Crown Hydro, LLC; Minnesota Notice of Availability of Draft Environmental Assessment, 62494 [2016-21746]

Download as PDF 62494 Federal Register / Vol. 81, No. 175 / Friday, September 9, 2016 / Notices Total Peaking would also install a third boil-off gas compressor unit powered by a 150 horsepower electric motor as well as ancillary electrical upgrades. DEPARTMENT OF ENERGY Background [Project No. 11175–025] On November 9, 2015, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Vaporization Capacity Increase and BOG Compressor Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. The Commission did not receive any comments in response to the NOI. The U.S. Department of Transportation is a cooperating agency in the preparation of the EA. Crown Hydro, LLC; Minnesota Notice of Availability of Draft Environmental Assessment asabaliauskas on DSK3SPTVN1PROD with NOTICES Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP15–557), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: September 2, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–21744 Filed 9–8–16; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:11 Sep 08, 2016 Jkt 238001 Federal Energy Regulatory Commission In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC’s) regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No. 486,52 Federal Register [FR] 47897), the Office of Energy Projects has reviewed Crown Hydro, LLC’s application for an amendment to original license for the Crown Mill Hydroelectric Project (FERC Project No. 11175), that would be located on the Mississippi River at the U.S. Army Corps of Engineers’ (Corps’) lock facility in Minneapolis, Minnesota. Staff prepared a draft environmental assessment (EA), which analyzes the potential environmental effects of amending the license for the project, and concludes that the amended license, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the draft EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll-free at 1–866–208–3676, or for TTY, 202–502–8659. You may also register online at www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For further information, contact Mo Fayyad by telephone at (202) 502–8759, or at mo.fayyad@ferc.gov. Dated: September 2, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–21746 Filed 9–8–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–175–000. Applicants: Grand View PV Solar Two LLC. Description: Application for Authorization Under Section 203 of Grand View PV Solar Two LLC. Filed Date: 8/31/16. Accession Number: 20160831–5364. Comments Due: 5 p.m. ET 9/21/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2641–026; ER10–2663–026; ER10–2881–026; ER10–2882–027; ER10–2883–026; ER10–2884–026; ER10–2885–026; ER10–2886–027; ER13–1101–022; ER13–1541–021; ER14–661–013; ER14– 787–015; ER15–54–007; ER15–55–007; ER15–647–004; ER15–1475–008; ER15– 2191–003; ER15–2453–003; ER15–2593– 007; ER16–452–007; ER16–705–005; ER16–706–005; ER16–1154–005. Applicants: Oleander Power Project, L.P., Southern Company—Florida LLC, Southern Power Company, Alabama Power Company, Georgia Power Company, Mississippi Power Company, Gulf Power Company, Southern Turner Cimarron I, LLC, Spectrum Nevada Solar, LLC, Campo Verde Solar, LLC, SG2 Imperial Valley LLC, Macho Springs Solar, LLC, Lost Hills Solar, LLC, Blackwell Solar, LLC, Kay Wind, LLC, North Star Solar, LLC, Grant Wind, LLC, Passadumkeag Windpark, LLC, Desert Stateline LLC, RE Tranquillity LLC, RE Garland A LLC, RE Garland LLC, Parrey, LLC. Description: Errata to August 1, 2016 Notification of Non-Material of Change E:\FR\FM\09SEN1.SGM 09SEN1

Agencies

[Federal Register Volume 81, Number 175 (Friday, September 9, 2016)]
[Notices]
[Page 62494]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-21746]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 11175-025]


Crown Hydro, LLC; Minnesota Notice of Availability of Draft 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission or FERC's) 
regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No. 
486,52 Federal Register [FR] 47897), the Office of Energy Projects has 
reviewed Crown Hydro, LLC's application for an amendment to original 
license for the Crown Mill Hydroelectric Project (FERC Project No. 
11175), that would be located on the Mississippi River at the U.S. Army 
Corps of Engineers' (Corps') lock facility in Minneapolis, Minnesota.
    Staff prepared a draft environmental assessment (EA), which 
analyzes the potential environmental effects of amending the license 
for the project, and concludes that the amended license, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    A copy of the draft EA is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
at www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659.
    You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 30 days from the date of this 
notice. Comments may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426.
    For further information, contact Mo Fayyad by telephone at (202) 
502-8759, or at mo.fayyad@ferc.gov.

    Dated: September 2, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-21746 Filed 9-8-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.