Lower Village Hydroelectric Associates, L.P., Sugar River Power LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 70105 [2016-24470]
Download as PDF
Federal Register / Vol. 81, No. 196 / Tuesday, October 11, 2016 / Notices
Dated: October 5, 2016.
Kate Mullan,
Acting Director, Information Collection
Clearance Division, Office of the Chief Privacy
Officer, Office of Management.
[FR Doc. 2016–24448 Filed 10–7–16; 8:45 am]
BILLING CODE 4000–01–P
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–9088–050.
Dated: October 4, 2016.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2016–24470 Filed 10–7–16; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 9088–050]
DEPARTMENT OF ENERGY
Lower Village Hydroelectric
Associates, L.P., Sugar River Power
LLC; Notice of Application for Transfer
of License and Soliciting Comments,
Motions To Intervene, and Protests
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
On September 15, 2016, Lower Village
Hydroelectric Associates, L.P.
(transferor) and Sugar River Power LLC
(transferee) filed an application for the
transfer of license of the Lower Village
Project No. 9088. The project is located
on the Sugar River in Sullivan County,
New Hampshire.
The applicants seek Commission
approval to transfer the license for the
Lower Village Project from Lower
Village Hydroelectric Associates, L.P. to
Sugar River Power LLC.
Applicants Contact: For transferor:
Mr. John Webster, General Partner,
Lower Village Hydroelectric Associates,
L.P., P.O. Box 178, South Berwick, ME
03908, Email: hydromagnt@gwi.net. For
transferee: Mr. Robert King, Manager,
Sugar River Power LLC, 42 Hurricane
Road, Keene, NH 03431, Phone: 603–
352–3444, Email: bking31415@
gmail.com and Ms. Elizabeth W.
Whittle, Nixon Peabody, LLP, 799 Ninth
Street NW., Suite 500, Washington, DC
20004, Phone: 202–585–8338, Email:
ewhittle@nixonpeabody.com.
FERC Contact: Patricia W. Gillis, (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the date that the Commission issues this
notice. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
VerDate Sep<11>2014
20:12 Oct 07, 2016
Jkt 241001
[Project No. 14796–000
GreenGenStorage LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On July 19, 2016, GreenGenStorage
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Mokelumne Pumped Storage Project, to
be located on the North Fork
Mokelumne River, Bear River, and Cole
Creek, in Amador and Calaveras County,
California. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The project concept envisions the
construction of a pumped storage
generating facility consisting of: (1) The
existing Salt Springs Reservoir (part of
PG&E’s currently licensed Mokelumne
River Project No. 137) as the lower pool;
(2) an upper reservoir using either the
existing Upper Bear or Lower Bear River
reservoirs (also part of PG&E’s
Mokelumne River Project); (3) a 16,000foot to 20,000-foot power tunnel
connecting the upper reservoir, pump
turbines, and the lower reservoir; (4) an
underground powerhouse containing
the pump-turbines and motorgenerators; (5) an approximately 3,000foot-long transmission line; and (6)
appurtenant facilities. GreenGenStorage
states that based on preliminary
analyses, the project would have from
one to three 380-megawatt generating
units and an average annual electricity
production of between 523 and 742
gigawatt-hours. GreenGenStorage plans
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
70105
to conduct studies to help further refine
the range of suitable generation
capabilities and other project
characteristics.
Applicant Contact: Mr. Edward
Cooper, Managing Director and Project
Manager, GreenGenStorage LLC, P.O.
Box 537, Summerland, CA 93067, (805)
450–2867 or edward@
greengenstorage.com.
FERC Contact: John M. Mudre; phone:
(202) 502–8902 or john.mudre@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14796–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14796) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: October 4, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–24474 Filed 10–7–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\11OCN1.SGM
11OCN1
Agencies
[Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)]
[Notices]
[Page 70105]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-24470]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9088-050]
Lower Village Hydroelectric Associates, L.P., Sugar River Power
LLC; Notice of Application for Transfer of License and Soliciting
Comments, Motions To Intervene, and Protests
On September 15, 2016, Lower Village Hydroelectric Associates, L.P.
(transferor) and Sugar River Power LLC (transferee) filed an
application for the transfer of license of the Lower Village Project
No. 9088. The project is located on the Sugar River in Sullivan County,
New Hampshire.
The applicants seek Commission approval to transfer the license for
the Lower Village Project from Lower Village Hydroelectric Associates,
L.P. to Sugar River Power LLC.
Applicants Contact: For transferor: Mr. John Webster, General
Partner, Lower Village Hydroelectric Associates, L.P., P.O. Box 178,
South Berwick, ME 03908, Email: hydromagnt@gwi.net. For transferee: Mr.
Robert King, Manager, Sugar River Power LLC, 42 Hurricane Road, Keene,
NH 03431, Phone: 603-352-3444, Email: bking31415@gmail.com and Ms.
Elizabeth W. Whittle, Nixon Peabody, LLP, 799 Ninth Street NW., Suite
500, Washington, DC 20004, Phone: 202-585-8338, Email:
ewhittle@nixonpeabody.com.
FERC Contact: Patricia W. Gillis, (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments, motions to intervene, and protests:
30 days from the date that the Commission issues this notice. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-9088-050.
Dated: October 4, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-24470 Filed 10-7-16; 8:45 am]
BILLING CODE 6717-01-P