Public Hearing, 69182-69183 [2016-24032]

Download as PDF 69182 Federal Register / Vol. 81, No. 193 / Wednesday, October 5, 2016 / Notices SMALL BUSINESS ADMINISTRATION Interest Rates The Small Business Administration publishes an interest rate called the optional ‘‘peg’’ rate (13 CFR 120.214) on a quarterly basis. This rate is a weighted average cost of money to the government for maturities similar to the average SBA direct loan. This rate may be used as a base rate for guaranteed fluctuating interest rate SBA loans. This rate will be 1.75 percent for the October–December quarter of FY 2017. Pursuant to 13 CFR 120.921(b), the maximum legal interest rate for any third party lender’s commercial loan which funds any portion of the cost of a 504 project (see 13 CFR 120.801) shall be 6% over the New York Prime rate or, if that exceeds the maximum interest rate permitted by the constitution or laws of a given State, the maximum interest rate will be the rate permitted by the constitution or laws of the given State. Linda T. Reilly, Acting Director, Office of Financial Assistance. [FR Doc. 2016–24034 Filed 10–4–16; 8:45 am] BILLING CODE 8025–01–P DEPARTMENT OF STATE [Public Notice: 9745] asabaliauskas on DSK3SPTVN1PROD with NOTICES Notice of Public Meeting of the President’s Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory Board Summary: In accordance with the Federal Advisory Committee Act (FACA), the PEPFAR Scientific Advisory Board (hereinafter referred to as ‘‘the Board’’) will meet on Tuesday, November 1, 2016 at 1800 G St. NW., Suite 10300, Washington DC 20006. The meeting will last from 8:30 a.m. until approximately 5:30 p.m. and is open to the public. The meeting will be hosted by the Office of the U.S. Global AIDS Coordinator and Health Diplomacy, and led by Ambassador Deborah Birx, who leads implementation of the President’s Emergency Plan for AIDS Relief (PEPFAR), and the Board Chair, Dr. Carlos del Rio. The Board serves the Global AIDS Coordinator in a solely advisory capacity concerning scientific, implementation, and policy issues related to the global response to HIV/ AIDS. These issues will be of concern as they influence the priorities and direction of PEPFAR evaluation and VerDate Sep<11>2014 18:15 Oct 04, 2016 Jkt 241001 research, the content of national and international strategies and implementation, and the role of PEPFAR in international discourse regarding an appropriate and resourced response. Topics for the meeting will include follow-up discussions of previous Board recommendations on financing and economics, and tuberculosis-HIV co-infection; updates on PEPFAR 3.0 programmatic activities in a number of areas including preexposure prophylaxis in pregnant and breastfeeding women; HPV testing in people living with HIV; voluntary medical male circumcision; and financing, data usage and increasing civil society engagement in PEPFAR processes and decisions. The public may attend this meeting as seating capacity allows. Admittance to the meeting will be by means of a prearranged clearance list. In order to be placed on the list and, if applicable, to request reasonable accommodation, please register online via the following: https://goo.gl/forms/ 0IonzRZq4lMcxwYB2 no later than Friday, October 21. While the meeting is open to public attendance, the Board will determine procedures for public participation. Requests for reasonable accommodation that are made after 5 p.m. on October 21 might not be possible to fulfill. For further information about the meeting, please contact Dr. Ebony Coleman, Designated Federal Officer for the Board, Office of the U.S. Global AIDS Coordinator and Health Diplomacy at ColemanEM@state.gov. Dated: September 15, 2016. Ebony Coleman, Office of the U.S. Global AIDS Coordinator and Health Diplomacy, Department of State. [FR Doc. 2016–24095 Filed 10–4–16; 8:45 am] BILLING CODE 4710–10–P SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on November 3, 2016, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for December 8, 2016, which will be SUMMARY: PO 00000 Frm 00147 Fmt 4703 Sfmt 4703 noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is November 14, 2016. DATES: The public hearing will convene on November 3, 2016, at 2:00 p.m. The public hearing will end at 5:00 p.m. or at the conclusion of public testimony, whichever is sooner. The deadline for the submission of written comments is November 14, 2016. ADDRESSES: The public hearing will be conducted at the Pennsylvania State Capitol, Room 8E–B, East Wing, Commonwealth Avenue, Harrisburg, Pa. FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436. Information concerning the applications for these projects is available at the SRBC Water Resource Portal at www.srbc.net/wrp. Additional supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.net/pubinfo/docs/2009–02_ Access_to_Records_Policy_ 20140115.pdf. SUPPLEMENTARY INFORMATION: The public hearing will cover the following projects: Projects Scheduled for Action 1. Project Sponsor and Facility: Cabot Oil & Gas Corporation (Bowman Creek), Eaton Township, Wyoming County, Pa. Application for renewal of surface water withdrawal of up to 0.290 mgd (peak day) (Docket No. 20121201). 2. Project Sponsor and Facility: Cabot Oil & Gas Corporation (Susquehanna River), Susquehanna Depot Borough, Susquehanna County, Pa. Application for renewal with modification of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20120903). 3. Project Sponsor and Facility: Chester Water Authority, East and West Nottingham Townships, Chester County, Pa. Application for an interconnection with the Town of Rising Sun of up to 1.800 mgd (peak day). 4. Project Sponsor and Facility: Conyngham Borough Authority, Sugarloaf Township, Luzerne County, Pa. Application for groundwater withdrawal of up to 0.120 mgd (30-day average) from Well 6. 5. Project Sponsor: Exelon Generation Company, LLC. Project Facility: Muddy Run Pumped Storage Project, Drumore and Martic Townships, Lancaster County, Pa. Application for an existing hydroelectric facility. E:\FR\FM\05OCN1.SGM 05OCN1 asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 193 / Wednesday, October 5, 2016 / Notices 6. Project Sponsor: Future Power PA, LLC. Project Facility: Good Spring NGCC, Porter Township, Schuylkill County, Pa. Application for consumptive water use of up to 0.063 mgd (peak day). 7. Project Sponsor: Future Power PA, LLC. Project Facility: Good Spring NGCC, Porter Township, Schuylkill County, Pa. Application for groundwater withdrawal of up to 0.126 mgd (30-day average) from Well RW–1. 8. Project Sponsor: Future Power PA, LLC. Project Facility: Good Spring NGCC, Porter Township, Schuylkill County, Pa. Application for groundwater withdrawal of up to 0.126 mgd (30-day average) from Well RW–2. 9. Project Sponsor and Facility: Gilberton Power Company, West Mahanoy Township, Schuylkill County, Pa. Application for renewal of consumptive water use of up to 1.510 mgd (peak day) (Docket No. 19851202). 10. Project Sponsor and Facility: Gilberton Power Company, West Mahanoy Township, Schuylkill County, Pa. Application for groundwater withdrawal of up to 1.870 mgd (30-day average) from the Gilberton Mine Pool. 11. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Moshannon Creek), Snow Shoe Township, Centre County, Pa. Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20120910). 12. Project Sponsor: Lycoming County Water and Sewer Authority. Project Facility: Halls Station System, Muncy Township, Lycoming County, Pa. Application for groundwater withdrawal of up to 0.158 mgd (30-day average) from Well PW–1. 13. Project Sponsor and Facility: Moxie Freedom LLC, Salem Township, Luzerne County, Pa. Minor modification to add a new source (Production Well 2) to existing consumptive use approval (no increase requested in consumptive use quantity) (Docket No. 20150907). 14. Project Sponsor and Facility: Moxie Freedom LLC, Salem Township, Luzerne County, Pa. Application for groundwater withdrawal of up to 0.062 mgd (30-day average) from Production Well 2. 15. Project Sponsor and Facility: Town of Nichols, Tioga County, N.Y. Application for groundwater withdrawal of up to 0.250 mgd (30-day average) from Well PW–1. 16. Project Sponsor and Facility: Town of Nichols, Tioga County, N.Y. Application for groundwater withdrawal of up to 0.250 mgd (30-day average) from Well PW–2. 17. Project Sponsor and Facility: Town of Rising Sun, Rising Sun District, VerDate Sep<11>2014 18:15 Oct 04, 2016 Jkt 241001 Cecil County, Md. Application for an interconnection with the Chester Water Authority of up to 1.800 mgd (peak day). 18. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Conodoguinet Creek), North Middleton Township, Cumberland County, Pa. Application for surface water withdrawal of up to 2.880 mgd (peak day). 19. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Frankstown Branch Juniata River), Frankstown Township, Blair County, Pa. Application for surface water withdrawal of up to 2.880 mgd (peak day). 20. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Susquehanna River), Highspire Borough and Lower Swatara Township, Dauphin County, Pa. Application for surface water withdrawal of up to 2.880 mgd (peak day). 21. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Swatara Creek), Londonderry Township, Dauphin County, Pa. Application for surface water withdrawal of up to 2.880 mgd (peak day). 22. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Tuscarora Creek), Lack Township, Juniata County, Pa. Application for surface water withdrawal of up to 2.880 mgd (peak day). 23. Project Sponsor and Facility: SWEPI LP (Cowanesque River), Deerfield Township, Tioga County, Pa. Application for surface water withdrawal of up to 2.000 mgd (peak day). 24. Project Sponsor and Facility: Transcontinental Gas Pipe Line Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Hemlock Township, Columbia County, Pa. Application for surface water withdrawal of up to 2.880 mgd (peak day). 25. Project Sponsor and Facility: Transcontinental Gas Pipe Line Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Hemlock Township, Columbia County, Pa. Application for consumptive water use of up to 0.100 mgd (peak day). Projects Scheduled for Action Involving a Diversion 1. Project Sponsor and Facility: Gilberton Power Company, West Mahanoy Township, Schuylkill County, Pa. Application for an into-basin diversion from the Delaware River Basin of up to 0.099 mgd (peak day) from Wells AN–P03 and AN–P04. 2. Project Sponsor and Facility: JKLM Energy, LLC, Roulette Township, Potter County, Pa. Application for an into- PO 00000 Frm 00148 Fmt 4703 Sfmt 4703 69183 basin diversion from the Ohio River Basin of up to 1.100 mgd (peak day) from the Goodwin and Son’s Sand and Gravel Quarry. Opportunity To Appear and Comment Interested parties may appear at the hearing to offer comments to the Commission on any project listed above. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Rules of conduct will be posted on the Commission’s Web site, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement such rules at the hearing. Written comments on any project listed above may also be mailed to Mr. Jason Oyler, General Counsel, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through www.srbc.net/pubinfo/ publicparticipation.htm. Comments mailed or electronically submitted must be received by the Commission on or before November 14, 2016, to be considered. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: September 29, 2016. Stephanie L. Richardson, Secretary to the Commission. [FR Doc. 2016–24032 Filed 10–4–16; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Forty Fourth RTCA SC–224 Standards for Airport Security Access Control Systems Plenary Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Forty Fourth RTCA SC–224 Standards for Airport Security Access Control Systems Plenary. AGENCY: The FAA is issuing this notice to advise the public of a meeting of Forty Fourth RTCA SC–224 Standards for Airport Security Access Control Systems Plenary. DATES: The meeting will be held November 03, 2016 10:00 a.m.–01:00 p.m. ADDRESSES: The meeting will be held at: RTCA Headquarters, 1150 18th Street NW., Suite 910, Washington, DC 20036. FOR FURTHER INFORMATION CONTACT: Karan Hofmann at khofmann@rtca.org or 202–330–0680, or The RTCA SUMMARY: E:\FR\FM\05OCN1.SGM 05OCN1

Agencies

[Federal Register Volume 81, Number 193 (Wednesday, October 5, 2016)]
[Notices]
[Pages 69182-69183]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-24032]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on November 3, 2016, in Harrisburg, Pennsylvania. At this 
public hearing, the Commission will hear testimony on the projects 
listed in the Supplementary Information section of this notice. Such 
projects are intended to be scheduled for Commission action at its next 
business meeting, tentatively scheduled for December 8, 2016, which 
will be noticed separately. The public should take note that this 
public hearing will be the only opportunity to offer oral comment to 
the Commission for the listed projects. The deadline for the submission 
of written comments is November 14, 2016.

DATES: The public hearing will convene on November 3, 2016, at 2:00 
p.m. The public hearing will end at 5:00 p.m. or at the conclusion of 
public testimony, whichever is sooner. The deadline for the submission 
of written comments is November 14, 2016.

ADDRESSES: The public hearing will be conducted at the Pennsylvania 
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg, 
Pa.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436.
    Information concerning the applications for these projects is 
available at the SRBC Water Resource Portal at www.srbc.net/wrp. 
Additional supporting documents are available to inspect and copy in 
accordance with the Commission's Access to Records Policy at 
www.srbc.net/pubinfo/docs/2009-02_Access_to_Records_Policy_20140115.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor and Facility: Cabot Oil & Gas Corporation 
(Bowman Creek), Eaton Township, Wyoming County, Pa. Application for 
renewal of surface water withdrawal of up to 0.290 mgd (peak day) 
(Docket No. 20121201).
    2. Project Sponsor and Facility: Cabot Oil & Gas Corporation 
(Susquehanna River), Susquehanna Depot Borough, Susquehanna County, Pa. 
Application for renewal with modification of surface water withdrawal 
of up to 1.500 mgd (peak day) (Docket No. 20120903).
    3. Project Sponsor and Facility: Chester Water Authority, East and 
West Nottingham Townships, Chester County, Pa. Application for an 
interconnection with the Town of Rising Sun of up to 1.800 mgd (peak 
day).
    4. Project Sponsor and Facility: Conyngham Borough Authority, 
Sugarloaf Township, Luzerne County, Pa. Application for groundwater 
withdrawal of up to 0.120 mgd (30-day average) from Well 6.
    5. Project Sponsor: Exelon Generation Company, LLC. Project 
Facility: Muddy Run Pumped Storage Project, Drumore and Martic 
Townships, Lancaster County, Pa. Application for an existing 
hydroelectric facility.

[[Page 69183]]

    6. Project Sponsor: Future Power PA, LLC. Project Facility: Good 
Spring NGCC, Porter Township, Schuylkill County, Pa. Application for 
consumptive water use of up to 0.063 mgd (peak day).
    7. Project Sponsor: Future Power PA, LLC. Project Facility: Good 
Spring NGCC, Porter Township, Schuylkill County, Pa. Application for 
groundwater withdrawal of up to 0.126 mgd (30-day average) from Well 
RW-1.
    8. Project Sponsor: Future Power PA, LLC. Project Facility: Good 
Spring NGCC, Porter Township, Schuylkill County, Pa. Application for 
groundwater withdrawal of up to 0.126 mgd (30-day average) from Well 
RW-2.
    9. Project Sponsor and Facility: Gilberton Power Company, West 
Mahanoy Township, Schuylkill County, Pa. Application for renewal of 
consumptive water use of up to 1.510 mgd (peak day) (Docket No. 
19851202).
    10. Project Sponsor and Facility: Gilberton Power Company, West 
Mahanoy Township, Schuylkill County, Pa. Application for groundwater 
withdrawal of up to 1.870 mgd (30-day average) from the Gilberton Mine 
Pool.
    11. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Moshannon Creek), Snow Shoe Township, Centre County, Pa. 
Application for renewal of surface water withdrawal of up to 0.999 mgd 
(peak day) (Docket No. 20120910).
    12. Project Sponsor: Lycoming County Water and Sewer Authority. 
Project Facility: Halls Station System, Muncy Township, Lycoming 
County, Pa. Application for groundwater withdrawal of up to 0.158 mgd 
(30-day average) from Well PW-1.
    13. Project Sponsor and Facility: Moxie Freedom LLC, Salem 
Township, Luzerne County, Pa. Minor modification to add a new source 
(Production Well 2) to existing consumptive use approval (no increase 
requested in consumptive use quantity) (Docket No. 20150907).
    14. Project Sponsor and Facility: Moxie Freedom LLC, Salem 
Township, Luzerne County, Pa. Application for groundwater withdrawal of 
up to 0.062 mgd (30-day average) from Production Well 2.
    15. Project Sponsor and Facility: Town of Nichols, Tioga County, 
N.Y. Application for groundwater withdrawal of up to 0.250 mgd (30-day 
average) from Well PW-1.
    16. Project Sponsor and Facility: Town of Nichols, Tioga County, 
N.Y. Application for groundwater withdrawal of up to 0.250 mgd (30-day 
average) from Well PW-2.
    17. Project Sponsor and Facility: Town of Rising Sun, Rising Sun 
District, Cecil County, Md. Application for an interconnection with the 
Chester Water Authority of up to 1.800 mgd (peak day).
    18. Project Sponsor and Facility: Sunoco Pipeline, L.P. 
(Conodoguinet Creek), North Middleton Township, Cumberland County, Pa. 
Application for surface water withdrawal of up to 2.880 mgd (peak day).
    19. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Frankstown 
Branch Juniata River), Frankstown Township, Blair County, Pa. 
Application for surface water withdrawal of up to 2.880 mgd (peak day).
    20. Project Sponsor and Facility: Sunoco Pipeline, L.P. 
(Susquehanna River), Highspire Borough and Lower Swatara Township, 
Dauphin County, Pa. Application for surface water withdrawal of up to 
2.880 mgd (peak day).
    21. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Swatara 
Creek), Londonderry Township, Dauphin County, Pa. Application for 
surface water withdrawal of up to 2.880 mgd (peak day).
    22. Project Sponsor and Facility: Sunoco Pipeline, L.P. (Tuscarora 
Creek), Lack Township, Juniata County, Pa. Application for surface 
water withdrawal of up to 2.880 mgd (peak day).
    23. Project Sponsor and Facility: SWEPI LP (Cowanesque River), 
Deerfield Township, Tioga County, Pa. Application for surface water 
withdrawal of up to 2.000 mgd (peak day).
    24. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Hemlock 
Township, Columbia County, Pa. Application for surface water withdrawal 
of up to 2.880 mgd (peak day).
    25. Project Sponsor and Facility: Transcontinental Gas Pipe Line 
Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Hemlock 
Township, Columbia County, Pa. Application for consumptive water use of 
up to 0.100 mgd (peak day).

Projects Scheduled for Action Involving a Diversion

    1. Project Sponsor and Facility: Gilberton Power Company, West 
Mahanoy Township, Schuylkill County, Pa. Application for an into-basin 
diversion from the Delaware River Basin of up to 0.099 mgd (peak day) 
from Wells AN-P03 and AN-P04.
    2. Project Sponsor and Facility: JKLM Energy, LLC, Roulette 
Township, Potter County, Pa. Application for an into-basin diversion 
from the Ohio River Basin of up to 1.100 mgd (peak day) from the 
Goodwin and Son's Sand and Gravel Quarry.

Opportunity To Appear and Comment

    Interested parties may appear at the hearing to offer comments to 
the Commission on any project listed above. The presiding officer 
reserves the right to limit oral statements in the interest of time and 
to otherwise control the course of the hearing. Rules of conduct will 
be posted on the Commission's Web site, www.srbc.net, prior to the 
hearing for review. The presiding officer reserves the right to modify 
or supplement such rules at the hearing. Written comments on any 
project listed above may also be mailed to Mr. Jason Oyler, General 
Counsel, Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, Pa. 17110-1788, or submitted electronically through 
www.srbc.net/pubinfo/publicparticipation.htm. Comments mailed or 
electronically submitted must be received by the Commission on or 
before November 14, 2016, to be considered.

    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: September 29, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016-24032 Filed 10-4-16; 8:45 am]
 BILLING CODE 7040-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.