Notice of Institution of Section 206 Proceeding and Refund Effective Date, 68005 [2016-23816]
Download as PDF
68005
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices
CHART 5—FIXED-RATE DIRECT SUBSIDIZED, DIRECT UNSUBSIDIZED, DIRECT PLUS LOANS, AND DIRECT CONSOLIDATION
LOANS FIRST DISBURSED ON OR AFTER 7/1/2006 AND BEFORE 7/1/2013—Continued
Loan type
Student grade level
First disbursed on or after
PLUS .................................
Parents and Graduate/Professionals.
7/1/2006 ............................
7/1/2013 ............................
Application received on or
after
Application received before
2/1/1999 ............................
7/1/2013 ............................
7/1/2013 ............................
...........................................
Consolidation .....................
N/A ....................................
Note: Interest rates for Direct Subsidized
Loans, Direct Unsubsidized Loans, and Direct
PLUS Loans first disbursed on or after July
1, 2013 and before July 1, 2016 are published
in earlier Federal Register notices, as
follows:
sradovich on DSK3GMQ082PROD with NOTICES
Rate
(%)
First disbursed before
• For loans first disbursed on or after
July 1, 2013, and prior to July 1, 2014,
see 78 FR 59011.
• For loans first disbursed on or after
July 1, 2014, and prior to July 1, 2015,
see 79 FR 37301.
• For loans first disbursed on or after
July 1, 2015, and prior to July 1, 2016,
see 80 FR 42488.
• For loans first disbursed on or after
July 1, 2016, and prior to July 1, 2017,
see 81 FR 38159.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Program Authority: 20 U.S.C. 1087 et
seq.
VerDate Sep<11>2014
17:56 Sep 30, 2016
Jkt 241001
Dated: September 27, 2016.
James W. Runcie,
Chief Operating Officer, Federal Student Aid.
[FR Doc. 2016–23767 Filed 9–30–16; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–116–000]
Notice of Institution of Section 206
Proceeding and Refund Effective Date
Talen Energy Marketing, LLC, Montour,
LLC, Bayonne Plant Holding, L.L.C., Camden
Plant Holdings, L.L.C., Elmwood Park Power,
LLC, Newark Bay Cogeneration Partnership,
L.P., Lower Mount Bethel Energy, LLC, York
Generation Company LLC, Pedricktown
Cogeneration Company LP, H.A. Wagner
LLC, Brandon Shores LLC, Chief Conemaugh
Power, LLC, Chief Keystone Power, LLC
On September 27, 2016, the
Commission issued an order in Docket
No. EL16–116–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into the justness and
reasonableness of the Talen Entities’,1
Chief Keystone Power, LLC’s, and Chief
Conemaugh Power, LLC’s Reactive
Service revenue requirements. Talen
Energy Marketing, LLC et al., 156 FERC
¶ 61,231 (2016).
1 Talen Energy Marketing, LLC, Montour, LLC
(Montour), Bayonne Plant Holding, L.L.C., Camden
Plant Holding, L.L.C., Elmwood Park Power, LLC,
Newark Bay Cogeneration Partnership, L.P., Lower
Mount Bethel Energy, LLC, York Generation
Company LLC, Pedricktown Cogeneration Company
LP, H.A. Wagner LLC, Brandon Shores LLC
(collectively, Talen Entities).
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
7.90
Weighted average of rates
on the loans being consolidated, rounded to
nearest higher 1⁄8 of 1
percent, not to exceed
8.25%
Weighted average of rates
on the loans being consolidated, rounded to
nearest higher 1⁄8 of 1
percent
The refund effective date in Docket
No. EL16–116–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL16–116–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214 (2016), within 21 days of the
date of issuance of the order.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–23816 Filed 9–30–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–2654–000]
City Point Energy Center, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of City
Point Energy Center, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 81, Number 191 (Monday, October 3, 2016)]
[Notices]
[Page 68005]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-23816]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL16-116-000]
Notice of Institution of Section 206 Proceeding and Refund
Effective Date
Talen Energy Marketing, LLC, Montour, LLC, Bayonne Plant
Holding, L.L.C., Camden Plant Holdings, L.L.C., Elmwood Park Power,
LLC, Newark Bay Cogeneration Partnership, L.P., Lower Mount Bethel
Energy, LLC, York Generation Company LLC, Pedricktown Cogeneration
Company LP, H.A. Wagner LLC, Brandon Shores LLC, Chief Conemaugh
Power, LLC, Chief Keystone Power, LLC
On September 27, 2016, the Commission issued an order in Docket No.
EL16-116-000, pursuant to section 206 of the Federal Power Act (FPA),
16 U.S.C. 824e (2012), instituting an investigation into the justness
and reasonableness of the Talen Entities',\1\ Chief Keystone Power,
LLC's, and Chief Conemaugh Power, LLC's Reactive Service revenue
requirements. Talen Energy Marketing, LLC et al., 156 FERC ] 61,231
(2016).
---------------------------------------------------------------------------
\1\ Talen Energy Marketing, LLC, Montour, LLC (Montour), Bayonne
Plant Holding, L.L.C., Camden Plant Holding, L.L.C., Elmwood Park
Power, LLC, Newark Bay Cogeneration Partnership, L.P., Lower Mount
Bethel Energy, LLC, York Generation Company LLC, Pedricktown
Cogeneration Company LP, H.A. Wagner LLC, Brandon Shores LLC
(collectively, Talen Entities).
---------------------------------------------------------------------------
The refund effective date in Docket No. EL16-116-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL16-116-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214 (2016),
within 21 days of the date of issuance of the order.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-23816 Filed 9-30-16; 8:45 am]
BILLING CODE 6717-01-P