City of Holyoke Gas and Electric Department; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 64457-64458 [2016-22602]
Download as PDF
Federal Register / Vol. 81, No. 182 / Tuesday, September 20, 2016 / Notices
(5) a 29.7-foot-wide, 10-foot-deep, 118foot-long open tailrace discharging into
the Third Level Canal; and, (6) 4.8kilovolt generator leads that connect
directly to the 4.8-kilovolt area
distribution system; and (7) appurtenant
facilities. The project is estimated to
generate 2,119,000 kilowatt-hours
annually.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
sradovich on DSK3GMQ082PROD with NOTICES
Issue Acceptance or Deficiency Letter—
October 2016
Request Additional Information—
October 2016
Issue Acceptance Letter—January 2017
Issue Scoping Document 1 for
comments—February 2017
Request Additional Information (if
necessary)—April 2017
Issue Scoping Document 2 (if
necessary)—May 2017
Notice that application is ready for
environmental analysis—May 2017
Notice of the availability of the draft
EA—November 2017
Notice of the availability of the final
EA—February 2018
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: September 14, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22606 Filed 9–19–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:13 Sep 19, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2386–004]
City of Holyoke Gas and Electric
Department; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests and Establishing
Procedural Schedule for Relicensing
and a Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 2386–004.
c. Date filed: August 31, 2016.
d. Applicant: City of Holyoke Gas and
Electric Department.
e. Name of Project: Holyoke Number
1 Hydroelectric Project.
f. Location: Between the first and
second level canals on the Holyoke
Canal System adjacent to the
Connecticut River, in the city of
Holyoke in Hampden County,
Massachusetts. The project does not
occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Paul Ducheney,
Superintendent, City of Holyoke Gas
and Electric Department, 99 Suffolk
Street, Holyoke, MA 01040, (413) 536–
9340 or ducheney@hged.com.
i. FERC Contact: Kyle Olcott, (202)
502–8963 or kyle.olcott@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
64457
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: October 31, 2016.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–2386–004.
m. The application is not ready for
environmental analysis at this time.
n. The existing Holyoke Number 1
project consists of: (1) An intake at the
wall of the First Level Canal fed by the
Holyoke Canal System (licensed under
FERC Project No. 2004) with two 14foot-8-inch-tall by 24-foot-7.5-inch wide
trash rack screens with 3.5-inch clear
spacing; (2) two parallel 10-footdiameter, 36.5-foot-long penstocks; (3) a
50-foot-long by 38-foot-wide brick
powerhouse with two 240-kilowatt and
two 288-kilowatt turbine generator
units; (4) two parallel 20-foot-wide,
328.5-foot-long brick arched tailrace
conduits discharging into the Second
Level Canal; and, (5) appurtenant
facilities. There is no transmission line
associated with the project as it is
located adjacent to the substation of
interconnection. The project is
estimated to generate 2,710,000
kilowatt-hours annually.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
E:\FR\FM\20SEN1.SGM
20SEN1
64458
Federal Register / Vol. 81, No. 182 / Tuesday, September 20, 2016 / Notices
Revisions to the schedule will be made
as appropriate.
Issue Acceptance or Deficiency Letter—
October 2016
Request Additional Information—
October 2016
Issue Acceptance Letter—January 2017
Issue Scoping Document 1 for
comments—February 2017
Request Additional Information (if
necessary)—April 2017
Issue Scoping Document 2 (if
necessary)—May 2017
Notice that application is ready for
environmental analysis—May 2017
Notice of the availability of the draft
EA—November 2017
Notice of the availability of the final
EA—February 2018
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: September 14, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22602 Filed 9–19–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2305–056]
sradovich on DSK3GMQ082PROD with NOTICES
Sabine River Authority of Texas,
Sabine River Authority, State of
Louisiana; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Temporary
Variance of License.
b. Project No.: 2305–056.
c. Date Filed: July 29, 2016.
d. Applicants: Sabine River Authority
of Texas, Sabine River Authority, State
of Louisiana.
e. Name of Project: Toledo Bend
Hydroelectric Project.
f. Location: On the Sabine River on
the Texas-Louisiana border in Panola,
Shelby, Sabine, and Newton counties in
Texas, and DeSoto, Sabine, and Vernon
parishes in Louisiana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Jim Brown,
Compliance Officer, Toledo Bend
Project Joint Operation, Sabine River
Authority, Texas, P.O. Box 579, Orange,
VerDate Sep<11>2014
17:13 Sep 19, 2016
Jkt 238001
TX 77631–0579, (409) 746–2192,
jbrown@sratx.org.
i. FERC Contact: Steve Sachs, (202)
502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 14
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2305–056.
k. Description of Request: The
applicants request a temporary variance
of the continuous flow releases required
by Article 402 of the license.
Specifically, the applicants request that
the Commission grant them a temporary
variance to continue the 144 cubic feet
per second release from the existing
bypass conduits until the applicants
complete the spillway refurbishment
project. The ongoing refurbishment
project necessitates vehicular access to
the spillway apron and releasing the
required continuous flows from the
spillway gates, as proposed in their
Spillway Flow Release Plan would
prevent the vehicular access. The
applicants expect to complete the work
by October 31, 2016, but state that they
would implement the targeted
continuous flows immediately if they
are able to complete construction
sooner.
l. Locations of the Applications: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. The filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the temporary
variance request. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 81, Number 182 (Tuesday, September 20, 2016)]
[Notices]
[Pages 64457-64458]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-22602]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2386-004]
City of Holyoke Gas and Electric Department; Notice of
Application Tendered for Filing With the Commission and Soliciting
Additional Study Requests and Establishing Procedural Schedule for
Relicensing and a Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 2386-004.
c. Date filed: August 31, 2016.
d. Applicant: City of Holyoke Gas and Electric Department.
e. Name of Project: Holyoke Number 1 Hydroelectric Project.
f. Location: Between the first and second level canals on the
Holyoke Canal System adjacent to the Connecticut River, in the city of
Holyoke in Hampden County, Massachusetts. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Paul Ducheney, Superintendent, City of
Holyoke Gas and Electric Department, 99 Suffolk Street, Holyoke, MA
01040, (413) 536-9340 or ducheney@hged.com.
i. FERC Contact: Kyle Olcott, (202) 502-8963 or
kyle.olcott@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: October 31, 2016.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-2386-004.
m. The application is not ready for environmental analysis at this
time.
n. The existing Holyoke Number 1 project consists of: (1) An intake
at the wall of the First Level Canal fed by the Holyoke Canal System
(licensed under FERC Project No. 2004) with two 14-foot-8-inch-tall by
24-foot-7.5-inch wide trash rack screens with 3.5-inch clear spacing;
(2) two parallel 10-foot-diameter, 36.5-foot-long penstocks; (3) a 50-
foot-long by 38-foot-wide brick powerhouse with two 240-kilowatt and
two 288-kilowatt turbine generator units; (4) two parallel 20-foot-
wide, 328.5-foot-long brick arched tailrace conduits discharging into
the Second Level Canal; and, (5) appurtenant facilities. There is no
transmission line associated with the project as it is located adjacent
to the substation of interconnection. The project is estimated to
generate 2,710,000 kilowatt-hours annually.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule.
[[Page 64458]]
Revisions to the schedule will be made as appropriate.
Issue Acceptance or Deficiency Letter--October 2016
Request Additional Information--October 2016
Issue Acceptance Letter--January 2017
Issue Scoping Document 1 for comments--February 2017
Request Additional Information (if necessary)--April 2017
Issue Scoping Document 2 (if necessary)--May 2017
Notice that application is ready for environmental analysis--May 2017
Notice of the availability of the draft EA--November 2017
Notice of the availability of the final EA--February 2018
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: September 14, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-22602 Filed 9-19-16; 8:45 am]