Susquehanna Nuclear, LLC; Susquehanna Steam Electric Station, Units 1 and 2; Consideration of Indirect License Transfer, 68462-68466 [2016-23955]
Download as PDF
68462
Federal Register / Vol. 81, No. 192 / Tuesday, October 4, 2016 / Notices
mstockstill on DSK3G9T082PROD with NOTICES
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Kathy Weaver
(Telephone: 301–415–6236 or Email:
Kathy.Weaver@nrc.gov) five days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Thirty-five hard copies of each
presentation or handout should be
provided to the DFO thirty minutes
before the meeting. In addition, one
electronic copy of each presentation
should be emailed to the DFO one day
before the meeting. If an electronic copy
cannot be provided within this
timeframe, presenters should provide
the DFO with a CD containing each
presentation at least thirty minutes
before the meeting. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public. Detailed
procedures for the conduct of and
participation in ACRS meetings were
published in the Federal Register on
October 21, 2015 (80 FR 63846).
Detailed meeting agendas and meeting
transcripts are available on the NRC
Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information
regarding topics to be discussed,
changes to the agenda, whether the
meeting has been canceled or
rescheduled, and the time allotted to
present oral statements can be obtained
from the Web site cited above or by
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, Maryland 20852. After
registering with Security, please contact
Mr. Theron Brown (Telephone: 240–
888–9835) to be escorted to the meeting
room.
Dated: September 27, 2016.
John Lai,
Acting Chief, Technical Support Branch,
Advisory Committee on Reactor Safeguards.
[FR Doc. 2016–23952 Filed 10–3–16; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
19:01 Oct 03, 2016
Jkt 241001
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Fukushima;
Notice of Meeting
The ACRS Subcommittee on
Fukushima will hold a meeting on
October 19, 2016, Room T–2B1, 11545
Rockville Pike, Rockville, Maryland
20852.
The meeting will be open to public
attendance.
The agenda for the subject meeting
shall be as follows:
Wednesday, October 19, 2016—8:30
p.m. Until 12:00 p.m.
The Subcommittee will discuss
guidance on mitigating strategies
assessment for new seismic information
and the status of the mitigation of
beyond-design-basis events rulemaking.
The Subcommittee will hear
presentations by and hold discussions
with the NRC staff and other interested
persons regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Mike Snodderly
(Telephone: 301–415–2241 or Email:
Mike.Snodderly@nrc.gov) five days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Thirty-five hard copies of each
presentation or handout should be
provided to the DFO thirty minutes
before the meeting. In addition, one
electronic copy of each presentation
should be emailed to the DFO one day
before the meeting. If an electronic copy
cannot be provided within this
timeframe, presenters should provide
the DFO with a CD containing each
presentation at least thirty minutes
before the meeting. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public. Detailed
procedures for the conduct of and
participation in ACRS meetings were
published in the Federal Register on
October 21, 2015 (80 FR 63846).
Detailed meeting agendas and meeting
transcripts are available on the NRC
Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information
regarding topics to be discussed,
changes to the agenda, whether the
meeting has been canceled or
rescheduled, and the time allotted to
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
present oral statements can be obtained
from the Web site cited above or by
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, Maryland 20852. After
registering with Security, please contact
Mr. Theron Brown (Telephone: 240–
888–9835) to be escorted to the meeting
room.
Dated: September 27, 2016.
John Lai,
Acting Chief, Technical Support Branch,
Advisory Committee on Reactor Safeguards.
[FR Doc. 2016–23953 Filed 10–3–16; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–387, 50–388, and 72–28;
NRC–2016–0187]
Susquehanna Nuclear, LLC;
Susquehanna Steam Electric Station,
Units 1 and 2; Consideration of Indirect
License Transfer
Nuclear Regulatory
Commission.
ACTION: Application for indirect license
transfer; notice of opportunity to
comment, request a hearing, and
petition for leave to intervene; order
imposing procedures.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) received and is
considering approval of an application
filed by Susquehanna Nuclear, LLC
(Susquehanna Nuclear), on June 29,
2016. The application seeks NRC
approval of the indirect transfer of
Susquehanna Nuclear’s interests in
Renewed Facility Operating License
Nos. NPF–14 and NPF–22 for
Susquehanna Steam Electric Station,
Units 1 and 2 (SSES), respectively, as
well as the general license for the SSES
Independent Spent Fuel Storage
Installation (ISFSI), from the current
parent holder, Talen Energy Corporation
(Talen), to Riverstone Holdings, LLC
(Riverstone). Because the application
contains sensitive unclassified nonsafeguards information (SUNSI) an
order imposes procedures to obtain
access to SUNSI for contention
preparation.
SUMMARY:
E:\FR\FM\04OCN1.SGM
04OCN1
Federal Register / Vol. 81, No. 192 / Tuesday, October 4, 2016 / Notices
Comments must be filed by
November 3, 2016. A request for a
hearing must be filed by October 24,
2016. Any potential party as defined in
§ 2.4 of title 10 of the Code of Federal
Regulations (10 CFR) who believes
access to SUNSI is necessary to respond
to this notice must request document
access by October 14, 2016.
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2016–0187. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463; email: Carol.Gallagher@nrc.gov. For
technical questions contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Email comments to:
Hearingdocket@nrc.gov. If you do not
receive an automatic email reply
confirming receipt, then contact us at
301–415–1677.
• Fax comments to: Secretary, U.S.
Nuclear Regulatory Commission at 301–
415–1101.
• Mail comments to: Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, ATTN:
Rulemakings and Adjudications Staff.
• Hand deliver comments to: 11555
Rockville Pike, Rockville, Maryland
20852, between 7:30 a.m. and 4:15 p.m.
(Eastern Time) Federal workdays;
telephone: 301–415–1677.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Tanya E. Hood, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–415–
1387; email: Tanya.Hood@nrc.gov.
SUPPLEMENTARY INFORMATION:
DATES:
I. Obtaining Information and
Submitting Comments
mstockstill on DSK3G9T082PROD with NOTICES
A. Obtaining Information
Please refer to Docket ID NRC–2016–
0187 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2016–0187.
VerDate Sep<11>2014
19:01 Oct 03, 2016
Jkt 241001
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. A
publicly-available version of the
application is available in ADAMS
under Package Accession No.
ML16181A414.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2016–
0187 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Introduction
The NRC is considering the issuance
of an order under 10 CFR 50.80
approving the indirect transfer of
control of Susquehanna Nuclear’s
interests in Renewed Facility Operating
License Nos. NPF–14 and NPF–22 for
SSES, as well as the general license for
the ISFSI from Talen to Riverstone.
Riverstone’s portfolio companies
currently hold 35 percent in the
aggregate of the outstanding common
stock of Talen.
According to the application for
approval filed by Susquehanna Nuclear,
acting on behalf of itself and Riverstone,
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
68463
the indirect transfer of control results
from a transaction in which Talen,
Susquehanna Nuclear’s ultimate parent,
will become wholly owned by the
portfolio companies of Riverstone. As a
result, all of the common stock of Talen
will become privately held by affiliates
of Riverstone, and Susquehanna Nuclear
will become indirectly controlled by
Riverstone as described in the
application. Riverstone would acquire
ownership of Susquehanna Nuclear’s 90
percent interest in SSES. Susquehanna
Nuclear will continue to operate the
facility and hold the licenses.
No physical changes to SSES or
operational changes are being proposed
in the application.
The NRC’s regulations at 10 CFR
50.80 state that no license for a
production or utilization facility, or any
right thereunder, shall be transferred,
directly or indirectly, through transfer of
control of the license, unless the
Commission gives its consent in writing.
The Commission will approve an
application for the indirect transfer of a
license if the Commission determines
that the proposed transaction, described
above, will not affect the qualifications
of the licensee to hold the license, and
that the transfer is otherwise consistent
with applicable provisions of law,
regulations, and orders issued by the
Commission.
III. Opportunity To Comment
Within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted as described in the
ADDRESSES section of this document.
IV. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 20 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and a petition to intervene
(petition) with respect to the action.
Petitions shall be filed in accordance
with the Commission’s ‘‘Agency Rules
of Practice and Procedure’’ in 10 CFR
part 2. Interested persons should
consult a current copy of 10 CFR 2.309,
which is available at the NRC’s PDR,
located at One White Flint North, Room
O1–F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. The
NRC’s regulations are accessible
electronically from the NRC Library on
the NRC’s Web site at https://
E:\FR\FM\04OCN1.SGM
04OCN1
mstockstill on DSK3G9T082PROD with NOTICES
68464
Federal Register / Vol. 81, No. 192 / Tuesday, October 4, 2016 / Notices
www.nrc.gov/reading-rm/doccollections/cfr/. If a petition is filed
within 20 days, the Commission or a
presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the petition; and the Secretary
or the Chief Administrative Judge of the
Atomic Safety and Licensing Board will
issue a notice of a hearing or an
appropriate order.
As required by 10 CFR 2.309, a
petition shall set forth with particularity
the interest of the petitioner in the
proceeding, and how that interest may
be affected by the results of the
proceeding. The petition should
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
general requirements: (1) The name,
address, and telephone number of the
petitioner; (2) the nature of the
petitioner’s right under the Act to be
made a party to the proceeding; (3) the
nature and extent of the petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
petitioner’s interest. The petition must
also set forth the specific contentions
which the petitioner seeks to have
litigated at the proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner shall provide a
brief explanation of the bases for the
contention and a concise statement of
the alleged facts or expert opinion
which support the contention and on
which the petitioner intends to rely in
proving the contention at the hearing.
The petitioner must also provide
references to those specific sources and
documents of which the petitioner is
aware and on which the petitioner
intends to rely to establish those facts or
expert opinion to support its position on
the issue. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
proceeding. The contention must be one
which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy these requirements with
respect to at least one contention will
not be permitted to participate as a
party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
VerDate Sep<11>2014
19:01 Oct 03, 2016
Jkt 241001
hearing with respect to resolution of
that person’s admitted contentions
consistent with the NRC’s regulations,
policies, and procedures.
Petitions for leave to intervene must
be filed no later than 20 days from the
date of publication of this notice.
Requests for hearing, petitions for leave
to intervene, and motions for leave to
file new or amended contentions that
are filed after the 20-day deadline will
not be entertained absent a
determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i)–(iii).
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1).
The petition should state the nature
and extent of the petitioner’s interest in
the proceeding. The petition should be
submitted to the Commission by
October 24, 2016. The petition must be
filed in accordance with the filing
instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document, and should meet the
requirements for petitions set forth in
this section, except that under 10 CFR
2.309(h)(2) a State, local governmental
body, or Federally-recognized Indian
Tribe, or agency thereof does not need
to address the standing requirements in
10 CFR 2.309(d) if the facility is located
within its boundaries. A State, local
governmental body, Federallyrecognized Indian Tribe, or agency
thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person
who does not wish, or is not qualified,
to become a party to the proceeding
may, in the discretion of the presiding
officer, be permitted to make a limited
appearance pursuant to the provisions
of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or
written statement of position on the
issues, but may not otherwise
participate in the proceeding. A limited
appearance may be made at any session
of the hearing or at any prehearing
conference, subject to the limits and
conditions as may be imposed by the
presiding officer. Details regarding the
opportunity to make a limited
appearance will be provided by the
presiding officer if such sessions are
scheduled.
V. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
to the submission of a request for
hearing or petition to intervene
(hereinafter ‘‘petition’’), and documents
filed by interested governmental entities
participating under 10 CFR 2.315(c),
must be filed in accordance with the
NRC’s E-Filing rule (72 FR 49139;
August 28, 2007, as amended at 77 FR
46562, August 3, 2012). The E-Filing
process requires participants to submit
and serve all adjudicatory documents
over the internet, or in some cases to
mail copies on electronic storage media.
Participants may not submit paper
copies of their filings unless they seek
an exemption in accordance with the
procedures described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a petition (even in instances
in which the participant, or its counsel
or representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
adjudicatory-sub.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC
Electronic Filing Help Desk will not be
able to offer assistance in using unlisted
software.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a petition. Submissions should
be in Portable Document Format (PDF).
Additional guidance on PDF
submissions is available on the NRC’s
public Web site at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the documents are submitted through
the NRC’s E-Filing system. To be timely,
E:\FR\FM\04OCN1.SGM
04OCN1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 81, No. 192 / Tuesday, October 4, 2016 / Notices
an electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing petition to
intervene is filed so that they can obtain
access to the document via the E-Filing
system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 7 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, Sixteenth Floor, One White
Flint North, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
VerDate Sep<11>2014
19:01 Oct 03, 2016
Jkt 241001
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, in some
instances, a petition will require
including information on local
residence in order to demonstrate a
proximity assertion of interest in the
proceeding. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
For further details, see the application
dated June 29, 2016.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing SUNSI.
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication of this notice will not be
considered absent a showing of good
cause for the late filing, addressing why
the request could not have been filed
earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
68465
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The email address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
E:\FR\FM\04OCN1.SGM
04OCN1
68466
Federal Register / Vol. 81, No. 192 / Tuesday, October 4, 2016 / Notices
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 20 days after the requestor is
granted access to that information.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff either after
a determination on standing and need
for access, the NRC staff shall
immediately notify the requestor in
writing, briefly stating the reason or
reasons for the denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) an officer if that officer
has been designated to rule on
information access issues.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have proposed
contentions meeting the specificity and
basis requirements in 10 CFR part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 28th day
of September, 2016.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 ........................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
Supporting the standing of a potential party identified by name and address; describing the need for the information in order
for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 requestor/petitioner reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to
file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 ......................
20 ......................
20 ......................
25 ......................
30 ......................
40 ......................
A .......................
A + 3 .................
mstockstill on DSK3G9T082PROD with NOTICES
A + 23 ...............
A + 48 ...............
A + 55 ...............
>A + 55 .............
[FR Doc. 2016–23955 Filed 10–3–16; 8:45 am]
BILLING CODE 7590–01–P
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
VerDate Sep<11>2014
19:01 Oct 03, 2016
Jkt 241001
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007, as amended at 77 FR
PO 00000
Frm 00069
Fmt 4703
Sfmt 9990
46562; August 3, 2012) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\04OCN1.SGM
04OCN1
Agencies
[Federal Register Volume 81, Number 192 (Tuesday, October 4, 2016)]
[Notices]
[Pages 68462-68466]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-23955]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-387, 50-388, and 72-28; NRC-2016-0187]
Susquehanna Nuclear, LLC; Susquehanna Steam Electric Station,
Units 1 and 2; Consideration of Indirect License Transfer
AGENCY: Nuclear Regulatory Commission.
ACTION: Application for indirect license transfer; notice of
opportunity to comment, request a hearing, and petition for leave to
intervene; order imposing procedures.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is
considering approval of an application filed by Susquehanna Nuclear,
LLC (Susquehanna Nuclear), on June 29, 2016. The application seeks NRC
approval of the indirect transfer of Susquehanna Nuclear's interests in
Renewed Facility Operating License Nos. NPF-14 and NPF-22 for
Susquehanna Steam Electric Station, Units 1 and 2 (SSES), respectively,
as well as the general license for the SSES Independent Spent Fuel
Storage Installation (ISFSI), from the current parent holder, Talen
Energy Corporation (Talen), to Riverstone Holdings, LLC (Riverstone).
Because the application contains sensitive unclassified non-safeguards
information (SUNSI) an order imposes procedures to obtain access to
SUNSI for contention preparation.
[[Page 68463]]
DATES: Comments must be filed by November 3, 2016. A request for a
hearing must be filed by October 24, 2016. Any potential party as
defined in Sec. 2.4 of title 10 of the Code of Federal Regulations (10
CFR) who believes access to SUNSI is necessary to respond to this
notice must request document access by October 14, 2016.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2016-0187. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; e-mail: Carol.Gallagher@nrc.gov. For technical questions contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Email comments to: Hearingdocket@nrc.gov. If you do not
receive an automatic email reply confirming receipt, then contact us at
301-415-1677.
Fax comments to: Secretary, U.S. Nuclear Regulatory
Commission at 301-415-1101.
Mail comments to: Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, ATTN: Rulemakings and
Adjudications Staff.
Hand deliver comments to: 11555 Rockville Pike, Rockville,
Maryland 20852, between 7:30 a.m. and 4:15 p.m. (Eastern Time) Federal
workdays; telephone: 301-415-1677.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Tanya E. Hood, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, telephone: 301-415-1387; email: Tanya.Hood@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2016-0187 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2016-0187.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. A
publicly-available version of the application is available in ADAMS
under Package Accession No. ML16181A414.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2016-0187 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Introduction
The NRC is considering the issuance of an order under 10 CFR 50.80
approving the indirect transfer of control of Susquehanna Nuclear's
interests in Renewed Facility Operating License Nos. NPF-14 and NPF-22
for SSES, as well as the general license for the ISFSI from Talen to
Riverstone. Riverstone's portfolio companies currently hold 35 percent
in the aggregate of the outstanding common stock of Talen.
According to the application for approval filed by Susquehanna
Nuclear, acting on behalf of itself and Riverstone, the indirect
transfer of control results from a transaction in which Talen,
Susquehanna Nuclear's ultimate parent, will become wholly owned by the
portfolio companies of Riverstone. As a result, all of the common stock
of Talen will become privately held by affiliates of Riverstone, and
Susquehanna Nuclear will become indirectly controlled by Riverstone as
described in the application. Riverstone would acquire ownership of
Susquehanna Nuclear's 90 percent interest in SSES. Susquehanna Nuclear
will continue to operate the facility and hold the licenses.
No physical changes to SSES or operational changes are being
proposed in the application.
The NRC's regulations at 10 CFR 50.80 state that no license for a
production or utilization facility, or any right thereunder, shall be
transferred, directly or indirectly, through transfer of control of the
license, unless the Commission gives its consent in writing. The
Commission will approve an application for the indirect transfer of a
license if the Commission determines that the proposed transaction,
described above, will not affect the qualifications of the licensee to
hold the license, and that the transfer is otherwise consistent with
applicable provisions of law, regulations, and orders issued by the
Commission.
III. Opportunity To Comment
Within 30 days from the date of publication of this notice, persons
may submit written comments regarding the license transfer application,
as provided for in 10 CFR 2.1305. The Commission will consider and, if
appropriate, respond to these comments, but such comments will not
otherwise constitute part of the decisional record. Comments should be
submitted as described in the ADDRESSES section of this document.
IV. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 20 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and a petition to intervene (petition)
with respect to the action. Petitions shall be filed in accordance with
the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR
part 2. Interested persons should consult a current copy of 10 CFR
2.309, which is available at the NRC's PDR, located at One White Flint
North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville,
Maryland 20852. The NRC's regulations are accessible electronically
from the NRC Library on the NRC's Web site at https://
[[Page 68464]]
www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed
within 20 days, the Commission or a presiding officer designated by the
Commission or by the Chief Administrative Judge of the Atomic Safety
and Licensing Board Panel, will rule on the petition; and the Secretary
or the Chief Administrative Judge of the Atomic Safety and Licensing
Board will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition shall set forth with
particularity the interest of the petitioner in the proceeding, and how
that interest may be affected by the results of the proceeding. The
petition should specifically explain the reasons why intervention
should be permitted with particular reference to the following general
requirements: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest. The petition
must also set forth the specific contentions which the petitioner seeks
to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner shall provide a brief explanation of the bases for the
contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to those specific sources and
documents of which the petitioner is aware and on which the petitioner
intends to rely to establish those facts or expert opinion to support
its position on the issue. The petition must include sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact. Contentions shall be limited to
matters within the scope of the proceeding. The contention must be one
which, if proven, would entitle the petitioner to relief. A petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions consistent with the NRC's regulations, policies, and
procedures.
Petitions for leave to intervene must be filed no later than 20
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 20-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i)-(iii).
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1).
The petition should state the nature and extent of the petitioner's
interest in the proceeding. The petition should be submitted to the
Commission by October 24, 2016. The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document, and should meet the requirements
for petitions set forth in this section, except that under 10 CFR
2.309(h)(2) a State, local governmental body, or Federally-recognized
Indian Tribe, or agency thereof does not need to address the standing
requirements in 10 CFR 2.309(d) if the facility is located within its
boundaries. A State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person who does not wish, or is not
qualified, to become a party to the proceeding may, in the discretion
of the presiding officer, be permitted to make a limited appearance
pursuant to the provisions of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or written statement of position on
the issues, but may not otherwise participate in the proceeding. A
limited appearance may be made at any session of the hearing or at any
prehearing conference, subject to the limits and conditions as may be
imposed by the presiding officer. Details regarding the opportunity to
make a limited appearance will be provided by the presiding officer if
such sessions are scheduled.
V. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene (hereinafter
``petition''), and documents filed by interested governmental entities
participating under 10 CFR 2.315(c), must be filed in accordance with
the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562, August 3, 2012). The E-Filing process requires participants
to submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Participants may
not submit paper copies of their filings unless they seek an exemption
in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition (even
in instances in which the participant, or its counsel or
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will establish an electronic
docket for the hearing in this proceeding if the Secretary has not
already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are available on the NRC's public Web site at
https://www.nrc.gov/site-help/e-submittals/adjudicatory-sub.html.
Participants may attempt to use other software not listed on the Web
site, but should note that the NRC's E-Filing system does not support
unlisted software, and the NRC Electronic Filing Help Desk will not be
able to offer assistance in using unlisted software.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a petition.
Submissions should be in Portable Document Format (PDF). Additional
guidance on PDF submissions is available on the NRC's public Web site
at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing
is considered complete at the time the documents are submitted through
the NRC's E-Filing system. To be timely,
[[Page 68465]]
an electronic filing must be submitted to the E-Filing system no later
than 11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing petition to
intervene is filed so that they can obtain access to the document via
the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals.html, by
email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 7 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a petition will require including
information on local residence in order to demonstrate a proximity
assertion of interest in the proceeding. With respect to copyrighted
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their submission.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
For further details, see the application dated June 29, 2016.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing SUNSI.
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication of this notice will not
be considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement
[[Page 68466]]
or Affidavit, or Protective Order \2\ setting forth terms and
conditions to prevent the unauthorized or inadvertent disclosure of
SUNSI by each individual who will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 20 days after
the requestor is granted access to that information.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, the NRC
staff shall immediately notify the requestor in writing, briefly
stating the reason or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) an officer if that officer has been
designated to rule on information access issues.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562; August 3, 2012) apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have proposed contentions
meeting the specificity and basis requirements in 10 CFR part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 28th day of September, 2016.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0........................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10....................... Deadline for submitting requests for access
to Sensitive Unclassified Non-Safeguards
Information (SUNSI) with information:
Supporting the standing of a potential party
identified by name and address; describing
the need for the information in order for
the potential party to participate
meaningfully in an adjudicatory proceeding.
20....................... Deadline for submitting petition for
intervention containing: (i) Demonstration
of standing; and (ii) all contentions whose
formulation does not require access to SUNSI
(+25 Answers to petition for intervention;
+7 requestor/petitioner reply).
20....................... U.S. Nuclear Regulatory Commission (NRC)
staff informs the requestor of the staff's
determination whether the request for access
provides a reasonable basis to believe
standing can be established and shows need
for SUNSI. (NRC staff also informs any party
to the proceeding whose interest independent
of the proceeding would be harmed by the
release of the information.) If NRC staff
makes the finding of need for SUNSI and
likelihood of standing, NRC staff begins
document processing (preparation of
redactions or review of redacted documents).
25....................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
requestor/petitioner to file a motion
seeking a ruling to reverse the NRC staff's
denial of access; NRC staff files copy of
access determination with the presiding
officer (or Chief Administrative Judge or
other designated officer, as appropriate).
If NRC staff finds ``need'' for SUNSI, the
deadline for any party to the proceeding
whose interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30....................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40....................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file
motion for Protective Order and draft Non-
Disclosure Affidavit. Deadline for applicant/
licensee to file Non-Disclosure Agreement
for SUNSI.
A........................ If access granted: Issuance of presiding
officer or other designated officer decision
on motion for protective order for access to
sensitive information (including schedule
for providing access and submission of
contentions) or decision reversing a final
adverse determination by the NRC staff.
A + 3.................... Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI
consistent with decision issuing the
protective order.
A + 23................... Deadline for submission of contentions whose
development depends upon access to SUNSI.
A + 48................... (Contention receipt +25) Answers to
contentions whose development depends upon
access to SUNSI.
A + 55................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 55.................. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2016-23955 Filed 10-3-16; 8:45 am]