Notice of Commission Staff Attendance at MISO Meetings, 63752-63753 [2016-22265]

Download as PDF 63752 Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices Central Street, Millinocket, Maine 04462; Telephone (207) 723–4341, x118. i. FERC Contact: Adam Peer, (202) 502–8449 or adam.peer@ferc.gov. j. This application is not ready for environmental analysis at this time. k. The Project Description: The existing Mattaceunk Hydroelectric Project consists of: (1) A 1,060-foot-long, 45-foot-high dam (Weldon Dam) with a crest elevation of 236.0 feet (USGS datum), and includes (i) a 110-foot-long earthen embankment extending to the left abutment; (ii) a combined intake and powerhouse structure; (iii) an upstream fish ladder; (iv) a 10-foot-wide log sluice structure, controlled by an 8foot-high vertical slide gate; (v) a 90foot-long, 19-foot-high gated spillway with a single roller gate; (vi) a 657.5foot-long, 70-foot high concrete gravity overflow spillway with 4-foot-high flashboards to create a maximum flashboard crest elevation of 240.0 feet; and (vii) a retaining wall at the right abutment; (2) a 1,664-acre reservoir with a total storage capacity of 20,981 acrefeet at a normal pool elevation of 240.00 feet (USGS datum); (3) a 142-foot-long, 99-foot-wide powerhouse (Weldon Station) integral to the dam containing two Kaplan turbines rated at 5,479 kilowatt (kW) and two fixed-blade propeller turbines rated at 5,489 kW, each driving a 6,000 kilovolt-ampere (kVA), 4,800 kW vertical synchronous generator for an authorized installed capacity of 19.2 megawatts (MW); (4) a downstream fishway; (5) an outdoor substation adjacent to the powerhouse; (6) a 9-mile-long, 34.5-kilovolt (kV) transmission line within a 120-footwide right of way; and (7) appurtenant facilities. The project generates about 123,332 megawatt-hours (MWh) annually. The Mattaceunk Project is operated with minimal fluctuations of the reservoir surface elevation. Flexibility on reservoir elevations is required to provide for safe installation of the project’s flashboards and to allow an adequate margin for wave action, debris loads, or sudden pool increases that might cause flashboard failure. The existing license requires a reservoir surface elevation no lower than 1.0 foot below the dam crest elevation of 236.0 feet when the 4-foot-high flashboards are not in use, and no lower than 2.0 feet below the top of flashboard elevation of 240.0 feet when the 4-foothigh flashboards are in use. The existing license also requires a year-round continuous minimum flow of 1,674 cubic feet per second (cfs) or inflow, whichever is less, and a daily average minimum flow of 2,392 cfs from July 1 through September 30 and 2,000 cfs from October 1 through June 30, unless inflow is less than the stated daily average minimum flows (in which case outflow from the project must equal the inflow to the project). Great Lakes Hydro proposes to: (1) Install a seasonal upstream eel ramp; (2) install an upstream passage structure for American shad, alewife, and blueback herring; (3) install trashracks having 1inch clear spacing to the full depth of the turbine intakes during the fish passage season; and (4) improve the recreation facility at the downstream angler access area. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..................................................... Commission issues Draft Environmental Assessment (EA) ................................................................................................... Comments on Draft EA ........................................................................................................................................................... Modified terms and conditions ................................................................................................................................................. Commission issues Final EA ................................................................................................................................................... o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: September 8, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–22266 Filed 9–15–16; 8:45 am] mstockstill on DSK3G9T082PROD with NOTICES BILLING CODE 6717–01–P VerDate Sep<11>2014 17:55 Sep 15, 2016 Jkt 238001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance at MISO Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that Commission staff may attend the following MISO-related meetings: • Advisory Committee Æ September 14, 10:15 a.m.–3 p.m., St. Paul Hotel, 350 Market Street, St. Paul, MN • Board of Directors Audit & Finance Committee Æ September 14, 3:45 p.m.–5 p.m., St. Paul Hotel, 350 Market Street, St. Paul, MN PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 October 2016. December 2016. June 2017. July 2017. September 2017. December 2017. • Board of Directors Æ September 15, 8:30 a.m.–12 noon, St. Paul Hotel, 350 Market Street, St. Paul, MN • Board of Directors Markets Committee Æ September 13, 9 a.m.–12 noon, St. Paul Hotel, 350 Market Street, St. Paul, MN • Board of Directors Corporate Governance and Strategic Planning Committee Æ September 13, 11:15 a.m.–1 p.m., St. Paul Hotel, 350 Market Street, St. Paul, MN Unless otherwise noted all of the meetings above will be held at either: Carmel, MISO Headquarters, 701 City Center Drive, 720 City Center Drive, and Carmel, IN 46032. E:\FR\FM\16SEN1.SGM 16SEN1 mstockstill on DSK3G9T082PROD with NOTICES Federal Register / Vol. 81, No. 180 / Friday, September 16, 2016 / Notices Little Rock, 1700 Centerview Drive, Little Rock, AR. Eagan, 2985 Ames Crossing Rd., Eagan, MN. Metarie, 3850 N. Causeway Blvd., Suite 442 Metairie, LA. Further information and dial in instructions may be found at www.misoenergy.org. All times are Local Prevailing Time. The above-referenced meetings are open to the public. The discussions at each of the meetings described above may address matters at issue in the following proceedings: Docket No. ER11–4081, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–678, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–2302, Midwest Independent Transmission System Operator, Inc. Docket No. ER13–187, Midwest Independent Transmission System Operator, Inc. Docket No. ER13–186, Midwest Independent Transmission System Operator, Inc. Docket No. ER13–101, Midwest Independent Transmission System Operator, Inc. Docket No. ER13–89, MidAmerican Energy Company Docket No. ER12–1266, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1265, Midwest Independent Transmission System Operator, Inc. Docket No. ER13–1924, Midcontinent Independent System Operator, Inc. Docket No. ER13–1943, Midcontinent Independent System Operator, Inc. Docket No. ER13–1944, Midcontinent Independent System Operator, Inc. Docket No. ER13–1945, Midcontinent Independent System Operator, Inc. Docket No. EL13–88, Northern Indiana Public Service Corp. v Midcontinent Independent System Operator, Inc., et al. Docket No. EL14–12, ABATE et al. v Midcontinent Independent System Operator, Inc., et al. Docket No. AD12–16, Capacity Deliverability across the MISO/PJM Seam Docket No. AD14–3, Coordination of Energy and Capacity across the MISO/ PJM Seam Docket No. ER13–1938, Midcontinent Independent System Operator, Inc. Docket No. ER14–1736, Midcontinent Independent System Operator, Inc. Docket No. ER14–2445, Midcontinent Independent System Operator, Inc. VerDate Sep<11>2014 17:55 Sep 15, 2016 Jkt 238001 Docket No. ER15–133, Midcontinent Independent System Operator, Inc. Docket No. ER15–530, Midcontinent Independent System Operator, Inc. Docket No. ER15–767, Midcontinent Independent System Operator, Inc. Docket No. ER15–945, Midcontinent Independent System Operator, Inc. Docket No. ER09–1431, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–2275, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–3279, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1194, Midwest Independent Transmission System Operator, Inc. Docket No. ER15–1210, Midcontinent Independent System Operator, Inc. Docket No. ER13–1938, Midcontinent Independent System Operator, Inc. Docket No. ER14–649, Midcontinent Independent System Operator, Inc. Docket No. ER14–2952, Midcontinent Independent System Operator, Inc. Docket No. ER14–2605, Midcontinent Independent System Operator, Inc. Docket No. ER14–1210, Midcontinent Independent System Operator, Inc. Docket No. ER15–943, Midcontinent Independent System Operator, Inc. Docket No. ER16–469, Midcontinent Independent System Operator, Inc. Docket No. ER15–2657, Midcontinent Independent System Operator, Inc. Docket No. ER16–533, Midcontinent Independent System Operator, Inc. Docket No. ER16–534, Midcontinent Independent System Operator, Inc. Docket No. ER16–675, Midcontinent Independent System Operator, Inc. Docket No. EL15–70, Public Citizen, Inc v. Midcontinent Independent System Operator, Inc. Docket No. EL15–71, People of the State of Illinois v. Midcontinent Independent System Operator, Inc. Docket No. EL15–72, Southwestern Electric Cooperative, Inc. v. Midcontinent Independent System Operator, Inc. Docket No. EL15–82, Illinois Industrial Energy Consumers v. Midcontinent Independent System Operator, Inc. Docket No. ER16–696, Midcontinent Independent System Operator, Inc. Docket No. ER16–770, Midcontinent Independent System Operator, Inc. Docket No. ER16–833, Midcontinent Independent System Operator, Inc. Docket No. ER16–56, Midcontinent Independent System Operator, Inc. Docket No. ER16–1039, Midcontinent Independent System Operator, Inc. Docket No. ER16–1096, Midcontinent Independent System Operator, Inc. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 63753 Docket No. EL16–112, Coalition of MISO Transmission Customers v. Midcontinent Independent System Operator, Inc. For more information, contact Patrick Clarey, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov, or Christopher Miller, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (317) 249–5936 or christopher.miller@ferc.gov. Dated: September 8, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–22265 Filed 9–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL16–71–000] Notice of Institution of Section 206 Proceeding and Refund Effective Date Monongahela Power Company Potomac Edison Company West Penn Power Company AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc. AEP West Virginia Transmission Company, Inc. Appalachian Power Company Indiana Michigan Power Company Kentucky Power Company Kingsport Power Company Ohio Power Company Wheeling Power Company Commonwealth Edison Company Commonwealth Edison Company of Indiana, Inc. Dayton Power and Light Company Virginia Electric and Power Company Public Service Electric and Gas Company PECO Energy Company PPL Electric Utilities Corporation Baltimore Gas and Electric Company Jersey Central Power & Light Company Metropolitan Edison Company Pennsylvania Electric Company Potomac Electric Power Company Atlantic City Electric Company Delmarva Power & Light Company UGI Utilities Inc. Allegheny Electric Cooperative, Inc. CED Rock Springs, LLC Old Dominion Electric Cooperative Rockland Electric Company Duquesne Light Company Neptune Regional Transmission System, LLC Trans-Allegheny Interstate Line Company Linden VFT, LLC American Transmission Systems, Incorporated City of Cleveland, Department of Public Utilities, Division of Cleveland Public Power E:\FR\FM\16SEN1.SGM 16SEN1

Agencies

[Federal Register Volume 81, Number 180 (Friday, September 16, 2016)]
[Notices]
[Pages 63752-63753]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-22265]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance at MISO Meetings

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that Commission staff may attend the following MISO-related 
meetings:

 Advisory Committee
    [cir] September 14, 10:15 a.m.-3 p.m., St. Paul Hotel, 350 Market 
Street, St. Paul, MN
 Board of Directors Audit & Finance Committee
    [cir] September 14, 3:45 p.m.-5 p.m., St. Paul Hotel, 350 Market 
Street, St. Paul, MN
 Board of Directors
    [cir] September 15, 8:30 a.m.-12 noon, St. Paul Hotel, 350 Market 
Street, St. Paul, MN
 Board of Directors Markets Committee
    [cir] September 13, 9 a.m.-12 noon, St. Paul Hotel, 350 Market 
Street, St. Paul, MN
 Board of Directors Corporate Governance and Strategic Planning 
Committee
    [cir] September 13, 11:15 a.m.-1 p.m., St. Paul Hotel, 350 Market 
Street, St. Paul, MN

    Unless otherwise noted all of the meetings above will be held at 
either:

Carmel, MISO Headquarters, 701 City Center Drive, 720 City Center 
Drive, and Carmel, IN 46032.

[[Page 63753]]

Little Rock, 1700 Centerview Drive, Little Rock, AR.
Eagan, 2985 Ames Crossing Rd., Eagan, MN.
Metarie, 3850 N. Causeway Blvd., Suite 442 Metairie, LA.

Further information and dial in instructions may be found at 
www.misoenergy.org. All times are Local Prevailing Time.
    The above-referenced meetings are open to the public.
    The discussions at each of the meetings described above may address 
matters at issue in the following proceedings:

Docket No. ER11-4081, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER12-678, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER12-2302, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER13-187, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER13-186, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER13-101, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER13-89, MidAmerican Energy Company
Docket No. ER12-1266, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER12-1265, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER13-1924, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1943, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1944, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1945, Midcontinent Independent System Operator, Inc.
Docket No. EL13-88, Northern Indiana Public Service Corp. v 
Midcontinent Independent System Operator, Inc., et al.
Docket No. EL14-12, ABATE et al. v Midcontinent Independent System 
Operator, Inc., et al.
Docket No. AD12-16, Capacity Deliverability across the MISO/PJM Seam
Docket No. AD14-3, Coordination of Energy and Capacity across the MISO/
PJM Seam
Docket No. ER13-1938, Midcontinent Independent System Operator, Inc.
Docket No. ER14-1736, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2445, Midcontinent Independent System Operator, Inc.
Docket No. ER15-133, Midcontinent Independent System Operator, Inc.
Docket No. ER15-530, Midcontinent Independent System Operator, Inc.
Docket No. ER15-767, Midcontinent Independent System Operator, Inc.
Docket No. ER15-945, Midcontinent Independent System Operator, Inc.
Docket No. ER09-1431, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER11-2275, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER11-3279, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER12-1194, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER15-1210, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1938, Midcontinent Independent System Operator, Inc.
Docket No. ER14-649, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2952, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2605, Midcontinent Independent System Operator, Inc.
Docket No. ER14-1210, Midcontinent Independent System Operator, Inc.
Docket No. ER15-943, Midcontinent Independent System Operator, Inc.
Docket No. ER16-469, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2657, Midcontinent Independent System Operator, Inc.
Docket No. ER16-533, Midcontinent Independent System Operator, Inc.
Docket No. ER16-534, Midcontinent Independent System Operator, Inc.
Docket No. ER16-675, Midcontinent Independent System Operator, Inc.
Docket No. EL15-70, Public Citizen, Inc v. Midcontinent Independent 
System Operator, Inc.
Docket No. EL15-71, People of the State of Illinois v. Midcontinent 
Independent System Operator, Inc.
Docket No. EL15-72, Southwestern Electric Cooperative, Inc. v. 
Midcontinent Independent System Operator, Inc.
Docket No. EL15-82, Illinois Industrial Energy Consumers v. 
Midcontinent Independent System Operator, Inc.
Docket No. ER16-696, Midcontinent Independent System Operator, Inc.
Docket No. ER16-770, Midcontinent Independent System Operator, Inc.
Docket No. ER16-833, Midcontinent Independent System Operator, Inc.
Docket No. ER16-56, Midcontinent Independent System Operator, Inc.
Docket No. ER16-1039, Midcontinent Independent System Operator, Inc.
Docket No. ER16-1096, Midcontinent Independent System Operator, Inc.
Docket No. EL16-112, Coalition of MISO Transmission Customers v. 
Midcontinent Independent System Operator, Inc.

    For more information, contact Patrick Clarey, Office of Energy 
Markets Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov, or Christopher Miller, Office of 
Energy Markets Regulation, Federal Energy Regulatory Commission at 
(317) 249-5936 or christopher.miller@ferc.gov.

    Dated: September 8, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-22265 Filed 9-15-16; 8:45 am]
BILLING CODE 6717-01-P