Download as PDF 63174 Federal Register / Vol. 81, No. 178 / Wednesday, September 14, 2016 / Notices Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 9842 is issued to the licensee for a period effective September 1, 2016 through August 31, 2017 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before August 31, 2017, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, Mr. Ray F. Ward, is authorized to continue operation of the Ward Mill Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: September 7, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–22014 Filed 9–13–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14504–001] asabaliauskas on DSK3SPTVN1PROD with NOTICES FFP Project 121, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 14504–001. c. Date Filed: July 26, 2016. d. Submitted By: Rye Development, LLC on behalf of FFP Project 121, LLC. e. Name of Project: New Cumberland Locks and Dam Hydroelectric Project. f. Location: At the existing Army Corps of Engineers’ New Cumberland Locks and Dam on the Ohio River in Jefferson County, Ohio and Hancock County, West Virginia. The project would occupy United States lands administered by the U.S. Army Corps of Engineers. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Applicant Contact: Mr. Erik Steimle, Vice President—Development, VerDate Sep<11>2014 20:55 Sep 13, 2016 Jkt 238001 Rye Development, LLC, 334 NW 11th Ave., Portland, OR 97209; (503) 998– 0230; email: erik@ryedevelopment.com. i. FERC Contact: Andy Bernick at (202) 502–8660; or email at andrew.bernick@ferc.gov. j. FFP Project 121, LLC filed its request to use the Traditional Licensing Process on July 26, 2016. FFP Project 121, LLC provided public notice of its request on July 29 through August 4, 2016. In a letter dated September 6, 2016, the Director of the Division of Hydropower Licensing approved FFP Project 121, LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Ohio and West Virginia State Historic Preservation officers, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating FFP Project 121, LLC as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. FFP Project 121, LLC filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 For assistance, contact FERC Online Support. Dated: September 6, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–22015 Filed 9–13–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC14–78–003. Applicants: NRG Energy, Inc. Description: Request for Amended Blanket Authorization of NRG Energy, Inc., et al. Filed Date: 9/6/16. Accession Number: 20160906–5429. Comments Due: 5 p.m. ET 9/27/16. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG16–146–000. Applicants: Indeck Niles, LLC. Description: Self-Certification of exempt wholesale generator (‘‘EWG’’) status of Indeck Niles, LLC. Filed Date: 9/7/16. Accession Number: 20160907–5110. Comments Due: 5 p.m. ET 9/28/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–058; ER10–2319–049; ER10–2317–049; ER13–1351–031; ER10–2330–056. Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama LLC, BE CA LLC, Florida Power Development LLC, Utility Contract Funding, L.L.C. Description: Notice of Non-Material Change in Status of the J.P. Morgan Sellers. Filed Date: 9/6/16. Accession Number: 20160906–5434. Comments Due: 5 p.m. ET 9/27/16. Docket Numbers: ER15–1706–004. Applicants: Newark Energy Center, LLC. Description: Compliance filing: Errata re Settlement Compliance Filing re EL15–97 et al to be effective 9/21/2015. Filed Date: 9/7/16. Accession Number: 20160907–5059. Comments Due: 5 p.m. ET 9/28/16. Docket Numbers: ER15–2631–004. Applicants: Odell Wind Farm, LLC. Description: Notice of Non-Material Change in Status of Odell Wind Farm, LLC. E:\FR\FM\14SEN1.SGM 14SEN1 asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 178 / Wednesday, September 14, 2016 / Notices Filed Date: 9/6/16. Accession Number: 20160906–5430. Comments Due: 5 p.m. ET 9/27/16. Docket Numbers: ER16–915–001. Applicants: Comanche Solar PV, LLC. Description: Notice of Non-Material Change in Status of Comanche Solar PV, LLC. Filed Date: 9/6/16. Accession Number: 20160906–5433. Comments Due: 5 p.m. ET 9/27/16. Docket Numbers: ER16–1718–001. Applicants: Tesoro Refining & Marketing Company LLC. Description: Market-Based Triennial Review Filing: Tesoro Amended Triennial Review Filing to be effective N/A. Filed Date: 9/7/16. Accession Number: 20160907–5088. Comments Due: 5 p.m. ET 11/7/16. Docket Numbers: ER16–2360–000. Applicants: Great Western Wind Energy, LLC. Description: Supplement to August 2, 2016 Great Western Wind Energy, LLC tariff under ER16–2360. Filed Date: 9/6/16. Accession Number: 20160906–5439. Comments Due: 5 p.m. ET 9/20/16. Docket Numbers: ER16–2557–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1139R2 Southwestern Public Service Company NITSA NOA Notice of Cancellation to be effective 2/1/2016. Filed Date: 9/7/16. Accession Number: 20160907–5062. Comments Due: 5 p.m. ET 9/28/16. Docket Numbers: ER16–2558–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: E&P Agreements for Alamo Springs Solar 1 and 2 to be effective 9/8/2016. Filed Date: 9/7/16. Accession Number: 20160907–5123. Comments Due: 5 p.m. ET 9/28/16. Docket Numbers: ER16–2559–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Queue Position Z2–089/AA2–099, Original Service Agreement No. 4525 to be effective 8/8/2016. Filed Date: 9/7/16. Accession Number: 20160907–5177. Comments Due: 5 p.m. ET 9/28/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s VerDate Sep<11>2014 20:55 Sep 13, 2016 Jkt 238001 Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2016–22041 Filed 9–13–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM12–17–000; Docket No. RM01–5–000] Revisions to Procedural Regulations Governing Transportation by Intrastate Pipelines; Electronic Tariff Filings; Notice of Changes to Etariff Part 284 Type of Filing Codes As the Commission recently stated in Atmos Pipeline—Texas 1 and Narragansett Electric Company,2 all filings that invoke Part 284 of the Commission’s regulations must be made via eTariff. Take notice that, effective November 7, 2016, the list of available eTariff Type of Filing Codes (TOFC) 3 will be modified as per the Appendix to this notice.4 For a more complete guide on filings under Natural Gas Policy Act of 1978 section 311 and Natural Gas Act section 1(c), see https://www.ferc.gov/industries/ gas/gen-info/intrastate-trans.asp. For further information, contact James Sarikas, Office of Energy Market 1 156 FERC ¶ 61,094 (2016). State Rate Certification filings should use TOFC 1360, or TOFC 1260 for the optional filing procedures under section 284.123(g). 2 155 FERC ¶ 61,159 (2016). A Hinshaw pipeline filing a cost and throughput study should use TOFC 790, or TOFC 1370 for the optional filing procedures under section 284.123(g). 3 The type of filing business process categories are described in the Implementation Guide for Electronic Filing of Parts 35, 154, 284, 300, and 341 Tariff Filings (August 12, 2013), found on the Commission’s Web site, https://www.ferc.gov/docsfiling/etariff/implementation-guide.pdf. 4 These TOFC were most recently modified in Order No. 781, effective September 30, 2013, which revised Part 284 to provide optional notice procedures. Revisions to Procedural Regulations Governing Transportation by Intrastate Pipelines, 144 FERC ¶ 61,034 (2013). Frm 00010 Fmt 4703 Sfmt 4703 Regulation at (202) 502–6831 or James.Sarikas@ferc.gov. Dated: September 6, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–22016 Filed 9–13–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Dated: September 7, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. PO 00000 63175 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP11–2473–000. Applicants: Gulf South Pipeline Company, LP. Description: Report Filing: 2015 Cash Pool Filing. Filed Date: 9/1/16. Accession Number: 20160901–5082. Comments Due: 5 p.m. ET 9/13/16. Docket Numbers: RP11–2474–000. Applicants: Gulf Crossing Pipeline Company LLC. Description: Report Filing: 2015 Cash Pool Filing. Filed Date: 9/1/16. Accession Number: 20160901–5078. Comments Due: 5 p.m. ET 9/13/16. Docket Numbers: RP16–1222–000. Applicants: Dominion Cove Point LNG, LP. Description: Compliance filing DCP— 2016 Revenue Crediting Report. Filed Date: 9/1/16. Accession Number: 20160901–5070. Comments Due: 5 p.m. ET 9/13/16. Docket Numbers: RP16–1223–000. Applicants: Enable Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing—September 2016 CERC 1019 LER 8744 to be effective 9/ 1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5086. Comments Due: 5 p.m. ET 9/13/16. Docket Numbers: RP16–1224–000. Applicants: Cimarron River Pipeline, LLC. Description: § 4(d) Rate Filing: Fuel Tracker 2016—Winter Season Rates to be effective 11/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5133. Comments Due: 5 p.m. ET 9/13/16. Docket Numbers: RP16–1225–000. Applicants: Columbia Gulf Transmission, LLC. Description: Annual Cash-Out Report of Columbia Gulf Transmission, LLC under RP16–1225. E:\FR\FM\14SEN1.SGM 14SEN1

Agencies

[Federal Register Volume 81, Number 178 (Wednesday, September 14, 2016)]
[Notices]
[Pages 63174-63175]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-22041]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC14-78-003.
    Applicants: NRG Energy, Inc.
    Description: Request for Amended Blanket Authorization of NRG 
Energy, Inc., et al.
    Filed Date: 9/6/16.
    Accession Number: 20160906-5429.
    Comments Due: 5 p.m. ET 9/27/16.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG16-146-000.
    Applicants: Indeck Niles, LLC.
    Description: Self-Certification of exempt wholesale generator 
(``EWG'') status of Indeck Niles, LLC.
    Filed Date: 9/7/16.
    Accession Number: 20160907-5110.
    Comments Due: 5 p.m. ET 9/28/16.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2331-058; ER10-2319-049; ER10-2317-049; ER13-
1351-031; ER10-2330-056.
    Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama 
LLC, BE CA LLC, Florida Power Development LLC, Utility Contract 
Funding, L.L.C.
    Description: Notice of Non-Material Change in Status of the J.P. 
Morgan Sellers.
    Filed Date: 9/6/16.
    Accession Number: 20160906-5434.
    Comments Due: 5 p.m. ET 9/27/16.

    Docket Numbers: ER15-1706-004.
    Applicants: Newark Energy Center, LLC.
    Description: Compliance filing: Errata re Settlement Compliance 
Filing re EL15-97 et al to be effective 9/21/2015.
    Filed Date: 9/7/16.
    Accession Number: 20160907-5059.
    Comments Due: 5 p.m. ET 9/28/16.

    Docket Numbers: ER15-2631-004.
    Applicants: Odell Wind Farm, LLC.
    Description: Notice of Non-Material Change in Status of Odell Wind 
Farm, LLC.

[[Page 63175]]

    Filed Date: 9/6/16.
    Accession Number: 20160906-5430.
    Comments Due: 5 p.m. ET 9/27/16.

    Docket Numbers: ER16-915-001.
    Applicants: Comanche Solar PV, LLC.
    Description: Notice of Non-Material Change in Status of Comanche 
Solar PV, LLC.
    Filed Date: 9/6/16.
    Accession Number: 20160906-5433.
    Comments Due: 5 p.m. ET 9/27/16.

    Docket Numbers: ER16-1718-001.
    Applicants: Tesoro Refining & Marketing Company LLC.
    Description: Market-Based Triennial Review Filing: Tesoro Amended 
Triennial Review Filing to be effective N/A.
    Filed Date: 9/7/16.
    Accession Number: 20160907-5088.
    Comments Due: 5 p.m. ET 11/7/16.

    Docket Numbers: ER16-2360-000.
    Applicants: Great Western Wind Energy, LLC.
    Description: Supplement to August 2, 2016 Great Western Wind 
Energy, LLC tariff under ER16-2360.
    Filed Date: 9/6/16.
    Accession Number: 20160906-5439.
    Comments Due: 5 p.m. ET 9/20/16.

    Docket Numbers: ER16-2557-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1139R2 Southwestern Public 
Service Company NITSA NOA Notice of Cancellation to be effective 2/1/
2016.
    Filed Date: 9/7/16.
    Accession Number: 20160907-5062.
    Comments Due: 5 p.m. ET 9/28/16.

    Docket Numbers: ER16-2558-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: E&P Agreements for Alamo 
Springs Solar 1 and 2 to be effective 9/8/2016.
    Filed Date: 9/7/16.
    Accession Number: 20160907-5123.
    Comments Due: 5 p.m. ET 9/28/16.

    Docket Numbers: ER16-2559-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Queue Position Z2-089/AA2-
099, Original Service Agreement No. 4525 to be effective 8/8/2016.
    Filed Date: 9/7/16.
    Accession Number: 20160907-5177.
    Comments Due: 5 p.m. ET 9/28/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 7, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-22041 Filed 9-13-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.