Loan Guarantees for Projects That Employ Innovative Technologies, 67924-67937 [2016-23268]
Download as PDF
67924
Proposed Rules
Federal Register
Vol. 81, No. 191
Monday, October 3, 2016
This section of the FEDERAL REGISTER
contains notices to the public of the proposed
issuance of rules and regulations. The
purpose of these notices is to give interested
persons an opportunity to participate in the
rule making prior to the adoption of the final
rules.
DEPARTMENT OF ENERGY
10 CFR Part 609
RIN 1901–AB38
Loan Guarantees for Projects That
Employ Innovative Technologies
Loan Programs Office,
Department of Energy.
ACTION: Notice of proposed rulemaking.
AGENCY:
The Department of Energy
(DOE) proposes to amend the
regulations implementing the loan
guarantee provisions in Title XVII of the
Energy Policy Act of 2005 (Title XVII or
the Act). The proposal is intended to
increase clarity and transparency,
reduce paperwork, and provide a more
workable interpretation of certain
statutory provisions in light of DOE’s
experience with the Title XVII program.
DATES: Comments on this proposed rule
must be postmarked no later than
November 2, 2016.
ADDRESSES: You may submit comments,
identified by RIN 1901–AB38, using any
of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
• Email:
LPO.ProposedRuleComments@
hq.doe.gov. Include RIN 1901–AB38 in
the subject line of the email. Please
include the full body of your comments
in the text of the message or as an
attachment.
• Postal Mail: Mark A. McCall,
Executive Director, Loan Programs
Office, 1000 Independence Avenue SW.,
Washington, DC 20585–0121. Please
submit one signed original paper copy.
Due to potential delays in DOE’s receipt
and processing of mail sent through the
U.S. Postal Service, we encourage
respondents to submit comments
electronically to ensure timely receipt.
• Hand Delivery/Courier: Mark A.
McCall, Executive Director, Loan
Programs Office, 1000 Independence
Avenue SW., Washington, DC 20585–
rmajette on DSK2TPTVN1PROD with PROPOSALS
SUMMARY:
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
0121. Please submit one signed original
paper copy.
This notice of proposed rulemaking
and any comments that DOE receives
will be made available on the
regulations.gov Web site at: https://
www.regulations.gov. You also may
obtain copies of comments by
contacting Mr. Westergard using the
information below.
FOR FURTHER INFORMATION CONTACT:
Mark S. Westergard, Loan Programs
Office, 1000 Independence Avenue SW.,
Washington, DC 20585–0121, (202) 287–
5621, email:
LPO.ProposedRuleComments@
hq.doe.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction and Background
II. Discussion of Proposed Rule
III. Public Comment Procedures
IV. Regulatory Review
V. Approval of the Office of the Secretary
I. Introduction and Background
Section 1703 (section 1703)
authorizes the Secretary of Energy
(Secretary) to make loan guarantees for
projects that avoid, reduce, or sequester
air pollutants or anthropogenic
emissions of greenhouse gases. Such
projects must also employ new or
significantly improved technologies as
compared to commercial technologies in
service in the United States at the time
the guarantee is issued. The two
principal goals of section 1703 are to
encourage commercial use in the United
States of new or significantly improved
energy related technologies and to
achieve substantial environmental
benefits. Section 1703 also identifies ten
categories of technologies and projects
that are potentially eligible for loan
guarantees. Commercial use of these
technologies is expected to help sustain
and promote economic growth, produce
a more stable and secure energy supply
and economy for the United States, and
improve the environment.
As a result of experience gained
implementing the loan guarantee
program authorized by section 1703,
and information received from program
participants, including applicants,
borrowers, sponsors, and lenders, as
well as various energy industry groups,
DOE proposes to amend the existing
regulations as described in Section II of
this proposed rule. The proposal is
intended to provide increased clarity
and transparency, reduce paperwork,
PO 00000
Frm 00001
Fmt 4702
Sfmt 4702
and provide a more workable
interpretation of certain statutory
provisions in light of DOE’s experience
with operation of the Title XVII
program.
II. Discussion of Proposed Rule
Section 1702(a) of Title XVII directs
the Secretary to make guarantees on the
terms and conditions determined by the
Secretary, after consultation with the
Secretary of the Treasury, and in
accordance with the prescriptions set
forth in section 1702. This provision
authorizes the Secretary to establish the
loan guarantee program and to
determine the terms and conditions of
individual loan guarantees, after
consultation with the Secretary of
Treasury, subject to the limitations in
paragraphs (b) through (k) of section
1702. Pursuant to direction provided in
Public Law 110–5 (Feb. 15, 2007) DOE
promulgated regulations to implement
Title XVII which are currently found at
10 CFR part 609 (the ‘‘Title XVII Rule’’).
See 74 FR 63544 (Dec. 4, 2009). (The
proposed rule was issued on Aug 7,
2009 (74 FR 39569).) The Title XVII
Rule addresses matters such as (1) the
manner in which proposed projects are
vetted, (2) precisely which project costs
are eligible for financing, (3) the
adequacy and character of equity capital
required from sponsors, and (4) what
types of co-financing and subordination
arrangements would be acceptable to
DOE. Similarly, in implementing the
Secretary’s general authority under
section 1702(a) and the Title XVII Rule,
the Loan Programs Office has adopted
extensive credit, loan monitoring and
risk monitoring policies and procedures,
detailed conditional commitment letters
and term sheets, and loan guarantee
agreements to carry out the purposes of
Title XVII.
In this rulemaking, DOE proposes
amendments to the regulations at 10
CFR part 609 based on its experience in
implementing the loan guarantee
program. The proposed changes address
topics such as the exchange of
information with potential applicants
and the solicitation process, the preapplication process, the restriction of a
project to a single location, and the
imposition of a risk-based fee. These
issues are described in the paragraphs
that follow.
For the past several years, the DOE
Loan Programs Office has increased
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
communication with interested
members of the public regarding the
Office, its programs, and solicitations.
DOE has prepared and distributed a
number of presentations explaining the
application process and the types of
projects that may be eligible under its
solicitations. The Executive Director of
the Loan Programs Office has
participated in numerous public
discussions regarding the program. DOE
has also increased communication by
regular, broadly distributed email
communications to thousands of
recipients that have expressed an
interest in keeping up with
developments in the Loan Programs
Office. Contacts by potential applicants
regarding the program have significantly
increased as a result of these efforts.
Nevertheless, the proposed rule
includes changes intended to clarify the
circumstances under which potential
applicants may communicate with DOE
prior to submitting an application. DOE
expects that the proposed changes
would increase transparency and result
in more applications by qualified
applicants with respect to potential
eligible projects.
The provisions of the existing rule
relating to Pre-Applications have caused
considerable confusion among potential
applicants and applicants. In this
proposed rule, DOE proposes to
eliminate the existing pre-application
process and codify procedures that
divide the application into two parts.
The Part I submission would provide
DOE with a description of the project or
facility, technical information,
background information on
management, financing strategy, and
progress to date of critical path
schedules. These schedules would
include items such as obtaining licenses
or regulatory permits and approvals, site
preparation and long lead-time
procurements, and would be used as a
basis for determining the eligibility of
the project and the project’s readiness to
proceed. Applicants whose Part I
application is sufficient to indicate, on
a preliminary basis, the eligibility of the
project and that it is ready to proceed
would be invited to submit Part II of the
application. The Part II submission
would involve substantially more, and
substantially more detailed, information
than is required for the Part I
submission. The proposed process of
requiring a two-part application is
designed, in part, to enable DOE to
screen interested projects and provide
an early indication of projects’
eligibility for a loan guarantee under
this program. The two-part application
process would additionally allow DOE
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
to charge the required fee in two parts,
making it more economical for smaller
businesses to apply. By allowing DOE to
engage in an initial review of project
proposals, the two-part application
process would reduce the paperwork
burden for applicants whose projects are
not ready to move forward into Part II.
Although there is no statutory
requirement that all parts of a project be
located at a single location, DOE’s
solicitations have provided that
generally, a Project is restricted to one
location within the United States but
that DOE, in its discretion, could
consider an application for a project
using a particular technology that is
proposed to be situated in more than
one location in the United States if
multiple locations are integral
components of a unitary plan, necessary
to the viability of the Project, and at
least one of the locations is identified in
the application. Applicants and
potential applicants found this
requirement of DOE’s solicitations
difficult to understand. Additionally,
this requirement inhibits an applicant’s
ability to propose certain types of
distributed energy facilities. DOE
reconsidered the need for such a
requirement and proposes a revised
definition of Eligible Project that would
explicitly state that a project may be
located at two or more locations in the
United States if the project is comprised
of installations or facilities employing a
single New or Significantly Improved
Technology that is deployed pursuant to
an integrated and comprehensive
business plan.
DOE also proposes to include in the
rule provisions for the use of Risk-Based
Charges. DOE, working in conjunction
with the Federal Financing Bank
(‘‘FFB’’), has developed a program
under which borrowers for certain types
of transactions pay a ‘‘credit-based
interest rate spread’’ in addition to
interest otherwise payable on loans that
are issued by FFB. Use of interest rate
spreads or other charges based upon the
creditworthiness or specific risks arising
from individual transactions are
commonplace in private-sector
commercial loan transactions, including
private-sector project finance loan
transactions. Such spreads or other
charges are also used by other federal
credit programs comparable to the Title
XVII loan guarantee program, such as
those administered by the Overseas
Private Investment Corporation and the
Export-Import Bank of the United
States. Use of Risk-Based Charges is
permitted pursuant to the grant of
authority to the Secretary in Section
1702(a) to determine the terms and
PO 00000
Frm 00002
Fmt 4702
Sfmt 4702
67925
conditions of the Title XVII loan
guarantee program.
A number of other changes have been
included to increase clarity and
transparency. Among those changes are:
Definitions have been clarified,
shortened where possible, and added;
specific references to the Cargo
Preference Act and the Davis Bacon Act
have been added; an introductory
section on how the rule is to be
interpreted has been added; and various
provisions of the existing rule have been
re-organized to more-appropriate places
in the rule. In a number of places,
references to the statutory requirement
that DOE consult with the Secretary of
the Treasury previously included in
Title XVII Rule have been removed.
Those references were removed solely
because they were unnecessary for
consideration by applicants and
potential applicants. DOE’s statutory
obligation to consult with the Secretary
of the Treasury under Section 1702(a) of
Title XVII remains unchanged, and no
change is intended in the existing
consultation arrangements between the
Secretary of Energy and the Secretary of
the Treasury.
III. Public Comment Procedures
Interested persons are invited to
participate in this proceeding by
submitting data, views, or arguments.
Written comments should be submitted
to the address, and in the form,
indicated in the ADDRESSES section of
this notice of proposed rulemaking. To
help DOE review the comments,
interested persons are asked to refer to
specific proposed rule provisions, if
possible.
If you submit information that you
believe to be exempt by law from public
disclosure, you should submit one
complete copy, as well as one copy from
which the information claimed to be
exempt by law from public disclosure
has been deleted. DOE is responsible for
the final determination with regard to
disclosure or nondisclosure of the
information and for treating it
accordingly under the DOE Freedom of
Information Act regulations at 10 CFR
1004.11.
IV. Regulatory Review
A. Executive Order 12866
This proposed rule has been
determined to be a significant regulatory
action under Executive Order 12866,
‘‘Regulatory Planning and Review,’’ 58
FR 51735 (October 4, 1993).
Accordingly, this action was subject to
review under that Executive Order by
the Office of Information and Regulatory
E:\FR\FM\03OCP1.SGM
03OCP1
67926
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
Affairs (OIRA) of the Office of
Management and Budget (OMB).
B. National Environmental Policy Act
DOE has determined that this
proposed rule is covered under the
Categorical Exclusion found in the
DOE’s National Environmental Policy
Act regulations at paragraph A.5 of
appendix A to subpart D, 10 CFR part
1021, which applies to rulemaking that
amends an existing rule or regulation
which does not change the
environmental effect of the rule or
regulation being amended.
rmajette on DSK2TPTVN1PROD with PROPOSALS
C. Regulatory Flexibility Act
The Regulatory Flexibility Act (5
U.S.C. 601 et seq.) requires preparation
of an initial regulatory flexibility
analysis for any rule that by law must
be proposed for public comment, unless
the agency certifies that the rule, if
promulgated, will not have a significant
economic impact on a substantial
number of small entities. As required by
Executive Order 13272, ‘‘Proper
Consideration of Small Entities in
Agency Rulemaking,’’ 67 FR 53461
(August 16, 2002), DOE published
procedures and policies on February 19,
2003, to ensure that the potential
impacts of its rules on small entities are
properly considered during the
rulemaking process (68 FR 7990). DOE
has made its procedures and policies
available on the Office of General
Counsel’s Web site: https://
www.energy.gov/gc/downloads/
executive-order-13272-considerationsmall-entities-agency-rulemaking.
DOE is not obliged to prepare a
regulatory flexibility analysis for this
rulemaking because there is not a
requirement to publish a general notice
of proposed rulemaking for rules related
to loans under the Administrative
Procedure Act (5 U.S.C. 553(a)(2)).
D. Paperwork Reduction Act
Information collection requirements
for the DOE regulations at 10 CFR part
609 were previously approved by OMB
pursuant to the Paperwork Reduction
Act of 1995 (44 U.S.C. 3501 et seq.) and
the procedure implementing that Act (5
CFR 1320.1 et seq.) under OMB Control
Number 1910–5134. This proposed rule
contains revised information collection
requirements subject to approval by
OMB. DOE has submitted the proposed
revised collection of information to
OMB for approval. Public reporting
burden for the revised requirements in
this proposed rule is estimated to
average 130 hours per response,
including the time for reviewing
instructions, searching existing data
sources, gathering and maintaining the
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
data needed, and completing and
reviewing the collection of information.
All responses are expected to be
collected electronically.
DOE invites public comment on: (1)
Whether the proposed information
collection requirements are necessary
for the performance of DOE’s functions,
including whether the information will
have practical utility; (2) the accuracy of
DOE’s estimates of the burden of the
proposed information collection
requirements; (3) ways to enhance the
quality, utility, and clarity of the
information to be collected; and (4)
ways to minimize the burden of the
information collection requirements on
respondents. Comments should be
addressed to the Department of Energy
Desk Officer, Office of Information and
Regulatory Affairs, OMB, 725 17th
Street NW., Washington, DC 20503.
Persons submitting comments to OMB
also are requested to send a copy to the
contact person at the address given in
the ADDRESSES section of this notice of
proposed rulemaking. Interested
persons may obtain a copy of the DOE’s
Paperwork Reduction Act Submission to
OMB from the contact person named in
this notice of proposed rulemaking.
Notwithstanding any other provision of
law, a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
E. Unfunded Mandates Reform Act of
1995
The Unfunded Mandates Reform Act
of 1995 (Act) (Pub. L. 104–4) generally
requires Federal agencies to examine
closely the impacts of regulatory actions
on State, local, and tribal governments.
The term ‘‘Federal mandate’’ is
defined in the Act to mean a Federal
intergovernmental mandate or a Federal
private sector mandate. Although the
proposed rule would impose certain
requirements on non-Federal
governmental and private sector
applicants for loan guarantees, the Act’s
definitions of the terms ‘‘Federal
intergovernmental mandate’’ and
‘‘Federal private sector mandate’’
exclude among other things, any
provision in legislation, statute, or
regulation that is a condition of Federal
assistance or a duty arising from
participation in a voluntary program.
The proposed rule would establish
requirements that persons voluntarily
seeking loan guarantees for projects that
would use certain new and improved
energy technologies must satisfy as a
condition of a Federal loan guarantee.
Thus, the proposed rule falls under the
exceptions in the definitions of ‘‘Federal
intergovernmental mandate’’ and
PO 00000
Frm 00003
Fmt 4702
Sfmt 4702
‘‘Federal private sector mandate’’ for
requirements that are a condition of
Federal assistance or a duty arising from
participation in a voluntary program.
The Act does not apply to this
rulemaking.
F. Treasury and General Government
Appropriations Act, 1999
Section 654 of the Treasury and
General Government Appropriations
Act, 1999 (Pub. L. 105–277) requires
Federal agencies to issue a Family
Policymaking Assessment for any
proposed rule that may affect family
well-being. The proposed rule would
not have any impact on the autonomy
or integrity of the family as an
institution. Accordingly, DOE has
concluded that it is not necessary to
prepare a Family Policymaking
Assessment.
G. Executive Order 13132
Executive Order 13132, ‘‘Federalism,’’
64 FR 43255 (August 4, 1999) imposes
certain requirements on agencies
formulating and implementing policies
or regulations that preempt State law or
that have federalism implications.
Agencies are required to examine the
constitutional and statutory authority
supporting any action that would limit
the policymaking discretion of the
States and carefully assess the necessity
for such actions. DOE has examined this
proposed rule and has determined that
it would not preempt State law and
would not have a substantial direct
effect on the States, on the relationship
between the national government and
the States, or on the distribution of
power and responsibilities among the
various levels of government. No further
action is required by Executive Order
13132.
H. Executive Order 12988
With respect to the review of existing
regulations and the promulgation of
new regulations, section 3(a) of
Executive Order 12988, ‘‘Civil Justice
Reform,’’ 61 FR 4729 (February 7, 1996),
imposes on Executive agencies the
general duty to adhere to the following
requirements: (1) Eliminate drafting
errors and ambiguity; (2) write
regulations to minimize litigation; and
(3) provide a clear legal standard for
affected conduct rather than a general
standard and promote simplification
and burden reduction. With regard to
the review required by section 3(a),
section 3(b) of Executive Order 12988
specifically requires that Executive
agencies make every reasonable effort to
ensure that the regulation: (1) Clearly
specifies the preemptive effect, if any;
(2) clearly specifies any effect on
E:\FR\FM\03OCP1.SGM
03OCP1
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
existing Federal law or regulation; (3)
provides a clear legal standard for
affected conduct while promoting
simplification and burden reduction; (4)
specifies the retroactive effect, if any; (5)
adequately defines key terms; and (6)
addresses other important issues
affecting clarity and general
draftsmanship under any guidelines
issued by the Attorney General. Section
3(c) of Executive Order 12988 requires
Executive agencies to review regulations
in light of applicable standards in
section 3(a) and section 3(b) to
determine whether they are met or it is
unreasonable to meet one or more of
them. DOE has completed the required
review and determined that, to the
extent permitted by law, the proposed
rule meets the relevant standards of
Executive Order 12988.
rmajette on DSK2TPTVN1PROD with PROPOSALS
I. Treasury and General Government
Appropriations Act, 2001
The Treasury and General
Government Appropriations Act, 2001
(44 U.S.C. 3516 note) provides for
agencies to review most disseminations
of information to the public under
guidelines established by each agency
pursuant to general guidelines issued by
OMB.
OMB’s guidelines were published at
67 FR 8452 (February 22, 2002), and
DOE’s guidelines were published at 67
FR 62446 (October 7, 2002). DOE has
reviewed this proposed rule under the
OMB and DOE guidelines and has
concluded that it is consistent with
applicable policies in those guidelines.
J. Executive Order 13211
Executive Order 13211, ‘‘Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use,’’ 66 FR 28355 (May
22, 2001) requires Federal agencies to
prepare and submit to the OMB, a
Statement of Energy Effects for any
proposed significant energy action. A
‘‘significant energy action’’ is defined as
any action by an agency that
promulgated or is expected to lead to
promulgation of a final rule, and that:
(1) Is a significant regulatory action
under Executive Order 12866, or any
successor order; and (2) is likely to have
a significant adverse effect on the
supply, distribution, or use of energy, or
(3) is designated by the Administrator of
OIRA as a significant energy action. For
any proposed significant energy action,
the agency must give a detailed
statement of any adverse effects on
energy supply, distribution, or use
should the proposal be implemented,
and of reasonable alternatives to the
action and their expected benefits on
energy supply, distribution, and use.
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
This regulatory action would not have a
significant adverse effect on the supply,
distribution, or use of energy and has
not been designated by OIRA as a
significant energy action, and is
therefore not a significant energy action.
Accordingly, DOE has not prepared a
Statement of Energy Effects.
K. Executive Order 12630
The Department has determined,
under Executive Order 12630,
‘‘Governmental Actions and Interference
with Constitutionally Protected Property
Rights,’’ 53 FR 8859 (March 18, 1988),
that this rulemaking would not result in
any takings which might require
compensation under the Fifth
Amendment to the United States
Constitution.
V. Approval of the Office of the
Secretary
The Secretary of Energy has approved
publication of this notice of proposed
rulemaking.
List of Subjects in 10 CFR Part 609
Administrative practice and
procedure, Energy, Loan programs, and
Reporting and recordkeeping
requirements.
Issued in Washington, DC, on September
21, 2016.
Mark A. McCall,
Executive Director, Loan Programs Office.
For the reasons stated in the
preamble, DOE proposes to revise part
609 of chapter II of title 10 of the Code
of Federal Regulations to read as
follows:
PART 609—LOAN GUARANTEES FOR
PROJECTS THAT EMPLOY
INNOVATIVE TECHNOLOGIES
Sec.
609.1 Purpose and scope.
609.2 Definitions and interpretation.
609.3 Solicitations.
609.4 Submission of applications.
609.5 Programmatic, technical and financial
evaluation of applications.
609.6 Term sheets and conditional
commitments.
609.7 Closing on the loan guarantee
agreement.
609.8 Loan guarantee agreement.
609.9 Lender servicing requirements.
609.10 Project costs.
609.11 Fees and charges.
609.12 Full faith and credit and
incontestability.
609.13 Default, demand, payment, and
foreclosure on collateral.
609.14 Preservation of collateral.
609.15 Audits and access to records.
609.16 Deviations.
Authority: 42 U.S.C. 7254, 16511–16514.
PO 00000
Frm 00004
Fmt 4702
Sfmt 4702
§ 609.1
67927
Purpose and scope.
(a) This part sets forth the policies
and procedures that DOE uses for
receiving, evaluating, and approving
applications for loan guarantees to
support Eligible Projects under section
1703 of the Energy Policy Act of 2005
(Act).
(b) This part applies to all
Applications, Conditional
Commitments, and Loan Guarantee
Agreements.
(c) Part 1024 of chapter X of title 10
of the Code of Federal Regulations
(PROCEDURES FOR FINANCIAL
ASSISTANCE APPEALS) shall not
apply to actions taken under this part.
§ 609.2
Definitions and interpretation.
(a) Definitions. When used in this part
the following words have the following
meanings.
Act means Title XVII of the Energy
Policy Act of 2005 (42 U.S.C. 16511–
16514), as amended.
Administrative cost of issuing a loan
guarantee means the total of all
administrative expenses that DOE
incurs during:
(1) The evaluation of an Application
for a loan guarantee;
(2) The negotiation and offer of a
Term Sheet;
(3) The negotiation of a Loan
Guarantee Agreement and related
documents, including the issuance of a
Guarantee; and
(4) The servicing and monitoring of a
Loan Guarantee Agreement, including
during the construction, startup,
commissioning, shakedown, and
operational phases of an Eligible Project.
Applicant means a Person, including
a prospective Borrower or Project
Sponsor, that submits an Application to
DOE.
Application means a written
submission of materials responsive to a
Solicitation that satisfies § 609.4 of this
part.
Application fee means the fee or fees
required to be paid by an Applicant in
connection with submission of an
Application and specified in a
Solicitation. The Application Fee does
not include the Credit Subsidy Cost.
Attorney General means the Attorney
General of the United States.
Borrower means any Person that
enters into a Loan Guarantee Agreement
with DOE and issues Guaranteed
Obligations.
Cargo preference act means the Cargo
Preference Act of 1954, 46 U.S.C 55305,
as amended.
Commercial technology means a
technology in general use in the
commercial marketplace in the United
States at the time the Term Sheet is
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
67928
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
offered by DOE. A technology is in
general use if it is being used in three
or more facilities that are in commercial
operation in the United States for the
same general purpose as the proposed
project, and has been used in each such
facility for a period of at least five years.
The five-year period for each facility
shall start on the in-service date of the
facility employing that particular
technology or, in the case of a retrofit of
a facility to employ a particular
technology, the date the facility resumes
commercial operation following
completion and testing of the retrofit.
For purposes of this section, facilities
that are in commercial operation
include projects that have been the
recipients of a loan guarantee from DOE
under this part.
Conditional commitment means a
Term Sheet offered by DOE and
accepted by the offeree of the Term
Sheet, all in accordance with § 609.6(c)
of this part; provided, that the Secretary
may terminate a Conditional
Commitment for any reason at any time
prior to the execution of the Loan
Guarantee Agreement; and provided,
further, that the Secretary may not
delegate this authority to terminate a
Conditional Commitment.
Contracting officer means the
Secretary of Energy or a DOE official
authorized by the Secretary to enter
into, administer or terminate DOE Loan
Guarantee Agreements and related
contracts on behalf of DOE.
Credit subsidy cost has the same
meaning as ‘‘cost of a loan guarantee’’ in
section 502(5)(C) of the Federal Credit
Reform Act of 1990, which is the net
present value, at the time the Loan
Guarantee Agreement is executed, of the
following estimated cash flows,
discounted to the point of disbursement:
(1) Payments by the Government to
cover defaults and delinquencies,
interest subsidies, or other payments;
less
(2) Payments to the Government
including origination and other fees,
penalties, and recoveries; including the
effects of changes in loan or debt terms
resulting from the exercise by the
Borrower, Eligible Lender or other
Holder of an option included in the
Loan Guarantee Agreement.
Davis-Bacon act means the statute
referenced in section 1702(k) of the Act.
DOE means the United States
Department of Energy.
Eligible lender means either:
(1) Any Person formed for the purpose
of, or engaged in the business of,
lending money that, as determined by
DOE in each case, is:
(i) Not debarred or suspended from
participation in a Federal government
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
contract or participation in a nonprocurement activity (under a set of
uniform regulations implemented for
numerous agencies, such as DOE, at 2
CFR part 180);
(ii) Not delinquent on any Federal
debt or loan;
(iii) Legally authorized and
empowered to enter into loan guarantee
transactions authorized by the Act and
these regulations;
(iv) Able to demonstrate experience in
originating and servicing loans for
commercial projects similar in size and
scope to the Eligible Project, or able to
procure such experience through
contracts acceptable to DOE; and
(v) Able to demonstrate experience as
the lead lender or underwriter by
presenting evidence of its participation
in large commercial projects or energyrelated projects or other relevant
experience, or able to procure such
experience through contracts acceptable
to DOE; or
(2) The Federal Financing Bank.
Eligible project means a project that:
(1) Is located in the United States at
one location, except that the project may
be located at two or more locations in
the United States if the project is
comprised of installations or facilities
employing a single New or Significantly
Improved Technology that is deployed
pursuant to an integrated and
comprehensive business plan. An
Eligible Project in more than one
location is a single Eligible Project;
(2) Deploys a New or Significantly
Improved Technology; and
(3) Satisfies all applicable
requirements of section 1703 of the Act,
the applicable Solicitation, and this
part.
Equity means cash contributed to the
permanent capital stock (or equivalent)
of the Borrower or the Eligible Project
by the shareholders or other owners of
the Borrower or the Eligible Project.
Equity does not include proceeds from
the non-guaranteed portion of a
Guaranteed Obligation, proceeds from
any other non-guaranteed loan or
obligation, or the value of any
government assistance or support.
Facility fee means the fee, to be paid
in the amount and in the manner
provided in the Term Sheet, to cover the
Administrative Cost of Issuing a Loan
Guarantee for the period from the
Borrower’s acceptance of the Term
Sheet through issuance of the
Guarantee.
Federal financing bank means an
instrumentality of the United States
government created by the Federal
Financing Bank Act of 1973, under the
general supervision of the Secretary of
the Treasury.
PO 00000
Frm 00005
Fmt 4702
Sfmt 4702
Guarantee means the undertaking of
the United States of America, acting
through the Secretary pursuant to Title
XVII of the Energy Policy Act of 2005,
to pay in accordance with the terms
thereof, principal and interest of a
Guaranteed Obligation.
Guaranteed obligation means any
loan or other debt obligation of the
Borrower for an Eligible Project for
which DOE guarantees all or any part of
the payment of principal and interest
under a Loan Guarantee Agreement
entered into pursuant to the Act.
Holder means any Person that holds a
promissory made by the Borrower
evidencing the Guaranteed Obligation
(or his designee or agent).
Intercreditor agreement means any
agreement or instrument (or amendment
or modification thereof) among DOE and
one or more other Persons providing
financing or other credit arrangements
to the Borrower or an Eligible Project) or
that otherwise provides for rights of
DOE in respect of a Borrower or in
respect of an Eligible Project, in each
case in form and substance satisfactory
to DOE.
Loan agreement means a written
agreement between a Borrower and an
Eligible Lender containing the terms
and conditions under which the Eligible
Lender will make a loan or loans to the
Borrower for an Eligible Project.
Loan guarantee agreement means a
written agreement that, when entered
into by DOE and a Borrower, and, if
applicable, an Eligible Lender,
establishes the obligation of DOE to
guarantee the payment of all or a
portion of the principal of, and interest
on, specified Guaranteed Obligations,
subject to the terms and conditions
specified in the Loan Guarantee
Agreement.
New or significantly improved
technology means a technology, or a
defined suite of technologies, concerned
with the production, consumption, or
transportation of energy and that is not
a Commercial Technology, and that has
either:
(1) Only recently been developed,
discovered, or learned; or
(2) Involves or constitutes one or more
meaningful and important
improvements in productivity or value,
in comparison to Commercial
Technologies in use in the United States
at the time the Term Sheet is issued.
OMB means the Office of Management
and Budget in the Executive Office of
the President.
Person means any natural person or
any legally constituted entity, including
a state or local government, tribe,
corporation, company, voluntary
association, partnership, limited
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
liability company, joint venture, and
trust.
Project costs mean those costs,
including escalation and contingencies,
that are to be expended or accrued by
a Borrower and are necessary,
reasonable, customary and directly
related to the design, engineering,
financing, construction, startup,
commissioning and shakedown of an
Eligible Project, as specified in
§ 609.10(a) of this part. Project Costs do
not include costs for the items set forth
in § 609.10(b) of this part.
Project sponsor means any Person that
assumes substantial responsibility for
the development, financing, and
structuring of an Eligible Project and, if
not the Applicant, owns or controls, by
itself and/or through individuals in
common or affiliated business entities, a
five percent or greater interest in the
proposed Eligible Project, the Borrower
or the Applicant.
Risk-based charge means a charge
that, together with the principal and
interest on the guaranteed loan, or at
such other times as DOE may determine,
is payable on specified dates during the
term of a Guaranteed Obligation.
Secretary means the Secretary of
Energy or a duly authorized designee or
successor in interest.
Solicitation means an announcement
that DOE is accepting Applications that
is widely disseminated to the public on
the DOE Web site or otherwise, and
which satisfies the requirements of
§ 609.3(b) of this part.
Term sheet means a written offer for
the issuance of a loan guarantee,
executed by the Secretary (or a DOE
official authorized by the Secretary to
execute such offer), delivered to the
offeree, that sets forth the detailed terms
and conditions under which DOE and
the Applicant will execute a Loan
Guarantee Agreement.
United States means the several
States, the District of Columbia, the
Commonwealth of Puerto Rico, the
Virgin Islands, Guam, American Samoa
and any territory or possession of the
United States of America.
(b) Interpretations. This part shall be
interpreted using the following
guidelines.
(1) The word ‘‘discretion’’ when used
with reference to DOE, including the
Secretary, means ‘‘sole discretion.’’
(2) Defined terms in the singular shall
include the plural and vice versa, and
the masculine, feminine or neuter
gender shall include all genders.
(3) The word ‘‘or’’ is not exclusive.
(4) References to laws by name or
popular name are references to the
version of such law appearing in the
United States Code and include any
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
amendment, supplement or
modification of such law, and all
regulations, rulings, and other laws
promulgated thereunder.
(5) References to information or
documents required or allowed to be
submitted to DOE mean information or
documents that are marked as provided
in 10 CFR 600.15(b). A document or
information that is not marked as
provided in 10 CFR 600.15(b) will not
be considered as having been submitted
to or received by DOE.
(6) A reference to a Person includes
such Person’s successors and permitted
assigns.
(7) The words ‘‘include,’’ ‘‘includes’’
and ‘‘including’’ are not limiting and
mean include, includes and including
‘‘without limitation’’ and ‘‘without
limitation by specification.’’
(8) The words ‘‘hereof,’’ ‘‘herein’’ and
‘‘hereunder’’ and words of similar
import refer this part as a whole and not
to any particular provision of this part.
§ 609.3
Solicitations.
(a) DOE may invite the submission of
Applications for loan guarantees for
Eligible Projects pursuant to a
Solicitation.
(b) Each Solicitation must include, at
a minimum, the following information:
(1) The dollar amount of loan
guarantee authority potentially being
made available by DOE in that
Solicitation;
(2) The place and deadline for
submission of Applications;
(3) The name and address of the DOE
representative whom a potential
Applicant may contact to receive further
information and a copy of the
Solicitation;
(4) The form, format, and page limits
applicable to the Application;
(5) The amount of the Application Fee
and any other fees that will be required;
(6) The programmatic, technical,
financial and other factors that DOE will
use to evaluate response submissions,
and their relative weightings in that
evaluation; and
(7) Such other information as DOE
may deem appropriate.
(c) Using procedures as may be
announced by DOE a potential
Applicant may request a meeting with
DOE to discuss its potential
Application. At its discretion, DOE may
meet with a potential Applicant, either
in person or electronically, to discuss its
potential Application. DOE may provide
a potential Applicant with a preliminary
response regarding whether its proposed
Application may constitute an Eligible
Project. DOE is not permitted to design
an Eligible Project for an Applicant, but
may respond, in its discretion, in
PO 00000
Frm 00006
Fmt 4702
Sfmt 4702
67929
general terms to specific proposals.
DOE’s responses to questions from
potential Applicants and DOE’s
statements to potential Applicants are
pre-decisional and preliminary in
nature. Any such responses and
statements are subject in their entirety
to any final action by DOE with respect
to an Application submitted in
accordance with § 609.4 of this part.
§ 609.4
Submission of applications.
(a) In response to a Solicitation, an
Applicant must meet all requirements
and provide all information specified in
this part and the Solicitation in the
manner and on or before the date
specified therein. DOE may direct that
Applications be submitted in more than
one part; provided, that the parts of
such Application, taken as a whole,
satisfy the requirements of § 609.4(c)
and this part. In such event, subsequent
parts of an Application may be filed
only after DOE invites an Applicant to
make an additional submission. The
initial part of an Application may be
used by DOE to determine the
likelihood that the project proposed by
an Applicant will be an Eligible Project,
and to evaluate such project’s readiness
to proceed. If there have been any
material amendments, modifications or
additions made to the information
previously submitted by an Applicant,
the Applicant shall provide a detailed
description thereof, including any
changes in the proposed project’s
financing structure or other terms,
promptly upon request by DOE. Where
DOE has directed that an Application be
submitted in parts, DOE may provide for
payment of the Application Fee in parts.
(b) An Applicant may submit only
one Application for one proposed
project using a particular technology.
An Applicant may not submit an
Application or Applications for
multiple Eligible Projects using the
same technology. An Applicant may
submit Applications for multiple
proposed projects using different
technologies. For purposes of this
paragraph, the term Applicant shall
include the Project Sponsor and any
subsidiaries or affiliates of the Project
Sponsor.
(c) An Application must include, at a
minimum, the following information
and materials:
(1) A completed Application form
signed by an individual with full
authority to bind the Applicant,
including the commitments and
representations made in each part of the
Application;
(2) The applicable Application Fee;
(3) A description of how and to what
measurable extent the proposed project
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
67930
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
avoids, reduces, or sequesters air
pollutants and/or anthropogenic
emissions of greenhouse gases,
including how to measure and verify
those effects;
(4) A description of the nature and
scope of the proposed project,
including:
(i) Key project milestones;
(ii) Location or locations of the
proposed project;
(iii) Identification and commercial
feasibility of the New or Significantly
Improved Technology to be deployed;
(iv) How the Applicant intends to
deploy such New or Significantly
Improved Technology in the proposed
project; and
(v) How the Applicant intends to
assure, to the extent possible, the further
commercial availability of the New or
Significantly Improved Technology in
the United States.
(5) An explanation of how the
proposed project qualifies as a project
within the category or categories of
projects referred to in the Solicitation;
(6) A detailed estimate of the total
Project Costs together with a description
of the methodology and assumptions
used;
(7) A detailed description of the
engineering and design contractor(s),
construction contractor(s), and
equipment supplier(s);
(8) The construction schedules for the
proposed project, including major
activity and cost milestones;
(9) A description of the material terms
and conditions of the development and
construction contracts to include the
performance guarantees, performance
bonds, liquidated damages provisions,
and equipment warranties;
(10) A detailed description of the
operations and maintenance provider(s),
the plant operating plan, estimated
staffing requirements, parts inventory,
major maintenance schedule, estimated
annual downtime, and performance
guarantees and related liquidated
damage provisions, if any;
(11) A description of the management
plan of operations to be employed in
carrying out the proposed project, and
information concerning the management
experience of each officer or key person
associated with the proposed project;
(12) A detailed description of the
proposed project decommissioning,
deconstruction, and disposal plan, and
the anticipated costs associated
therewith;
(13) An analysis of the market for any
product (including but not limited to
electricity and chemicals) to be
produced by, or services to be provided
by, the proposed project, including
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
relevant economics justifying the
analysis, and copies of
(i) Any contracts for the sale of such
products or the provision of such
services, or
(ii) Any other assurance of the
revenues to be generated from sale of
such products or provision of such
services;
(14) A detailed description of the
overall financial plan for the proposed
project, including all sources and uses
of funding, equity and debt, and the
liability of parties associated with the
proposed project over the term of the
Loan Guarantee Agreement;
(15) A copy of all material
agreements, whether entered into or
proposed, relevant to the investment,
design, engineering, financing,
construction, startup commissioning,
shakedown, operations and
maintenance of the proposed project;
(16) A copy of the financial closing
checklist for the equity and debt to the
extent available;
(17) The Applicant’s business plan on
which the proposed project is based and
Applicant’s financial model with
respect to the proposed project for the
proposed term of the Guaranteed
Obligations, including, as applicable,
pro forma income statements, balance
sheets, and cash flows. All such
information and data must include
assumptions made in their preparation
and the range of revenue, operating cost,
and credit assumptions considered;
(18) Financial statements for the three
immediately preceding fiscal years of
the Applicant (or such shorter period as
the Applicant has been in existence)
that have been audited by an
independent certified public accounting
firm, including all associated
certifications, notes and letters to
management, as well as interim
financial statements and notes for the
current fiscal year for the Applicant and
all other Persons the credit of which is
material to the success of the
transactions described in the
Application;
(19) A copy of all legal opinions, and
other material reports, analyses, and
reviews related to the proposed project
that have been delivered prior to
submission of any part of the
Application;
(20) An independent engineering
report prepared by an engineer with
experience in the industry and
familiarity with similar projects. The
report should address the proposed
project’s siting and permitting
arrangements, engineering and design,
contractual requirements,
environmental compliance, testing,
PO 00000
Frm 00007
Fmt 4702
Sfmt 4702
commissioning and operations, and
maintenance;
(21) A credit history of the Applicant
and each Project Sponsor;
(22) A preliminary credit assessment
for the proposed project without a loan
guarantee from a nationally recognized
rating agency for projects where the
estimated total Project Costs exceed $25
million. For proposed projects where
the total estimated Project Costs are $25
million or less and where conditions
justify, in the sole discretion of the
Secretary, DOE may require such an
assessment;
(23) A list showing the status of and
estimated completion date of
Applicant’s required applications for
federal, state, and local permits,
authorizations or approvals to site,
construct, and operate the proposed
project;
(24) A report containing an analysis of
the potential environmental impacts of
the proposed project that will enable
DOE to—
(i) Assess whether the proposed
project will comply with all applicable
environmental requirements; and
(ii) Undertake and complete any
necessary reviews under the National
Environmental Policy Act of 1969;
(25) A listing and description of the
assets of or to be utilized for the benefit
of the proposed project, and of any other
asset that will serve as collateral
pledged in respect of the Guaranteed
Obligations, including appropriate data
as to the value of such assets and the
useful life of any physical assets. With
respect to real property assets listed, an
appraisal that is consistent with the
‘‘Uniform Standards of Professional
Appraisal Practice,’’ promulgated by the
Appraisal Standards Board of the
Appraisal Foundation, and performed
by licensed or certified appraisers, is
required;
(26) An analysis demonstrating that,
at the time of the Application, there is
a reasonable prospect that Borrower will
be able to repay the Guaranteed
Obligations (including interest)
according to their terms, and a complete
description of the operational and
financial assumptions and
methodologies on which this
demonstration is based; and
(27) If proposed project assets or
facilities are or will be jointly owned by
the Applicant and one or more other
Persons or entities, each of which owns
an undivided ownership interest in
such proposed project assets or
facilities, a description of the
Applicant’s rights and obligations in
respect of its undivided ownership
interest in such proposed project assets
or facilities.
E:\FR\FM\03OCP1.SGM
03OCP1
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
(d) During the Application evaluation
process pursuant to § 609.5 of this part,
DOE may request additional
information, potentially including a
preliminary credit rating or credit
assessment, with respect to the
proposed project.
(e) DOE will not consider any part of
any Application or the Application as a
whole complete unless the Application
Fee (or the required portion of the
Application Fee related to a particular
part of the Application) has been paid.
An Application Fee paid in connection
with one Application is not transferable
to another Application. Except in the
discretion of DOE, no portion of the
Application Fee is refundable;
(f) DOE has no obligation to evaluate
an Application that is not complete, and
may proceed with such evaluation, or a
partial evaluation, only in its discretion.
(g) Unless an Applicant requests an
extension and such an extension is
granted by DOE in its discretion, an
Application may be rejected if it is not
complete within four years from the
date of submission (or date of
submission of the first part thereof, in
the case of Applications made in more
than one part).
(h) Upon making a determination to
engage independent consultants or
outside counsel with respect to an
Application, DOE will proceed to
evaluate and process such Application
only following execution by an
Applicant or Project Sponsor, as
appropriate, of an agreement satisfactory
to DOE to pay the fees and expenses
charged by the independent consultants
and outside legal counsel.
rmajette on DSK2TPTVN1PROD with PROPOSALS
§ 609.5 Programmatic, technical and
financial evaluation of applications.
(a) In reviewing completed
Applications, and in prioritizing and
selecting those as to which a Term Sheet
should be offered, DOE will apply the
criteria set forth in the Act, any
applicable Solicitation, and this part.
Applications will be considered in a
competitive process, i.e. each
Application will be evaluated against
other Applications responsive to the
Solicitation. .DOE may compare an
Application to Applications related to
other projects that DOE reasonably
believes may become the subject of an
Application. Applications will be
denied if:
(1) The proposed project is not an
Eligible Project;
(2) The applicable technology is not
ready to be deployed commercially in
the United States, cannot yield a
commercially viable product or service
in the use proposed in the Application,
does not have the potential to be
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
deployed in other commercial projects
in the United States, or is not or will not
be available for further commercial use
in the United States;
(3) The Person proposed to issue the
loan or purchase other debt obligations
constituting the Guaranteed Obligations
is not an Eligible Lender;
(4) The proposed project is for
demonstration, research, or
development;
(5) Significant Equity for the proposed
project will not be provided by the date
of issuance of the Guaranteed
Obligations, or such later time as DOE
in its discretion may determine; or
(6) The proposed project does not
present a reasonable prospect of
repayment of the Guaranteed
Obligations.
(b) If an Application has not been
denied pursuant to § 609.5(a), DOE will
evaluate the proposed Project based on
the criteria set forth in the Act, any
applicable Solicitation and the
following:
(1) To what measurable extent the
proposed project avoids, reduces, or
sequesters air pollutants or
anthropogenic emissions of greenhouses
gases, or contributes to the avoidance,
reduction or sequestration of air
pollutants or anthropogenic emissions
of greenhouse gases;
(2) To what extent the technology to
be deployed in the proposed project—
(i) Is ready to be deployed
commercially in the United States, can
be replicated, yields a commercially
viable product or service in the use
proposed in the proposed project, has
potential to be deployed in other
commercial projects in the United
States, and is or will be available for
further commercial use in the United
States; and
(ii) Constitutes an important
improvement in technology, as
compared to available Commercial
Technologies, used to avoid, reduce or
sequester air pollutants or
anthropogenic emissions of greenhouse
gases;
(3) To what extent the Applicant has
a plan to advance or assist in the
advancement of that technology into the
commercial marketplace in the United
States;
(4) The extent to which the level of
proposed support in the Application is
consistent with a reasonable prospect of
repayment of the Guaranteed
Obligations by considering, among other
factors:
(i) The extent to which the requested
amount of the loan guarantee, the
requested amount of Guaranteed
Obligations and, if applicable, the
expected amount of any other financing
PO 00000
Frm 00008
Fmt 4702
Sfmt 4702
67931
or credit arrangements, are reasonable
relative to the nature and scope of the
proposed project;
(ii) The total amount and nature of the
Project Costs and the extent to which
Project Costs are to be funded by
Guaranteed Obligations; and
(iii) The feasibility of the proposed
project and likelihood that it will
produce sufficient revenues to service
its debt obligations over the life of the
loan guarantee and assure timely
repayment of Guaranteed Obligations;
(5) The likelihood that the proposed
project will be ready for full commercial
operations in the time frame stated in
the Application;
(6) The amount of Equity committed
and to be committed to the proposed
project by the Borrower, the Project
Sponsor, and other Persons;
(7) Whether there is sufficient
evidence that the Borrower will
diligently implement the proposed
project, including initiating and
completing the proposed project in a
timely manner;
(8) Whether and to what extent the
Applicant will rely upon other Federal
and non-Federal Government assistance
such as grants, tax credits, or other loan
guarantees to support the financing,
construction, and operation of the
proposed project and how such
assistance will impact the proposed
project;
(9) The levels of safeguards provided
to the Federal Government in the event
of default through collateral, warranties,
and other assurance of repayment
described in the Application, including
the nature of any anticipated
intercreditor arrangements;
(10) The Applicant’s, or the relevant
contractor’s, capacity and expertise to
operate the proposed project
successfully, based on factors such as
financial soundness, management
organization, and the nature and extent
of corporate and individual experience;
(11) The ability of the proposed
Borrower to ensure that the proposed
project will comply with all applicable
laws and regulations, including all
applicable environmental statutes and
regulations;
(12) The levels of market, regulatory,
legal, financial, technological, and other
risks associated with the proposed
project and their appropriateness for a
loan guarantee provided by DOE;
(13) Whether the Application contains
sufficient information, including a
detailed description of the nature and
scope of the proposed project and the
nature, scope, and risk coverage of the
loan guarantee sought to enable DOE to
perform a thorough assessment of the
proposed project; and
E:\FR\FM\03OCP1.SGM
03OCP1
67932
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
(14) Such other criteria that DOE
deems relevant in evaluating the merits
of an Application.
(c) After DOE completes its review
and evaluation of a proposed project
pursuant to § 609.5(b) and this part,
DOE will notify the Applicant in writing
of its determination whether to proceed
with due diligence and negotiation of a
Term Sheet in accordance with § 609.6
of this part. DOE will proceed only if it
determines that the proposed project is
highly qualified and suitable for a
Guarantee. Upon written confirmation
from the Applicant that it desires to
proceed, DOE and the Applicant will
commence negotiations.
(d) A determination by DOE not to
proceed with a proposed project
following evaluation pursuant to
§ 609.5(b) shall be final and nonappealable, but shall not prejudice the
Applicant or other affected Persons from
applying for a Guarantee in respect of a
different proposed project pursuant to
another, separate Application.
rmajette on DSK2TPTVN1PROD with PROPOSALS
§ 609.6 Term sheets and conditional
commitments.
(a) DOE, after negotiation of a Term
Sheet with an Applicant, may offer such
Term Sheet to an Applicant or such
other Person that is an affiliate of the
Applicant and that is acceptable to DOE.
DOE’s offer of a Term Sheet shall be in
writing and signed by the Contracting
Officer. DOE’s negotiation of a Term
Sheet imposes no obligation on the
Secretary to offer a Term Sheet to the
Applicant.
(b) DOE shall terminate its
negotiations of a Term Sheet if it has not
offered a Term Sheet in respect of an
Eligible Project within four years after
the date of the written notification set
forth in § 609.5(c) of this part, unless
extended in writing in the discretion of
the Contracting Officer.
(c) If and when the offeree specified
in a Term Sheet satisfies all terms and
conditions for acceptance of the Term
Sheet, including written acceptance
thereof and payment of all fees specified
in § 609.11(f) and therein to be paid at
or prior to acceptance of the Term
Sheet, the Term Sheet shall become a
Conditional Commitment. Each
Conditional Commitment shall include
an expiration date no more than two
years from the date it is issued, unless
extended in writing in the discretion of
the Contracting Officer. When and if all
of the terms and conditions specified in
the Conditional Commitment have been
met, DOE and the Applicant may enter
into a Loan Guarantee Agreement.
(d) If, subsequent to execution of a
Conditional Commitment, the financing
arrangements of the Borrower, or in
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
respect of an Eligible Project, change
from those described in the Conditional
Commitment, the Applicant shall
promptly provide updated financing
information in writing to DOE. All such
updated information shall be deemed to
be information submitted in connection
with an Application and shall be subject
to § 609.4(b). Based on such updated
information, DOE may take one or more
of the following actions:
(1) Determine that such changes are
not material to the Borrower, the
Eligible Project or DOE;
(2) Amend the Conditional
Commitment accordingly;
(3) Postpone the expected closing date
of the associated Loan Guarantee
Agreement; or
(4) Terminate the Conditional
Commitment.
§ 609.7 Closing on the loan guarantee
agreement.
(a) Subsequent to entering into a
Conditional Commitment with an
Applicant, DOE, after consultation with
the Applicant, will set a closing date for
execution of a Loan Guarantee
Agreement.
(b) Prior to or on the closing date of
a Loan Guarantee Agreement, DOE will
ensure that:
(1) One of the following has occurred:
(i) An appropriation for the Credit
Subsidy Cost has been made;
(ii) The Secretary has received from
the Borrower payment in full for the
Credit Subsidy Cost and deposited the
payment into the Treasury; or
(iii) A combination of one or more
appropriations under paragraph (b)(1)(i)
of this section and one or more
payments from the Borrower under
paragraph (b)(1)(ii) of this section has
been made that is equal to the Credit
Subsidy Cost;
(2) Pursuant to section 1702(h) of the
Act, DOE has received from the
Applicant the remainder of the Facility
Fee referred to in § 609.11(b) of this
part;
(3) OMB has reviewed and approved
DOE’s calculation of the Credit Subsidy
Cost of the Guarantee;
(4) The Department of the Treasury
has been consulted as to the terms and
conditions of the Loan Guarantee
Agreement;
(5) The Loan Guarantee Agreement
and related documents contain all terms
and conditions DOE deems reasonable
and necessary to protect the interest of
the United States;
(6) Each holder of the Guaranteed
Obligations is an Eligible Lender, and
the servicer of the Guaranteed
Obligations meets the servicing
performance requirements of § 609.9(b)
of this part;
PO 00000
Frm 00009
Fmt 4702
Sfmt 4702
(7) DOE has determined the principal
amount of the Guaranteed Obligations
expected to be issued in respect of the
Eligible Project, as estimated at the time
of issuance, will not exceed 80 percent
of the Project Costs of the Eligible
Project;
(8) All conditions precedent specified
in the Conditional Commitment are
either satisfied or waived by the
Contracting Officer and all other
applicable contractual, statutory, and
regulatory requirements have been
satisfied or waived by the Contracting
Officer. If the counterparty to the
Conditional Commitment has not
satisfied all such terms and conditions
on or prior to the closing date of the
Loan Guarantee Agreement, the
Secretary may, in his discretion, set a
new closing date, or terminate the
Conditional Commitment; and
(9) Where the total Project Costs for an
Eligible Project are projected to exceed
$25 million, the Applicant must provide
a credit rating from a nationally
recognized rating agency reflecting the
revised Conditional Commitment for the
project without a Federal guarantee.
Where total Project Costs are projected
to be $25 million or less, the Secretary
may, on a case-by-case basis, require a
credit rating. If a credit rating is
required, an updated rating must be
provided to the Secretary not later than
30 days prior to closing.
§ 609.8
Loan guarantee agreement.
(a) Only a Loan Guarantee Agreement
executed by the Contracting Officer can
obligate DOE to issue a Guarantee in
respect of Guaranteed Obligations.
(b) DOE is not bound by oral
representations.
(c) Each Loan Guarantee Agreement
shall contain the following requirements
and conditions, and shall not be
executed until the Contracting Officer
determines that the following
requirements and conditions are
satisfied:
(1) The Federal Financing Bank shall
be the only Eligible Lender in
transactions where DOE guarantees 100
percent (but not less than 100 percent)
of the principal and interest of the
Guaranteed Obligations issued under a
Loan Guarantee Agreement.
(i) Where DOE guarantees more than
90 percent of the Guaranteed Obligation,
the guaranteed portion cannot be
separated from or ‘‘stripped’’ from the
non-guaranteed portion of the
Guaranteed Obligation if the loan is
participated, syndicated or otherwise
resold in the secondary market; and
(ii) Where DOE guarantees 90 percent
or less of the Guaranteed Obligation, the
guaranteed portion may be separated
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
from or ‘‘stripped’’ from the nonguaranteed portion of the Guaranteed
Obligation, if the loan is participated,
syndicated or otherwise resold in the
secondary debt market;
(2) The Borrower shall be obligated to
make full repayment of the principal
and interest on the Guaranteed
Obligations and other debt of a
Borrower over a period of up to the
lesser of 30 years or 90 percent of the
projected useful life of the Eligible
Project’s major physical assets, as
calculated in accordance with U.S.
generally accepted accounting
principles and practices. The nonguaranteed portion (if any) of any
Guaranteed Obligations must be repaid
pro rata, and on the same amortization
schedule, with the guaranteed portion.
(3) If any financing or credit
arrangement of the Borrower or relating
to the Eligible Project, other than the
Guaranteed Obligations, has an
amortization period shorter than that of
the Guaranteed Obligations, DOE shall
have determined that the resulting
financing structure allocates to DOE a
reasonably proportionate share of the
default risk, in light of:
(i) DOE’s share of the total debt
financing of the Borrower,
(ii) Risk allocation among the credit
providers to the Borrower, and
(iii) Internal and external credit
enhancements.
(4) Consistent with the requirements
of section 149(b) of the Internal Revenue
Code, the Guaranteed Obligations shall
not finance, directly, indirectly, or
through effective subordination within
the meaning of section II.A of OMB
Circular No. A–129 (January 2013), taxexempt debt obligations. Guaranteed
Obligations and any tax-exempt debt
obligations payable directly or
indirectly from the revenues of the
Borrower or other resources of the
Borrower must be repaid using separate,
dedicated revenue streams or other
separate sources of repayment, and must
be separately collateralized. The terms
of the Guaranteed Obligations, such as,
for example, grace periods, repayment
schedules, and availability of deferrals,
must not create effective subordination.
The Guaranteed Obligations shall not be
used as collateral to secure tax-exempt
debt obligations or guarantee loans
funded by tax-exempt debt obligations;
(5) The principal amount of the
Guaranteed Obligations, when
combined with funds from other sources
committed and available to the
Borrower, shall be sufficient to pay for
expected Project Costs (including
adequate contingency amounts), the
applicable items specified in § 609.10(b)
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
of this part, and otherwise to carry out
the Eligible Project;
(6) There shall be a reasonable
prospect of repayment by the Borrower
of the principal of and interest on the
Guaranteed Obligations and all of its
other debt obligations;
(7) The Borrower shall pledge
collateral or surety determined by DOE
to be necessary to secure the repayment
of the Guaranteed Obligations. Such
collateral or security may include
Eligible Project assets and assets not
related to the Eligible Project;
(8) The Loan Guarantee Agreement
and related documents shall include
detailed terms and conditions that DOE
deems necessary and appropriate to
protect the interests of the United States
in the case of default, including
ensuring availability of all relevant
intellectual property rights, technical
data including software, and technology
necessary for DOE or any Person or
entity selected by DOE, to complete,
operate, convey, and dispose of the
defaulted Borrower or the Eligible
Project;
(9) The Guaranteed Obligations shall
not be subordinate to other financing.
Guaranteed Obligations are not
subordinate to other financing if the lien
on property securing the Guaranteed
Obligations, together with liens that are
pari passu with such lien, if any, take
priority or precedence over other
charges or encumbrances upon the same
property and must be satisfied before
such other charges are entitled to
participate in proceeds of the property’s
sale. In DOE’s discretion, Guaranteed
Obligations may share a lien position
with other financing;
(10) There is satisfactory evidence
that the Borrower will diligently pursue
the Eligible Project and is willing,
competent, and capable of performing
its obligations under the Loan Guarantee
Agreement and the loan documentation
relating to its other debt obligations;
(11) The Borrower shall have paid all
fees and expenses due to DOE or the
U.S. Government, including such
amount of the Credit Subsidy Cost as
may be due and payable from the
Borrower pursuant to the Conditional
Commitment, upon execution of the
Loan Guarantee Agreement;
(12) The Borrower, any Eligible
Lender, and each other relevant party
shall take, and be obligated to continue
to take, those actions necessary to
perfect and maintain liens on collateral
pledged in respect of the Guaranteed
Obligations;
(13) DOE or its representatives shall
have access to the offices of the
Borrower and the Eligible Project site at
all reasonable times in order to—
PO 00000
Frm 00010
Fmt 4702
Sfmt 4702
67933
(i) Monitor the performance by the
Borrower of its obligations under the
Loan Guarantee Agreement, and
(ii) Performance of the Eligible
Project;
(14) DOE and Borrower have reached
an agreement regarding the information
that will be made available to DOE and
the information that will be made
publicly available;
(15) The Borrower shall have filed
applications for or obtained any
required regulatory approvals for the
Eligible Project and is in compliance, or
promptly will be in compliance, where
appropriate, with all Federal, state, and
local regulatory requirements;
(16) The Borrower shall have no
delinquent Federal debt;
(17) The Project Sponsors have made
or will make a significant Equity
investment in the Borrower or the
Eligible Project, and will maintain
control of the Borrower or the Eligible
Project as agreed in the LGA; and
(18) The Loan Guarantee Agreement
and related agreements shall include
such other terms and conditions as DOE
deems necessary or appropriate to
protect the interests of the United
States.
(d) The Loan Guarantee Agreement
shall provide that, in the event of a
default by the Borrower:
(1) Interest on the Guaranteed
Obligations shall accrue at the rate
stated in the Loan Guarantee Agreement
or the Loan Agreement, until DOE
makes full payment of the defaulted
Guaranteed Obligations and, except
when such Guaranteed Obligations are
funded through the Federal Financing
Bank, DOE shall not be required to pay
any premium, default penalties, or
prepayment penalties; and
(2) The holder of collateral pledged in
respect of the Guaranteed Obligations
shall be obligated to take such actions
as DOE may reasonably require to
provide for the care, preservation,
protection, and maintenance of such
collateral so as to enable the United
States to achieve maximum recovery.
(e)(1) An Eligible Lender or other
Holder may sell, assign or transfer a
Guaranteed Obligation to another
Eligible Lender that meets the
requirements of § 609.9 of this part.
Such latter Eligible Lender shall be
required to assume all servicing,
monitoring and reporting requirements
as provided in the Loan Guarantee
Agreement. Any transfer of the
servicing, monitoring, and reporting
functions shall be subject to the prior
written approval of DOE.
(2) The Secretary, or the Secretary’s
designee or contractual agent, for the
purpose of identifying Holders with the
E:\FR\FM\03OCP1.SGM
03OCP1
67934
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
right to receive payment under the
Guaranteed Obligations, shall include in
the Loan Guarantee Agreement or
related documents a procedure for
tracking and identifying Holders of
Guaranteed Obligations. Any
contractual agent approved by the
Secretary to perform this function may
transfer or assign this responsibility
only with the Secretary’s prior written
approval.
(f) Each Loan Guarantee Agreement
shall require the Borrower to make
representations and warranties, agree to
covenants, and satisfy conditions
precedent to closing and to each
disbursement that, in each case, relate to
its compliance with the Davis-Bacon
Act and the Cargo Preference Act.
(g) The Applicant, the Borrower or the
Project Sponsor must estimate,
calculate, record, and provide to DOE
any time DOE requests such information
and at the times provided in the Loan
Guarantee Agreement all costs incurred
in the design, engineering, financing,
construction, startup, commissioning
and shakedown of the Eligible Project in
accordance with generally accepted
accounting principles and practices.
rmajette on DSK2TPTVN1PROD with PROPOSALS
§ 609.9
Lender servicing requirements.
(a) When reviewing and evaluating a
proposed Eligible Project, all Eligible
Lenders (other than the Federal
Financing Bank) shall at all times
exercise the level of care and diligence
that a reasonable and prudent lender
would exercise when reviewing,
evaluating and disbursing a loan made
by it without a Federal guarantee.
(b) Loan servicing duties shall be
performed by an Eligible Lender, DOE,
or another qualified loan servicer
approved by DOE. When performing its
servicing duties, the loan servicer shall
at all times exercise the level of care and
diligence that a reasonable and prudent
lender would exercise when servicing a
loan made without a Federal guarantee,
including:
(1) During the construction period,
monitoring the satisfaction of all of the
conditions precedent to all loan
disbursements, as provided in the Loan
Guarantee Agreement, Loan Agreement
or related documents;
(2) During the operational phase,
monitoring and servicing the
Guaranteed Obligations and collection
of the outstanding principal and
accrued interest as well as undertaking
to ensure that the collateral package
securing the Guaranteed Obligations
remains uncompromised; and
(3) Until the Guaranteed Obligation
has been repaid, providing annual or
more frequent financial and other
reports on the status and condition of
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
the Guaranteed Obligations and the
Eligible Project, and promptly notifying
DOE if it becomes aware of any
problems or irregularities concerning
the Eligible Project or the ability of the
Borrower to make payment on the
Guaranteed Obligations or its other debt
obligations.
§ 609.10
Project costs.
(a) Project Costs include:
(1) Costs of acquisition, lease, or
rental of real property, including
engineering fees, surveys, title
insurance, recording fees, and legal fees
incurred in connection with land
acquisition, lease or rental, site
improvements, site restoration, access
roads, and fencing;
(2) Costs of engineering, architectural,
legal and bond fees, and insurance paid
in connection with construction of the
facility;
(3) Costs of equipment purchases,
including a reasonable reserve of spare
parts to the extent required;
(4) Costs to provide facilities and
services related to safety and
environmental protection;
(5) Costs of financial, legal, and other
professional services, including services
necessary to obtain required licenses
and permits and to prepare
environmental reports and data;
(6) Costs of issuing Eligible Project
debt, such as fees, transaction, and costs
referred to in § 609.10(a)(5), and other
customary charges imposed by Eligible
Lenders;
(7) Costs of necessary and appropriate
insurance and bonds of all types
including letters of credit and any
collateral required therefor;
(8) Costs of design, engineering,
startup, commissioning and shakedown;
(9) Costs of obtaining licenses to
intellectual property necessary to
design, construct, and operate the
Eligible Project;
(10) To the extent
(i) Required by the Loan Guarantee
Agreement and
(ii) Not intended or available for any
cost referred to in § 609.10(b),
costs of funding any reserve fund,
including without limitation, a debt
service reserve, a maintenance reserve,
and a contingency reserve for cost
overruns during construction; provided
that proceeds of a Guaranteed Loan
deposited to any reserve fund shall not
be removed from such fund except to
pay Project Costs, to pay principal of the
Guaranteed Loan, or otherwise to be
used as provided in the Loan Guarantee
Agreement;
(11) Capitalized interest necessary to
meet market requirements and other
carrying costs during construction; and
PO 00000
Frm 00011
Fmt 4702
Sfmt 4702
(12) Other necessary and reasonable
costs.
(b) Project Costs do not include:
(1) Fees and commissions charged to
Borrower, including finder’s fees, for
obtaining Federal or other funds;
(2) Parent corporation or other
affiliated entity’s general and
administrative expenses, and nonEligible Project related parent
corporation or affiliated entity
assessments, including organizational
expenses;
(3) Goodwill, franchise, trade, or
brand name costs;
(4) Dividends and profit sharing to
stockholders, employees, and officers;
(5) Research, development, and
demonstration costs of readying an
innovative technology for employment
in a commercial project;
(6) Costs that are excessive or are not
directly required to carry out the
Eligible Project, as determined by DOE;
(7) Expenses incurred after startup,
commissioning, and shakedown before
the facility, or, in DOE’s discretion, any
portion of the facility, has been placed
in service;
(8) Borrower-paid Credit Subsidy
Costs, the Administrative Cost of Issuing
a Loan Guarantee, and any other fee
collected by DOE; and
(9) Operating costs.
§ 609.11
Fees and charges.
(a) Unless explicitly authorized by
statute, no funds obtained from the
Federal Government, or from a loan or
other instrument guaranteed by the
Federal Government, may be used to
pay for the Credit Subsidy Cost, the
Application Fee, the Facility Fee, the
Guarantee Fee, the maintenance fee and
any other fees charged by or paid to
DOE relating to the Act or any
Guarantee thereunder.
(b) DOE may charge Applicants a nonrefundable Facility Fee, with a portion
being payable on or prior to the date on
which the Applicant executes the
Commitment Letter and the remainder
being payable on or prior to the closing
date for the Loan Guarantee Agreement.
(c) In order to encourage and
supplement private lending activity
DOE may collect from Borrowers for
deposit in the United States Treasury a
non-refundable Risk-Based Charge
which, together with the interest rate on
the Guaranteed Obligation that LPO
determines to be appropriate, will take
into account the prevailing rate of
interest in the private sector for similar
loans and risks. The Risk-Based Charge
shall be paid at such times and in such
manner as may be determined by DOE,
but no less frequently than once each
year, commencing with payment of a
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
pro-rated payment on the date the
Guarantee is issued. The amount of the
Risk-Based Charge will be specified in
the Loan Guarantee Agreement.
(d) DOE may collect a maintenance
fee to cover DOE’s administrative
expenses, other than extraordinary
expenses, incurred in servicing and
monitoring a Loan Guarantee
Agreement. The maintenance fee shall
accrue from the date of execution of the
Loan Guarantee Agreement through the
date of payment in full of the related
Guaranteed Obligations. If DOE
determines to collect a maintenance fee,
it shall be paid by the Borrower each
year (or portion thereof) in advance in
the amount specified in the applicable
Loan Guarantee Agreement.
(e) In the event a Borrower or an
Eligible Project experiences difficulty
relating to technical, financial, or legal
matters or other events (e.g., engineering
failure or financial workouts), the
Borrower shall be liable as follows:
(1) If such difficulty requires DOE to
incur time or expenses beyond those
customarily expended to monitor and
administer performing loans, DOE may
collect an extraordinary expenses fee
from the Borrower that will reimburse
DOE for such time and expenses, as
determined by DOE; and
(2) For all fees and expenses of DOE’s
independent consultants and outside
counsel, to the extent that such fees and
expenses are elected to be paid by DOE
notwithstanding the provisions of
paragraphs (f) and (g) of this section.
(f) Each Applicant, Borrower or
Project Sponsor, as applicable, shall be
responsible for the payment of all fees
and expenses charged by DOE’s
independent consultants and outside
legal counsel in connection with an
Application, Conditional Commitment
or Loan Guarantee Agreement, as
applicable. Upon making a
determination to engage independent
consultants or outside counsel with
respect to an Application, DOE will
proceed to evaluate and process such
Application only following execution by
an Applicant or Project Sponsor, as
appropriate, of an agreement satisfactory
to DOE to pay the fees and expenses
charged by the independent consultants
and outside legal counsel. Appropriate
provisions regarding payment of such
fees and expenses shall also be included
in each Term Sheet and Loan Guaranty
Agreement or, upon a determination by
DOE, in other appropriate agreements.
(g) Notwithstanding payment by
Applicant, Borrower or Project Sponsor,
all services rendered by an independent
consultant or outside legal counsel to
DOE in connection with an Application,
Conditional Commitment or Loan
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
Guarantee Agreement shall be solely for
the benefit of DOE (and such other
creditors as DOE may agree in writing).
DOE may require, in its discretion, the
payment of an advance retainer to such
independent consultants or outside
legal counsel as security for the
collection of the fees and expenses
charged by the independent consultants
and outside legal counsel. In the event
an Applicant, Borrower or Project
Sponsor fails to comply with the
provisions of such payment agreement,
DOE in its discretion, may stop work on
or terminate an Application, a
Conditional Commitment or a Loan
Guarantee Agreement, or may take such
other remedial measures in its
discretion as it deems appropriate.
(h) DOE shall not be financially liable
under any circumstances to any
independent consultant or outside
counsel for services rendered in
connection with an Application,
Conditional Commitment or Loan
Guarantee Agreement except to the
extent DOE has previously entered into
an express written agreement to pay for
such services.
§ 609.12 Full faith and credit and
incontestability.
The full faith and credit of the United
States is pledged to the payment of
principal and interest of Guaranteed
Obligations pursuant to Guarantees
issued in accordance with the Act and
this Part. The issuance by DOE of a
Guarantee shall be conclusive evidence
that it has been properly obtained; that
the underlying loan qualified for such
Guarantee; and that, but for fraud or
material misrepresentation by the
Holder, such Guarantee shall be legal,
valid, binding and enforceable against
DOE in accordance with its terms.
§ 609.13 Default, demand, payment, and
foreclosure on collateral.
(a) If a Borrower defaults in making a
required payment of principal or
interest on a Guaranteed Obligation and
such default has not been cured within
the applicable grace period, the Holder
may make written demand for payment
upon the Secretary in accordance with
the terms of the applicable Guarantee. If
a Borrower defaults in making a
required payment of principal or
interest on a Guaranteed Obligation and
such default has not been cured within
the applicable grace period, the
Secretary shall notify the Attorney
General.
(b) Subject to the terms of the
applicable Guarantee, the Secretary
shall make payment within 60 days after
receipt of written demand for payment
from the Holder, provided that the
PO 00000
Frm 00012
Fmt 4702
Sfmt 4702
67935
demand for payment complies in all
respects with the terms of the applicable
Guarantee. Interest shall accrue to the
Holder at the rate stated in the
promissory note evidencing the
Guaranteed Obligation, without giving
effect to the Borrower’s default in
making a required payment of principal
or interest on the applicable Guarantee
Obligation or any other default by the
Borrower, until the Guaranteed
Obligation has been fully paid by DOE.
Payment by the Secretary on the
applicable Guarantee does not change
Borrower’s obligations under the
promissory note evidencing the
Guaranteed Obligation, Loan Guarantee
Agreement, Loan Agreement or related
documents, including an obligation to
pay default interest.
(c) Following payment by the
Secretary pursuant to the applicable
Guarantee, upon demand by DOE, the
Holder shall transfer and assign to the
Secretary (or his designee or agent) the
promissory note evidencing the
Guaranteed Obligation, all rights and
interests of the Holder in the
Guaranteed Obligation, and all rights
and interests of the Holder in respect of
the Guaranteed Obligation, except to the
extent that the Secretary determines that
such promissory note or any of such
rights and interests shall not be
transferred and assigned to the
Secretary. Such transfer and assignment
shall include, without limitation, all of
the liens, security and collateral rights
of the Holder (or his designee or agent)
in respect of the Guaranteed Obligation.
(d) Following payment by the
Secretary pursuant to a Guarantee or
other default of a Guaranteed
Obligation, the Secretary is authorized
to protect and foreclose on the
collateral, take action to recover costs
incurred by, and all amounts owed to,
the United States as a result of the
defaulted Guarantee Obligation, and
take such other action necessary or
appropriate to protect the interests of
the United States. In respect of any such
authorized actions that involve a
judicial proceeding or other judicial
action, the Secretary shall act through
the Attorney General. The foregoing
provisions of this paragraph shall not
relieve the Secretary from its obligations
pursuant to any applicable Intercreditor
Agreement. Nothing in this paragraph
shall limit the Secretary from exercising
any rights or remedies pursuant to the
terms of the Loan Guarantee Agreement.
(e) The cash proceeds received as a
result of any foreclosure on the
collateral or other action, shall be
distributed in accordance with the Loan
Guarantee Agreement (subject to any
applicable Intercreditor Agreement).
E:\FR\FM\03OCP1.SGM
03OCP1
rmajette on DSK2TPTVN1PROD with PROPOSALS
67936
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
(f) The Loan Guarantee Agreement
shall provide that cash proceeds
received by the Secretary (or his
designee or agent) as a result of any
foreclosure on the collateral or other
action shall be applied in the following
order of priority:
(1) Toward the pro rata payment of
any costs and expenses (including
unpaid fees, fees and expenses of
counsel, contractors and agents, and
liabilities and advances made or
incurred) of the Secretary, the Attorney
General, the Holder, a collateral agent or
other responsible person of any of them
(solely in their individual capacities as
such and not on behalf of or for the
benefit of their principals), incurred in
connection with any authorized action
following payment by the Secretary
pursuant to a Guarantee or other default
of a Guaranteed Obligation, or as
otherwise permitted under the Loan
Agreement or Loan Guarantee
Agreement.
(2) To pay all accrued and unpaid fees
due and payable to the Secretary, the
Attorney General, the Holder, a
collateral agent or other responsible
person of any of them on a pro rata basis
in respect of the Guaranteed Obligation;
(3) To pay all accrued and unpaid
interest due and payable to the
Secretary, the Attorney General, the
Holder, a collateral agent or other
responsible person of any of them on a
pro rata basis in respect of the
Guaranteed Obligation;
(4) To pay all unpaid principal of the
Guaranteed Obligation;
(5) To pay all other obligations of the
Borrower under the Loan Guarantee
Agreement, the Loan Agreement and
related documents that are remaining
after giving effect to the preceding
provisions and are then due and
payable; and
(6) To pay to the Borrower, or its
successors and assigns, or as a court of
competent jurisdiction may direct, any
cash proceeds then remaining following
the application of all payment described
above.
(g) No action taken by the Holder or
its agent or designee in respect of any
collateral will affect the rights of any
person, including the Secretary, having
an interest in the Guaranteed
Obligations or other debt obligations, to
pursue, jointly or severally, legal action
against the Borrower or other liable
persons, for any amounts owing in
respect of the Guaranteed Obligation or
other applicable debt obligations.
(h) In the event that the Secretary
considers it necessary or desirable to
protect or further the interest of the
United States in connection exercise of
rights as a lien holder or recovery of
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
deficiencies due under the Guaranteed
Obligation, the Secretary may take such
action as he determines to be
appropriate under the circumstances.
(i) Nothing in this part precludes, nor
shall any provision of this part be
construed to preclude, the Secretary
from purchasing any collateral or
Holder’s or other person’s interest in the
Eligible Project upon foreclosure of the
collateral.
(j) Nothing in this part precludes, nor
shall any provision of this part be
construed to preclude, forbearance by
any Holder with the consent of the
Secretary for the benefit of the Borrower
and the United States.
(k) The Holder and the Secretary may
agree to a formal or informal plan of
reorganization in respect of the
Borrower, to include a restructuring of
the Guaranteed Obligation and other
applicable debt of the Borrower on such
terms and conditions as the Secretary
determines are in the best interest of the
United States.
§ 609.14
Preservation of collateral.
(a) If the Secretary exercises his right
under the Loan Guarantee Agreement to
require the holder of pledged collateral
to take such actions as the Secretary
(subject to any applicable Intercreditor
Agreement) may reasonably require to
provide for the care, preservation,
protection, and maintenance of such
collateral so as to enable the United
States to achieve maximum recovery
from the collateral, the Secretary shall,
subject to compliance with the
Antideficiency Act, 31 U.S.C. 1341 et
seq., reimburse the holder of such
collateral for reasonable and appropriate
expenses incurred in taking actions
required by the Secretary (unless
otherwise provided in applicable
agreements). Except as provided in
§ 609.13, no party may waive or
relinquish, without the consent of the
Secretary, any such collateral to which
the United States would be subrogated
upon payment under the Loan
Guarantee Agreement.
(b) In the event of a default, the
Secretary may enter into such contracts
as he determines are required or
appropriate, taking into account the
term of any applicable Intercreditor
Agreement, to care for, preserve, protect
or maintain collateral pledged in respect
of Guaranteed Obligations. The cost of
such contracts may be charged to the
Borrower.
§ 609.15
Audits and access to records.
Each Loan Guarantee Agreement and
related documents shall provide that:
(a) The Eligible Lender, or DOE in
conjunction with the Federal Financing
PO 00000
Frm 00013
Fmt 4702
Sfmt 4702
Bank where loans are funded by the
Federal Financing Bank or other Holder
or other party servicing the Guaranteed
Obligations, as applicable, and the
Borrower, shall keep such records
concerning the Eligible Project as are
necessary, including the Application,
Term Sheet, Conditional Commitment,
Loan Guarantee Agreement, Credit
Agreement, mortgage, note,
disbursement requests and supporting
documentation, financial statements,
audit reports of independent accounting
firms, lists of all Eligible Project assets
and non-Eligible Project assets pledged
in respect of the Guaranteed
Obligations, all off-take and other
revenue producing agreements,
documentation for all Eligible Project
indebtedness, income tax returns,
technology agreements, documentation
for all permits and regulatory approvals
and all other documents and records
relating to the Borrower or the Eligible
Project, as determined by the Secretary,
to facilitate an effective audit and
performance evaluation of the Eligible
Project; and
(b) The Secretary and the Comptroller
General, or their duly authorized
representatives, shall have access, for
the purpose of audit and examination,
to any pertinent books, documents,
papers and records of the Borrower,
Eligible Lender or DOE or other Holder
or other party servicing the Guaranteed
Obligation, as applicable. Such
inspection may be made during regular
office hours of the Borrower, Eligible
Lender or DOE or other Holder, or other
party servicing the Eligible Project and
the Guaranteed Obligations, as
applicable, or at any other time
mutually convenient.
§ 609.16
Deviations.
(a) To the extent that the requirements
under this part are not specified by the
Act or other applicable statutes, DOE
may authorize deviations from the
requirements of this part upon:
(1) Either (A) receipt from the
Applicant, Borrower or Project Sponsor,
as applicable, of—
(i) A written request that the Secretary
deviate from one or more requirements,
and
(ii) A supporting statement briefly
describing one or more justifications for
such deviation, or
(iii)(B) a determination by the
Secretary in his discretion to undertake
a deviation;
(2) A finding by the Secretary that
such deviation supports program
objectives and the special circumstances
stated in the request make such
deviation clearly in the best interest of
the Government; and
E:\FR\FM\03OCP1.SGM
03OCP1
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 / Proposed Rules
(3) If the waiver would constitute a
substantial change in the financial terms
of the Loan Guarantee Agreement and
related documents, consultation by DOE
with OMB and the Secretary of the
Treasury.
(b) If a deviation under this section
results in an increase in the applicable
Credit Subsidy Cost, such increase shall
be funded either by additional fees paid
by or on behalf of the Borrower or, if an
appropriation is available by means of
an appropriations act. The Secretary has
discretion to determine how the cost of
a deviation is funded.
[FR Doc. 2016–23268 Filed 9–30–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2016–9117; Directorate
Identifier 2016–NM–095–AD]
RIN 2120–AA64
Airworthiness Directives; Airbus
Airplanes
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice of proposed rulemaking
(NPRM).
AGENCY:
We propose to adopt a new
airworthiness directive (AD) for certain
A330–200 Freighter, –200 and –300
series airplanes; and Airbus Model
A340–200, –300, –500, and –600 series
airplanes. This proposed AD was
prompted by reports of certain
hydraulic reservoirs (HRs) becoming
depressurized due to air leakage from
the HR pressure relief valve (PRV). This
proposed AD would require repetitive
inspections of the hydraulic fluid levels
and nitrogen gas pressure in the HR for
each hydraulic circuit, and if necessary,
adjustment of the fluid level(s) and
nitrogen pressure in affected HRs. We
are proposing this AD to detect and
correct air leakage from the HR PRV,
which could lead to the loss of one or
more hydraulic systems, with the
possible result of loss of control of the
airplane.
DATES: We must receive comments on
this proposed AD by November 17,
2016.
ADDRESSES: You may send comments,
using the procedures found in 14 CFR
11.43 and 11.45, by any of the following
methods:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov. Follow the
instructions for submitting comments.
rmajette on DSK2TPTVN1PROD with PROPOSALS
SUMMARY:
VerDate Sep<11>2014
14:35 Sep 30, 2016
Jkt 241001
• Fax: 202–493–2251.
• Mail: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
• Hand Delivery: Deliver to Mail
address above between 9 a.m. and 5
p.m., Monday through Friday, except
Federal holidays.
For service information identified in
this NPRM, contact Airbus SAS,
Airworthiness Office—EAL, 1 Rond
Point Maurice Bellonte, 31707 Blagnac
Cedex, France; telephone: +33 5 61 93
36 96; fax: +33 5 61 93 45 80; email:
airworthiness.A330-A340@airbus.com;
Internet: https://www.airbus.com.
Examining the AD Docket
You may examine the AD docket on
the Internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2016–
9117; or in person at the Docket
Management Facility between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket
contains this proposed AD, the
regulatory evaluation, any comments
received, and other information. The
street address for the Docket Operations
office (telephone: 800–647–5527) is in
the ADDRESSES section. Comments will
be available in the AD docket shortly
after receipt.
FOR FURTHER INFORMATION CONTACT:
Vladimir Ulyanov, Aerospace Engineer,
International Branch, ANM–116,
Transport Airplane Directorate, FAA,
1601 Lind Avenue SW., Renton, WA
98057–3356; telephone: 425–227–1138;
fax: 425–227–1149.
SUPPLEMENTARY INFORMATION:
Comments Invited
We invite you to send any written
relevant data, views, or arguments about
this proposed AD. Send your comments
to an address listed under the
ADDRESSES section. Include ‘‘Docket No.
FAA–2016–9117; Directorate Identifier
2016–NM–095–AD’’ at the beginning of
your comments. We specifically invite
comments on the overall regulatory,
economic, environmental, and energy
aspects of this proposed AD. We will
consider all comments received by the
closing date and may amend this
proposed AD based on those comments.
We will post all comments we
receive, without change, to https://
www.regulations.gov, including any
personal information you provide. We
will also post a report summarizing each
substantive verbal contact we receive
about this proposed AD.
PO 00000
Frm 00014
Fmt 4702
Sfmt 4702
67937
Discussion
The European Aviation Safety Agency
(EASA), which is the Technical Agent
for the Member States of the European
Union, has issued EASA AD 2016–0107,
dated June 7, 2016, to correct an unsafe
condition for certain Airbus Model
A330–200 Freighter, –200 and –300
series airplanes; and Airbus Model
A340–200, –300, –500, and –600 series
airplanes. The MCAI states:
Some events of depressurisation of
hydraulic reservoirs have been reported, due
to air leakage from the HR PRV [hydraulic
reservoir pressure relief valve]. The results of
the investigations revealed that the air
leakage was due to the extrusion of the Oring seal from the HR PRV. This may have
happened during HR maintenance, testing or
during flight, if HR over-filling was
performed, as a result of which hydraulic
fluid could pass through the PRV, causing
[the] PRV seal to migrate from its nominal
position, leading to loss of HR pressurisation.
This condition, if not detected and
corrected, could lead to the loss of one or
more hydraulic systems, possibly resulting in
loss of control of the aeroplane.
Prompted by these findings, Airbus issued
Alert Operators Transmission (AOT)
A29L005–16 [dated January 28, 2016] to
provide inspection instructions.
For the reasons described above, this
[EASA] AD requires repetitive inspections of
the HR fluid level of each hydraulic circuit
and, depending on findings, accomplishment
of applicable corrective action(s). This
[EASA] AD also requires actions when
maintenance action is accomplished on
hydraulic reservoirs.
This [EASA] AD is considered as interim
action and further [EASA] AD action may
follow.
Required actions include repetitive
inspection of the hydraulic fluid levels
and nitrogen gas pressure in the HR for
each hydraulic circuit, and if necessary,
adjustment of the fluid level(s) and
nitrogen pressure in affected HRs. You
may examine the MCAI in the AD
docket on the Internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2016–
9117.
Related Service Information Under 1
CFR Part 51
We reviewed Airbus Alert Operators
Transmission (AOT) A29L005–16,
Revision 01, dated June 28, 2016. This
service information describes
procedures for inspecting hydraulic
fluid levels and nitrogen gas pressure in
certain HRs, and adjustment of the fluid
level(s) and nitrogen pressure in
affected HRs. This service information is
reasonably available because the
interested parties have access to it
through their normal course of business
or by the means identified in the
ADDRESSES section.
E:\FR\FM\03OCP1.SGM
03OCP1
Agencies
[Federal Register Volume 81, Number 191 (Monday, October 3, 2016)]
[Proposed Rules]
[Pages 67924-67937]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-23268]
========================================================================
Proposed Rules
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains notices to the public of
the proposed issuance of rules and regulations. The purpose of these
notices is to give interested persons an opportunity to participate in
the rule making prior to the adoption of the final rules.
========================================================================
Federal Register / Vol. 81, No. 191 / Monday, October 3, 2016 /
Proposed Rules
[[Page 67924]]
DEPARTMENT OF ENERGY
10 CFR Part 609
RIN 1901-AB38
Loan Guarantees for Projects That Employ Innovative Technologies
AGENCY: Loan Programs Office, Department of Energy.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) proposes to amend the
regulations implementing the loan guarantee provisions in Title XVII of
the Energy Policy Act of 2005 (Title XVII or the Act). The proposal is
intended to increase clarity and transparency, reduce paperwork, and
provide a more workable interpretation of certain statutory provisions
in light of DOE's experience with the Title XVII program.
DATES: Comments on this proposed rule must be postmarked no later than
November 2, 2016.
ADDRESSES: You may submit comments, identified by RIN 1901-AB38, using
any of the following methods:
Federal eRulemaking Portal: https://www.regulations.gov.
Follow the instructions for submitting comments.
Email: LPO.ProposedRuleComments@hq.doe.gov. Include RIN
1901-AB38 in the subject line of the email. Please include the full
body of your comments in the text of the message or as an attachment.
Postal Mail: Mark A. McCall, Executive Director, Loan
Programs Office, 1000 Independence Avenue SW., Washington, DC 20585-
0121. Please submit one signed original paper copy. Due to potential
delays in DOE's receipt and processing of mail sent through the U.S.
Postal Service, we encourage respondents to submit comments
electronically to ensure timely receipt.
Hand Delivery/Courier: Mark A. McCall, Executive Director,
Loan Programs Office, 1000 Independence Avenue SW., Washington, DC
20585- 0121. Please submit one signed original paper copy.
This notice of proposed rulemaking and any comments that DOE
receives will be made available on the regulations.gov Web site at:
https://www.regulations.gov. You also may obtain copies of comments by
contacting Mr. Westergard using the information below.
FOR FURTHER INFORMATION CONTACT: Mark S. Westergard, Loan Programs
Office, 1000 Independence Avenue SW., Washington, DC 20585-0121, (202)
287-5621, email: LPO.ProposedRuleComments@hq.doe.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction and Background
II. Discussion of Proposed Rule
III. Public Comment Procedures
IV. Regulatory Review
V. Approval of the Office of the Secretary
I. Introduction and Background
Section 1703 (section 1703) authorizes the Secretary of Energy
(Secretary) to make loan guarantees for projects that avoid, reduce, or
sequester air pollutants or anthropogenic emissions of greenhouse
gases. Such projects must also employ new or significantly improved
technologies as compared to commercial technologies in service in the
United States at the time the guarantee is issued. The two principal
goals of section 1703 are to encourage commercial use in the United
States of new or significantly improved energy related technologies and
to achieve substantial environmental benefits. Section 1703 also
identifies ten categories of technologies and projects that are
potentially eligible for loan guarantees. Commercial use of these
technologies is expected to help sustain and promote economic growth,
produce a more stable and secure energy supply and economy for the
United States, and improve the environment.
As a result of experience gained implementing the loan guarantee
program authorized by section 1703, and information received from
program participants, including applicants, borrowers, sponsors, and
lenders, as well as various energy industry groups, DOE proposes to
amend the existing regulations as described in Section II of this
proposed rule. The proposal is intended to provide increased clarity
and transparency, reduce paperwork, and provide a more workable
interpretation of certain statutory provisions in light of DOE's
experience with operation of the Title XVII program.
II. Discussion of Proposed Rule
Section 1702(a) of Title XVII directs the Secretary to make
guarantees on the terms and conditions determined by the Secretary,
after consultation with the Secretary of the Treasury, and in
accordance with the prescriptions set forth in section 1702. This
provision authorizes the Secretary to establish the loan guarantee
program and to determine the terms and conditions of individual loan
guarantees, after consultation with the Secretary of Treasury, subject
to the limitations in paragraphs (b) through (k) of section 1702.
Pursuant to direction provided in Public Law 110-5 (Feb. 15, 2007) DOE
promulgated regulations to implement Title XVII which are currently
found at 10 CFR part 609 (the ``Title XVII Rule''). See 74 FR 63544
(Dec. 4, 2009). (The proposed rule was issued on Aug 7, 2009 (74 FR
39569).) The Title XVII Rule addresses matters such as (1) the manner
in which proposed projects are vetted, (2) precisely which project
costs are eligible for financing, (3) the adequacy and character of
equity capital required from sponsors, and (4) what types of co-
financing and subordination arrangements would be acceptable to DOE.
Similarly, in implementing the Secretary's general authority under
section 1702(a) and the Title XVII Rule, the Loan Programs Office has
adopted extensive credit, loan monitoring and risk monitoring policies
and procedures, detailed conditional commitment letters and term
sheets, and loan guarantee agreements to carry out the purposes of
Title XVII.
In this rulemaking, DOE proposes amendments to the regulations at
10 CFR part 609 based on its experience in implementing the loan
guarantee program. The proposed changes address topics such as the
exchange of information with potential applicants and the solicitation
process, the pre-application process, the restriction of a project to a
single location, and the imposition of a risk-based fee. These issues
are described in the paragraphs that follow.
For the past several years, the DOE Loan Programs Office has
increased
[[Page 67925]]
communication with interested members of the public regarding the
Office, its programs, and solicitations. DOE has prepared and
distributed a number of presentations explaining the application
process and the types of projects that may be eligible under its
solicitations. The Executive Director of the Loan Programs Office has
participated in numerous public discussions regarding the program. DOE
has also increased communication by regular, broadly distributed email
communications to thousands of recipients that have expressed an
interest in keeping up with developments in the Loan Programs Office.
Contacts by potential applicants regarding the program have
significantly increased as a result of these efforts. Nevertheless, the
proposed rule includes changes intended to clarify the circumstances
under which potential applicants may communicate with DOE prior to
submitting an application. DOE expects that the proposed changes would
increase transparency and result in more applications by qualified
applicants with respect to potential eligible projects.
The provisions of the existing rule relating to Pre-Applications
have caused considerable confusion among potential applicants and
applicants. In this proposed rule, DOE proposes to eliminate the
existing pre-application process and codify procedures that divide the
application into two parts. The Part I submission would provide DOE
with a description of the project or facility, technical information,
background information on management, financing strategy, and progress
to date of critical path schedules. These schedules would include items
such as obtaining licenses or regulatory permits and approvals, site
preparation and long lead-time procurements, and would be used as a
basis for determining the eligibility of the project and the project's
readiness to proceed. Applicants whose Part I application is sufficient
to indicate, on a preliminary basis, the eligibility of the project and
that it is ready to proceed would be invited to submit Part II of the
application. The Part II submission would involve substantially more,
and substantially more detailed, information than is required for the
Part I submission. The proposed process of requiring a two-part
application is designed, in part, to enable DOE to screen interested
projects and provide an early indication of projects' eligibility for a
loan guarantee under this program. The two-part application process
would additionally allow DOE to charge the required fee in two parts,
making it more economical for smaller businesses to apply. By allowing
DOE to engage in an initial review of project proposals, the two-part
application process would reduce the paperwork burden for applicants
whose projects are not ready to move forward into Part II.
Although there is no statutory requirement that all parts of a
project be located at a single location, DOE's solicitations have
provided that generally, a Project is restricted to one location within
the United States but that DOE, in its discretion, could consider an
application for a project using a particular technology that is
proposed to be situated in more than one location in the United States
if multiple locations are integral components of a unitary plan,
necessary to the viability of the Project, and at least one of the
locations is identified in the application. Applicants and potential
applicants found this requirement of DOE's solicitations difficult to
understand. Additionally, this requirement inhibits an applicant's
ability to propose certain types of distributed energy facilities. DOE
reconsidered the need for such a requirement and proposes a revised
definition of Eligible Project that would explicitly state that a
project may be located at two or more locations in the United States if
the project is comprised of installations or facilities employing a
single New or Significantly Improved Technology that is deployed
pursuant to an integrated and comprehensive business plan.
DOE also proposes to include in the rule provisions for the use of
Risk-Based Charges. DOE, working in conjunction with the Federal
Financing Bank (``FFB''), has developed a program under which borrowers
for certain types of transactions pay a ``credit-based interest rate
spread'' in addition to interest otherwise payable on loans that are
issued by FFB. Use of interest rate spreads or other charges based upon
the creditworthiness or specific risks arising from individual
transactions are commonplace in private-sector commercial loan
transactions, including private-sector project finance loan
transactions. Such spreads or other charges are also used by other
federal credit programs comparable to the Title XVII loan guarantee
program, such as those administered by the Overseas Private Investment
Corporation and the Export-Import Bank of the United States. Use of
Risk-Based Charges is permitted pursuant to the grant of authority to
the Secretary in Section 1702(a) to determine the terms and conditions
of the Title XVII loan guarantee program.
A number of other changes have been included to increase clarity
and transparency. Among those changes are: Definitions have been
clarified, shortened where possible, and added; specific references to
the Cargo Preference Act and the Davis Bacon Act have been added; an
introductory section on how the rule is to be interpreted has been
added; and various provisions of the existing rule have been re-
organized to more-appropriate places in the rule. In a number of
places, references to the statutory requirement that DOE consult with
the Secretary of the Treasury previously included in Title XVII Rule
have been removed. Those references were removed solely because they
were unnecessary for consideration by applicants and potential
applicants. DOE's statutory obligation to consult with the Secretary of
the Treasury under Section 1702(a) of Title XVII remains unchanged, and
no change is intended in the existing consultation arrangements between
the Secretary of Energy and the Secretary of the Treasury.
III. Public Comment Procedures
Interested persons are invited to participate in this proceeding by
submitting data, views, or arguments. Written comments should be
submitted to the address, and in the form, indicated in the ADDRESSES
section of this notice of proposed rulemaking. To help DOE review the
comments, interested persons are asked to refer to specific proposed
rule provisions, if possible.
If you submit information that you believe to be exempt by law from
public disclosure, you should submit one complete copy, as well as one
copy from which the information claimed to be exempt by law from public
disclosure has been deleted. DOE is responsible for the final
determination with regard to disclosure or nondisclosure of the
information and for treating it accordingly under the DOE Freedom of
Information Act regulations at 10 CFR 1004.11.
IV. Regulatory Review
A. Executive Order 12866
This proposed rule has been determined to be a significant
regulatory action under Executive Order 12866, ``Regulatory Planning
and Review,'' 58 FR 51735 (October 4, 1993). Accordingly, this action
was subject to review under that Executive Order by the Office of
Information and Regulatory
[[Page 67926]]
Affairs (OIRA) of the Office of Management and Budget (OMB).
B. National Environmental Policy Act
DOE has determined that this proposed rule is covered under the
Categorical Exclusion found in the DOE's National Environmental Policy
Act regulations at paragraph A.5 of appendix A to subpart D, 10 CFR
part 1021, which applies to rulemaking that amends an existing rule or
regulation which does not change the environmental effect of the rule
or regulation being amended.
C. Regulatory Flexibility Act
The Regulatory Flexibility Act (5 U.S.C. 601 et seq.) requires
preparation of an initial regulatory flexibility analysis for any rule
that by law must be proposed for public comment, unless the agency
certifies that the rule, if promulgated, will not have a significant
economic impact on a substantial number of small entities. As required
by Executive Order 13272, ``Proper Consideration of Small Entities in
Agency Rulemaking,'' 67 FR 53461 (August 16, 2002), DOE published
procedures and policies on February 19, 2003, to ensure that the
potential impacts of its rules on small entities are properly
considered during the rulemaking process (68 FR 7990). DOE has made its
procedures and policies available on the Office of General Counsel's
Web site: https://www.energy.gov/gc/downloads/executive-order-13272-consideration-small-entities-agency-rulemaking.
DOE is not obliged to prepare a regulatory flexibility analysis for
this rulemaking because there is not a requirement to publish a general
notice of proposed rulemaking for rules related to loans under the
Administrative Procedure Act (5 U.S.C. 553(a)(2)).
D. Paperwork Reduction Act
Information collection requirements for the DOE regulations at 10
CFR part 609 were previously approved by OMB pursuant to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.) and the procedure
implementing that Act (5 CFR 1320.1 et seq.) under OMB Control Number
1910-5134. This proposed rule contains revised information collection
requirements subject to approval by OMB. DOE has submitted the proposed
revised collection of information to OMB for approval. Public reporting
burden for the revised requirements in this proposed rule is estimated
to average 130 hours per response, including the time for reviewing
instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the
collection of information. All responses are expected to be collected
electronically.
DOE invites public comment on: (1) Whether the proposed information
collection requirements are necessary for the performance of DOE's
functions, including whether the information will have practical
utility; (2) the accuracy of DOE's estimates of the burden of the
proposed information collection requirements; (3) ways to enhance the
quality, utility, and clarity of the information to be collected; and
(4) ways to minimize the burden of the information collection
requirements on respondents. Comments should be addressed to the
Department of Energy Desk Officer, Office of Information and Regulatory
Affairs, OMB, 725 17th Street NW., Washington, DC 20503. Persons
submitting comments to OMB also are requested to send a copy to the
contact person at the address given in the ADDRESSES section of this
notice of proposed rulemaking. Interested persons may obtain a copy of
the DOE's Paperwork Reduction Act Submission to OMB from the contact
person named in this notice of proposed rulemaking. Notwithstanding any
other provision of law, a person is not required to respond to a
collection of information unless it displays a currently valid OMB
control number.
E. Unfunded Mandates Reform Act of 1995
The Unfunded Mandates Reform Act of 1995 (Act) (Pub. L. 104-4)
generally requires Federal agencies to examine closely the impacts of
regulatory actions on State, local, and tribal governments.
The term ``Federal mandate'' is defined in the Act to mean a
Federal intergovernmental mandate or a Federal private sector mandate.
Although the proposed rule would impose certain requirements on non-
Federal governmental and private sector applicants for loan guarantees,
the Act's definitions of the terms ``Federal intergovernmental
mandate'' and ``Federal private sector mandate'' exclude among other
things, any provision in legislation, statute, or regulation that is a
condition of Federal assistance or a duty arising from participation in
a voluntary program. The proposed rule would establish requirements
that persons voluntarily seeking loan guarantees for projects that
would use certain new and improved energy technologies must satisfy as
a condition of a Federal loan guarantee. Thus, the proposed rule falls
under the exceptions in the definitions of ``Federal intergovernmental
mandate'' and ``Federal private sector mandate'' for requirements that
are a condition of Federal assistance or a duty arising from
participation in a voluntary program. The Act does not apply to this
rulemaking.
F. Treasury and General Government Appropriations Act, 1999
Section 654 of the Treasury and General Government Appropriations
Act, 1999 (Pub. L. 105-277) requires Federal agencies to issue a Family
Policymaking Assessment for any proposed rule that may affect family
well-being. The proposed rule would not have any impact on the autonomy
or integrity of the family as an institution. Accordingly, DOE has
concluded that it is not necessary to prepare a Family Policymaking
Assessment.
G. Executive Order 13132
Executive Order 13132, ``Federalism,'' 64 FR 43255 (August 4, 1999)
imposes certain requirements on agencies formulating and implementing
policies or regulations that preempt State law or that have federalism
implications. Agencies are required to examine the constitutional and
statutory authority supporting any action that would limit the
policymaking discretion of the States and carefully assess the
necessity for such actions. DOE has examined this proposed rule and has
determined that it would not preempt State law and would not have a
substantial direct effect on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government. No further
action is required by Executive Order 13132.
H. Executive Order 12988
With respect to the review of existing regulations and the
promulgation of new regulations, section 3(a) of Executive Order 12988,
``Civil Justice Reform,'' 61 FR 4729 (February 7, 1996), imposes on
Executive agencies the general duty to adhere to the following
requirements: (1) Eliminate drafting errors and ambiguity; (2) write
regulations to minimize litigation; and (3) provide a clear legal
standard for affected conduct rather than a general standard and
promote simplification and burden reduction. With regard to the review
required by section 3(a), section 3(b) of Executive Order 12988
specifically requires that Executive agencies make every reasonable
effort to ensure that the regulation: (1) Clearly specifies the
preemptive effect, if any; (2) clearly specifies any effect on
[[Page 67927]]
existing Federal law or regulation; (3) provides a clear legal standard
for affected conduct while promoting simplification and burden
reduction; (4) specifies the retroactive effect, if any; (5) adequately
defines key terms; and (6) addresses other important issues affecting
clarity and general draftsmanship under any guidelines issued by the
Attorney General. Section 3(c) of Executive Order 12988 requires
Executive agencies to review regulations in light of applicable
standards in section 3(a) and section 3(b) to determine whether they
are met or it is unreasonable to meet one or more of them. DOE has
completed the required review and determined that, to the extent
permitted by law, the proposed rule meets the relevant standards of
Executive Order 12988.
I. Treasury and General Government Appropriations Act, 2001
The Treasury and General Government Appropriations Act, 2001 (44
U.S.C. 3516 note) provides for agencies to review most disseminations
of information to the public under guidelines established by each
agency pursuant to general guidelines issued by OMB.
OMB's guidelines were published at 67 FR 8452 (February 22, 2002),
and DOE's guidelines were published at 67 FR 62446 (October 7, 2002).
DOE has reviewed this proposed rule under the OMB and DOE guidelines
and has concluded that it is consistent with applicable policies in
those guidelines.
J. Executive Order 13211
Executive Order 13211, ``Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use,'' 66 FR 28355
(May 22, 2001) requires Federal agencies to prepare and submit to the
OMB, a Statement of Energy Effects for any proposed significant energy
action. A ``significant energy action'' is defined as any action by an
agency that promulgated or is expected to lead to promulgation of a
final rule, and that: (1) Is a significant regulatory action under
Executive Order 12866, or any successor order; and (2) is likely to
have a significant adverse effect on the supply, distribution, or use
of energy, or (3) is designated by the Administrator of OIRA as a
significant energy action. For any proposed significant energy action,
the agency must give a detailed statement of any adverse effects on
energy supply, distribution, or use should the proposal be implemented,
and of reasonable alternatives to the action and their expected
benefits on energy supply, distribution, and use. This regulatory
action would not have a significant adverse effect on the supply,
distribution, or use of energy and has not been designated by OIRA as a
significant energy action, and is therefore not a significant energy
action. Accordingly, DOE has not prepared a Statement of Energy
Effects.
K. Executive Order 12630
The Department has determined, under Executive Order 12630,
``Governmental Actions and Interference with Constitutionally Protected
Property Rights,'' 53 FR 8859 (March 18, 1988), that this rulemaking
would not result in any takings which might require compensation under
the Fifth Amendment to the United States Constitution.
V. Approval of the Office of the Secretary
The Secretary of Energy has approved publication of this notice of
proposed rulemaking.
List of Subjects in 10 CFR Part 609
Administrative practice and procedure, Energy, Loan programs, and
Reporting and recordkeeping requirements.
Issued in Washington, DC, on September 21, 2016.
Mark A. McCall,
Executive Director, Loan Programs Office.
For the reasons stated in the preamble, DOE proposes to revise part
609 of chapter II of title 10 of the Code of Federal Regulations to
read as follows:
PART 609--LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE
TECHNOLOGIES
Sec.
609.1 Purpose and scope.
609.2 Definitions and interpretation.
609.3 Solicitations.
609.4 Submission of applications.
609.5 Programmatic, technical and financial evaluation of
applications.
609.6 Term sheets and conditional commitments.
609.7 Closing on the loan guarantee agreement.
609.8 Loan guarantee agreement.
609.9 Lender servicing requirements.
609.10 Project costs.
609.11 Fees and charges.
609.12 Full faith and credit and incontestability.
609.13 Default, demand, payment, and foreclosure on collateral.
609.14 Preservation of collateral.
609.15 Audits and access to records.
609.16 Deviations.
Authority: 42 U.S.C. 7254, 16511-16514.
Sec. 609.1 Purpose and scope.
(a) This part sets forth the policies and procedures that DOE uses
for receiving, evaluating, and approving applications for loan
guarantees to support Eligible Projects under section 1703 of the
Energy Policy Act of 2005 (Act).
(b) This part applies to all Applications, Conditional Commitments,
and Loan Guarantee Agreements.
(c) Part 1024 of chapter X of title 10 of the Code of Federal
Regulations (PROCEDURES FOR FINANCIAL ASSISTANCE APPEALS) shall not
apply to actions taken under this part.
Sec. 609.2 Definitions and interpretation.
(a) Definitions. When used in this part the following words have
the following meanings.
Act means Title XVII of the Energy Policy Act of 2005 (42 U.S.C.
16511-16514), as amended.
Administrative cost of issuing a loan guarantee means the total of
all administrative expenses that DOE incurs during:
(1) The evaluation of an Application for a loan guarantee;
(2) The negotiation and offer of a Term Sheet;
(3) The negotiation of a Loan Guarantee Agreement and related
documents, including the issuance of a Guarantee; and
(4) The servicing and monitoring of a Loan Guarantee Agreement,
including during the construction, startup, commissioning, shakedown,
and operational phases of an Eligible Project.
Applicant means a Person, including a prospective Borrower or
Project Sponsor, that submits an Application to DOE.
Application means a written submission of materials responsive to a
Solicitation that satisfies Sec. 609.4 of this part.
Application fee means the fee or fees required to be paid by an
Applicant in connection with submission of an Application and specified
in a Solicitation. The Application Fee does not include the Credit
Subsidy Cost.
Attorney General means the Attorney General of the United States.
Borrower means any Person that enters into a Loan Guarantee
Agreement with DOE and issues Guaranteed Obligations.
Cargo preference act means the Cargo Preference Act of 1954, 46
U.S.C 55305, as amended.
Commercial technology means a technology in general use in the
commercial marketplace in the United States at the time the Term Sheet
is
[[Page 67928]]
offered by DOE. A technology is in general use if it is being used in
three or more facilities that are in commercial operation in the United
States for the same general purpose as the proposed project, and has
been used in each such facility for a period of at least five years.
The five-year period for each facility shall start on the in-service
date of the facility employing that particular technology or, in the
case of a retrofit of a facility to employ a particular technology, the
date the facility resumes commercial operation following completion and
testing of the retrofit. For purposes of this section, facilities that
are in commercial operation include projects that have been the
recipients of a loan guarantee from DOE under this part.
Conditional commitment means a Term Sheet offered by DOE and
accepted by the offeree of the Term Sheet, all in accordance with Sec.
609.6(c) of this part; provided, that the Secretary may terminate a
Conditional Commitment for any reason at any time prior to the
execution of the Loan Guarantee Agreement; and provided, further, that
the Secretary may not delegate this authority to terminate a
Conditional Commitment.
Contracting officer means the Secretary of Energy or a DOE official
authorized by the Secretary to enter into, administer or terminate DOE
Loan Guarantee Agreements and related contracts on behalf of DOE.
Credit subsidy cost has the same meaning as ``cost of a loan
guarantee'' in section 502(5)(C) of the Federal Credit Reform Act of
1990, which is the net present value, at the time the Loan Guarantee
Agreement is executed, of the following estimated cash flows,
discounted to the point of disbursement:
(1) Payments by the Government to cover defaults and delinquencies,
interest subsidies, or other payments; less
(2) Payments to the Government including origination and other
fees, penalties, and recoveries; including the effects of changes in
loan or debt terms resulting from the exercise by the Borrower,
Eligible Lender or other Holder of an option included in the Loan
Guarantee Agreement.
Davis-Bacon act means the statute referenced in section 1702(k) of
the Act.
DOE means the United States Department of Energy.
Eligible lender means either:
(1) Any Person formed for the purpose of, or engaged in the
business of, lending money that, as determined by DOE in each case, is:
(i) Not debarred or suspended from participation in a Federal
government contract or participation in a non-procurement activity
(under a set of uniform regulations implemented for numerous agencies,
such as DOE, at 2 CFR part 180);
(ii) Not delinquent on any Federal debt or loan;
(iii) Legally authorized and empowered to enter into loan guarantee
transactions authorized by the Act and these regulations;
(iv) Able to demonstrate experience in originating and servicing
loans for commercial projects similar in size and scope to the Eligible
Project, or able to procure such experience through contracts
acceptable to DOE; and
(v) Able to demonstrate experience as the lead lender or
underwriter by presenting evidence of its participation in large
commercial projects or energy-related projects or other relevant
experience, or able to procure such experience through contracts
acceptable to DOE; or
(2) The Federal Financing Bank.
Eligible project means a project that:
(1) Is located in the United States at one location, except that
the project may be located at two or more locations in the United
States if the project is comprised of installations or facilities
employing a single New or Significantly Improved Technology that is
deployed pursuant to an integrated and comprehensive business plan. An
Eligible Project in more than one location is a single Eligible
Project;
(2) Deploys a New or Significantly Improved Technology; and
(3) Satisfies all applicable requirements of section 1703 of the
Act, the applicable Solicitation, and this part.
Equity means cash contributed to the permanent capital stock (or
equivalent) of the Borrower or the Eligible Project by the shareholders
or other owners of the Borrower or the Eligible Project. Equity does
not include proceeds from the non-guaranteed portion of a Guaranteed
Obligation, proceeds from any other non-guaranteed loan or obligation,
or the value of any government assistance or support.
Facility fee means the fee, to be paid in the amount and in the
manner provided in the Term Sheet, to cover the Administrative Cost of
Issuing a Loan Guarantee for the period from the Borrower's acceptance
of the Term Sheet through issuance of the Guarantee.
Federal financing bank means an instrumentality of the United
States government created by the Federal Financing Bank Act of 1973,
under the general supervision of the Secretary of the Treasury.
Guarantee means the undertaking of the United States of America,
acting through the Secretary pursuant to Title XVII of the Energy
Policy Act of 2005, to pay in accordance with the terms thereof,
principal and interest of a Guaranteed Obligation.
Guaranteed obligation means any loan or other debt obligation of
the Borrower for an Eligible Project for which DOE guarantees all or
any part of the payment of principal and interest under a Loan
Guarantee Agreement entered into pursuant to the Act.
Holder means any Person that holds a promissory made by the
Borrower evidencing the Guaranteed Obligation (or his designee or
agent).
Intercreditor agreement means any agreement or instrument (or
amendment or modification thereof) among DOE and one or more other
Persons providing financing or other credit arrangements to the
Borrower or an Eligible Project) or that otherwise provides for rights
of DOE in respect of a Borrower or in respect of an Eligible Project,
in each case in form and substance satisfactory to DOE.
Loan agreement means a written agreement between a Borrower and an
Eligible Lender containing the terms and conditions under which the
Eligible Lender will make a loan or loans to the Borrower for an
Eligible Project.
Loan guarantee agreement means a written agreement that, when
entered into by DOE and a Borrower, and, if applicable, an Eligible
Lender, establishes the obligation of DOE to guarantee the payment of
all or a portion of the principal of, and interest on, specified
Guaranteed Obligations, subject to the terms and conditions specified
in the Loan Guarantee Agreement.
New or significantly improved technology means a technology, or a
defined suite of technologies, concerned with the production,
consumption, or transportation of energy and that is not a Commercial
Technology, and that has either:
(1) Only recently been developed, discovered, or learned; or
(2) Involves or constitutes one or more meaningful and important
improvements in productivity or value, in comparison to Commercial
Technologies in use in the United States at the time the Term Sheet is
issued.
OMB means the Office of Management and Budget in the Executive
Office of the President.
Person means any natural person or any legally constituted entity,
including a state or local government, tribe, corporation, company,
voluntary association, partnership, limited
[[Page 67929]]
liability company, joint venture, and trust.
Project costs mean those costs, including escalation and
contingencies, that are to be expended or accrued by a Borrower and are
necessary, reasonable, customary and directly related to the design,
engineering, financing, construction, startup, commissioning and
shakedown of an Eligible Project, as specified in Sec. 609.10(a) of
this part. Project Costs do not include costs for the items set forth
in Sec. 609.10(b) of this part.
Project sponsor means any Person that assumes substantial
responsibility for the development, financing, and structuring of an
Eligible Project and, if not the Applicant, owns or controls, by itself
and/or through individuals in common or affiliated business entities, a
five percent or greater interest in the proposed Eligible Project, the
Borrower or the Applicant.
Risk-based charge means a charge that, together with the principal
and interest on the guaranteed loan, or at such other times as DOE may
determine, is payable on specified dates during the term of a
Guaranteed Obligation.
Secretary means the Secretary of Energy or a duly authorized
designee or successor in interest.
Solicitation means an announcement that DOE is accepting
Applications that is widely disseminated to the public on the DOE Web
site or otherwise, and which satisfies the requirements of Sec.
609.3(b) of this part.
Term sheet means a written offer for the issuance of a loan
guarantee, executed by the Secretary (or a DOE official authorized by
the Secretary to execute such offer), delivered to the offeree, that
sets forth the detailed terms and conditions under which DOE and the
Applicant will execute a Loan Guarantee Agreement.
United States means the several States, the District of Columbia,
the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American
Samoa and any territory or possession of the United States of America.
(b) Interpretations. This part shall be interpreted using the
following guidelines.
(1) The word ``discretion'' when used with reference to DOE,
including the Secretary, means ``sole discretion.''
(2) Defined terms in the singular shall include the plural and vice
versa, and the masculine, feminine or neuter gender shall include all
genders.
(3) The word ``or'' is not exclusive.
(4) References to laws by name or popular name are references to
the version of such law appearing in the United States Code and include
any amendment, supplement or modification of such law, and all
regulations, rulings, and other laws promulgated thereunder.
(5) References to information or documents required or allowed to
be submitted to DOE mean information or documents that are marked as
provided in 10 CFR 600.15(b). A document or information that is not
marked as provided in 10 CFR 600.15(b) will not be considered as having
been submitted to or received by DOE.
(6) A reference to a Person includes such Person's successors and
permitted assigns.
(7) The words ``include,'' ``includes'' and ``including'' are not
limiting and mean include, includes and including ``without
limitation'' and ``without limitation by specification.''
(8) The words ``hereof,'' ``herein'' and ``hereunder'' and words of
similar import refer this part as a whole and not to any particular
provision of this part.
Sec. 609.3 Solicitations.
(a) DOE may invite the submission of Applications for loan
guarantees for Eligible Projects pursuant to a Solicitation.
(b) Each Solicitation must include, at a minimum, the following
information:
(1) The dollar amount of loan guarantee authority potentially being
made available by DOE in that Solicitation;
(2) The place and deadline for submission of Applications;
(3) The name and address of the DOE representative whom a potential
Applicant may contact to receive further information and a copy of the
Solicitation;
(4) The form, format, and page limits applicable to the
Application;
(5) The amount of the Application Fee and any other fees that will
be required;
(6) The programmatic, technical, financial and other factors that
DOE will use to evaluate response submissions, and their relative
weightings in that evaluation; and
(7) Such other information as DOE may deem appropriate.
(c) Using procedures as may be announced by DOE a potential
Applicant may request a meeting with DOE to discuss its potential
Application. At its discretion, DOE may meet with a potential
Applicant, either in person or electronically, to discuss its potential
Application. DOE may provide a potential Applicant with a preliminary
response regarding whether its proposed Application may constitute an
Eligible Project. DOE is not permitted to design an Eligible Project
for an Applicant, but may respond, in its discretion, in general terms
to specific proposals. DOE's responses to questions from potential
Applicants and DOE's statements to potential Applicants are pre-
decisional and preliminary in nature. Any such responses and statements
are subject in their entirety to any final action by DOE with respect
to an Application submitted in accordance with Sec. 609.4 of this
part.
Sec. 609.4 Submission of applications.
(a) In response to a Solicitation, an Applicant must meet all
requirements and provide all information specified in this part and the
Solicitation in the manner and on or before the date specified therein.
DOE may direct that Applications be submitted in more than one part;
provided, that the parts of such Application, taken as a whole, satisfy
the requirements of Sec. 609.4(c) and this part. In such event,
subsequent parts of an Application may be filed only after DOE invites
an Applicant to make an additional submission. The initial part of an
Application may be used by DOE to determine the likelihood that the
project proposed by an Applicant will be an Eligible Project, and to
evaluate such project's readiness to proceed. If there have been any
material amendments, modifications or additions made to the information
previously submitted by an Applicant, the Applicant shall provide a
detailed description thereof, including any changes in the proposed
project's financing structure or other terms, promptly upon request by
DOE. Where DOE has directed that an Application be submitted in parts,
DOE may provide for payment of the Application Fee in parts.
(b) An Applicant may submit only one Application for one proposed
project using a particular technology. An Applicant may not submit an
Application or Applications for multiple Eligible Projects using the
same technology. An Applicant may submit Applications for multiple
proposed projects using different technologies. For purposes of this
paragraph, the term Applicant shall include the Project Sponsor and any
subsidiaries or affiliates of the Project Sponsor.
(c) An Application must include, at a minimum, the following
information and materials:
(1) A completed Application form signed by an individual with full
authority to bind the Applicant, including the commitments and
representations made in each part of the Application;
(2) The applicable Application Fee;
(3) A description of how and to what measurable extent the proposed
project
[[Page 67930]]
avoids, reduces, or sequesters air pollutants and/or anthropogenic
emissions of greenhouse gases, including how to measure and verify
those effects;
(4) A description of the nature and scope of the proposed project,
including:
(i) Key project milestones;
(ii) Location or locations of the proposed project;
(iii) Identification and commercial feasibility of the New or
Significantly Improved Technology to be deployed;
(iv) How the Applicant intends to deploy such New or Significantly
Improved Technology in the proposed project; and
(v) How the Applicant intends to assure, to the extent possible,
the further commercial availability of the New or Significantly
Improved Technology in the United States.
(5) An explanation of how the proposed project qualifies as a
project within the category or categories of projects referred to in
the Solicitation;
(6) A detailed estimate of the total Project Costs together with a
description of the methodology and assumptions used;
(7) A detailed description of the engineering and design
contractor(s), construction contractor(s), and equipment supplier(s);
(8) The construction schedules for the proposed project, including
major activity and cost milestones;
(9) A description of the material terms and conditions of the
development and construction contracts to include the performance
guarantees, performance bonds, liquidated damages provisions, and
equipment warranties;
(10) A detailed description of the operations and maintenance
provider(s), the plant operating plan, estimated staffing requirements,
parts inventory, major maintenance schedule, estimated annual downtime,
and performance guarantees and related liquidated damage provisions, if
any;
(11) A description of the management plan of operations to be
employed in carrying out the proposed project, and information
concerning the management experience of each officer or key person
associated with the proposed project;
(12) A detailed description of the proposed project
decommissioning, deconstruction, and disposal plan, and the anticipated
costs associated therewith;
(13) An analysis of the market for any product (including but not
limited to electricity and chemicals) to be produced by, or services to
be provided by, the proposed project, including relevant economics
justifying the analysis, and copies of
(i) Any contracts for the sale of such products or the provision of
such services, or
(ii) Any other assurance of the revenues to be generated from sale
of such products or provision of such services;
(14) A detailed description of the overall financial plan for the
proposed project, including all sources and uses of funding, equity and
debt, and the liability of parties associated with the proposed project
over the term of the Loan Guarantee Agreement;
(15) A copy of all material agreements, whether entered into or
proposed, relevant to the investment, design, engineering, financing,
construction, startup commissioning, shakedown, operations and
maintenance of the proposed project;
(16) A copy of the financial closing checklist for the equity and
debt to the extent available;
(17) The Applicant's business plan on which the proposed project is
based and Applicant's financial model with respect to the proposed
project for the proposed term of the Guaranteed Obligations, including,
as applicable, pro forma income statements, balance sheets, and cash
flows. All such information and data must include assumptions made in
their preparation and the range of revenue, operating cost, and credit
assumptions considered;
(18) Financial statements for the three immediately preceding
fiscal years of the Applicant (or such shorter period as the Applicant
has been in existence) that have been audited by an independent
certified public accounting firm, including all associated
certifications, notes and letters to management, as well as interim
financial statements and notes for the current fiscal year for the
Applicant and all other Persons the credit of which is material to the
success of the transactions described in the Application;
(19) A copy of all legal opinions, and other material reports,
analyses, and reviews related to the proposed project that have been
delivered prior to submission of any part of the Application;
(20) An independent engineering report prepared by an engineer with
experience in the industry and familiarity with similar projects. The
report should address the proposed project's siting and permitting
arrangements, engineering and design, contractual requirements,
environmental compliance, testing, commissioning and operations, and
maintenance;
(21) A credit history of the Applicant and each Project Sponsor;
(22) A preliminary credit assessment for the proposed project
without a loan guarantee from a nationally recognized rating agency for
projects where the estimated total Project Costs exceed $25 million.
For proposed projects where the total estimated Project Costs are $25
million or less and where conditions justify, in the sole discretion of
the Secretary, DOE may require such an assessment;
(23) A list showing the status of and estimated completion date of
Applicant's required applications for federal, state, and local
permits, authorizations or approvals to site, construct, and operate
the proposed project;
(24) A report containing an analysis of the potential environmental
impacts of the proposed project that will enable DOE to--
(i) Assess whether the proposed project will comply with all
applicable environmental requirements; and
(ii) Undertake and complete any necessary reviews under the
National Environmental Policy Act of 1969;
(25) A listing and description of the assets of or to be utilized
for the benefit of the proposed project, and of any other asset that
will serve as collateral pledged in respect of the Guaranteed
Obligations, including appropriate data as to the value of such assets
and the useful life of any physical assets. With respect to real
property assets listed, an appraisal that is consistent with the
``Uniform Standards of Professional Appraisal Practice,'' promulgated
by the Appraisal Standards Board of the Appraisal Foundation, and
performed by licensed or certified appraisers, is required;
(26) An analysis demonstrating that, at the time of the
Application, there is a reasonable prospect that Borrower will be able
to repay the Guaranteed Obligations (including interest) according to
their terms, and a complete description of the operational and
financial assumptions and methodologies on which this demonstration is
based; and
(27) If proposed project assets or facilities are or will be
jointly owned by the Applicant and one or more other Persons or
entities, each of which owns an undivided ownership interest in such
proposed project assets or facilities, a description of the Applicant's
rights and obligations in respect of its undivided ownership interest
in such proposed project assets or facilities.
[[Page 67931]]
(d) During the Application evaluation process pursuant to Sec.
609.5 of this part, DOE may request additional information, potentially
including a preliminary credit rating or credit assessment, with
respect to the proposed project.
(e) DOE will not consider any part of any Application or the
Application as a whole complete unless the Application Fee (or the
required portion of the Application Fee related to a particular part of
the Application) has been paid. An Application Fee paid in connection
with one Application is not transferable to another Application. Except
in the discretion of DOE, no portion of the Application Fee is
refundable;
(f) DOE has no obligation to evaluate an Application that is not
complete, and may proceed with such evaluation, or a partial
evaluation, only in its discretion.
(g) Unless an Applicant requests an extension and such an extension
is granted by DOE in its discretion, an Application may be rejected if
it is not complete within four years from the date of submission (or
date of submission of the first part thereof, in the case of
Applications made in more than one part).
(h) Upon making a determination to engage independent consultants
or outside counsel with respect to an Application, DOE will proceed to
evaluate and process such Application only following execution by an
Applicant or Project Sponsor, as appropriate, of an agreement
satisfactory to DOE to pay the fees and expenses charged by the
independent consultants and outside legal counsel.
Sec. 609.5 Programmatic, technical and financial evaluation of
applications.
(a) In reviewing completed Applications, and in prioritizing and
selecting those as to which a Term Sheet should be offered, DOE will
apply the criteria set forth in the Act, any applicable Solicitation,
and this part. Applications will be considered in a competitive
process, i.e. each Application will be evaluated against other
Applications responsive to the Solicitation. .DOE may compare an
Application to Applications related to other projects that DOE
reasonably believes may become the subject of an Application.
Applications will be denied if:
(1) The proposed project is not an Eligible Project;
(2) The applicable technology is not ready to be deployed
commercially in the United States, cannot yield a commercially viable
product or service in the use proposed in the Application, does not
have the potential to be deployed in other commercial projects in the
United States, or is not or will not be available for further
commercial use in the United States;
(3) The Person proposed to issue the loan or purchase other debt
obligations constituting the Guaranteed Obligations is not an Eligible
Lender;
(4) The proposed project is for demonstration, research, or
development;
(5) Significant Equity for the proposed project will not be
provided by the date of issuance of the Guaranteed Obligations, or such
later time as DOE in its discretion may determine; or
(6) The proposed project does not present a reasonable prospect of
repayment of the Guaranteed Obligations.
(b) If an Application has not been denied pursuant to Sec.
609.5(a), DOE will evaluate the proposed Project based on the criteria
set forth in the Act, any applicable Solicitation and the following:
(1) To what measurable extent the proposed project avoids, reduces,
or sequesters air pollutants or anthropogenic emissions of greenhouses
gases, or contributes to the avoidance, reduction or sequestration of
air pollutants or anthropogenic emissions of greenhouse gases;
(2) To what extent the technology to be deployed in the proposed
project--
(i) Is ready to be deployed commercially in the United States, can
be replicated, yields a commercially viable product or service in the
use proposed in the proposed project, has potential to be deployed in
other commercial projects in the United States, and is or will be
available for further commercial use in the United States; and
(ii) Constitutes an important improvement in technology, as
compared to available Commercial Technologies, used to avoid, reduce or
sequester air pollutants or anthropogenic emissions of greenhouse
gases;
(3) To what extent the Applicant has a plan to advance or assist in
the advancement of that technology into the commercial marketplace in
the United States;
(4) The extent to which the level of proposed support in the
Application is consistent with a reasonable prospect of repayment of
the Guaranteed Obligations by considering, among other factors:
(i) The extent to which the requested amount of the loan guarantee,
the requested amount of Guaranteed Obligations and, if applicable, the
expected amount of any other financing or credit arrangements, are
reasonable relative to the nature and scope of the proposed project;
(ii) The total amount and nature of the Project Costs and the
extent to which Project Costs are to be funded by Guaranteed
Obligations; and
(iii) The feasibility of the proposed project and likelihood that
it will produce sufficient revenues to service its debt obligations
over the life of the loan guarantee and assure timely repayment of
Guaranteed Obligations;
(5) The likelihood that the proposed project will be ready for full
commercial operations in the time frame stated in the Application;
(6) The amount of Equity committed and to be committed to the
proposed project by the Borrower, the Project Sponsor, and other
Persons;
(7) Whether there is sufficient evidence that the Borrower will
diligently implement the proposed project, including initiating and
completing the proposed project in a timely manner;
(8) Whether and to what extent the Applicant will rely upon other
Federal and non-Federal Government assistance such as grants, tax
credits, or other loan guarantees to support the financing,
construction, and operation of the proposed project and how such
assistance will impact the proposed project;
(9) The levels of safeguards provided to the Federal Government in
the event of default through collateral, warranties, and other
assurance of repayment described in the Application, including the
nature of any anticipated intercreditor arrangements;
(10) The Applicant's, or the relevant contractor's, capacity and
expertise to operate the proposed project successfully, based on
factors such as financial soundness, management organization, and the
nature and extent of corporate and individual experience;
(11) The ability of the proposed Borrower to ensure that the
proposed project will comply with all applicable laws and regulations,
including all applicable environmental statutes and regulations;
(12) The levels of market, regulatory, legal, financial,
technological, and other risks associated with the proposed project and
their appropriateness for a loan guarantee provided by DOE;
(13) Whether the Application contains sufficient information,
including a detailed description of the nature and scope of the
proposed project and the nature, scope, and risk coverage of the loan
guarantee sought to enable DOE to perform a thorough assessment of the
proposed project; and
[[Page 67932]]
(14) Such other criteria that DOE deems relevant in evaluating the
merits of an Application.
(c) After DOE completes its review and evaluation of a proposed
project pursuant to Sec. 609.5(b) and this part, DOE will notify the
Applicant in writing of its determination whether to proceed with due
diligence and negotiation of a Term Sheet in accordance with Sec.
609.6 of this part. DOE will proceed only if it determines that the
proposed project is highly qualified and suitable for a Guarantee. Upon
written confirmation from the Applicant that it desires to proceed, DOE
and the Applicant will commence negotiations.
(d) A determination by DOE not to proceed with a proposed project
following evaluation pursuant to Sec. 609.5(b) shall be final and non-
appealable, but shall not prejudice the Applicant or other affected
Persons from applying for a Guarantee in respect of a different
proposed project pursuant to another, separate Application.
Sec. 609.6 Term sheets and conditional commitments.
(a) DOE, after negotiation of a Term Sheet with an Applicant, may
offer such Term Sheet to an Applicant or such other Person that is an
affiliate of the Applicant and that is acceptable to DOE. DOE's offer
of a Term Sheet shall be in writing and signed by the Contracting
Officer. DOE's negotiation of a Term Sheet imposes no obligation on the
Secretary to offer a Term Sheet to the Applicant.
(b) DOE shall terminate its negotiations of a Term Sheet if it has
not offered a Term Sheet in respect of an Eligible Project within four
years after the date of the written notification set forth in Sec.
609.5(c) of this part, unless extended in writing in the discretion of
the Contracting Officer.
(c) If and when the offeree specified in a Term Sheet satisfies all
terms and conditions for acceptance of the Term Sheet, including
written acceptance thereof and payment of all fees specified in Sec.
609.11(f) and therein to be paid at or prior to acceptance of the Term
Sheet, the Term Sheet shall become a Conditional Commitment. Each
Conditional Commitment shall include an expiration date no more than
two years from the date it is issued, unless extended in writing in the
discretion of the Contracting Officer. When and if all of the terms and
conditions specified in the Conditional Commitment have been met, DOE
and the Applicant may enter into a Loan Guarantee Agreement.
(d) If, subsequent to execution of a Conditional Commitment, the
financing arrangements of the Borrower, or in respect of an Eligible
Project, change from those described in the Conditional Commitment, the
Applicant shall promptly provide updated financing information in
writing to DOE. All such updated information shall be deemed to be
information submitted in connection with an Application and shall be
subject to Sec. 609.4(b). Based on such updated information, DOE may
take one or more of the following actions:
(1) Determine that such changes are not material to the Borrower,
the Eligible Project or DOE;
(2) Amend the Conditional Commitment accordingly;
(3) Postpone the expected closing date of the associated Loan
Guarantee Agreement; or
(4) Terminate the Conditional Commitment.
Sec. 609.7 Closing on the loan guarantee agreement.
(a) Subsequent to entering into a Conditional Commitment with an
Applicant, DOE, after consultation with the Applicant, will set a
closing date for execution of a Loan Guarantee Agreement.
(b) Prior to or on the closing date of a Loan Guarantee Agreement,
DOE will ensure that:
(1) One of the following has occurred:
(i) An appropriation for the Credit Subsidy Cost has been made;
(ii) The Secretary has received from the Borrower payment in full
for the Credit Subsidy Cost and deposited the payment into the
Treasury; or
(iii) A combination of one or more appropriations under paragraph
(b)(1)(i) of this section and one or more payments from the Borrower
under paragraph (b)(1)(ii) of this section has been made that is equal
to the Credit Subsidy Cost;
(2) Pursuant to section 1702(h) of the Act, DOE has received from
the Applicant the remainder of the Facility Fee referred to in Sec.
609.11(b) of this part;
(3) OMB has reviewed and approved DOE's calculation of the Credit
Subsidy Cost of the Guarantee;
(4) The Department of the Treasury has been consulted as to the
terms and conditions of the Loan Guarantee Agreement;
(5) The Loan Guarantee Agreement and related documents contain all
terms and conditions DOE deems reasonable and necessary to protect the
interest of the United States;
(6) Each holder of the Guaranteed Obligations is an Eligible
Lender, and the servicer of the Guaranteed Obligations meets the
servicing performance requirements of Sec. 609.9(b) of this part;
(7) DOE has determined the principal amount of the Guaranteed
Obligations expected to be issued in respect of the Eligible Project,
as estimated at the time of issuance, will not exceed 80 percent of the
Project Costs of the Eligible Project;
(8) All conditions precedent specified in the Conditional
Commitment are either satisfied or waived by the Contracting Officer
and all other applicable contractual, statutory, and regulatory
requirements have been satisfied or waived by the Contracting Officer.
If the counterparty to the Conditional Commitment has not satisfied all
such terms and conditions on or prior to the closing date of the Loan
Guarantee Agreement, the Secretary may, in his discretion, set a new
closing date, or terminate the Conditional Commitment; and
(9) Where the total Project Costs for an Eligible Project are
projected to exceed $25 million, the Applicant must provide a credit
rating from a nationally recognized rating agency reflecting the
revised Conditional Commitment for the project without a Federal
guarantee. Where total Project Costs are projected to be $25 million or
less, the Secretary may, on a case-by-case basis, require a credit
rating. If a credit rating is required, an updated rating must be
provided to the Secretary not later than 30 days prior to closing.
Sec. 609.8 Loan guarantee agreement.
(a) Only a Loan Guarantee Agreement executed by the Contracting
Officer can obligate DOE to issue a Guarantee in respect of Guaranteed
Obligations.
(b) DOE is not bound by oral representations.
(c) Each Loan Guarantee Agreement shall contain the following
requirements and conditions, and shall not be executed until the
Contracting Officer determines that the following requirements and
conditions are satisfied:
(1) The Federal Financing Bank shall be the only Eligible Lender in
transactions where DOE guarantees 100 percent (but not less than 100
percent) of the principal and interest of the Guaranteed Obligations
issued under a Loan Guarantee Agreement.
(i) Where DOE guarantees more than 90 percent of the Guaranteed
Obligation, the guaranteed portion cannot be separated from or
``stripped'' from the non-guaranteed portion of the Guaranteed
Obligation if the loan is participated, syndicated or otherwise resold
in the secondary market; and
(ii) Where DOE guarantees 90 percent or less of the Guaranteed
Obligation, the guaranteed portion may be separated
[[Page 67933]]
from or ``stripped'' from the non-guaranteed portion of the Guaranteed
Obligation, if the loan is participated, syndicated or otherwise resold
in the secondary debt market;
(2) The Borrower shall be obligated to make full repayment of the
principal and interest on the Guaranteed Obligations and other debt of
a Borrower over a period of up to the lesser of 30 years or 90 percent
of the projected useful life of the Eligible Project's major physical
assets, as calculated in accordance with U.S. generally accepted
accounting principles and practices. The non-guaranteed portion (if
any) of any Guaranteed Obligations must be repaid pro rata, and on the
same amortization schedule, with the guaranteed portion.
(3) If any financing or credit arrangement of the Borrower or
relating to the Eligible Project, other than the Guaranteed
Obligations, has an amortization period shorter than that of the
Guaranteed Obligations, DOE shall have determined that the resulting
financing structure allocates to DOE a reasonably proportionate share
of the default risk, in light of:
(i) DOE's share of the total debt financing of the Borrower,
(ii) Risk allocation among the credit providers to the Borrower,
and
(iii) Internal and external credit enhancements.
(4) Consistent with the requirements of section 149(b) of the
Internal Revenue Code, the Guaranteed Obligations shall not finance,
directly, indirectly, or through effective subordination within the
meaning of section II.A of OMB Circular No. A-129 (January 2013), tax-
exempt debt obligations. Guaranteed Obligations and any tax-exempt debt
obligations payable directly or indirectly from the revenues of the
Borrower or other resources of the Borrower must be repaid using
separate, dedicated revenue streams or other separate sources of
repayment, and must be separately collateralized. The terms of the
Guaranteed Obligations, such as, for example, grace periods, repayment
schedules, and availability of deferrals, must not create effective
subordination. The Guaranteed Obligations shall not be used as
collateral to secure tax-exempt debt obligations or guarantee loans
funded by tax-exempt debt obligations;
(5) The principal amount of the Guaranteed Obligations, when
combined with funds from other sources committed and available to the
Borrower, shall be sufficient to pay for expected Project Costs
(including adequate contingency amounts), the applicable items
specified in Sec. 609.10(b) of this part, and otherwise to carry out
the Eligible Project;
(6) There shall be a reasonable prospect of repayment by the
Borrower of the principal of and interest on the Guaranteed Obligations
and all of its other debt obligations;
(7) The Borrower shall pledge collateral or surety determined by
DOE to be necessary to secure the repayment of the Guaranteed
Obligations. Such collateral or security may include Eligible Project
assets and assets not related to the Eligible Project;
(8) The Loan Guarantee Agreement and related documents shall
include detailed terms and conditions that DOE deems necessary and
appropriate to protect the interests of the United States in the case
of default, including ensuring availability of all relevant
intellectual property rights, technical data including software, and
technology necessary for DOE or any Person or entity selected by DOE,
to complete, operate, convey, and dispose of the defaulted Borrower or
the Eligible Project;
(9) The Guaranteed Obligations shall not be subordinate to other
financing. Guaranteed Obligations are not subordinate to other
financing if the lien on property securing the Guaranteed Obligations,
together with liens that are pari passu with such lien, if any, take
priority or precedence over other charges or encumbrances upon the same
property and must be satisfied before such other charges are entitled
to participate in proceeds of the property's sale. In DOE's discretion,
Guaranteed Obligations may share a lien position with other financing;
(10) There is satisfactory evidence that the Borrower will
diligently pursue the Eligible Project and is willing, competent, and
capable of performing its obligations under the Loan Guarantee
Agreement and the loan documentation relating to its other debt
obligations;
(11) The Borrower shall have paid all fees and expenses due to DOE
or the U.S. Government, including such amount of the Credit Subsidy
Cost as may be due and payable from the Borrower pursuant to the
Conditional Commitment, upon execution of the Loan Guarantee Agreement;
(12) The Borrower, any Eligible Lender, and each other relevant
party shall take, and be obligated to continue to take, those actions
necessary to perfect and maintain liens on collateral pledged in
respect of the Guaranteed Obligations;
(13) DOE or its representatives shall have access to the offices of
the Borrower and the Eligible Project site at all reasonable times in
order to--
(i) Monitor the performance by the Borrower of its obligations
under the Loan Guarantee Agreement, and
(ii) Performance of the Eligible Project;
(14) DOE and Borrower have reached an agreement regarding the
information that will be made available to DOE and the information that
will be made publicly available;
(15) The Borrower shall have filed applications for or obtained any
required regulatory approvals for the Eligible Project and is in
compliance, or promptly will be in compliance, where appropriate, with
all Federal, state, and local regulatory requirements;
(16) The Borrower shall have no delinquent Federal debt;
(17) The Project Sponsors have made or will make a significant
Equity investment in the Borrower or the Eligible Project, and will
maintain control of the Borrower or the Eligible Project as agreed in
the LGA; and
(18) The Loan Guarantee Agreement and related agreements shall
include such other terms and conditions as DOE deems necessary or
appropriate to protect the interests of the United States.
(d) The Loan Guarantee Agreement shall provide that, in the event
of a default by the Borrower:
(1) Interest on the Guaranteed Obligations shall accrue at the rate
stated in the Loan Guarantee Agreement or the Loan Agreement, until DOE
makes full payment of the defaulted Guaranteed Obligations and, except
when such Guaranteed Obligations are funded through the Federal
Financing Bank, DOE shall not be required to pay any premium, default
penalties, or prepayment penalties; and
(2) The holder of collateral pledged in respect of the Guaranteed
Obligations shall be obligated to take such actions as DOE may
reasonably require to provide for the care, preservation, protection,
and maintenance of such collateral so as to enable the United States to
achieve maximum recovery.
(e)(1) An Eligible Lender or other Holder may sell, assign or
transfer a Guaranteed Obligation to another Eligible Lender that meets
the requirements of Sec. 609.9 of this part. Such latter Eligible
Lender shall be required to assume all servicing, monitoring and
reporting requirements as provided in the Loan Guarantee Agreement. Any
transfer of the servicing, monitoring, and reporting functions shall be
subject to the prior written approval of DOE.
(2) The Secretary, or the Secretary's designee or contractual
agent, for the purpose of identifying Holders with the
[[Page 67934]]
right to receive payment under the Guaranteed Obligations, shall
include in the Loan Guarantee Agreement or related documents a
procedure for tracking and identifying Holders of Guaranteed
Obligations. Any contractual agent approved by the Secretary to perform
this function may transfer or assign this responsibility only with the
Secretary's prior written approval.
(f) Each Loan Guarantee Agreement shall require the Borrower to
make representations and warranties, agree to covenants, and satisfy
conditions precedent to closing and to each disbursement that, in each
case, relate to its compliance with the Davis-Bacon Act and the Cargo
Preference Act.
(g) The Applicant, the Borrower or the Project Sponsor must
estimate, calculate, record, and provide to DOE any time DOE requests
such information and at the times provided in the Loan Guarantee
Agreement all costs incurred in the design, engineering, financing,
construction, startup, commissioning and shakedown of the Eligible
Project in accordance with generally accepted accounting principles and
practices.
Sec. 609.9 Lender servicing requirements.
(a) When reviewing and evaluating a proposed Eligible Project, all
Eligible Lenders (other than the Federal Financing Bank) shall at all
times exercise the level of care and diligence that a reasonable and
prudent lender would exercise when reviewing, evaluating and disbursing
a loan made by it without a Federal guarantee.
(b) Loan servicing duties shall be performed by an Eligible Lender,
DOE, or another qualified loan servicer approved by DOE. When
performing its servicing duties, the loan servicer shall at all times
exercise the level of care and diligence that a reasonable and prudent
lender would exercise when servicing a loan made without a Federal
guarantee, including:
(1) During the construction period, monitoring the satisfaction of
all of the conditions precedent to all loan disbursements, as provided
in the Loan Guarantee Agreement, Loan Agreement or related documents;
(2) During the operational phase, monitoring and servicing the
Guaranteed Obligations and collection of the outstanding principal and
accrued interest as well as undertaking to ensure that the collateral
package securing the Guaranteed Obligations remains uncompromised; and
(3) Until the Guaranteed Obligation has been repaid, providing
annual or more frequent financial and other reports on the status and
condition of the Guaranteed Obligations and the Eligible Project, and
promptly notifying DOE if it becomes aware of any problems or
irregularities concerning the Eligible Project or the ability of the
Borrower to make payment on the Guaranteed Obligations or its other
debt obligations.
Sec. 609.10 Project costs.
(a) Project Costs include:
(1) Costs of acquisition, lease, or rental of real property,
including engineering fees, surveys, title insurance, recording fees,
and legal fees incurred in connection with land acquisition, lease or
rental, site improvements, site restoration, access roads, and fencing;
(2) Costs of engineering, architectural, legal and bond fees, and
insurance paid in connection with construction of the facility;
(3) Costs of equipment purchases, including a reasonable reserve of
spare parts to the extent required;
(4) Costs to provide facilities and services related to safety and
environmental protection;
(5) Costs of financial, legal, and other professional services,
including services necessary to obtain required licenses and permits
and to prepare environmental reports and data;
(6) Costs of issuing Eligible Project debt, such as fees,
transaction, and costs referred to in Sec. 609.10(a)(5), and other
customary charges imposed by Eligible Lenders;
(7) Costs of necessary and appropriate insurance and bonds of all
types including letters of credit and any collateral required therefor;
(8) Costs of design, engineering, startup, commissioning and
shakedown;
(9) Costs of obtaining licenses to intellectual property necessary
to design, construct, and operate the Eligible Project;
(10) To the extent
(i) Required by the Loan Guarantee Agreement and
(ii) Not intended or available for any cost referred to in Sec.
609.10(b),
costs of funding any reserve fund, including without limitation, a debt
service reserve, a maintenance reserve, and a contingency reserve for
cost overruns during construction; provided that proceeds of a
Guaranteed Loan deposited to any reserve fund shall not be removed from
such fund except to pay Project Costs, to pay principal of the
Guaranteed Loan, or otherwise to be used as provided in the Loan
Guarantee Agreement;
(11) Capitalized interest necessary to meet market requirements and
other carrying costs during construction; and
(12) Other necessary and reasonable costs.
(b) Project Costs do not include:
(1) Fees and commissions charged to Borrower, including finder's
fees, for obtaining Federal or other funds;
(2) Parent corporation or other affiliated entity's general and
administrative expenses, and non-Eligible Project related parent
corporation or affiliated entity assessments, including organizational
expenses;
(3) Goodwill, franchise, trade, or brand name costs;
(4) Dividends and profit sharing to stockholders, employees, and
officers;
(5) Research, development, and demonstration costs of readying an
innovative technology for employment in a commercial project;
(6) Costs that are excessive or are not directly required to carry
out the Eligible Project, as determined by DOE;
(7) Expenses incurred after startup, commissioning, and shakedown
before the facility, or, in DOE's discretion, any portion of the
facility, has been placed in service;
(8) Borrower-paid Credit Subsidy Costs, the Administrative Cost of
Issuing a Loan Guarantee, and any other fee collected by DOE; and
(9) Operating costs.
Sec. 609.11 Fees and charges.
(a) Unless explicitly authorized by statute, no funds obtained from
the Federal Government, or from a loan or other instrument guaranteed
by the Federal Government, may be used to pay for the Credit Subsidy
Cost, the Application Fee, the Facility Fee, the Guarantee Fee, the
maintenance fee and any other fees charged by or paid to DOE relating
to the Act or any Guarantee thereunder.
(b) DOE may charge Applicants a non-refundable Facility Fee, with a
portion being payable on or prior to the date on which the Applicant
executes the Commitment Letter and the remainder being payable on or
prior to the closing date for the Loan Guarantee Agreement.
(c) In order to encourage and supplement private lending activity
DOE may collect from Borrowers for deposit in the United States
Treasury a non-refundable Risk-Based Charge which, together with the
interest rate on the Guaranteed Obligation that LPO determines to be
appropriate, will take into account the prevailing rate of interest in
the private sector for similar loans and risks. The Risk-Based Charge
shall be paid at such times and in such manner as may be determined by
DOE, but no less frequently than once each year, commencing with
payment of a
[[Page 67935]]
pro-rated payment on the date the Guarantee is issued. The amount of
the Risk-Based Charge will be specified in the Loan Guarantee
Agreement.
(d) DOE may collect a maintenance fee to cover DOE's administrative
expenses, other than extraordinary expenses, incurred in servicing and
monitoring a Loan Guarantee Agreement. The maintenance fee shall accrue
from the date of execution of the Loan Guarantee Agreement through the
date of payment in full of the related Guaranteed Obligations. If DOE
determines to collect a maintenance fee, it shall be paid by the
Borrower each year (or portion thereof) in advance in the amount
specified in the applicable Loan Guarantee Agreement.
(e) In the event a Borrower or an Eligible Project experiences
difficulty relating to technical, financial, or legal matters or other
events (e.g., engineering failure or financial workouts), the Borrower
shall be liable as follows:
(1) If such difficulty requires DOE to incur time or expenses
beyond those customarily expended to monitor and administer performing
loans, DOE may collect an extraordinary expenses fee from the Borrower
that will reimburse DOE for such time and expenses, as determined by
DOE; and
(2) For all fees and expenses of DOE's independent consultants and
outside counsel, to the extent that such fees and expenses are elected
to be paid by DOE notwithstanding the provisions of paragraphs (f) and
(g) of this section.
(f) Each Applicant, Borrower or Project Sponsor, as applicable,
shall be responsible for the payment of all fees and expenses charged
by DOE's independent consultants and outside legal counsel in
connection with an Application, Conditional Commitment or Loan
Guarantee Agreement, as applicable. Upon making a determination to
engage independent consultants or outside counsel with respect to an
Application, DOE will proceed to evaluate and process such Application
only following execution by an Applicant or Project Sponsor, as
appropriate, of an agreement satisfactory to DOE to pay the fees and
expenses charged by the independent consultants and outside legal
counsel. Appropriate provisions regarding payment of such fees and
expenses shall also be included in each Term Sheet and Loan Guaranty
Agreement or, upon a determination by DOE, in other appropriate
agreements.
(g) Notwithstanding payment by Applicant, Borrower or Project
Sponsor, all services rendered by an independent consultant or outside
legal counsel to DOE in connection with an Application, Conditional
Commitment or Loan Guarantee Agreement shall be solely for the benefit
of DOE (and such other creditors as DOE may agree in writing). DOE may
require, in its discretion, the payment of an advance retainer to such
independent consultants or outside legal counsel as security for the
collection of the fees and expenses charged by the independent
consultants and outside legal counsel. In the event an Applicant,
Borrower or Project Sponsor fails to comply with the provisions of such
payment agreement, DOE in its discretion, may stop work on or terminate
an Application, a Conditional Commitment or a Loan Guarantee Agreement,
or may take such other remedial measures in its discretion as it deems
appropriate.
(h) DOE shall not be financially liable under any circumstances to
any independent consultant or outside counsel for services rendered in
connection with an Application, Conditional Commitment or Loan
Guarantee Agreement except to the extent DOE has previously entered
into an express written agreement to pay for such services.
Sec. 609.12 Full faith and credit and incontestability.
The full faith and credit of the United States is pledged to the
payment of principal and interest of Guaranteed Obligations pursuant to
Guarantees issued in accordance with the Act and this Part. The
issuance by DOE of a Guarantee shall be conclusive evidence that it has
been properly obtained; that the underlying loan qualified for such
Guarantee; and that, but for fraud or material misrepresentation by the
Holder, such Guarantee shall be legal, valid, binding and enforceable
against DOE in accordance with its terms.
Sec. 609.13 Default, demand, payment, and foreclosure on collateral.
(a) If a Borrower defaults in making a required payment of
principal or interest on a Guaranteed Obligation and such default has
not been cured within the applicable grace period, the Holder may make
written demand for payment upon the Secretary in accordance with the
terms of the applicable Guarantee. If a Borrower defaults in making a
required payment of principal or interest on a Guaranteed Obligation
and such default has not been cured within the applicable grace period,
the Secretary shall notify the Attorney General.
(b) Subject to the terms of the applicable Guarantee, the Secretary
shall make payment within 60 days after receipt of written demand for
payment from the Holder, provided that the demand for payment complies
in all respects with the terms of the applicable Guarantee. Interest
shall accrue to the Holder at the rate stated in the promissory note
evidencing the Guaranteed Obligation, without giving effect to the
Borrower's default in making a required payment of principal or
interest on the applicable Guarantee Obligation or any other default by
the Borrower, until the Guaranteed Obligation has been fully paid by
DOE. Payment by the Secretary on the applicable Guarantee does not
change Borrower's obligations under the promissory note evidencing the
Guaranteed Obligation, Loan Guarantee Agreement, Loan Agreement or
related documents, including an obligation to pay default interest.
(c) Following payment by the Secretary pursuant to the applicable
Guarantee, upon demand by DOE, the Holder shall transfer and assign to
the Secretary (or his designee or agent) the promissory note evidencing
the Guaranteed Obligation, all rights and interests of the Holder in
the Guaranteed Obligation, and all rights and interests of the Holder
in respect of the Guaranteed Obligation, except to the extent that the
Secretary determines that such promissory note or any of such rights
and interests shall not be transferred and assigned to the Secretary.
Such transfer and assignment shall include, without limitation, all of
the liens, security and collateral rights of the Holder (or his
designee or agent) in respect of the Guaranteed Obligation.
(d) Following payment by the Secretary pursuant to a Guarantee or
other default of a Guaranteed Obligation, the Secretary is authorized
to protect and foreclose on the collateral, take action to recover
costs incurred by, and all amounts owed to, the United States as a
result of the defaulted Guarantee Obligation, and take such other
action necessary or appropriate to protect the interests of the United
States. In respect of any such authorized actions that involve a
judicial proceeding or other judicial action, the Secretary shall act
through the Attorney General. The foregoing provisions of this
paragraph shall not relieve the Secretary from its obligations pursuant
to any applicable Intercreditor Agreement. Nothing in this paragraph
shall limit the Secretary from exercising any rights or remedies
pursuant to the terms of the Loan Guarantee Agreement.
(e) The cash proceeds received as a result of any foreclosure on
the collateral or other action, shall be distributed in accordance with
the Loan Guarantee Agreement (subject to any applicable Intercreditor
Agreement).
[[Page 67936]]
(f) The Loan Guarantee Agreement shall provide that cash proceeds
received by the Secretary (or his designee or agent) as a result of any
foreclosure on the collateral or other action shall be applied in the
following order of priority:
(1) Toward the pro rata payment of any costs and expenses
(including unpaid fees, fees and expenses of counsel, contractors and
agents, and liabilities and advances made or incurred) of the
Secretary, the Attorney General, the Holder, a collateral agent or
other responsible person of any of them (solely in their individual
capacities as such and not on behalf of or for the benefit of their
principals), incurred in connection with any authorized action
following payment by the Secretary pursuant to a Guarantee or other
default of a Guaranteed Obligation, or as otherwise permitted under the
Loan Agreement or Loan Guarantee Agreement.
(2) To pay all accrued and unpaid fees due and payable to the
Secretary, the Attorney General, the Holder, a collateral agent or
other responsible person of any of them on a pro rata basis in respect
of the Guaranteed Obligation;
(3) To pay all accrued and unpaid interest due and payable to the
Secretary, the Attorney General, the Holder, a collateral agent or
other responsible person of any of them on a pro rata basis in respect
of the Guaranteed Obligation;
(4) To pay all unpaid principal of the Guaranteed Obligation;
(5) To pay all other obligations of the Borrower under the Loan
Guarantee Agreement, the Loan Agreement and related documents that are
remaining after giving effect to the preceding provisions and are then
due and payable; and
(6) To pay to the Borrower, or its successors and assigns, or as a
court of competent jurisdiction may direct, any cash proceeds then
remaining following the application of all payment described above.
(g) No action taken by the Holder or its agent or designee in
respect of any collateral will affect the rights of any person,
including the Secretary, having an interest in the Guaranteed
Obligations or other debt obligations, to pursue, jointly or severally,
legal action against the Borrower or other liable persons, for any
amounts owing in respect of the Guaranteed Obligation or other
applicable debt obligations.
(h) In the event that the Secretary considers it necessary or
desirable to protect or further the interest of the United States in
connection exercise of rights as a lien holder or recovery of
deficiencies due under the Guaranteed Obligation, the Secretary may
take such action as he determines to be appropriate under the
circumstances.
(i) Nothing in this part precludes, nor shall any provision of this
part be construed to preclude, the Secretary from purchasing any
collateral or Holder's or other person's interest in the Eligible
Project upon foreclosure of the collateral.
(j) Nothing in this part precludes, nor shall any provision of this
part be construed to preclude, forbearance by any Holder with the
consent of the Secretary for the benefit of the Borrower and the United
States.
(k) The Holder and the Secretary may agree to a formal or informal
plan of reorganization in respect of the Borrower, to include a
restructuring of the Guaranteed Obligation and other applicable debt of
the Borrower on such terms and conditions as the Secretary determines
are in the best interest of the United States.
Sec. 609.14 Preservation of collateral.
(a) If the Secretary exercises his right under the Loan Guarantee
Agreement to require the holder of pledged collateral to take such
actions as the Secretary (subject to any applicable Intercreditor
Agreement) may reasonably require to provide for the care,
preservation, protection, and maintenance of such collateral so as to
enable the United States to achieve maximum recovery from the
collateral, the Secretary shall, subject to compliance with the
Antideficiency Act, 31 U.S.C. 1341 et seq., reimburse the holder of
such collateral for reasonable and appropriate expenses incurred in
taking actions required by the Secretary (unless otherwise provided in
applicable agreements). Except as provided in Sec. 609.13, no party
may waive or relinquish, without the consent of the Secretary, any such
collateral to which the United States would be subrogated upon payment
under the Loan Guarantee Agreement.
(b) In the event of a default, the Secretary may enter into such
contracts as he determines are required or appropriate, taking into
account the term of any applicable Intercreditor Agreement, to care
for, preserve, protect or maintain collateral pledged in respect of
Guaranteed Obligations. The cost of such contracts may be charged to
the Borrower.
Sec. 609.15 Audits and access to records.
Each Loan Guarantee Agreement and related documents shall provide
that:
(a) The Eligible Lender, or DOE in conjunction with the Federal
Financing Bank where loans are funded by the Federal Financing Bank or
other Holder or other party servicing the Guaranteed Obligations, as
applicable, and the Borrower, shall keep such records concerning the
Eligible Project as are necessary, including the Application, Term
Sheet, Conditional Commitment, Loan Guarantee Agreement, Credit
Agreement, mortgage, note, disbursement requests and supporting
documentation, financial statements, audit reports of independent
accounting firms, lists of all Eligible Project assets and non-Eligible
Project assets pledged in respect of the Guaranteed Obligations, all
off-take and other revenue producing agreements, documentation for all
Eligible Project indebtedness, income tax returns, technology
agreements, documentation for all permits and regulatory approvals and
all other documents and records relating to the Borrower or the
Eligible Project, as determined by the Secretary, to facilitate an
effective audit and performance evaluation of the Eligible Project; and
(b) The Secretary and the Comptroller General, or their duly
authorized representatives, shall have access, for the purpose of audit
and examination, to any pertinent books, documents, papers and records
of the Borrower, Eligible Lender or DOE or other Holder or other party
servicing the Guaranteed Obligation, as applicable. Such inspection may
be made during regular office hours of the Borrower, Eligible Lender or
DOE or other Holder, or other party servicing the Eligible Project and
the Guaranteed Obligations, as applicable, or at any other time
mutually convenient.
Sec. 609.16 Deviations.
(a) To the extent that the requirements under this part are not
specified by the Act or other applicable statutes, DOE may authorize
deviations from the requirements of this part upon:
(1) Either (A) receipt from the Applicant, Borrower or Project
Sponsor, as applicable, of--
(i) A written request that the Secretary deviate from one or more
requirements, and
(ii) A supporting statement briefly describing one or more
justifications for such deviation, or
(iii)(B) a determination by the Secretary in his discretion to
undertake a deviation;
(2) A finding by the Secretary that such deviation supports program
objectives and the special circumstances stated in the request make
such deviation clearly in the best interest of the Government; and
[[Page 67937]]
(3) If the waiver would constitute a substantial change in the
financial terms of the Loan Guarantee Agreement and related documents,
consultation by DOE with OMB and the Secretary of the Treasury.
(b) If a deviation under this section results in an increase in the
applicable Credit Subsidy Cost, such increase shall be funded either by
additional fees paid by or on behalf of the Borrower or, if an
appropriation is available by means of an appropriations act. The
Secretary has discretion to determine how the cost of a deviation is
funded.
[FR Doc. 2016-23268 Filed 9-30-16; 8:45 am]
BILLING CODE 6450-01-P