Notice of Effectiveness of Exempt Wholesale Generator Status, 70673 [2016-24762]

Download as PDF 70673 Federal Register / Vol. 81, No. 198 / Thursday, October 13, 2016 / Notices Dated: October 6, 2016. Kimberly D. Bose, Secretary. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. [FR Doc. 2016–24727 Filed 10–12–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–1307–000. Applicants: WBI Energy Transmission, Inc. Description: Annual Penalty Revenue Credit Report of WBI Energy Transmission, Inc. Filed Date: 9/30/16. Accession Number: 20160930–5361. Comments Due: 5 p.m. ET 10/12/16. Filings in Existing Proceedings Docket Numbers: RP16–1306–001. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: Tariff Amendment: Volume No. 2—Neg. Rate Agmt—MEX Gas Supply, S.L. SP301591—Amended to be effective 10/6/2016. Filed Date: 10/5/16. Accession Number: 20161005–5136. Comments Due: 5 p.m. ET 10/17/16. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 06, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–24766 Filed 10–12–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status McHenry Battery Storage, LLC .................................................................................................................................................. East Pecos Solar, LLC ............................................................................................................................................................... Solverde 1, LLC ......................................................................................................................................................................... Antelope DSR 1, LLC ................................................................................................................................................................ Cimarron Bend Wind Project I, LLC .......................................................................................................................................... Take notice that during the month of September 2016, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: October 5, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–24762 Filed 10–12–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2880–014] Lhorne on DSK30JT082PROD with NOTICES Cherokee Falls Hydroelectric Project, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 2880–014. c. Date Filed: July 29, 2016. d. Submitted By: Cherokee Falls Hydroelectric Project, LLC. VerDate Sep<11>2014 14:07 Oct 12, 2016 Jkt 241001 e. Name of Project: Cherokee Falls Hydroelectric Project. f. Location: On the Broad River, in Cherokee, County, South Carolina. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Beth Harris, Enel Green Power North America, Inc., 11 Anderson Street, Piedmont, SC 29673; (864) 846–0042; email—Beth.Harris@Enel.com. i. FERC Contact: Michael Spencer at (202) 502–6093; or email at michael.spencer@ferc.gov. j. Cherokee Falls Hydroelectric Project, LLC filed its request to use the Traditional Licensing Process on August 2, 2016. Cherokee Falls Hydroelectric Project, LLC provided public notice of its request on September 16, 2016. In a letter dated October 6, 2016, the Director of the Division of Hydropower Licensing approved Cherokee Falls Hydroelectric Project, LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 EG16–126–000 EG16–127–000 EG16–128–000 EG16–129–000 EG16–130–000 agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the South Carolina State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Cherokee Falls Hydroelectric Project, LLC as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Cherokee Falls Hydroelectric Project, LLC filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// E:\FR\FM\13OCN1.SGM 13OCN1

Agencies

[Federal Register Volume 81, Number 198 (Thursday, October 13, 2016)]
[Notices]
[Page 70673]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-24762]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status

------------------------------------------------------------------------
 
------------------------------------------------------------------------
McHenry Battery Storage, LLC..........  EG16-126-000
East Pecos Solar, LLC.................  EG16-127-000
Solverde 1, LLC.......................  EG16-128-000
Antelope DSR 1, LLC...................  EG16-129-000
Cimarron Bend Wind Project I, LLC.....  EG16-130-000
------------------------------------------------------------------------

    Take notice that during the month of September 2016, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

    Dated: October 5, 2016.
 Nathaniel J. Davis, Sr.,
 Deputy Secretary.
[FR Doc. 2016-24762 Filed 10-12-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.