Notice of Commission Staff Attendance, 63754-63755 [2016-22267]
Download as PDF
63754
Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
City of Hamilton, OH
Hudson Transmission Partners, LLC
East Kentucky Power Cooperative, Inc.
City of Rochelle
ITC Interconnection LLC
PJM Interconnection, L.L.C.
On August 26, 2016, the Commission
issued an order in Docket No. EL16–71–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether the PJM Transmission
Owners are complying with their Order
No. 890 obligations. Monongahela
Power Company et al., 156 FERC
¶ 61,134 (2016).
The refund effective date in Docket
No. EL16–71–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL16–71–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22264 Filed 9–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP16–98–000; PF15–29–000]
mstockstill on DSK3G9T082PROD with NOTICES
Dominion Carolina Gas Transmission,
LLC; Notice of Revised Schedule for
Environmental Review of the Transco
to Charleston Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the Environmental Assessment (EA) for
Dominion Carolina Gas Transmission,
LLC’s Transco to Charleston Project.
The previous Notice of Schedule, issued
on July 25, 2016, identified September
19, 2016 as the EA issuance date.
However, Dominion Carolina Gas
Transmission, LLC filed a supplement
on August 22, 2016 which identified
several route adjustments and
workspace modifications. As a result,
staff has revised the schedule for
issuance of the EA.
VerDate Sep<11>2014
17:55 Sep 15, 2016
Jkt 238001
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription
(www.ferc.gov/docs-filing/
esubscription.asp).
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on September 28, 2016.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22259 Filed 9–15–16; 8:45 am]
[FR Doc. 2016–22262 Filed 9–15–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ID–7993–000]
Notice of Commission Staff
Attendance
Schedule for Environmental Review
Issuance of EA: October 19, 2016.
90-day Federal Authorization
Decision Deadline: January 17, 2017.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
Van Orden, Tracy; Notice of Filing
Take notice that on September 7,
2016, Tracy Van Orden filed an
application for authorization to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d(b), and Part 45 of the
Regulations of the Federal Energy
Regulatory Commission (Commission),
18 CFR Part 45.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee
September 15, 2016, 9:30 a.m.–12:00
p.m. (EST)
PJM Transmission Expansion Advisory
Committee
September 15, 2016, 11:00 a.m.–3:00
p.m. (EST)
The above-referenced meetings will
be held at:
PJM Conference and Training Center,
PJM Interconnection, 2750 Monroe
Boulevard, Audubon, PA 19403.
The above-referenced meetings are
open to stakeholders. Further
information may be found at
www.pjm.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER16–453, PJM
Interconnection, L.L.C. and Northeast
Transmission Development, LLC.
Docket No. ER16–736, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
E:\FR\FM\16SEN1.SGM
16SEN1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices
Docket No. ER14–1485, PJM
Interconnection, L.L.C.
Docket Nos. ER13–1944, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–1344, PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C. and Potomac
Electric Power Company
Docket No. ER15–2562, PJM
Interconnection, L.L.C.
Docket No. ER15–2563, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, L.L.C., et al. v. PJM
Interconnection, L.L.C.
Docket No. ER15–2114, PJM
Interconnection, L.L.C. and
Transource West Virginia, L.L.C.
Docket No. EL15–79, TransSource,
L.L.C. v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Delaware Public
Service Commission, et al., v. PJM
Interconnection, L.L.C., et al.
Docket No. EL15–67, Linden VFT, L.L.C.
v. PJM Interconnection, L.L.C.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. ER16–1335, PJM
Interconnection, L.L.C.
Docket No. ER16–1232, PJM
Interconnection, L.L.C.
Docket No. ER16–1499, PJM
Interconnection, L.L.C.
Docket No. ER16–1807, First Energy
Solutions Corp.
Docket No. EL16–96, PJM
Interconnection, L.L.C.
Docket No. EL16–71, Monongahela
Power Company et al.
Docket No. ER16–2518, PJM
Interconnection, L.L.C.
Docket No. ER16–2539, PJM
Interconnection, L.L.C.
Docket No. ER16–2401, PJM
Interconnection, L.L.C.
Docket No. EL16–109–000, Virginia
Electric and Power Company v. PJM
Interconnection L.L.C.
For more information, contact the
following:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission, (202) 502–
6604, Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, (202) 502–6474,
Alina.Halay@ferc.gov.
Dated: September 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22267 Filed 9–15–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:55 Sep 15, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–497–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on August 29, 2016,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, Texas 77056, filed in
Docket No. CP16–497–000, a prior
notice request pursuant to sections
157.205, 157.213, and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA). Columbia seeks
authorization to: (i) Convert a storage
well in Wayne County, Ohio from
injection/withdrawal status to
observation status and abandon its
associated pipeline and appurtenances,
and (ii) plug and abandon two storage
wells, and their associated
appurtenances, located in Ashland, and
Vinton Counties, Ohio, respectively.
Columbia proposes to perform these
activities under its blanket certificate
issued in Docket No. CP83–76–000, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection.
The filing may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
William A. Sala, Jr., Senior Counsel,
Columbia Gas Transmission, LLC, 5151
San Felipe, Suite 2500, Houston, Texas
77056, or by calling (713) 386–3743
(telephone), or (713) 386–3755 (fax)
tsala@cpg.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
63755
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22260 Filed 9–15–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 81, Number 180 (Friday, September 16, 2016)]
[Notices]
[Pages 63754-63755]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-22267]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
meetings related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
PJM Planning Committee
September 15, 2016, 9:30 a.m.-12:00 p.m. (EST)
PJM Transmission Expansion Advisory Committee
September 15, 2016, 11:00 a.m.-3:00 p.m. (EST)
The above-referenced meetings will be held at:
PJM Conference and Training Center, PJM Interconnection, 2750 Monroe
Boulevard, Audubon, PA 19403.
The above-referenced meetings are open to stakeholders. Further
information may be found at www.pjm.com.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER16-453, PJM Interconnection, L.L.C. and Northeast
Transmission Development, LLC.
Docket No. ER16-736, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
[[Page 63755]]
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket Nos. ER13-1944, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-1344, PJM Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C. and Potomac Electric
Power Company
Docket No. ER15-2562, PJM Interconnection, L.L.C.
Docket No. ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, L.L.C., et al. v. PJM
Interconnection, L.L.C.
Docket No. ER15-2114, PJM Interconnection, L.L.C. and Transource West
Virginia, L.L.C.
Docket No. EL15-79, TransSource, L.L.C. v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Delaware Public Service Commission, et al., v. PJM
Interconnection, L.L.C., et al.
Docket No. EL15-67, Linden VFT, L.L.C. v. PJM Interconnection, L.L.C.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER13-198, PJM Interconnection, L.L.C.
Docket No. ER16-1335, PJM Interconnection, L.L.C.
Docket No. ER16-1232, PJM Interconnection, L.L.C.
Docket No. ER16-1499, PJM Interconnection, L.L.C.
Docket No. ER16-1807, First Energy Solutions Corp.
Docket No. EL16-96, PJM Interconnection, L.L.C.
Docket No. EL16-71, Monongahela Power Company et al.
Docket No. ER16-2518, PJM Interconnection, L.L.C.
Docket No. ER16-2539, PJM Interconnection, L.L.C.
Docket No. ER16-2401, PJM Interconnection, L.L.C.
Docket No. EL16-109-000, Virginia Electric and Power Company v. PJM
Interconnection L.L.C.
For more information, contact the following:
Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, (202) 502-6604, Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, (202) 502-6474, Alina.Halay@ferc.gov.
Dated: September 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-22267 Filed 9-15-16; 8:45 am]
BILLING CODE 6717-01-P