016)]
[Notices]
[Pages 71498-71499]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-25028]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3777-010]
Consolidated Hydro New Hampshire, LLC; Notice of Intent To File
License Application, Filing of Pre-Application Document, Approving Use
of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 3777-010.
c. Date Filed: August 31, 2016.
d. Submitted By: Consolidated Hydro New Hampshire, LLC.
e. Name of Project: Rollinsford Hydroelectric Project.
f. Location: On the Salmon Falls River, in Strafford County, New
Hampshire and York County, Maine. No federal lands are occupied by the
project works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Kevin Webb, Enel Green Power North
America, Inc., One Tech Drive, Suite 200, Andover, MA 01810; (978) 681-
1900; email_kevin.webb@enel.com.
i. FERC Contact: Dr. Nicholas Palso at (202) 502-8854; or email at
nicholas.palso@ferc.gov.
j. Consolidated Hydro New Hampshire, LLC filed its request to use
the Traditional Licensing Process on August 31, 2016. Consolidated
Hydro New Hampshire, LLC provided public notice of its request on
August 24, 2016. In a letter issued on October 11, 2016, the Director
of the Division of Hydropower Licensing approved Consolidated Hydro New
Hampshire,
[[Page 71499]]
LLC's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New Hampshire and Maine State Historic
Preservation Officers, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Consolidated Hydro New
Hampshire, LLC as the Commission's non-federal representative for
carrying out informal consultation pursuant to section 7 of the
Endangered Species Act and section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management Act; and consultation pursuant to
section 106 of the National Historic Preservation Act.
m. Consolidated Hydro New Hampshire, LLC filed a Pre-Application
Document (PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 3777. Pursuant to 18 CFR
16.8, 16.9, and 16.10, each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by August 31,
2019.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: October 11, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-25028 Filed 10-14-16; 8:45 am]
BILLING CODE 6717-01-P