Actions Taken at September 8, 2016, Meeting, 68094-68095 [2016-23737]
Download as PDF
68094
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices
Railroad—Abandonment Portion
Goshen Branch Between Firth &
Ammon, in Bingham & Bonneville
Counties, Idaho, 360 I.C.C. 91 (1979). To
address whether this condition
adequately protects affected employees,
a petition for partial revocation under
49 U.S.C. 10502(d) must be filed.
Provided no formal expression of
intent to file an offer of financial
assistance (OFA) to subsidize continued
rail service has been received, this
exemption will be effective on
November 2, 2016, unless stayed
pending reconsideration. Petitions to
stay that do not involve environmental
issues and formal expressions of intent
to file an OFA to subsidize continued
rail service under 49 CFR 1152.27(c)(2) 3
must be filed by October 13, 2016.4
Petitions to reopen must be filed by
October 21, 2016, with the Surface
Transportation Board, 395 E Street SW.,
Washington, DC 20423–0001.
A copy of any petition filed with the
Board should be sent to Florida
Northern’s representative: Audrey L.
Brodrick, Fletcher & Sippel LLC, 29
North Wacker Drive, Suite 920, Chicago,
IL 60606.
If the verified notice contains false or
misleading information, the exemption
is void ab initio.
Board decisions and notices are
available on our Web site at
‘‘WWW.STB.GOV.’’
Decided: September 27, 2016.
By the Board, Rachel D. Campbell,
Director, Office of Proceedings.
Tia Delano,
Clearance Clerk.
[FR Doc. 2016–23727 Filed 9–30–16; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Actions Taken at September 8, 2016,
Meeting
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
As part of its regular business
meeting held on September 8, 2016, in
Cooperstown, New York, the
Commission took the following actions:
approved or tabled the applications of
sradovich on DSK3GMQ082PROD with NOTICES
SUMMARY:
3 Each OFA must be accompanied by the filing
fee, which is currently set at $1,600. See 49 CFR
1002.2(f)(25).
4 Because this is a discontinue proceeding and
not an abandonment, interim trail use/rail banking
and public use conditions are not appropriate.
Because there will be an environmental review
during abandonment, this discontinuance does not
require an environmental review.
VerDate Sep<11>2014
17:56 Sep 30, 2016
Jkt 241001
certain water resources projects; and
took additional actions, as set forth in
the Supplementary Information below.
DATES: The business meeting was held
on September 8, 2016. Please refer to the
notice published in 81 FR 64812,
September 21, 2016, for additional
information on the proposed
rulemaking, including public hearing
dates and locations. Comments on the
proposed consumptive use mitigation
policy may be submitted to the
Commission on or before January 6,
2017.
ADDRESSES: Comments may be mailed
to: Jason E. Oyler, Esq., General
Counsel, Susquehanna River Basin
Commission, 4423 N. Front Street,
Harrisburg, PA 17110–1788, or
submitted electronically at https://
www.srbc.net/pubinfo/
publicparticipation/
PublicComments.aspx?type=5&cat=20.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel,
telephone: (717) 238–0423, ext. 1312;
fax: (717) 238–2436; email: joyler@
srbc.net. Regular mail inquiries may be
sent to the above address. See also
Commission Web site at www.srbc.net.
SUPPLEMENTARY INFORMATION: In
addition to the actions taken on projects
identified in the summary above and the
listings below, the following items were
also presented or acted upon at the
business meeting: (1) rescission of the
Commission’s Information Technology
Services Fee; (2) approval/ratification of
a contract and several grants; (3) release
of proposed rulemaking to clarify
application requirements and standards
for review of projects, amend the rules
dealing with the mitigation of
consumptive uses, add a subpart to
provide for registration of grandfathered
projects, and revise requirements
dealing with hearings and enforcement
actions, and release of a consumptive
use mitigation policy; (4) a report on
delegated settlements with the following
project sponsors, pursuant to SRBC
Resolution 2014–15: Lackawanna
Energy Center, in the amount of $2,000;
and Troy Borough Municipal Authority,
in the amount of $5,000.; 5) approval to
extend the term of an emergency
certificate with Furman Foods, Inc. to
November 30, 2016; and 6) continuance
of the Show Cause proceeding granted
to Montage Mountain Resorts, LP, to the
December 2016 Commission meeting.
Project Applications Approved
The Commission approved the
following project applications:
1. Project Sponsor and Facility:
Bloomfield Borough Water Authority,
Centre Township, Perry County, Pa.
PO 00000
Frm 00139
Fmt 4703
Sfmt 4703
Groundwater withdrawal of up to 0.180
mgd (30-day average) from Well 3.
2. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Susquehanna
River), Great Bend Township,
Susquehanna County, Pa. Renewal of
surface water withdrawal of up to 2.000
mgd (peak day) (Docket No. 20120904).
3. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Elizabethtown Borough, Lancaster
County, Pa. Groundwater withdrawal of
up to 0.201 mgd (30-day average) from
Well 1.
4. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Mount Joy Township, Lancaster County,
Pa. Groundwater withdrawal of up to
0.106 mgd (30-day average) from Well 3.
5. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Elizabethtown Borough, Lancaster
County, Pa. Groundwater withdrawal of
up to 0.130 mgd (30-day average) from
Well 4.
6. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Mount Joy Township, Lancaster County,
Pa. Groundwater withdrawal of up to
0.187 mgd (30-day average) from Well 8.
7. Project Sponsor and Facility:
Elizabethtown Area Water Authority,
Mount Joy Township, Lancaster County,
Pa. Groundwater withdrawal of up to
0.216 mgd (30-day average) from Well 9.
8. Project Sponsor and Facility:
Geisinger Health System, Mahoning
Township, Montour County, Pa.
Modification to increase consumptive
water use by an additional 0.319 mgd
(peak day), for a total consumptive
water use of up to 0.499 mgd (peak day)
(Docket No. 19910103).
9. Project Sponsor: Pennsylvania
American Water Company. Project
Facility: Nittany Water System, Walker
Township, Centre County, Pa.
Groundwater withdrawal of up to 0.262
mgd (30-day average) from Nittany Well
1.
10. Project Sponsor and Facility:
Republic Services of Pennsylvania, LLC,
Windsor and Lower Windsor
Townships, York County, Pa. Renewal
of groundwater withdrawal of up to
0.350 mgd (30-day average) from
groundwater remediation wells (Docket
No. 19860903).
11. Project Sponsor and Facility: SWN
Production Company, LLC, Herrick
Township, Bradford County, Pa.
Groundwater withdrawal of up to 0.101
mgd (30-day average) from the Fields
Supply Well.
12. Project Sponsor and Facility:
Talisman Energy USA Inc.
(Susquehanna River), Sheshequin
Township, Bradford County, Pa.
Renewal of surface water withdrawal of
E:\FR\FM\03OCN1.SGM
03OCN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Notices
up to 1.500 mgd (peak day) (Docket No.
20120912).
13. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Chiques Creek), West Hempfield
Township, Lancaster County, Pa.
Surface water withdrawal of up to 2.880
mgd (peak day).
14. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-1), Conestoga
Township, Lancaster County, Pa.
Surface water withdrawal of up to 0.360
mgd (peak day).
15. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-1), Conestoga
Township, Lancaster County, Pa.
Consumptive water use of up to 0.100
mgd (peak day).
16. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-2), Conestoga
Township, Lancaster County, Pa.
Surface water withdrawal of up to 0.360
mgd (peak day).
17. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Conestoga River-2), Conestoga
Township, Lancaster County, Pa.
Consumptive water use of up to 0.100
mgd (peak day).
18. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Deep Creek), Hegins Township,
Schuylkill County, Pa. Surface water
withdrawal of up to 2.880 mgd (peak
day).
19. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Fishing Creek), Sugarloaf Township,
Columbia County, Pa. Surface water
withdrawal of up to 2.592 mgd (peak
day).
20. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Pequea Creek), Martic Township,
Lancaster County, Pa. Surface water
withdrawal of up to 2.880 mgd (peak
day).
21. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Roaring Creek), Franklin Township,
Columbia County, Pa. Surface water
withdrawal of up to 2.880 mgd (peak
day).
22. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River), Eaton Township,
VerDate Sep<11>2014
17:56 Sep 30, 2016
Jkt 241001
Wyoming County, Pa. Surface water
withdrawal of up to 2.592 mgd (peak
day).
23. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River), Eaton Township,
Wyoming County, Pa. Consumptive
water use of up to 0.100 mgd (peak day).
24. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-1), Montour
Township and Catawissa Borough,
Columbia County, Pa. Surface water
withdrawal of up to 0.360 mgd (peak
day).
25. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-1), Montour
Township and Catawissa Borough,
Columbia County, Pa. Consumptive
water use of up to 0.100 mgd (peak day).
26. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Swatara Creek), East Hanover
Township, Lebanon County, Pa. Surface
water withdrawal of up to 2.880 mgd
(peak day).
Project Applications Tabled
The Commission tabled action on the
following project applications:
1. Project Sponsor: Exelon Generation
Company, LLC. Project Facility: Muddy
Run Pumped Storage Project, Drumore
and Martic Townships, Lancaster
County, Pa. Application for an existing
hydroelectric facility.
2. Project Sponsor and Facility:
Gilberton Power Company, West
Mahanoy Township, Schuylkill County,
Pa. Application for renewal of
consumptive water use of up to 1.510
mgd (peak day) (Docket No. 19851202).
3. Project Sponsor and Facility:
Gilberton Power Company, West
Mahanoy Township, Schuylkill County,
Pa. Application for groundwater
withdrawal of up to 1.870 mgd (30-day
average) from the Gilberton Mine Pool.
4. Project Sponsor and Facility:
Manbel Devco I, LP, Manheim
Township, Lancaster County, Pa.
Application for groundwater
withdrawal of up to 4.320 mgd (30-day
average) from the Belmont Quarry.
5. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-2), Montour
Township, Columbia County, Pa.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
6. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
PO 00000
Frm 00140
Fmt 4703
Sfmt 4703
68095
Company, LLC. Project: Atlantic Sunrise
(Susquehanna River-2), Montour
Township, Columbia County, Pa.
Application for consumptive water use
of up to 0.100 mgd (peak day).
7. Project Sponsor and Facility:
Village of Windsor, Broome County,
N.Y. Application for groundwater
withdrawal of up to 0.380 mgd (30-day
average) from Well 2.
8. Project Sponsor and Facility: West
Manchester Township Authority, West
Manchester Township, York County, Pa.
Application for groundwater
withdrawal of up to 0.216 mgd (30-day
average) from Well 7.
Project Application Withdrawn by
Project Sponsor
The following project sponsor
withdrew its project application:
1. Project Sponsor and Facility:
Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise
(Little Fishing Creek), Mount Pleasant
Township, Columbia County, Pa.
Application for surface water
withdrawal of up to 2.880 mgd (peak
day).
Authority: Pub.L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: September 27, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016–23737 Filed 9–30–16; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Revise Notice of Intent for an
Environmental Impact Statement:
North-South Corridor Study: Interstate
10 to U.S. Highway 60, Pinal County,
Arizona
Federal Highway
Administration (FHWA), United States
Department of Transportation (USDOT).
ACTION: Revised Notice of Intent (NOI).
AGENCY:
A NOI to prepare an
Environmental Impact Statement (EIS)
was published in the Federal Register
on September 20, 2010. The FHWA is
issuing this notice to advise the public
of a change to the environmental review
process for the proposed North-South
Corridor. The FHWA and the project
sponsor, the Arizona Department of
Transportation (ADOT), intend to use a
tiered process in which a Tier 1 EIS will
be prepared to evaluate potential
corridor alternatives, along with a NoAction alternative, for a future projectspecific alignment.
SUMMARY:
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 81, Number 191 (Monday, October 3, 2016)]
[Notices]
[Pages 68094-68095]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-23737]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Actions Taken at September 8, 2016, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: As part of its regular business meeting held on September 8,
2016, in Cooperstown, New York, the Commission took the following
actions: approved or tabled the applications of certain water resources
projects; and took additional actions, as set forth in the
Supplementary Information below.
DATES: The business meeting was held on September 8, 2016. Please refer
to the notice published in 81 FR 64812, September 21, 2016, for
additional information on the proposed rulemaking, including public
hearing dates and locations. Comments on the proposed consumptive use
mitigation policy may be submitted to the Commission on or before
January 6, 2017.
ADDRESSES: Comments may be mailed to: Jason E. Oyler, Esq., General
Counsel, Susquehanna River Basin Commission, 4423 N. Front Street,
Harrisburg, PA 17110-1788, or submitted electronically at https://www.srbc.net/pubinfo/publicparticipation/PublicComments.aspx?type=5&cat=20.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel,
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email:
joyler@srbc.net. Regular mail inquiries may be sent to the above
address. See also Commission Web site at www.srbc.net.
SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects
identified in the summary above and the listings below, the following
items were also presented or acted upon at the business meeting: (1)
rescission of the Commission's Information Technology Services Fee; (2)
approval/ratification of a contract and several grants; (3) release of
proposed rulemaking to clarify application requirements and standards
for review of projects, amend the rules dealing with the mitigation of
consumptive uses, add a subpart to provide for registration of
grandfathered projects, and revise requirements dealing with hearings
and enforcement actions, and release of a consumptive use mitigation
policy; (4) a report on delegated settlements with the following
project sponsors, pursuant to SRBC Resolution 2014-15: Lackawanna
Energy Center, in the amount of $2,000; and Troy Borough Municipal
Authority, in the amount of $5,000.; 5) approval to extend the term of
an emergency certificate with Furman Foods, Inc. to November 30, 2016;
and 6) continuance of the Show Cause proceeding granted to Montage
Mountain Resorts, LP, to the December 2016 Commission meeting.
Project Applications Approved
The Commission approved the following project applications:
1. Project Sponsor and Facility: Bloomfield Borough Water
Authority, Centre Township, Perry County, Pa. Groundwater withdrawal of
up to 0.180 mgd (30-day average) from Well 3.
2. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Renewal of surface water withdrawal of up to 2.000 mgd (peak day)
(Docket No. 20120904).
3. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Elizabethtown Borough, Lancaster County, Pa. Groundwater
withdrawal of up to 0.201 mgd (30-day average) from Well 1.
4. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Mount Joy Township, Lancaster County, Pa. Groundwater
withdrawal of up to 0.106 mgd (30-day average) from Well 3.
5. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Elizabethtown Borough, Lancaster County, Pa. Groundwater
withdrawal of up to 0.130 mgd (30-day average) from Well 4.
6. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Mount Joy Township, Lancaster County, Pa. Groundwater
withdrawal of up to 0.187 mgd (30-day average) from Well 8.
7. Project Sponsor and Facility: Elizabethtown Area Water
Authority, Mount Joy Township, Lancaster County, Pa. Groundwater
withdrawal of up to 0.216 mgd (30-day average) from Well 9.
8. Project Sponsor and Facility: Geisinger Health System, Mahoning
Township, Montour County, Pa. Modification to increase consumptive
water use by an additional 0.319 mgd (peak day), for a total
consumptive water use of up to 0.499 mgd (peak day) (Docket No.
19910103).
9. Project Sponsor: Pennsylvania American Water Company. Project
Facility: Nittany Water System, Walker Township, Centre County, Pa.
Groundwater withdrawal of up to 0.262 mgd (30-day average) from Nittany
Well 1.
10. Project Sponsor and Facility: Republic Services of
Pennsylvania, LLC, Windsor and Lower Windsor Townships, York County,
Pa. Renewal of groundwater withdrawal of up to 0.350 mgd (30-day
average) from groundwater remediation wells (Docket No. 19860903).
11. Project Sponsor and Facility: SWN Production Company, LLC,
Herrick Township, Bradford County, Pa. Groundwater withdrawal of up to
0.101 mgd (30-day average) from the Fields Supply Well.
12. Project Sponsor and Facility: Talisman Energy USA Inc.
(Susquehanna River), Sheshequin Township, Bradford County, Pa. Renewal
of surface water withdrawal of
[[Page 68095]]
up to 1.500 mgd (peak day) (Docket No. 20120912).
13. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Chiques Creek), West Hempfield
Township, Lancaster County, Pa. Surface water withdrawal of up to 2.880
mgd (peak day).
14. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-1), Conestoga
Township, Lancaster County, Pa. Surface water withdrawal of up to 0.360
mgd (peak day).
15. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-1), Conestoga
Township, Lancaster County, Pa. Consumptive water use of up to 0.100
mgd (peak day).
16. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-2), Conestoga
Township, Lancaster County, Pa. Surface water withdrawal of up to 0.360
mgd (peak day).
17. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Conestoga River-2), Conestoga
Township, Lancaster County, Pa. Consumptive water use of up to 0.100
mgd (peak day).
18. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Deep Creek), Hegins Township,
Schuylkill County, Pa. Surface water withdrawal of up to 2.880 mgd
(peak day).
19. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Fishing Creek), Sugarloaf
Township, Columbia County, Pa. Surface water withdrawal of up to 2.592
mgd (peak day).
20. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Pequea Creek), Martic
Township, Lancaster County, Pa. Surface water withdrawal of up to 2.880
mgd (peak day).
21. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Roaring Creek), Franklin
Township, Columbia County, Pa. Surface water withdrawal of up to 2.880
mgd (peak day).
22. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River), Eaton
Township, Wyoming County, Pa. Surface water withdrawal of up to 2.592
mgd (peak day).
23. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River), Eaton
Township, Wyoming County, Pa. Consumptive water use of up to 0.100 mgd
(peak day).
24. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-1), Montour
Township and Catawissa Borough, Columbia County, Pa. Surface water
withdrawal of up to 0.360 mgd (peak day).
25. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-1), Montour
Township and Catawissa Borough, Columbia County, Pa. Consumptive water
use of up to 0.100 mgd (peak day).
26. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Swatara Creek), East Hanover
Township, Lebanon County, Pa. Surface water withdrawal of up to 2.880
mgd (peak day).
Project Applications Tabled
The Commission tabled action on the following project applications:
1. Project Sponsor: Exelon Generation Company, LLC. Project
Facility: Muddy Run Pumped Storage Project, Drumore and Martic
Townships, Lancaster County, Pa. Application for an existing
hydroelectric facility.
2. Project Sponsor and Facility: Gilberton Power Company, West
Mahanoy Township, Schuylkill County, Pa. Application for renewal of
consumptive water use of up to 1.510 mgd (peak day) (Docket No.
19851202).
3. Project Sponsor and Facility: Gilberton Power Company, West
Mahanoy Township, Schuylkill County, Pa. Application for groundwater
withdrawal of up to 1.870 mgd (30-day average) from the Gilberton Mine
Pool.
4. Project Sponsor and Facility: Manbel Devco I, LP, Manheim
Township, Lancaster County, Pa. Application for groundwater withdrawal
of up to 4.320 mgd (30-day average) from the Belmont Quarry.
5. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-2), Montour
Township, Columbia County, Pa. Application for surface water withdrawal
of up to 2.880 mgd (peak day).
6. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Susquehanna River-2), Montour
Township, Columbia County, Pa. Application for consumptive water use of
up to 0.100 mgd (peak day).
7. Project Sponsor and Facility: Village of Windsor, Broome County,
N.Y. Application for groundwater withdrawal of up to 0.380 mgd (30-day
average) from Well 2.
8. Project Sponsor and Facility: West Manchester Township
Authority, West Manchester Township, York County, Pa. Application for
groundwater withdrawal of up to 0.216 mgd (30-day average) from Well 7.
Project Application Withdrawn by Project Sponsor
The following project sponsor withdrew its project application:
1. Project Sponsor and Facility: Transcontinental Gas Pipe Line
Company, LLC. Project: Atlantic Sunrise (Little Fishing Creek), Mount
Pleasant Township, Columbia County, Pa. Application for surface water
withdrawal of up to 2.880 mgd (peak day).
Authority: Pub.L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: September 27, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016-23737 Filed 9-30-16; 8:45 am]