Puerto Rico Electric Power Authority; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 71091 [2016-24882]
Download as PDF
rmajette on DSK2TPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 199 / Friday, October 14, 2016 / Notices
approved Mr. Ruger’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New Hampshire State Historic
Preservation Officer, as required by
section 106, National Historic
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. Mr. Ruger filed a PAD, including a
proposed process plan and schedule,
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
licensee’s office located at 169 Sunapee
Street, Newport, NH 03773. Call (603)
863–6332 to make an appointment.
n. The licensee states his unequivocal
intent to submit an application for a
subsequent license for Project No.
10934. Pursuant to 18 CFR 16.8, 16.9,
and 16.10 each application for a
subsequent license and any competing
license applications must be filed with
the Commission at least 24 months prior
to the expiration of the existing license.
All applications for license for this
project must be filed by April 30, 2019.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: October 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–24884 Filed 10–13–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
14:29 Oct 13, 2016
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 663–070]
Puerto Rico Electric Power Authority;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent To
File License Application and Request
To Use the Traditional Licensing
Process.
b. Project No.: 663–070.
c. Date Filed: August 11, 2016.
d. Submitted By: Puerto Rico Electric
Power Authority.
´
e. Name of Project: Rıo Blanco
Hydroelectric Project.
´
f. Location: On the Rıo Blanco, on the
southern border of the El Yunque
National Forest in the Municipality of
Naguabo near the community of Florida,
Puerto Rico. The project occupies 2.2
acres of United States lands
administered by the U.S. Forest Service.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Indira
´
Mohip Colon, Puerto Rico Electric
Power Authority, 1110 Ponce de Leon
Ave. Pda 171⁄2, NEOS Building, Office
#701, Santurce, PR 00936; (787) 521–
4968; or email at lMOHIP@AEEPR.COM.
i. FERC Contact: Sarah Salazar at
(202) 502–6863; or email at
sarah.salazar@ferc.gov.
j. Puerto Rico Electric Power
Authority filed its request to use the
Traditional Licensing Process on August
11, 2016. Puerto Rico Electric Power
Authority provided public notice of its
request on August 11, 2016. In a letter
dated October 7, 2016, the Director of
the Division of Hydropower Licensing
approved Puerto Rico Electric Power
Authority’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Puerto Rico State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
71091
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
the Puerto Rico Electric Power
Authority as the Commission’s nonfederal representative for carrying out
informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. Puerto Rico Electric Power
Authority filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 663.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by August 20, 2019.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: October 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–24882 Filed 10–13–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 81, Number 199 (Friday, October 14, 2016)]
[Notices]
[Page 71091]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-24882]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 663-070]
Puerto Rico Electric Power Authority; Notice of Intent To File
License Application, Filing of Pre-Application Document, Approving Use
of the Traditional Licensing Process
a. Type of Filing: Notice of Intent To File License Application and
Request To Use the Traditional Licensing Process.
b. Project No.: 663-070.
c. Date Filed: August 11, 2016.
d. Submitted By: Puerto Rico Electric Power Authority.
e. Name of Project: R[iacute]o Blanco Hydroelectric Project.
f. Location: On the R[iacute]o Blanco, on the southern border of
the El Yunque National Forest in the Municipality of Naguabo near the
community of Florida, Puerto Rico. The project occupies 2.2 acres of
United States lands administered by the U.S. Forest Service.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Indira Mohip Col[oacute]n, Puerto
Rico Electric Power Authority, 1110 Ponce de Leon Ave. Pda 17\1/2\,
NEOS Building, Office #701, Santurce, PR 00936; (787) 521-4968; or
email at l-MOHIP@AEEPR.COM.
i. FERC Contact: Sarah Salazar at (202) 502-6863; or email at
sarah.salazar@ferc.gov.
j. Puerto Rico Electric Power Authority filed its request to use
the Traditional Licensing Process on August 11, 2016. Puerto Rico
Electric Power Authority provided public notice of its request on
August 11, 2016. In a letter dated October 7, 2016, the Director of the
Division of Hydropower Licensing approved Puerto Rico Electric Power
Authority's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Puerto Rico State Historic Preservation Officer,
as required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating the Puerto Rico Electric
Power Authority as the Commission's non-federal representative for
carrying out informal consultation pursuant to section 7 of the
Endangered Species Act and section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management Act; and consultation pursuant to
section 106 of the National Historic Preservation Act.
m. Puerto Rico Electric Power Authority filed a Pre-Application
Document (PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 663. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by August 20,
2019.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: October 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-24882 Filed 10-13-16; 8:45 am]
BILLING CODE 6717-01-P