Southeastern Power Administration; Notice of Filing, 62495-62496 [2016-21682]

Download as PDF asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 175 / Friday, September 9, 2016 / Notices in Status of Oleander Power Project, Limited Partnership, et al. Filed Date: 8/31/16. Accession Number: 20160831–5404. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER11–4028–008. Applicants: Portsmouth Genco, LLC. Description: Notice of Non-Material Change in Status of Portsmouth Genco, LLC. Filed Date: 8/31/16. Accession Number: 20160831–5398. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER16–1255–001. Applicants: Antelope Big Sky Ranch LLC. Description: Compliance filing: Antelope Big Sky Ranch LLC MBR Tariff to be effective 5/21/2016. Filed Date: 8/31/16. Accession Number: 20160831–5158. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER16–2522–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 3243 City of Piggott, AR Municipal Light, Water and Sewer NITSA NOA to be effective 8/1/2016. Filed Date: 8/31/16. Accession Number: 20160831–5360. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER16–2523–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 3244 City of Malden ? Board of Public Works NITSA NOA to be effective 8/1/2016. Filed Date: 8/31/16. Accession Number: 20160831–5361. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER16–2524–000. Applicants: Entergy Louisiana, LLC. Description: Section 205(d) Rate Filing: EES LBA Agreements to be effective 9/1/2016. Filed Date: 8/31/16. Accession Number: 20160831–5363. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER16–2525–000. Applicants: PJM Interconnection, L.L.C. Description: Notice of cancellation of Three Service Agreements of PJM Interconnection, L.L.C. Filed Date: 8/31/16. Accession Number: 20160831–5375. Comments Due: 5 p.m. ET 9/21/16. Docket Numbers: ER16–2526–000. Applicants: WSPP Inc. Description: Section 205(d) Rate Filing: Schedule Q PacifiCorp Normal 2016 to be effective 6/9/2016. Filed Date: 9/1/16. Accession Number: 20160901–5037. Comments Due: 5 p.m. ET 9/22/16. VerDate Sep<11>2014 17:11 Sep 08, 2016 Jkt 238001 Docket Numbers: ER16–2527–000. Applicants: Caprock Solar I LLC. Description: Baseline eTariff Filing: MBR Tariff and Application to be effective 11/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5049. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2528–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) Rate Filing: 2016–09–01_SA 6507_ Termination of White Pine 1 SSR Agreement to be effective 11/26/2016. Filed Date: 9/1/16. Accession Number: 20160901–5057. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2529–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: Section 205(d) Rate Filing: Revisions to Net Commitment Period Compensation Calculation for Dual Fuel Audits to be effective 11/1/ 2016. Filed Date: 9/1/16. Accession Number: 20160901–5087. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2530–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 2028R9 Sunflower Electric Power Corporation NITSA NOA Notice of Cancellation to be effective 6/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5107. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2531–000. Applicants: NYSEG Solutions, LLC. Description: Tariff Cancellation: Cancellation to be effective 9/30/2016. Filed Date: 9/1/16. Accession Number: 20160901–5146. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2532–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) Rate Filing: 2016–09–01_Filing to Amend RPU Attachment O and Protocols to be effective 11/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5156. Comments Due: 5 p.m. ET 9/22/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 62495 time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 1, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–21679 Filed 9–8–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EF16–7–000] Southeastern Power Administration; Notice of Filing Take notice that on August 29, 2016, Southeastern Power Administration submitted a tariff filing per: Jim Woodruff System Rate Adjustment to be effective 10/1/2016. Any person desiring to intervene or to protest in this proceeding must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the E:\FR\FM\09SEN1.SGM 09SEN1 62496 Federal Register / Vol. 81, No. 175 / Friday, September 9, 2016 / Notices Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov.or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on September 28, 2016. Dated: September 1, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–21682 Filed 9–8–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission asabaliauskas on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–2234–001. Applicants: EF Kenilworth LLC. Description: Tariff Amendment: Supplement to Market-Based Rate Application to be effective 7/20/2016. Filed Date: 8/31/16. Accession Number: 20160831–5183. Comments Due: 5 p.m. ET 9/12/16. Docket Numbers: ER16–2533–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Revisions to the Parameter Limited Schedule Exception Process to be effective 10/31/2016. Filed Date: 9/1/16. Accession Number: 20160901–5184. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2534–000. Applicants: Midcontinent Independent System Operator, Inc., Northern Indiana Public Service Company. Description: Section 205(d) Rate Filing: 2016–09–01_NIPSCO Request for Approval of Depreciation Rates to be effective 10/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5189. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2535–000. VerDate Sep<11>2014 17:11 Sep 08, 2016 Jkt 238001 Applicants: New England Power Pool Participants Committee. Description: Section 205(d) Rate Filing: Sep 2016 Membership Filing to be effective 8/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5218. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2536–000. Applicants: Pacific Gas and Electric Company. Description: Tariff Cancellation: Termination of PWRPA’s Ramal Road and River Road WDT Service Agreements to be effective 11/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5230. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2537–000. Applicants: Tucson Electric Power Company. Description: Tariff Cancellation: Cancellation of Service Agreement No. 356 to be effective 5/27/2015. Filed Date: 9/1/16. Accession Number: 20160901–5234. Comments Due: 5 p.m. ET 9/22/16. Docket Numbers: ER16–2538–000. Applicants: Tucson Electric Power Company. Description: Tariff Cancellation: Cancellation of Service Agreement Nos. 319, 345, 346, 347, 348 and 357 to be effective 9/1/2016. Filed Date: 9/1/16. Accession Number: 20160901–5235. Comments Due: 5 p.m. ET 9/22/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 1, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–21680 Filed 9–8–16; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14453–001; 14791–000] Prineville Energy Storage LLC, Ochoco Irrigation District; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 1, 2016, Prineville Energy Storage LLC (Prineville) and Ochoco Irrigation District (Ochoco) filed preliminary permit applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of a hydropower project at the U.S. Army Corps of Engineers’ (Corps) Prineville Reservoir and Arthur Bowman Dam, located on the Crooked River near the City of Prineville in Crook County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. Prineville’s project would be a pumped storage project that uses the Corps’ Prineville Reservoir as the lower reservoir. The project would consist of the following new facilities: (1) A 40foot-high, 7,700-foot-long concrete-faced rockfill embankment creating a 64-acre upper reservoir; (2) a 15-foot-diameter, 1,400-foot-long low pressure tunnel; (3) two 11-foot-diameter, 1,880-foot-long high pressure conduit; (4) a powerhouse with two 100-megawatt (MW) reversible pump turbines located 365 feet west of the Prineville Reservoir; (5) a tailrace; and (6) a 16-mile-long, 115-kilovolt (kV) transmission line interconnecting with the Ponderosa substation. The Prineville Project would have an average annual generation of 525,600 megawatt-hours (MWh). Applicants Contact: Mr. Matthew Shapiro, CEO, Prineville Energy Storage, LLC, 1210 W. Franklin Street, Ste. 2, Boise, ID 83702. (208) 246–9925. Ochoco’s Bowman Dam Project would be a conventional project that uses the Corps’ existing intake structure at the Bowman Dam and Prineville Reservoir, and the following new facilities: (1) A 10-foot-diameter, 310-foot-long steel pipe inserted into the Corps’ existing intake tunnel; (2) a valve chamber; (3) a 9-foot-diameter, 108.44-foot-long steel penstock; (4) a powerhouse with one 3MW and one 1-MW Francis turbine/ E:\FR\FM\09SEN1.SGM 09SEN1

Agencies

[Federal Register Volume 81, Number 175 (Friday, September 9, 2016)]
[Notices]
[Pages 62495-62496]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-21682]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EF16-7-000]


Southeastern Power Administration; Notice of Filing

    Take notice that on August 29, 2016, Southeastern Power 
Administration submitted a tariff filing per: Jim Woodruff System Rate 
Adjustment to be effective 10/1/2016.
    Any person desiring to intervene or to protest in this proceeding 
must file in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or 
before 5:00 p.m. Eastern time on the specified comment date. Protests 
will be considered by the Commission in determining the appropriate 
action to be taken, but will not serve to make protestants parties to 
the proceeding. Any person wishing to become a party must file a notice 
of intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the

[[Page 62496]]

Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    The filings in the above proceeding are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive email notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please email FERCOnlineSupport@ferc.gov.or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern time on September 28, 2016.

    Dated: September 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-21682 Filed 9-8-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.