San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange; Notice of Compliance Filing, 62117-62118 [2016-21416]

Download as PDF Federal Register / Vol. 81, No. 174 / Thursday, September 8, 2016 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–496–000] mstockstill on DSK3G9T082PROD with NOTICES Tennessee Gas Pipeline Company, L.L.C.; Notice of Application Take notice that on August 19, 2016, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Suite 1000, Houston, Texas 77002, filed an application pursuant to section 7(c) of the Natural Gas Act (NGA) and the Federal Energy Regulatory Commission’s (Commission) regulations seeking authorization to construct, and operate certain compression facilities located in Texas (Lone Star Project), all as more fully described in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. The Lone Star Project includes the construction, and operation of the following facilities in the state of Texas: (1) Construction of a new 10,915 horsepower (hp) compressor station 3A to be located in San Patricio County, Texas; and (2) construction of a new 10,500 hp compressor station 11A to be located in Jackson County, Texas. The proposed facilities will be located on Tennessee’s 100 Line, between Tennessee’s existing Compressor Station 1 and Compressor Station 17, in San Patricio and Jackson counties, Texas. Tennessee states that the facilities will provide firm transportation service of up to 300,000 dekatherms per day to Corpus Christi Liquefaction, LLC. The estimated cost of the project is $131.9 million. Any questions regarding this application should be directed to John Griffin, Assistant General Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Suite 1000, Houston, Texas 77002, or call (713) 420–3624, or by email John_ Griffin2@kindermorgan.com, or Ellen Eastham, Senior Regulatory Analyst II, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Suite 1000, Houston, Texas 77002, or call (713) 420–4344, or by email Ellen_ Eastham@kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, VerDate Sep<11>2014 19:34 Sep 07, 2016 Jkt 238001 within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 62117 project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on September 22, 2016. Dated: September 1, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–21566 Filed 9–7–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL00–95–291; EL00–98–263] San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange; Notice of Compliance Filing Take notice that on August 29, 2016, the California Independent System Operator Corporation submitted additional information related to May 4, 2016 Refund Rerun Compliance Filing pursuant to the Federal Energy Regulatory Commission’s (Commission) July 15, 2011 Order Accepting E:\FR\FM\08SEN1.SGM 08SEN1 62118 Federal Register / Vol. 81, No. 174 / Thursday, September 8, 2016 / Notices Compliance Filings and Providing Guidance.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on September 23, 2016. Dated: August 31, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–21416 Filed 9–7–16; 8:45 am] mstockstill on DSK3G9T082PROD with NOTICES BILLING CODE 6717–01–P 1 San Diego Gas & Elec. Co. v. Sellers of Energy and Ancillary Servs., 136 FERC ¶ 61,036 (2011). VerDate Sep<11>2014 19:34 Sep 07, 2016 Jkt 238001 Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–2492–000] Phoenix Energy New England, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Phoenix Energy New England, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 19, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 Dated: August 29, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–21528 Filed 9–7–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–2496–000] CXA Sundevil I, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of CXA Sundevil I, Inc.‘s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 19, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. E:\FR\FM\08SEN1.SGM 08SEN1

Agencies

[Federal Register Volume 81, Number 174 (Thursday, September 8, 2016)]
[Notices]
[Pages 62117-62118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-21416]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL00-95-291; EL00-98-263]


San Diego Gas & Electric Company v. Sellers of Energy and 
Ancillary Services Into Markets Operated by the California Independent 
System Operator Corporation and the California Power Exchange; 
Investigation of Practices of the California Independent System 
Operator and the California Power Exchange; Notice of Compliance Filing

    Take notice that on August 29, 2016, the California Independent 
System Operator Corporation submitted additional information related to 
May 4, 2016 Refund Rerun Compliance Filing pursuant to the Federal 
Energy Regulatory Commission's (Commission) July 15, 2011 Order 
Accepting

[[Page 62118]]

Compliance Filings and Providing Guidance.\1\
---------------------------------------------------------------------------

    \1\ San Diego Gas & Elec. Co. v. Sellers of Energy and Ancillary 
Servs., 136 FERC ] 61,036 (2011).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on September 23, 2016.

    Dated: August 31, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-21416 Filed 9-7-16; 8:45 am]
 BILLING CODE 6717-01-P