Notice of Commission Staff Attendance at MISO Meetings, 63752-63753 [2016-22265]
Download as PDF
63752
Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices
Central Street, Millinocket, Maine
04462; Telephone (207) 723–4341, x118.
i. FERC Contact: Adam Peer, (202)
502–8449 or adam.peer@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing Mattaceunk Hydroelectric
Project consists of: (1) A 1,060-foot-long,
45-foot-high dam (Weldon Dam) with a
crest elevation of 236.0 feet (USGS
datum), and includes (i) a 110-foot-long
earthen embankment extending to the
left abutment; (ii) a combined intake
and powerhouse structure; (iii) an
upstream fish ladder; (iv) a 10-foot-wide
log sluice structure, controlled by an 8foot-high vertical slide gate; (v) a 90foot-long, 19-foot-high gated spillway
with a single roller gate; (vi) a 657.5foot-long, 70-foot high concrete gravity
overflow spillway with 4-foot-high
flashboards to create a maximum
flashboard crest elevation of 240.0 feet;
and (vii) a retaining wall at the right
abutment; (2) a 1,664-acre reservoir with
a total storage capacity of 20,981 acrefeet at a normal pool elevation of 240.00
feet (USGS datum); (3) a 142-foot-long,
99-foot-wide powerhouse (Weldon
Station) integral to the dam containing
two Kaplan turbines rated at 5,479
kilowatt (kW) and two fixed-blade
propeller turbines rated at 5,489 kW,
each driving a 6,000 kilovolt-ampere
(kVA), 4,800 kW vertical synchronous
generator for an authorized installed
capacity of 19.2 megawatts (MW); (4) a
downstream fishway; (5) an outdoor
substation adjacent to the powerhouse;
(6) a 9-mile-long, 34.5-kilovolt (kV)
transmission line within a 120-footwide right of way; and (7) appurtenant
facilities. The project generates about
123,332 megawatt-hours (MWh)
annually.
The Mattaceunk Project is operated
with minimal fluctuations of the
reservoir surface elevation. Flexibility
on reservoir elevations is required to
provide for safe installation of the
project’s flashboards and to allow an
adequate margin for wave action, debris
loads, or sudden pool increases that
might cause flashboard failure. The
existing license requires a reservoir
surface elevation no lower than 1.0 foot
below the dam crest elevation of 236.0
feet when the 4-foot-high flashboards
are not in use, and no lower than 2.0
feet below the top of flashboard
elevation of 240.0 feet when the 4-foothigh flashboards are in use. The existing
license also requires a year-round
continuous minimum flow of 1,674
cubic feet per second (cfs) or inflow,
whichever is less, and a daily average
minimum flow of 2,392 cfs from July 1
through September 30 and 2,000 cfs
from October 1 through June 30, unless
inflow is less than the stated daily
average minimum flows (in which case
outflow from the project must equal the
inflow to the project). Great Lakes
Hydro proposes to: (1) Install a seasonal
upstream eel ramp; (2) install an
upstream passage structure for
American shad, alewife, and blueback
herring; (3) install trashracks having 1inch clear spacing to the full depth of
the turbine intakes during the fish
passage season; and (4) improve the
recreation facility at the downstream
angler access area.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues Draft Environmental Assessment (EA) ...................................................................................................
Comments on Draft EA ...........................................................................................................................................................
Modified terms and conditions .................................................................................................................................................
Commission issues Final EA ...................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22266 Filed 9–15–16; 8:45 am]
mstockstill on DSK3G9T082PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:55 Sep 15, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance at MISO Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that Commission staff may attend
the following MISO-related meetings:
• Advisory Committee
Æ September 14, 10:15 a.m.–3 p.m.,
St. Paul Hotel, 350 Market Street,
St. Paul, MN
• Board of Directors Audit & Finance
Committee
Æ September 14, 3:45 p.m.–5 p.m., St.
Paul Hotel, 350 Market Street, St.
Paul, MN
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
October 2016.
December 2016.
June 2017.
July 2017.
September 2017.
December 2017.
• Board of Directors
Æ September 15, 8:30 a.m.–12 noon,
St. Paul Hotel, 350 Market Street,
St. Paul, MN
• Board of Directors Markets Committee
Æ September 13, 9 a.m.–12 noon, St.
Paul Hotel, 350 Market Street, St.
Paul, MN
• Board of Directors Corporate
Governance and Strategic Planning
Committee
Æ September 13, 11:15 a.m.–1 p.m.,
St. Paul Hotel, 350 Market Street,
St. Paul, MN
Unless otherwise noted all of the
meetings above will be held at either:
Carmel, MISO Headquarters, 701 City
Center Drive, 720 City Center Drive,
and Carmel, IN 46032.
E:\FR\FM\16SEN1.SGM
16SEN1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices
Little Rock, 1700 Centerview Drive,
Little Rock, AR.
Eagan, 2985 Ames Crossing Rd., Eagan,
MN.
Metarie, 3850 N. Causeway Blvd., Suite
442 Metairie, LA.
Further information and dial in
instructions may be found at
www.misoenergy.org. All times are
Local Prevailing Time.
The above-referenced meetings are
open to the public.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. ER11–4081, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–678, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–2302, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–187, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–186, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–101, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–89, MidAmerican
Energy Company
Docket No. ER12–1266, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1265, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–1924, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1943, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1944, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1945, Midcontinent
Independent System Operator, Inc.
Docket No. EL13–88, Northern Indiana
Public Service Corp. v Midcontinent
Independent System Operator, Inc., et
al.
Docket No. EL14–12, ABATE et al. v
Midcontinent Independent System
Operator, Inc., et al.
Docket No. AD12–16, Capacity
Deliverability across the MISO/PJM
Seam
Docket No. AD14–3, Coordination of
Energy and Capacity across the MISO/
PJM Seam
Docket No. ER13–1938, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–1736, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2445, Midcontinent
Independent System Operator, Inc.
VerDate Sep<11>2014
17:55 Sep 15, 2016
Jkt 238001
Docket No. ER15–133, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–530, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–767, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–945, Midcontinent
Independent System Operator, Inc.
Docket No. ER09–1431, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–2275, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–3279, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1194, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER15–1210, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1938, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–649, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2952, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2605, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–1210, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–943, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–469, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2657, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–533, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–534, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–675, Midcontinent
Independent System Operator, Inc.
Docket No. EL15–70, Public Citizen, Inc
v. Midcontinent Independent System
Operator, Inc.
Docket No. EL15–71, People of the State
of Illinois v. Midcontinent
Independent System Operator, Inc.
Docket No. EL15–72, Southwestern
Electric Cooperative, Inc. v.
Midcontinent Independent System
Operator, Inc.
Docket No. EL15–82, Illinois Industrial
Energy Consumers v. Midcontinent
Independent System Operator, Inc.
Docket No. ER16–696, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–770, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–833, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–56, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–1039, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–1096, Midcontinent
Independent System Operator, Inc.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
63753
Docket No. EL16–112, Coalition of
MISO Transmission Customers v.
Midcontinent Independent System
Operator, Inc.
For more information, contact Patrick
Clarey, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov, or Christopher
Miller, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (317) 249–5936 or
christopher.miller@ferc.gov.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–22265 Filed 9–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL16–71–000]
Notice of Institution of Section 206
Proceeding and Refund Effective Date
Monongahela Power Company
Potomac Edison Company
West Penn Power Company
AEP Indiana Michigan Transmission
Company, Inc.
AEP Kentucky Transmission Company, Inc.
AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company,
Inc.
Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana,
Inc.
Dayton Power and Light Company
Virginia Electric and Power Company
Public Service Electric and Gas Company
PECO Energy Company
PPL Electric Utilities Corporation
Baltimore Gas and Electric Company
Jersey Central Power & Light Company
Metropolitan Edison Company
Pennsylvania Electric Company
Potomac Electric Power Company
Atlantic City Electric Company
Delmarva Power & Light Company
UGI Utilities Inc.
Allegheny Electric Cooperative, Inc.
CED Rock Springs, LLC
Old Dominion Electric Cooperative
Rockland Electric Company
Duquesne Light Company
Neptune Regional Transmission System, LLC
Trans-Allegheny Interstate Line Company
Linden VFT, LLC
American Transmission Systems,
Incorporated
City of Cleveland, Department of Public
Utilities, Division of Cleveland Public
Power
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 81, Number 180 (Friday, September 16, 2016)]
[Notices]
[Pages 63752-63753]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-22265]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance at MISO Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that Commission staff may attend the following MISO-related
meetings:
Advisory Committee
[cir] September 14, 10:15 a.m.-3 p.m., St. Paul Hotel, 350 Market
Street, St. Paul, MN
Board of Directors Audit & Finance Committee
[cir] September 14, 3:45 p.m.-5 p.m., St. Paul Hotel, 350 Market
Street, St. Paul, MN
Board of Directors
[cir] September 15, 8:30 a.m.-12 noon, St. Paul Hotel, 350 Market
Street, St. Paul, MN
Board of Directors Markets Committee
[cir] September 13, 9 a.m.-12 noon, St. Paul Hotel, 350 Market
Street, St. Paul, MN
Board of Directors Corporate Governance and Strategic Planning
Committee
[cir] September 13, 11:15 a.m.-1 p.m., St. Paul Hotel, 350 Market
Street, St. Paul, MN
Unless otherwise noted all of the meetings above will be held at
either:
Carmel, MISO Headquarters, 701 City Center Drive, 720 City Center
Drive, and Carmel, IN 46032.
[[Page 63753]]
Little Rock, 1700 Centerview Drive, Little Rock, AR.
Eagan, 2985 Ames Crossing Rd., Eagan, MN.
Metarie, 3850 N. Causeway Blvd., Suite 442 Metairie, LA.
Further information and dial in instructions may be found at
www.misoenergy.org. All times are Local Prevailing Time.
The above-referenced meetings are open to the public.
The discussions at each of the meetings described above may address
matters at issue in the following proceedings:
Docket No. ER11-4081, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-678, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-2302, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER13-187, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER13-186, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER13-101, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER13-89, MidAmerican Energy Company
Docket No. ER12-1266, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1265, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER13-1924, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1943, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1944, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1945, Midcontinent Independent System Operator, Inc.
Docket No. EL13-88, Northern Indiana Public Service Corp. v
Midcontinent Independent System Operator, Inc., et al.
Docket No. EL14-12, ABATE et al. v Midcontinent Independent System
Operator, Inc., et al.
Docket No. AD12-16, Capacity Deliverability across the MISO/PJM Seam
Docket No. AD14-3, Coordination of Energy and Capacity across the MISO/
PJM Seam
Docket No. ER13-1938, Midcontinent Independent System Operator, Inc.
Docket No. ER14-1736, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2445, Midcontinent Independent System Operator, Inc.
Docket No. ER15-133, Midcontinent Independent System Operator, Inc.
Docket No. ER15-530, Midcontinent Independent System Operator, Inc.
Docket No. ER15-767, Midcontinent Independent System Operator, Inc.
Docket No. ER15-945, Midcontinent Independent System Operator, Inc.
Docket No. ER09-1431, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER11-2275, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER11-3279, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1194, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER15-1210, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1938, Midcontinent Independent System Operator, Inc.
Docket No. ER14-649, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2952, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2605, Midcontinent Independent System Operator, Inc.
Docket No. ER14-1210, Midcontinent Independent System Operator, Inc.
Docket No. ER15-943, Midcontinent Independent System Operator, Inc.
Docket No. ER16-469, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2657, Midcontinent Independent System Operator, Inc.
Docket No. ER16-533, Midcontinent Independent System Operator, Inc.
Docket No. ER16-534, Midcontinent Independent System Operator, Inc.
Docket No. ER16-675, Midcontinent Independent System Operator, Inc.
Docket No. EL15-70, Public Citizen, Inc v. Midcontinent Independent
System Operator, Inc.
Docket No. EL15-71, People of the State of Illinois v. Midcontinent
Independent System Operator, Inc.
Docket No. EL15-72, Southwestern Electric Cooperative, Inc. v.
Midcontinent Independent System Operator, Inc.
Docket No. EL15-82, Illinois Industrial Energy Consumers v.
Midcontinent Independent System Operator, Inc.
Docket No. ER16-696, Midcontinent Independent System Operator, Inc.
Docket No. ER16-770, Midcontinent Independent System Operator, Inc.
Docket No. ER16-833, Midcontinent Independent System Operator, Inc.
Docket No. ER16-56, Midcontinent Independent System Operator, Inc.
Docket No. ER16-1039, Midcontinent Independent System Operator, Inc.
Docket No. ER16-1096, Midcontinent Independent System Operator, Inc.
Docket No. EL16-112, Coalition of MISO Transmission Customers v.
Midcontinent Independent System Operator, Inc.
For more information, contact Patrick Clarey, Office of Energy
Markets Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov, or Christopher Miller, Office of
Energy Markets Regulation, Federal Energy Regulatory Commission at
(317) 249-5936 or christopher.miller@ferc.gov.
Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-22265 Filed 9-15-16; 8:45 am]