Notice of Application for Transfer of Licenses and Soliciting Comments and Motions To Intervene, 70414-70415 [2016-24602]
Download as PDF
70414
Federal Register / Vol. 81, No. 197 / Wednesday, October 12, 2016 / Notices
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
Docket No.
ascending order. These filings are
available for electronic review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
File date
Prohibited:
1. CP16–22–000 .............................................................................
2. CP16–22–000 .............................................................................
3. CP16–22–000 .............................................................................
4. CP15–558–000 ...........................................................................
5. P–14341–000 ..............................................................................
Exempt:
1. CP16–10–000 .............................................................................
Presenter or requester
9–21–2016
9–21–2016
9–21–2016
9–26–2016
9–26–2016
Mass Mailing.1
Mass Mailing.2
Mass Mailing,3
Evan M. Schneider.
Mitchell Wexler
9–20–2016
2. CP15–558–000 ...........................................................................
9–20–2016
3. CP16–121–000 ...........................................................................
9–20–2016
4. CP15–77–000 .............................................................................
CP15–88–000 ..................................................................................
5. CP15–520–000 ...........................................................................
6. ER13–2483–001 .........................................................................
9–23–2016
U.S. House Representative.
H. Morgan Griffith.
State of New Jersey Senator.
Raymond J. Lesniak.
City of Providence, Rhode Island.
Mayor Jorge O. Elorza.
United States Senator Mitch McConnell.
9–26–2016
9–26–2016
FERC Staff.4
U.S. House Representative Dave Brat.
Dated: October 4, 2016
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2016–24555 Filed 10–11–16; 8:45 am]
Notice of Application for Transfer of
Licenses and Soliciting Comments and
Motions To Intervene
BILLING CODE 6717–01–P
Littleville Power Company, Inc., Kelley’s Falls, LLC, Somersworth Hydro Company,
Inc., Newbury Hydro Company, LLC, Hydro Energies Corporation, Barnet Hydro
Company, LLC, Mascoma Hydro Corporation, Salmon Falls Hydro, LLC, Green
Mountain Power Corporation.
On September 14, 2016, the above
mentioned transferors and Green
Mountain Power Corporation
(transferee) filed an application for
Project number
mstockstill on DSK3G9T082PROD with NOTICES
P–2801–039
P–3025–027
P–4451–018
P–5261–021
P–5313–015
....................................
....................................
....................................
....................................
....................................
Location
Glendale Project ............................
Kelley’s Falls Project .....................
Lower Great Falls Project ..............
Newbury Project ............................
Dewey’s
Mills
Hydroelectric
Project.
Barnet Hydro Project .....................
Glen Hydro Project ........................
South
Berwick
Hydroelectric
Project.
1 Twenty four letters have been sent to FERC
Commissioners and staff under this docket number.
2 Twenty four letters have been sent to FERC
Commissioners and staff under this docket number.
20:13 Oct 11, 2016
transfer of licenses for the following
projects.
Project name
P–5702–017 ....................................
P–8405–021 ....................................
P–11163–048 ..................................
VerDate Sep<11>2014
Project Nos. 2801–039, 3025–027, 4451–018, 5261–
021, 5313–015, 5702–017, 8405–021, and 11163–
048, respectively.
Jkt 241001
Housatonic River, Berkshire County, MA.
Piscataquog River, Hillsborough County, NH.
Salmon Falls River, Strafford County, NH; York County, ME.
Wells River, Orange County, VT.
Wells River, Orange County, VT.
Stevens River, Caledonia County, VT.
Mascoma River, Grafton County, NH.
Salmon Falls River, York County, ME; Rollinsford & Strafford, counties, NH.
3 Twelve letters have been sent to FERC
Commissioners and staff under this docket number.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
4 Memo reporting communication with Cassandra
Forsyth, FERC Contractor, and various agency
representatives.
E:\FR\FM\12OCN1.SGM
12OCN1
Federal Register / Vol. 81, No. 197 / Wednesday, October 12, 2016 / Notices
The transferors and transferee seek
Commission approval to transfer the
licenses for the above mentioned
projects from the transferors to the
transferee.
Applicant Contacts: For Transferor:
Mr. Stephen Pike, Vice President,
Operations, Enel Green Power North
America, Inc., 1 Tech Drive, Suite 220,
Andover, MA 01810, Email:
Stephen.Pike@enel.com and General
Counsel, Enel Green Power North
America, Inc., 1 Tech Drive, Suite 220,
Andover, MA 01810, Email:
generalcounsel@enel.com. For
Transferee: Ms. Charlotte Ancel, Vice
President, Power Supply & General
Counsel, Green Mountain Power
Corporation, 163 Acorn Lane,
Colchester, VT 05446, Email:
Charlotte.Ancel@
greenmountainpower.com and Ms.
Elizabeth Kohler, Esq., Downs Rachlin
Martin PLLC, 199 Main Street, P.O. Box
190, Burlington, VT 05402, Email:
EKohler@drm.com.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice, by the
Commission. The Commission strongly
encourages electronic filing. Please file
motions to intervene and comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2801–039, P–
3025–027, P–4451–018, P–5261–021, P–
5313–015, P–5702–017, P–8405–021,
and P–11163–048.
Dated: October 5, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–24602 Filed 10–11–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–22–000]
Joseph W. Yeamans; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On September 23, 2016, Joseph W.
Yeamans filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
70415
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed FMC 33B
Micro-hydro Project would have an
installed capacity of 5 kilowatts (kW),
and would be located along an existing
irrigation pipeline on the applicant’s
land. The project would be located near
the Town of Paonia in Delta County,
Colorado.
Applicant Contact: Joseph W.
Yeamans, 15445 Amsbury Rd., Paonia,
CO 81428 Phone No. (970) 527–4323.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) An
approximately 17-foot by 9-foot
underground concrete vault containing
one 4-jet Turgo turbine/generating unit
with an installed capacity of 5 kW; (2)
a 387-foot-long, 12-inch-diameter
penstock, which further reduces to a
short, 8-inch-diameter penstock with an
8-inch-diameter bypass; (3) four short,
4-inch-diameter pipes supplying the
turbine/generating unit’s four jets; (4) a
75-foot-long, 15-inch-diameter tailrace
pipe discharging water to an existing
irrigation conduit; and (5) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of 12,000 kilowatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
mstockstill on DSK3G9T082PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: The
proposed addition of the hydroelectric
project along the existing irrigation
pipeline will not alter its primary
purpose. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
VerDate Sep<11>2014
20:13 Oct 11, 2016
Jkt 241001
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Y
Y
Y
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
E:\FR\FM\12OCN1.SGM
12OCN1
Agencies
[Federal Register Volume 81, Number 197 (Wednesday, October 12, 2016)]
[Notices]
[Pages 70414-70415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-24602]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Transfer of Licenses and Soliciting
Comments and Motions To Intervene
Littleville Power Company, Inc., Kelley's Project Nos. 2801-039, 3025-
Falls, LLC, Somersworth Hydro Company, 027, 4451-018, 5261-021,
Inc., Newbury Hydro Company, LLC, Hydro 5313-015, 5702-017, 8405-
Energies Corporation, Barnet Hydro 021, and 11163-048,
Company, LLC, Mascoma Hydro Corporation, respectively.
Salmon Falls Hydro, LLC, Green Mountain
Power Corporation.
On September 14, 2016, the above mentioned transferors and Green
Mountain Power Corporation (transferee) filed an application for
transfer of licenses for the following projects.
------------------------------------------------------------------------
Project number Project name Location
------------------------------------------------------------------------
P-2801-039.................... Glendale Project. Housatonic River,
Berkshire County,
MA.
P-3025-027.................... Kelley's Falls Piscataquog River,
Project. Hillsborough County,
NH.
P-4451-018.................... Lower Great Falls Salmon Falls River,
Project. Strafford County,
NH; York County, ME.
P-5261-021.................... Newbury Project.. Wells River, Orange
County, VT.
P-5313-015.................... Dewey's Mills Wells River, Orange
Hydroelectric County, VT.
Project.
P-5702-017.................... Barnet Hydro Stevens River,
Project. Caledonia County,
VT.
P-8405-021.................... Glen Hydro Mascoma River,
Project. Grafton County, NH.
P-11163-048................... South Berwick Salmon Falls River,
Hydroelectric York County, ME;
Project. Rollinsford &
Strafford, counties,
NH.
------------------------------------------------------------------------
[[Page 70415]]
The transferors and transferee seek Commission approval to transfer
the licenses for the above mentioned projects from the transferors to
the transferee.
Applicant Contacts: For Transferor: Mr. Stephen Pike, Vice
President, Operations, Enel Green Power North America, Inc., 1 Tech
Drive, Suite 220, Andover, MA 01810, Email: Stephen.Pike@enel.com and
General Counsel, Enel Green Power North America, Inc., 1 Tech Drive,
Suite 220, Andover, MA 01810, Email: generalcounsel@enel.com. For
Transferee: Ms. Charlotte Ancel, Vice President, Power Supply & General
Counsel, Green Mountain Power Corporation, 163 Acorn Lane, Colchester,
VT 05446, Email: Charlotte.Ancel@greenmountainpower.com and Ms.
Elizabeth Kohler, Esq., Downs Rachlin Martin PLLC, 199 Main Street,
P.O. Box 190, Burlington, VT 05402, Email: EKohler@drm.com.
FERC Contact: Patricia W. Gillis, (202) 502-8735.
Deadline for filing comments and motions to intervene: 30 days from
the issuance date of this notice, by the Commission. The Commission
strongly encourages electronic filing. Please file motions to intervene
and comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2801-039, P-3025-027, P-4451-018, P-5261-021, P-5313-
015, P-5702-017, P-8405-021, and P-11163-048.
Dated: October 5, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-24602 Filed 10-11-16; 8:45 am]
BILLING CODE 6717-01-P